BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

383

Click here to load reader

description

SAP PM

Transcript of BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

Page 1: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

User Manual

Breakdown Maintenance Process(BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0)

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 1

Page 2: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

Contents

OVERVIEW................................................................................................................................................. 5

Business Process Description Overview..............................................................................................5

3(A): Breakdown Maintenance –Internal processing (No external services)................................................8

1. Create Notification............................................................................................................................ 8

2. Assign Notification – Assign to responsible person for maintenance..............................................11

3. Re-Assign to responsible person for maintenance.........................................................................15

4. Acknowledge Notification and “Put in Process” Notification:...........................................................18

5) Decision on Maintenance Order Requirement................................................................................20

6) Create Maintenance Order from Notification..................................................................................21

7. Material Planning Against Order.....................................................................................................28

9) Check of material availability in storage location............................................................................34

10 A) Change in Material Requirement..............................................................................................44

11) Create Reservation for Return of Material to Store (if material issued is not consumed).............45

12) Order Confirmation....................................................................................................................... 46

13) Complete Order............................................................................................................................ 50

14) Process Notification...................................................................................................................... 54

15) Process Notification...................................................................................................................... 57

16) Complete Notification...................................................................................................................59

17) Maintenance Order Settlement.....................................................................................................64

18) Business Completion of Maintenance Order................................................................................66

3(B): Breakdown Maintenance by Vendor (Warranty/AMC is Available)...................................................68

1. Create Notification.......................................................................................................................... 68

2. Assign Notification – Assign to responsible person for maintenance..............................................71

3. Re-Assign to responsible person for maintenance.........................................................................75

4. Acknowledge Notification and “Put in Process” Notification:...........................................................78

5) Call the Warranty/AMC Vendor:.....................................................................................................79

5) Decision on Maintenance Order Requirement................................................................................81

6) Create Maintenance Order from Notification..................................................................................82

9) Check of material availability in storage location............................................................................95

10) Change in Material Requirement................................................................................................104

11) Create Reservation for Return of Material to Store (if material issued is not consumed)..........107

12) Order Confirmation.....................................................................................................................108

13) Complete Order.......................................................................................................................... 111

14) Process Notification.................................................................................................................... 115

15) Process Notification.................................................................................................................... 118

16) Complete Notification.................................................................................................................120

17) Maintenance Order Settlement...................................................................................................124

KO88................................................................................................................................................ 124

18) Business Completion of Maintenance Order..............................................................................126

3C: Breakdown Maintenance by Vendor (Need Based Service and APO is available)...........................128

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 2

Page 3: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

1. Create Notification........................................................................................................................ 128

2. Assign Notification – Assign to responsible person for maintenance............................................131

3. Re-Assign to responsible person for maintenance.......................................................................135

4. Acknowledge Notification and “Put in Process” Notification:.........................................................138

5) Decision on Maintenance Order Requirement..............................................................................139

6) Create Maintenance Order from Notification................................................................................140

7A) Material Planning Against Order................................................................................................146

8) Workflow for Maintenance Order Approval...................................................................................161

8A) Order Approval.......................................................................................................................... 161

9) Check of material availability in storage location..........................................................................164

10) Change in Material Requirement................................................................................................173

11) View Purchase Requisition number............................................................................................176

12) Purchase Order Process............................................................................................................180

12B) Change Purchase Order..........................................................................................................184

13) Post Down Payment (Optional)..................................................................................................191

14) Call /inform the Vendor:..............................................................................................................193

15) Change in Service Planning against Order.................................................................................195

16) Service procurement process for new requirement....................................................................196

18) Order Confirmation.....................................................................................................................196

19) Complete Order.......................................................................................................................... 199

20) Process Notification.................................................................................................................... 203

21) Process Notification.................................................................................................................... 206

22) Complete Notification.................................................................................................................207

23) Service Entry sheet Process......................................................................................................212

23A) Create Service entry sheet with reference to Purchase order.................................................212

24) Maintenance Order Settlement...................................................................................................220

25) Business Completion of Maintenance Order..............................................................................222

26) Accounting entry verification.......................................................................................................223

27) Print SES Document..................................................................................................................225

28) Invoice verification Process........................................................................................................228

28A) Invoice Verification for Service Performed...............................................................................228

3D: Breakdown Maintenance by Vendor (Need Based Service requirement).........................................231

1. Create Notification........................................................................................................................ 231

2. Assign Notification – Assign to responsible person for maintenance............................................234

3. Re-Assign to responsible person for maintenance.......................................................................239

4. Acknowledge Notification and “Put in Process” Notification:.........................................................241

5) Decision on Maintenance Order Requirement..............................................................................243

6) Create Maintenance Order from Notification................................................................................244

7A) Material Planning Against Order................................................................................................249

8) Workflow for Maintenance Order Approval...................................................................................257

8A) Order Approval.......................................................................................................................... 257

9) Check of material availability in storage location..........................................................................259

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 3

Page 4: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

10) Change in Material Requirement................................................................................................269

11) View Purchase Requisition number............................................................................................272

13) Purchase Order Process............................................................................................................275

13B) Change Purchase Order..........................................................................................................279

14) Post Down Payment (Optional)..................................................................................................286

15) Call /inform the Vendor:..............................................................................................................288

16) Change in Service Planning against Order.................................................................................290

17) Service procurement process for new requirement....................................................................294

19) Order Confirmation.....................................................................................................................294

20) Complete Order.......................................................................................................................... 298

21) Process Notification.................................................................................................................... 302

22) Process Notification.................................................................................................................... 305

23) Complete Notification.................................................................................................................306

24) Service Entry sheet Process......................................................................................................311

24A) Create Service entry sheet with reference to Purchase order.................................................311

25) Maintenance Order Settlement...................................................................................................319

26) Business Completion of Maintenance Order..............................................................................321

27) Accounting entry verification.......................................................................................................323

28) Print SES Document..................................................................................................................326

Work Certification Process...............................................................................................................329

29) Invoice verification Process........................................................................................................329

29A) Invoice Verification for Service Performed...............................................................................329

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 4

Page 5: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

OVERVIEW

Business Process Description Overview

Process Overview: Breakdown maintenance

The Breakdown maintenance process shall consist of the following major activities:

1 Raising of breakdown notification with correct priority by operation group to notify

the responsible Maintenance department/ main work centre. Based on effect on

communication, Breakdown notification shall need to be prioritized by assigning correct

priority.

a. Breakdown which directly affects the communication will be given ‘1’ priority

And required to be attended within 4 hours, it would require planning whatsoever

At site

b. Breakdowns which are related to equipments which are indirectly related to

Communication and do not cause immediate communication loss shall be given

Priority ‘2’, such jobs can be attended within 24 hours.

c. Breakdowns related to equipments which are not directly or indirectly related to

Communication but are important otherwise, shall be given priority ‘3’. Such jobs

Can be attended within 3 days

The breakdown notification will mostly be raised by operation group but at times it can

also be raised by maintenance personnel or planning personnel if required.

2. Receipt of Notification by planners for dates scheduling.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 5

Page 6: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

3. Receipt of Breakdown Notifications by Maintenance department for processing.

4. Notification release (Put in process) by assigned person who acknowledges it.

5. Creation of Breakdown Maintenance order by maintenance Department if material or

external service (contractual job) is needed to carry out the maintenance.

Planning of operations (activities)

Planning of materials required

Planning of manpower required

Planning of external service quantity required

6. Release of order by authorized person in maintenance department

7. Issue of materials from store by MM department

8. Execution of work at site by internal manpower and/or external agency.

9. Time confirmation of order operations by maint. Department

10. Entry of technical findings (Damage, cause, activities etc.) and Malfunction end time

in the breakdown notification by maint. Department

11. Completion of tasks in notification and Notification completion (NOCO)

12. Creation of service entry sheet for the external operations (done by external agency)

by maint. Department

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 6

Page 7: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

13. Entry of consumed quantity of external services in the service entry sheet and

acceptance of service entry sheet. If service level agreement is breached then penalty

is to be imposed as per agreed terms and conditions.

14. Technical Completion (TECO) of order.

15. Month-end settlement of Maint. Order by Accounts department.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 7

Page 8: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

Business Process Procedure: Breakdown maintenance.

3(A): Breakdown Maintenance –Internal processing

(No external services)

1. Create Notification

Purpose

A defect has occurred and you create a Breakdown Notification. You enter a brief

description of defect, technical object (Functional Location / Equipment) on which defect

has occurred, optionally the detail description in subject long text and task required to

be done.

Trigger

Perform this procedure when there is a need for Manpower and material requirement for

your Breakdown Maintenance Activities

Prerequisites

Technical Object ( Functional Location / Equipment)

Main Work Center

Cost Center

HR Employee List

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 8

Page 9: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

Procedure

1. Access the transaction choosing one of the following navigation options:

SAP Menu a) Logistics --- Plant maintenance--- Maintenance processing

--- Notification --- Create (General)

b) Logistics --- Plant maintenance --- Maintenance

processing --- Notification --- Create (Special) ---

Malfunction Report

T CodeType IW21 / IW24 in Command Field and press

User Menu Select corresponding Node for IW21 / IW24 / Notification

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 9

Enter Notification Type

Page 10: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

Note :

If known, the equipment no. can directly be entered or equipment can be selected from

Equipment field F4 help by giving proper selection criteria like equipment description,

Plant, plant section, planner group, Main work center etc. in selection option ‘Equipment

by equipment list’.

CLICK ON SAVE BUTTON

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 10

1. Enter short Text

2.Enter Equipment code (or) Func.Location

3. Select Breakdown

4. Enter the appropriate text

Page 11: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

2. Assign Notification – Assign to responsible person for maintenance

Partner Function “Initiator” is maintained manually by the Notification creator

.

“Person Responsible” is either picked from master data (if maintained) or can be

maintained manually by Notification creator.

User Status “Assigned” is set by “Initiator”.

Information flow is triggered and information is sent to “Person Responsible” via Email.

Notification can be assigned to multiple “Person Responsible”.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 11

System will savethis notificationwith generating aninternal number

Page 12: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

Open the Notification in change mode

SAP Menu Logistics --- Plant maintenance --- Maintenance

processing --- Notification --- Change

T CodeType IW22 in Command Field and press

User Menu Select corresponding Node for IW22 / Notification

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 12

Click here to change the staus

Page 13: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 13

Select Assigned and proceed.

5. Enter Partner Details

Page 14: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

CLICK ON SAVE BUTTON. MAIL/SAP MAIL IS SENT TO RESPONSIBLE PERSON

SEE IN BOX/ E-MAIL

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 14

1. Status updated to ASGD

On saving a mail is triggered in SAP system.

Page 15: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

3. Re-Assign to responsible person for maintenance.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 15

The Mail carries the following details

1.Change the Partner no and press Enter

Page 16: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 16

New Person Responsible is assigned

Click here to change the status

Page 17: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 17

Select RASG and press ENTER

2. Save

Page 18: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

Information flow is triggered to all maintained “New Personal Responsible”, and

“Initiator” via Email.

4. Acknowledge Notification and “Put in Process” Notification:

Open the Notification in change mode using any one navigation option shown below

SAP Menu Logistics --- Plant maintenance --- Maintenance

processing --- Notification --- Change

T CodeType IW22 in Command Field and press

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 18

1. Check the status

Page 19: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

User Menu Select corresponding Node for IW22 / Notification

User Status “ACKD” is set by “Person Responsible”.

Notification is “Put in Process” by “Person Responsible”.

Information flow is triggered to “Initiator” and all “Person Responsible” about status

update.

5) Decision on Maintenance Order Requirement

Decide on the requirement of Maintenance order, based on material to be consumed

from stores

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 19

1. Click to change the status ACKD

2. Click here to put the Notification in process

3. Click to save the Notification.

Page 20: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

5A) Maintenance Order for material to be consumed from stores

Follow steps from 6 to 18

5B) Maintenance Order not required as no material consumed/services used

Follow steps from 14 to 16

6) Create Maintenance Order from Notification

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 20

Click here to create an order

Page 21: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

1. An Order can be created directly from the Notification screen.

To create an Order directly from the notification screen click create order, as shown

in the above screen.

2. On the Create Breakdown order: Central Header Data will get copied from the

Notification e.g. Order Header, Planner Group, Maint work center, Reference object etc.

If any changes are required it can be done.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 21

Check the Order type and proceed

Page 22: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

3. According to the planning assign the operations which need to be carried out.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 22

Page 23: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

The first operation in the operations screen gets copied from the order header as default

by the system as shown below. It can be replaced with some other operation, or if some

similar operations are there in some task list then those operations can also be copied

directly to the order.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 23

1. First operation get copied from the order header, it can be replaced if required

2. After enteringthe operation enterthe no of manpower in No field and enter the no of proposed duration in theduration field, Based on these entries system willcalculate the duration

Page 24: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

For copying operation from the task list :

Go to Extras (from Menu bar) --- Task list selection --- General task list or To Reference

object (If Equipment or function location task list exists) ---- Select the task list as shown

below If you will go for selection of a task list, then system will give a message first (as

shown below) that you want to delete the existing operations or want to keep them,

choose accordingly.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 24

Page 25: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

Click - execute button at top left of the screen.

You will get the list of Task lists fulfilling the above selection criteria.

Select your Task list and click button at top of the page or alternatively you can

double click on the task list group.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 25

These fields will becomegray based on the selectioncriteria, either Gen task list orfunction loc. Or equipment task

Page 26: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

Now system will ask you weather you want to copy the work center from the task list or

some other work center you want to choose, if you want to change the work center

according to your notification then change it accordingly.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 26

1. Selectthe task list

2. Click on this button or double click on the tasklist group

1. Enter yourwork center ifrequired

Page 27: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

Now System will ask you weather you want to select all the operations of the task list or

only some selected operations you want to select, choose accordingly.

7. Material Planning Against Order

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 27

2. Click on all tocopy this workcenter

If you want to select allthe operations then clickon all, otherwise if youwant to select someselected operations thenselect those operations

Enter the material code / Qty / Store Location Etc., and proceed.

Page 28: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

Enter the material code no if known or select the material from the drop down, and enter

the required quantity as per the requirement. Then press enter; now system will ask you

for which operation you want to assign this material as shown below, either enter the

operation no or click on operation list and select the desired operation.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 28

1. Select the Operation and proceed

2. Press after selection of operation

Page 29: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 29

Click on General Data

Page 30: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

On saving the order a message will be displayed.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 30

Reservation created

Page 31: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

7A) Workflow for Maintenance Order Approval (IF REQUIRED)

Open the Order in change mode using any one navigation option shown below.

SAP Menu Logistics --- Plant maintenance --- Maintenance

processing --- Order--- Change

T Code Type IW32 in Command Field and press

User Menu Select corresponding Node for IW32 / Order

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 31

Select Enhancement Tab

Page 32: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

Approver received sap mail, he approved/not approved and sent back

Responsible person receive sap mail &released the maintainance order

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 32

Select Note sheet

1.Enter theSAP ID of the Approver

2.Enter the text and continue

3. Click send mail.

Page 33: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

8A) Order Release

Open the order in the change mode using Transaction code IW32 (or) as mentioned in

the earlier steps. Press to release the order and press to save the order.

In Maintenance order system status will be set REL

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 33

1. Release the order

2. Save the order

Page 34: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

9) Check of material availability in storage location

SAP Menu

Materials Management ---Purchasing ---Mater Data ---SUbsequent Settlement ---Vendor Rebate Arrangement ---Environment ---Environment ---Condition /Arrangement ---Environment ---Pricing ---Environment ---Value Assignment ---Inventory Management ---Environment ---Stock ---MB52 --- Warehouse Stock.

T Code Type MB52 in Command Field and press

User Menu Select corresponding Node for MB52 / Ware house stock

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 34

Page 35: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 35

1. Enter the Plant / Storage Location, Etc

2. Execute

Page 36: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

Material Issue against Reservation (if the material is available in storage location)

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 36

Material Code / Qty can be checked here

Page 37: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

9A) Material Issue against Reservation (if the material is available in storage

location) Prerequisites - Reservation no

SAP MenuLogistics---Material Management---Purchasing---Purchase Order---

Follow On Functions---MIGO

T Code Type MIGO in Command Field and press

User Menu Select corresponding Node for MIGO / Goods Issue

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 37

Enter Reservation no and press ENTER

Page 38: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 38

Click on Material Tab

Page 39: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 39

Click on Quantity Tab and check the details

Page 40: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 40

1. Enter the no if Qty to be posted

3. Click on Where Tab and check the details

Page 41: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 41

2. Click on reservation tab to check the details

1. Check the details like Moment type / Stock type Storage Location Etc.

Page 42: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 42

After checking all the details press Account Assignment Tab.

Page 43: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

After Posting the material will be posted and document no will be generated.

9B) if the material is not available in storage location

Please refer MM Script of Material Stock transfer or Material Procurement.

MB21- CREAT RESERVATION UNDER MOVEMENT 913MIGO- WITH RESPECT TO RESERVATION FOR TRANSFER & POSTING WHICH GIVES MATERIAL DOCUMENT NOMIGO-WITH RESPECT TO MATERIAL DOCUMENT FOR PLACE IN STORAGE

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 43

1.Click on Check

2. Click on Post

Page 44: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

9C) Display Material Document

Prerequisites – Material Document no (Obtained while posting a reservation).

SAP MenuLogistics – Material Management ---Purchasing ---Purchase Order ---Follow on Fuctions ---MIGO

T Code Type MIGO in Command Field and press

User Menu Select corresponding Node for MIGO / Goods Issue

Enter the Material Document no to display the material document.

10 A) Change in Material Requirement

Open the order in change mode

SAP Menu Logistics --- Plant maintenance --- Maintenance

processing --- Order--- Change

T CodeType IW32 in Command Field and press

User Menu Select corresponding Node for IW32 / Order

CREAT NEW OPERATIONBSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 44

Page 45: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

ADD MATERIAL

APPROVAL CAN BE TAKEN FROM ENHANCEMENT TAB/NOTESHEET

10 B) Material Issue against Reservation

Please refer steps 9 to 9C.

11) Create Reservation for Return of Material to Store (if material issued is not

consumed)

Please refer steps 10 to 10B with negative quantity. The quantity in the case of return

will be negative.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 45

Add new component and proceed.

Page 46: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

12) Order Confirmation

SAP Menu Logistics----Plant Maintenance---Maintenance Processing---Completion

Confirmation----Entry—IW41 Individual Time Confirmation

T CodeType IW41 in Command Field and press

User Menu Select corresponding Node for IW41 / Completion Confirmation

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 46

Enter Order no. and press ENTER

Page 47: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 47

Page 48: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 48

Check the details like Final Confirmation and other details and press ENTER

Page 49: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 49

Number of confirmation is displayed below.

Page 50: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

13) Complete Order

Open the order in change mode

SAP Menu Logistics --- Plant maintenance --- Maintenance

processing --- Order--- Change

T CodeType IW32 in Command Field and press

User Menu Select corresponding Node for IW32 / Order

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 50

Enter the Order no and press Enter

Page 51: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 51

Click on Flag

Page 52: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 52

Check the date and time and press ENTER

Page 53: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 53

Order saved and message is displayed with respective numbers

Page 54: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

14) Process Notification

Open the notification on change mode and set user status as Work Completed in

Notification.

User Status “Work Completed” is set by “Person Responsible”.

Information flow is triggered to “Initiator” and all “Person Responsible” about status update via Email and SMS.SAP Menu Logistics --- Plant maintenance --- Maintenance

processing --- Notification --- Change

T CodeType IW22 in Command Field and press

User Menu Select corresponding Node for IW22 / Notification

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 54

Enter the Notification No. and proceed

Click here to change the status to COMP

Page 55: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 55

Page 56: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

Information flow is triggered to “Initiator” and all “Person Responsible” about status

update via Email and SMS.

15) Process Notification

Set user status as Confirmed Or Set user status as Rework

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 56

Set the status to COMP.

Page 57: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

(follow all the Steps from 3 to 15)

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 57

Click to change the User Status

Page 58: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

If the user status is set as Rework (follow all the Steps from 3 to 15)

User Status “Confirmed” or “Rework” is set by “Initiator”.

Information flow is triggered to all “Person Responsible” about status update via

Email.

User Status “Work Completed” is set by “Person Responsible”.

AFTER USER STATUS CONFIRM BY INITIATOR, RESPONSIBLE PERSON WILL

COMPLETE THE NOTIFICATION i.e. WILL FILL CATALOG/END TIME etc.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 58

Status can either be changed to 1. REWK or 2. CNFR

Page 59: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

16) Complete Notification

Open the Notification in change Mode

SAP Menu Logistics --- Plant maintenance --- Maintenance

processing --- Notification --- Change

T CodeType IW22 in Command Field and press

User Menu Select corresponding Node for IW22 / Notification

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 59

Click the Flag to complete the Notif.

Page 60: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

Fill up the all catalog data – Object Parts & Damage / Causes / Activities etc.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 60

Page 61: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

CLICK ON BLACK FLAG FOR COMPLETION OF NOTIFICATION

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 61

Page 62: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 62

Status is updated to NOCO. Check the same and proceed

Page 63: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

17) Maintenance Order Settlement

SAP MenuLOGISTICS---PRODUCTION---SHOP FLOOR CONTROL---PERIOD

END CLOSING---SETTLEMENT---KO88 - INDIVIDUAL PROCESSING

T Code K088

User Menu Select corresponding Node for K088 / Settlement.

Enter the following details in the Initial Screen:

Controlling Area

Maintenance Order Number

Settlement Period

Fiscal Year

Processing Type

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 63

Page 64: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

EXECUTE

TEST RUN OK

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 64

1. Enter Controlling are

2. Enter the following a. Settlement period b. Fiscal Year c. Processing Type

Page 65: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

18) Business Completion of Maintenance Order

Open the order in change mode using anyone of the Navigation option.

SAP Menu Logistics --- Plant maintenance --- Maintenance

processing --- Order--- Change

T Code Type IW32 in Command Field and press

User Menu Select corresponding Node for IW32 / Order

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 65

Select Complete (Business)

Page 66: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 66

Status is updated to CLSD

Page 67: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

3(B): Breakdown Maintenance by Vendor

(Warranty/AMC is Available)

Pre-requisite: In case of Breakdown Maintenance by the Vendor through AMC “Annual

Maintenance Contract”/P.O which is procured through MM procurement are to be

referred

1. Create Notification

Purpose

A defect has occurred and you create a Breakdown Notification. You enter a brief

description of defect, technical object (Functional Location / Equipment) on which defect

has occurred, optionally the detail. description in subject long text and task required to

be done.

Trigger

Perform this pocedure when there is a need for Manpower and material requirement for

your Breakdown Maintenance Activities

Prerequisites

Technical Object ( Functional Location / Equipment)

Main Work Center

Cost Center

HR Employee List

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 67

Page 68: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

Procedure

1. Access the transaction choosing one of the following navigation options:

SAP Menu

a) Logistics --- Plant maintenance--- Maintenance

processing --- Notification --- Create (General)

b) Logistics --- Plant maintenance --- Maintenance

processing --- Notification --- Create (Special) ---

Malfunction Report

T Code Type IW21 / IW24 in Command Field and press

User Menu Select corresponding Node for IW21 / IW24 / Notification

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 68

Enter Notification Type

Page 69: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

Note :

If known, the equipment no. can directly be entered or equipment can be selected from

Equipment field F4 help by giving proper selection criteria like equipment description,

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 69

1. Enter short Text

2.Enter Equipment code (or) Func.Location

3. Select Breakdown

4. Enter the appropriate text

Page 70: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

plant, plant section, planner group, Main work center etc. in selection option ‘Equipment

by equipment list’.

2. Assign Notification – Assign to responsible person for maintenance

Partner Function “Initiator” is maintained manually by the Notification creator.

“Person Responsible” is either picked from master data (if maintained) or can be

maintained manually by Notification creator.

User Status “Assigned” is set by “Initiator”.

Information flow is triggered and information is sent to “Person Responsible” via Email.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 70

System will savethis notificationwith generating aninternal number

Page 71: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

Notification can be assigned to multiple “Person Responsible”.

Open the Notification in change mode

SAP Menu Logistics --- Plant maintenance --- Maintenance

processing --- Notification --- Change

T CodeType IW22 in Command Field and press

User Menu Select corresponding Node for IW22 / Notification

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 71

Enter the Partner details.

Page 72: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 72

Click here to change the staus

Select Assigned and proceed.

Page 73: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

SAVE &

Information flow is triggered and information is sent to “Person Responsible” via Email.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 73

1. Status updated to ASGD

2. Save

On saving a mail is triggered in SAP system.

Page 74: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

3. Re-Assign to responsible person for maintenance.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 74

The Mail carries the following details

1.Change the Partner no and press Enter

Page 75: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 75

New Person Responsible is assigned

Click here to change the status

Page 76: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

Information flow is triggered to all maintained “New Personal Responsible”, and

“Initiator” via Email.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 76

Select RASG and press ENTER

1. Check the status

2. Save

Page 77: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

4. Acknowledge Notification and “Put in Process” Notification:

Open the Notification in change mode using any one navigation option shown below

SAP Menu Logistics --- Plant maintenance --- Maintenance

processing --- Notification --- Change

T CodeType IW22 in Command Field and press

User Menu Select corresponding Node for IW22 / Notification

User Status “ACKD” is set by “Person Responsible”.

Notification is “Put in Process” by “Person Responsible”.

Information flow is triggered to “Initiator” and all “Person Responsible” about status

update.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 77

1. Click to change the staus tp ACKD

2. Click here to put the Notif ication process

3. Click to save the Notif.

Page 78: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

5) Call the Warranty/AMC Vendor:

Enter the Vendor Details in Vendor Docket Screen in Notification.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 78

Enter all the vendor details.

Page 79: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 79

1. Enter Purchasing Doc. No

2. Communication Details (Filled to inform specific person from vendor side)

3. Click here to change the staus to VEND

Page 80: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

SAVE & Information flow is triggered and information is sent to VENDER VIA MAIL.

5) Decision on Maintenance Order Requirement

Decide on the requirement of Maintenance order, based on material to be consumed

from stores

5A) Maintenance Order for material to be consumed from stores

Follow steps from 6 to 24

5B) Maintenance Order not required as no material consumed/services used

Follow steps from 14 to 16

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 80

Select the status to VEND

Page 81: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

6) Create Maintenance Order from Notification

1. An Order can be created directly from the Notification screen.

To create an Order directly from the notification screen click create order, as shown

in the above screen.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 81

Click here to create an order

Page 82: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

2. On the Create Breakdown order: Central Header Data will get copied from the

Notification e.g. Order Header, Planner Group, Maint work center, Reference object etc.

If any changes are required it can be done.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 82

Check the Order type and proceed

Page 83: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

3. According to the planning assign the operations which need to be carried out.

The first operation in the operations screen gets copied from the order header as default

by the system as shown below. It can be replaced with some other operation, or if some

similar operations are there in some task list then those operations can also be copied

directly to the order.

For copying operation from the task list :BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 83

1. First operation get copied from the order header, it can be replaced if required

2. After enteringthe operation enterthe no of manpower in No field and enter the no of proposed duration in theduration field,Based on these entries system willcalculate the duration

Page 84: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

Go to Extras (from Menu bar)

Task list selection

General task list or To Reference

object (If Equipment or function location task list exists)

Select the task list as shown below If you will go for selection of a task list, then system

will give a message first (as shown below) that you want to delete the existing

operations or want to keep them, choose accordingly.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 84

Page 85: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

Click - execute button at top left of the screen.

You will get the list of Task lists fulfilling the above selection criteria.

Select your Task list and click button at top of the page or alternatively you can

double click on the task list group.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 85

These fields will becomegray based on the selectioncriteria, either Gen task list orfunction loc. Or equipment task

Page 86: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

Now system will ask you weather you want to copy the work center from the task list or

some other work center you want to choose, if you want to change the work center

according to your notification then change it accordingly.

Now System will ask you weather you want to select all the operations of the task list or

only some selected operations you want to select, choose accordingly.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 86

1. Selectthe task list

2. Click on this button or double click on the tasklist group

1. Enter yourwork center ifrequired

2. Click on all tocopy this workcenter

Page 87: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

7. Material Planning Against Order

Enter the material code no if known or select the material from the drop down, and enter

the required quantity as per the requirement. Then press enter; now system will ask you

for which operation you want to assign this material as shown below, either enter the

operation no or click on operation list and select the desired operation.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 87

If you want to select allthe operations then clickon all, otherwise if youwant to select someselected operations thenselect those operations

Enter the material code / Qty / Store Location Etc., and proceed.

Page 88: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 88

Click on General Data

Select the relevant Operation and press

Page 89: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

On saving the order a message will be displayed.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 89

Reservation created

Page 90: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

7A) Workflow for Maintenance Order Approval ( If Required )

It is before REL OF MAINTAINANCE ORDER

Open the Order in change mode using any one navigation option shown below.

SAP Menu Logistics --- Plant maintenance --- Maintenance

processing --- Order--- Change

T Code Type IW32 in Command Field and press

User Menu Select corresponding Node for IW32 / Order

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 90

Select Enhancement Tab

Page 91: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 91

Select Notesheet

Page 92: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 92

1.Enter theSAP ID of the Approver

2.Enter the text and continue

3. Click send mail.

Page 93: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

8A) Order Release

Open the order in any one navigation options shown below.

SAP Menu Logistics --- Plant maintenance --- Maintenance

processing --- Order--- Change

T Code Type IW32 in Command Field and press

User Menu Select corresponding Node for IW32 / Order

Open the order in the change mode using any one navigation option shown below

Press to release the order and press to save the order.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 93

1. Release the order

2. Save the order

Page 94: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

9) Check of material availability in storage location

SAP Menu

Materials Management ---Purchasing ---Mater Data ---SUbsequent Settlement ---Vendor Rebate Arrangement ---Environment ---Environment ---Condition/Arrangement ---Environment ---Pricing ---

Environment ---Value Assignment ---Inventory Management ---Environment ---Stock ---MB52 --- Warehouse Stock.

T Code Type MB52 in Command Field and press

User Menu Select corresponding Node for MB52 / Ware house stock

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 94

1. Enter the Plant / Storage Location, Etc

2. Execute

Page 95: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

Material Issue against Reservation (if the material is available in storage location)

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 95

Material Code / Qty can be checked here

Page 96: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

9A) Material Issue against Reservation (if the material is available in storage location)

Prerequisites - Reservation no.

SAP MenuLogistics---Material Management---Purchasing---Purchase Order---Follow On

Functions---MIGO

T Code Type MIGO in Command Field and press

User Menu Select corresponding Node for MIGO / Goods Issue

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 96

Enter Reservation no and press ENTER

Page 97: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 97

Click on Material Tab

Page 98: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 98

Click on Quantity Tab and check the details

Page 99: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 99

1. Enter the no if Qty to be posted

3. Click on Where Tab and check the details

Page 100: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 100

2. Click on reservation tab to check the details

1. Check the details like Moment type / Stock type Storage Location Etc.

Page 101: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 101

After checking all the details press Account Assignment Tab.

Page 102: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

After Posting the material will be posted and document no will be generated.

9B) If the material is not available in storage location

Please refer MM Script of Material Stock transfer or Material Procurement.

MB21-UNDER MOV913

MIGO-UNDER913

MIGO-UNDER915

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 102

1.Click on Check

2. Click on Post

Page 103: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

9C) Display Material Document

Prerequisites – Material Document no (Obtained while posting a reservation).

SAP MenuLogistics---Material Management---Purchasing---Purchase Order---

Follow On Functions---MIGO

T Code Type MIGO in Command Field and press

User Menu Select corresponding Node for MIGO / Goods Issue

Enter the Material Document no to display the material document.

10) Change in Material Requirement

Open the order in change mode

SAP Menu Logistics --- Plant maintenance --- Maintenance

processing --- Order--- Change

T Code Type IW32 in Command Field and press

User Menu Select corresponding Node for IW32 / Order

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 103

Page 104: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 104

Add new component and proceed.

Page 105: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 105

Select Enhancement Tab

Select Notesheet

Page 106: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

SAVE& MAIL IS SENT TO APPROVER. HE WILL APPROVE/NOT APPROVE &SENT

BACK

10B) Material Requirement change

10C) Material Issue against Reservation

Please refer steps 9 to 9C.

11) Create Reservation for Return of Material to Store (if material issued is not

consumed)

Please refer steps 10 to 10C. The quantity in the case of return will be negative.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 106

1.Enter theSAP ID of the Approver

2.Enter the text and continue

3. Click send mail.

Page 107: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

12) Order Confirmation

SAP Menu Logistics----Plant Maintenance---Maintenance Processing---Completion

Confirmation----Entry—IW41 Individual Time Confirmation

T CodeType IW41 in Command Field and press

User Menu Select corresponding Node for IW41 / Completion Confirmation

A pop window will open as mentioned below.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 107

Enter Order no. and press ENTER

After entering the time confirmation details ( Actual Work ) SAVE IT.

Page 108: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 108

Check the details like Final Confirmation and other details and press ENTER

Page 109: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 109

Number of confirmation is displayed below.

Page 110: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

13) Complete Order

Open the order in change mode using any one navigation option shown below.

SAP Menu Logistics --- Plant maintenance --- Maintenance

processing --- Order--- Change

T Code Type IW32 in Command Field and press

User Menu Select corresponding Node for IW32 / Order

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 110

Enter the Order no and press Enter

Click on Flag

Page 111: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 111

Page 112: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 112

Check the date and time and press ENTER

Page 113: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 113

Order saved and message is displayed.

Page 114: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

14) Process Notification

Open the notification on change mode and set user status as Work Completed in Notification.SAP Menu Logistics --- Plant maintenance --- Maintenance

processing --- Notification --- Change

T CodeType IW22 in Command Field and press

User Menu Select corresponding Node for IW22 / Notification

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 114

Enter the Notification No and proceed

Page 115: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

SET USER STATUS COMPLETED BY RESPONSIBLE PERSON & SAVE.SAP MAIL

TO INITIATOR

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 115

1. Maintain “Vendor Docket Details”

2. Click to change the user status

Page 116: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

User Status “Work Completed” is set by “Person Responsible”.

Information flow is triggered to “Initiator” and all “Person Responsible” about status

update via Email.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 116

Set the status to CNFR

Page 117: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

15) Process Notification

Set user status as Confirmed Or Set user status as Rework

(follow all the Steps from 3 to 15)

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 117

Click to change the User Status

Page 118: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

If the user status is set as Rework (follow all the Steps from 3 to 15)

User Status “Confirmed” or “Rework” is set by “Initiator”.

Information flow is triggered to all “Person Responsible” about status update via

Email.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 118

Status can either be changed to 1. REWK or 2. CNFR

Page 119: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

16) Complete Notification

Open the Notification in the change mode using transaction code IW22 or from the SAP

menu as mentioned in the earlier steps.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 119

Click the Flag to complete the Notif.

Page 120: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

Fiiup the all catalog data – Object Parts & Damage / Causes / Activities etc.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 120

Page 121: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 121

Page 122: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

IW32

Maintenance order TECO

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 122

Status is updated to NOCO. Check the same and proceed

Page 123: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

17) Maintenance Order Settlement

SAP Menu

T CodeKO88

User Menu Maintenance Order Settlement

Enter the following details in the next Pop-up window.

Controlling area

Settlement period

Fiscal Year

Processing Type

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 123

Page 124: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

18) Business Completion of Maintenance Order

Open the Order in change mode using anyone of the navigation mode.BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 124

1. Enter Controlling are

2. Enter the following a. Settlement period b. Fiscal Year c. Processing Type

Page 125: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

SAP Menu Logistics --- Plant maintenance --- Maintenance

processing --- Order--- Change

T Code Type IW32 in Command Field and press

User Menu Select corresponding Node for IW32 / Order

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 125

Select Complete (Business)

Page 126: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

19) PO Process

20) Service Entry Sheet

21) Accounting entry verification

22) Debit/ Credit Notes Refer Work MM Manuals

23) Vendor Payment

24) Display Accounting Document

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 126

Status is updated to CLSD

Page 127: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

3C: Breakdown Maintenance by Vendor (Need Based Service

and APO is available)

1. Create Notification

Purpose

A defect has occurred and you create a Breakdown Notification. You enter a brief

description of defect,

technical object (Functional Location / Equipment) on which defect has occurred,

optionally the detail

description in subject long text and task required to be done.

Trigger

Perform this procedure when there is a need for Manpower and material requirement for

your Breakdown

Maintenance Activities

Prerequisites

Technical Object ( Functional Location / Equipment)

Main Work Center

Cost Center

HR Employee List

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 127

Page 128: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

Procedure

1. Access the transaction choosing one of the following navigation options:

SAP Menu

a) Logistics --- Plant maintenance--- Maintenance

processing --- Notification --- Create (General)

b) Logistics --- Plant maintenance --- Maintenance

processing --- Notification --- Create (Special) ---

Malfunction Report

T Code Type IW21 / IW24 in Command Field and press

User Menu Select corresponding Node for IW21 / IW24 / Notification

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 128

Enter Notification Type

Page 129: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

Note :

If known, the equipment no. can directly be entered or equipment can be selected from

Equipment field F4 help by giving proper selection criteria like equipment description,

plant, plant section, planner group, Main work center etc. in selection option ‘Equipment

by equipment list.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 129

1. Enter short Text

2.Enter Equipment code (or) Func.Location

3. Select Breakdown

4. Enter the appropriate text

Page 130: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

2. Assign Notification – Assign to responsible person for maintenance

Partner Function “Initiator” is maintained manually by the Notification creator

.“Person Responsible” is either picked from master data (if maintained) or can be

maintained manually by Notification creator.

User Status “Assigned” is set by “Initiator”.

Information flow is triggered and information is sent to “Person Responsible” via Email.

Notification can be assigned to multiple “Person Responsible”.

Open the Notification in change mode using any one navigation options shown below.

SAP Menu Logistics --- Plant maintenance --- Maintenance

processing --- Notification --- Change

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 130

System will savethis notificationwith generating aninternal number

Page 131: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

T Code

Type IW22 in Command Field and press

User Menu Select corresponding Node for IW22 / Notification

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 131

5. Enter Partner Details

Page 132: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 132

Click here to change the staus

Select Assigned and proceed.

Page 133: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

SAVE & MAIL IS SENT TO ASGNED PERSON

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 133

1. Status updated to ASGD

2. Save

On saving a mail is triggered in SAP system.

Page 134: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

3. Re-Assign to responsible person for maintenance.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 134

The Mail carries the following details

1. Change the Partner no and press Enter

Page 135: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 135

New Person Responsible is assigned

Click here to change the status

Page 136: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

Information flow is triggered to all maintained “New Personal Responsible”, and

“Initiator” via Email.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 136

Select RASG and press ENTER

1. Check the status

2. Save

Page 137: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

4. Acknowledge Notification and “Put in Process” Notification:

Open the Notification in change mode using any one navigation option shown below.

SAP Menu Logistics --- Plant maintenance --- Maintenance

processing --- Notification --- Change

T CodeType IW22 in Command Field and press

User Menu Select corresponding Node for IW22 / Notification

Note:

User Status “ACKD” is set by “Person Responsible”.

Notification is “Put in Process” by “Person Responsible”.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 137

Page 138: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

Information flow is triggered to “Initiator” and all “Person Responsible” about status

update.

5) Decision on Maintenance Order Requirement

Decide on the requirement of Maintenance order, based on material to be consumed

from stores

5A) Maintenance Order for material to be consumed from stores

Follow steps from 6 to 18

5B) Maintenance Order not required as no material consumed/services used

Follow steps from 14 to 16

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 138

1. Click to change the staus tp ACKD

2. Click here to put the Notif ication process

3. Click to save the Notif.

Page 139: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

6) Create Maintenance Order from Notification

1. An Order can be created directly from the Notification screen.

To create an Order directly from the notification screen click create order, as shown

in the above screen.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 139

Click here to create an order

Page 140: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

2. On the Create Breakdown order: Central Header Data will get copied from the

Notification e.g. Order Header, Planner Group, Maint work center, Reference object etc.

If any changes are required it can be done.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 140

Check the Order type and proceed

Page 141: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

3. According to the planning assign the operations which need to be carried out.

The first operation in the operations screen gets copied from the order header as default

by the system as shown below. It can be replaced with some other operation, or if some

similar operations are there in some task list then those operations can also be copied

directly to the order.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 141

1. First operation get copied from the order header, it can be replaced if required

2. After enteringthe operation enterthe no of manpower in No field and enter the no of proposed duration in theduration field,Based on these entries system willcalculate the duration

Page 142: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

Click - execute button at top left of the screen.

You will get the list of Task lists fulfilling the above selection criteria.

Select your Task list and click button at top of the page or alternatively you can

double click on the task list group.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 142

These fields will becomegray based on the selectioncriteria, either Gen task list orfunction loc. Or equipment task

Page 143: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

Now system will ask you weather you want to copy the work center from the task list or

some other work center you want to choose, if you want to change the work center

according to your notification then change it accordingly.

Now System will ask you weather you want to select all the operations of the task list or

only some selected operations you want to select, choose accordingly.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 143

1. Selectthe task list

2. Click on this button or double click on the tasklist group

1. Enter yourwork center ifrequired

2. Click on all tocopy this workcenter

Page 144: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

7A) Material Planning Against Order

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 144

If you want to select allthe operations then clickon all, otherwise if youwant to select someselected operations thenselect those operations

Enter the material code / Qty / Store Location Etc., and proceed.

Page 145: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

Enter the material code no if known or select the material from the drop down, and enter

the required quantity as per the requirement. Then press enter; now system will ask you

for which operation you want to assign this material as shown below, either enter the

operation no or click on operation list and select the desired operation.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 145

Select the relevant Operation and press

Page 146: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 146

Click on General Data

Page 147: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 147

Reservation created

Page 148: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

7B) Service Planning against Order

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 148

Select operation Tab

Page 149: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 149

1. Change the control Key to PM03directly (or) Press F4

2. Click External

Page 150: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

Select the appropriate control key and select

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 150

Select the control key PM03

Page 151: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 151

Enter the Available APO ( Agreement ) in the field . The following data will be copied from the contract.

1. Material Group2. Purchasing Group:3. Purchasing Organization:4. Requisitioner:5. Tracking No:

Page 152: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

After pressing the Continue check button , following message will get displayed

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 152

Page 153: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

Select the Operation with ( PM03 ) contol key , and Go to EXTERNAL button.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 153

Page 154: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

Then select the Services available in the APO , from “service selection” button at

the bottom.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 154

Select EXTERNAL BUTTON

Page 155: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 155

Select Service Selection

Page 156: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

CLICK on the SERVICES for ADOPT SERVICES.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 156

Select For Adopt services from APO

Page 157: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 157

Select For Entering the cost centre

Page 158: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

Cost for the service will appear in the service , is PICKED from APO.

On saving the order a message will be displayed .

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 158

Continue for service selection

Page 159: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

8) Workflow for Maintenance Order Approval

Open the Order in change mode using any one navigation shown below

SAP Menu Logistics --- Plant maintenance --- Maintenance

processing --- Order--- Change

T Code Type IW32 in Command Field and press

User Menu Select corresponding Node for IW32 / Order

8A) Order Approval

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 159

Select Enhancement Tab

Page 160: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

APPROVER RECEIVED SAP MAIL.HE APPROVE/ NOTAPPROVE & SENT BACK

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 160

Select Notesheet

1.Enter theSAP ID of the Approver

2.Enter the text and continue

3. Click send mail.

Page 161: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

8B) Order Release

Open the order in the change mode using Transaction code IW32 (or) as mentioned in

the earlier steps. Press to release the order and press to save the order.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 161

1. Release the order

2. Save the order

Page 162: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

9) Check of material availability in storage location

SAP Menu

Materials Management ---Purchasing ---Mater Data ---SUbsequent Settlement ---Vendor Rebate Arrangement ---Environment ---Environment ---Condition/Arrangement ---Environment ---Pricing ---Environment ---Value Assignment ---Inventory Management ---Environment ---Stock ---MB52 --- Warehouse Stock.

T Code Type MB52 in Command Field and press

User Menu Select corresponding Node for MB52 / Ware house stock

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 162

1. Enter the Plant / Storage Location, Etc

2. Execute

Page 163: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

Material Issue against Reservation (if the material is available in storage location)

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 163

Material Code / Qty can be checked here

Page 164: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

9A) Material Issue against Reservation (if the material is available in storage

location)

Prerequisites - Reservation no.

SAP MenuLogistics---Material Management---Purchasing---Purchase Order---Follow On Functions---MIGO

T Code Type MIGO in Command Field and press

User Menu Select corresponding Node for MIGO / Goods Issue

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 164

Enter Reservation no and press ENTER

Page 165: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 165

Click on Material Tab

Page 166: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 166

Click on Quantity Tab and check the details

Page 167: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 167

1. Enter the no if Qty to be posted

3. Click on Where Tab and check the details

Page 168: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 168

2. Click on reservation tab to check the details

1. Check the details like Moment type / Stock type Storage Location Etc.

Page 169: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 169

After checking all the details press Account Assignment Tab.

Page 170: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

After Posting the material document no will be generated.

9B) If the material is not available in storage location

Please refer MM Script of Material Stock transfer or Material Procurement.

MB21- CREAT RESERVATION UNDER MOVEMENT 913MIGO- WITH RESPECT TO RESERVATION FOR TRANSFER & POSTING WHICH GIVES MATERIAL DOCUMENT NOMIGO-WITH RESPECT TO MATERIAL DOCUMENT FOR PLACE IN STORAGE

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 170

1.Click on Check

2. Click on Post

Page 171: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

9C) Display Material Document

Prerequisites – Material Document no (Obtained while posting a reservation).

SAP MenuLogistics---Material Management---Purchasing---Purchase Order---Follow On Functions---MIGO

T Code Type MIGO in Command Field and press

User Menu Select corresponding Node for MIGO / Goods Issue

Enter the Material Document no to display the material document.

10) Change in Material Requirement

Open the order in change mode using any navigation option shown below.

SAP Menu Logistics --- Plant maintenance --- Maintenance

processing --- Order--- Change

T Code Type IW32 in Command Field and press

User Menu Select corresponding Node for IW32 / Order

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 171

Page 172: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 172

Select Enhancement Tab

Page 173: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

10B) Material Requirement change

10C) Material Issue against Reservation

Please refer steps 9 to 9C.

10D) Create Reservation for Return of Material to Store

If material issued is not consumed, returning is done as per steps 10 to 10C.

The quantity in the case of return will be negative.

11) View Purchase Requisition number

Open the order in change mode using any one navigation option shown below.BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 173

Select Notesheet

Page 174: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

SAP Menu Logistics --- Plant maintenance --- Maintenance

processing --- Order--- Change

T Code Type IW32 in Command Field and press

User Menu Select corresponding Node for IW32 / Order

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 174

Page 175: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 175

Purchase. Requisition no can be viewed

Page 176: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

11A) Initiate and Release Purchase Requisition

SAP Menu Go to EASY ACCESS Screen by /n

T Code /n

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 176

Go to SAP Business Workplace

Page 177: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

Now release the PR as per MM workflow procedure.

12) Purchase Order Process

12A Create Purchase Order.

Maintain Additional information required

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 177

Double click on INBOX – It will display the list of Messages .

Open a notesheet for “Purchase. Requisition”

Page 178: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

SAP Menu Logistics---Materials Management---Purchasing---Purchase Order ---

Create---ME21N – Vendor / Supplying Plant Known.

T Code ME21N

User Menu Select corresponding Node for ME21N / Create Purchasing Order.

Maintain Header text as per Requirement

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 178

Page 179: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 179

1. Enter the Purchase req. no

2. Execute

Page 180: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

SELECT PR & ADOPT

PO CREATED

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 180

Page 181: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

12B) Change Purchase Order

SAP Menu Logistics---Materials Management---Purchasing---Purchase Order ---

Change---ME22N – Change.

T Code ME22N

User Menu Select corresponding Node for ME22N / Change Purchasing Order.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 181

Page 182: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 182

Click here to change the Purchase order no.

Eneter the relevant Purch.Order

Page 183: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

Change the Description (or) details you want to change and Save.

12C) Display Purchase Order

SAP Menu Logistics---Materials Management---Purchasing---Purchase Order---

Display---ME23N – Vendor / Supplying Plant Known.

T Code ME23N - Display

User Menu Select corresponding Node for ME23N / Display Purchase Order.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 183

Page 184: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

All the required details can be viewed from this transaction

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 184

Click here to enter the Purchase order no.

Enter the Purchase order no.

Page 185: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

12D) Release Purchase Order. Initiate PO release for next level

SAP Menu Logistics---Materials Management---Purchasing---Purchase Order

--- Release---.

T Code PO release work flow

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 185

Page 186: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

12E) Print PO

SAP Menu Logistics---Materials Management---Purchasing---Purchase Order

--- Messages---ME9F – Individual Release.

T Code Type ME9F and in Command Field and press

User Menu Select corresponding Node for ME9F / Release

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 186

1. Enter the Purchase Order no

2. Execute

Page 187: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

Work Order is printed. Please click the icon to view the format.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 187

Click Trial Print Out

Select the no of copies req.

Press here

Page 188: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

13) Post Down Payment (Optional)

SAP Menu Logistics---Accounts Payable---Document Entry---Down

Payment---F-48-Down Payment

T Code Type F-48 in Command Field and press

User Menu Select corresponding Node for F-48 / Down Payment.

This step is optional. Follow the steps in case down payment is requested.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 188

Page 189: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 189

Enter the following details Company CodePosting dateCurrencyVendor CodeHeader TextPurchase orderBank NumberRequest no (Optional)

Page 190: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

14) Call /inform the Vendor:

Open the notification in change mode using any one of the Navigation option.

SAP Menu Logistics --- Plant maintenance --- Maintenance

processing --- Notification --- Change

T CodeType IW22 in Command Field and press

User Menu Select corresponding Node for IW22 / Notification

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 190

Page 191: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 191

Enter all the Communication details

Click here to change the status to vend

Page 192: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

Service vendor details will be updated . Information to Vendor is sent to Vendor’s Email

ID thru SAP as per the details maintained in Vendor Docket Screen.

15) Change in Service Planning against Order

Open the Order in change mode using any one navigation option below.

SAP Menu Logistics --- Plant maintenance --- Maintenance

processing --- Order--- Change

T Code Type IW32 in Command Field and press

User Menu Select corresponding Node for IW32 / Order

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 192

Set the status as VEND

Page 193: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

16) Service procurement process for new requirement

Please refer steps 11 to 13.

17)Create Reservation for Return of Material to Store (if material issued is not consumed

18) Order Confirmation

SAP Menu Logistics----Plant Maintenance---Maintenance Processing---Completion Confirmation----Entry—IW41 Individual Time Confirmation

T CodeType IW41 in Command Field and press

User Menu Select corresponding Node for IW41 / Completion Confirmation

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 193

Enter Order no. and press ENTER

Page 194: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

A pop window will open as mentioned below.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 194

Check the details like Final Confirmation and other details and press ENTER

After entering the time confirmation details ( Actual Work ) SAVE IT.

Page 195: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 195

Number of confirmation is displayed below.

Page 196: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

19) Complete Order

Open the order in change mode using any navigation option shown below.

SAP Menu Logistics --- Plant maintenance --- Maintenance

processing --- Order--- Change

T Code Type IW32 in Command Field and press

User Menu Select corresponding Node for IW32 / Order

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 196

Enter the Order no and press Enter

Page 197: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 197

Click on Flag

Page 198: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 198

Check the date and time and press ENTER

Page 199: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 199

Order saved and message is displayed with respective numbers

Page 200: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

20) Process Notification

Open the notification on change mode and set user status as Work Completed in

Notification

SAP Menu Logistics --- Plant maintenance --- Maintenance

processing --- Notification --- Change

T Code Type IW22 in Command Field and press

User Menu Select corresponding Node for IW22 / Notification

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 200

Enter the Notification No and proceed

Page 201: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 201

1. Maintain “Vendor Docket Details”

2. Click to change the user status

Page 202: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 202

Set the status to COMP

Page 203: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

21) Process NotificationSet user status as Confirmed Or Set user status as Rework (follow all the Steps from 3 to 15)

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 203

Click to change the User Status

Page 204: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

If the user status is set as rework (follow all the Steps from 3 to 15)

User Status “Confirmed” or “Rework” is set by “Initiator”.

Information flow is triggered to all “Person Responsible” about status update via

Email.

22) Complete Notification

Open the Notification in the change mode using transaction code IW22 or from the SAP

menu as mentioned in the earlier steps.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 204

Status can either be changed to 1. REWK or 2. CNFR

Page 205: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

Fiiup the all catalog data – Object Parts & Damage / Causes / Activities etc.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 205

Click the Flag to complete the Notif.

Page 206: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 206

Page 207: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 207

Page 208: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 208

Status is updated to NOCO. Check the same and proceed

Page 209: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

23) Service Entry sheet Process

Please refer P.O. issued for this maintenance

23A) Create Service entry sheet with reference to Purchase order

Use any one of the navigation mode to create the Service Entry Sheet with Reference

to Purchase Order

SAP MenuLogistics---Material Management---Purchasing---Purchasing Order---

Follow On Functions---Service Entry Sheet---ML81N-Maintain

T Code ML81N

User Menu Select corresponding Node for ML81N / Service Entry Sheet.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 209

Page 210: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 210

Enter Purchase order no.

Page 211: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

After saving a message is displayed as shown below.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 211

Press create.

1. Enter the service details

2. Save

Page 212: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 212

Creation of Service Entry Sheet triggers a auto generated mail

Enter the Mai Id of the Approver.

Page 213: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

23B) Release Service entry sheet Initiate SES release for next level.

Prerequisites

Service Entry Sheet no.

Use any one of the navigation mode to release the Service Entry Sheet.

SAP MenuLogistics---Material Management---Purchasing---Purchasing Order---

Follow On Functions---Service Entry Sheet---ML81N-Maintain

T Code ML81N

User Menu Select corresponding Node for ML81N / Service Entry Sheet.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 213

Page 214: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 214

1. Enter the service Entry Sheet no

2. Execute

Page 215: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

On Saving following Message is displayed

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 215

1.Select the Relevant Doc.

2. Release

3. Save

Page 216: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 216

1. Enter the Service Entry Sheet no

2. Execute

Page 217: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

On saving, the following document is displayed.

24) Maintenance Order Settlement

Use any one of the navigation mode to release the Service Entry Sheet.

SAP MenuLogistics---Plant Maintenance----Maintenance Processing---

Notification---Maintennace Processing---Completion Confimration----

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 217

1. Select the Relevant Doc.

2. Release

3. Save

Enter Doc. Header Text and press

Page 218: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

Entry---IW41---Individual Time Confirmation

T Code K088

User Menu Select corresponding Node for K088 / Individual Time Confirmation

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 218

1. Enter Controlling area

2. Enter the following a. Settlement period b. Fiscal Year c. Processing Type

Page 219: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

25) Business Completion of Maintenance Order

Open the order in change mode using anyone of the Navigation option.

SAP Menu Logistics --- Plant maintenance --- Maintenance

processing --- Order--- Change

T Code Type IW32 in Command Field and press

User Menu Select corresponding Node for IW32 / Order

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 219

Select Complete (Business)

Page 220: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

26) Accounting entry verification

Prerequisite

Service Entry Sheet no

Use any one of the Navigation option

SAP MenuLogistics---Material Management---Purchasing---Purchasing Order---

Follow On Functions---Service Entry Sheet---ML81N-Maintain

T Code ML81N

User Menu Select corresponding Node for ML81N / Service Entry Sheet.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 220

Status is updated to CLSD

Page 221: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 221

Click here to enter Service sheet no

Enter Service sheet no and press

Page 222: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

27) Print SES Document

Prerequisite

Service Entry Sheet no.

SAP MenuLogistics---Material Management---Purchasing---Purchasing Order---

Follow On Functions---Service Entry Sheet---ML83 Print / Transmit.

T Code ML83

User Menu Select corresponding Node for ML81N / Service Entry Sheet.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 222

Page 223: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 223

1. Enter Entry sheet no

2. Enter Purchase order no

3. Execute

Page 224: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

The Doc. Gets printed. Printed copy can be viewed by clicking the icon.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 224

1. Select the relevant field

2. Select Trial Print Out

Select Print

Page 225: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

28) Invoice verification Process

28A) Invoice Verification for Service Performed

Use any one of the navigation mode.

SAP Menu Logistics---Material Management---Purchasing---Purchasing Order---

Follow On Functions---MIRO Logistics Invoice Verification

T Code MIRO

User Menu Select corresponding Node for SBWP / Workplace

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 225

1. Enter Purchase order no.

2. Enter Ref no

3. Enter Date

4. Press ENTER after filling all the details

Page 226: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

28C) Adjustment of down payment.

Since, Adjustment of down payment is done already follow the next step

28D) Vendor Payment

Use any one of the Navigation option.

SAP MenuLogistics---Accounting---Financial Accounting---Accounts Payable---

Document Entry---Outgoing Payment---F-53

T Code Type F-53 in Command Field and press

User Menu Select corresponding Node for F-53 / Outgoing Payment

In the Initial screen, plz enter the following datas.

Enter Document Date

Enter Posting Date

Enter Bank Account

Enter Amount

Select Invoice

An accounting document is generated.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 226

Page 227: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

28E) Display Accounting Document

Use any one of the navigation mode.

SAP MenuLogistics---Material Management---Purchasing---Purchasing Order---

Follow On Functions---MIRO Logistics Invoice Verification

T Code Type MIRO in Command Field and press

User Menu Select corresponding Node for MIRO / Logistics Invoice Verification.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 227

1. Enter Purchase order no.

2. Enter Ref no

3. Enter Date

4. Press ENTER after filling all the details

Page 228: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

3D: Breakdown Maintenance by Vendor (Need Based Service requirement)

1. Create Notification

Purpose

A defect has occurred and you create a Breakdown Notification. You enter a brief

description of defect, technical object (Functional Location / Equipment) on which defect

has occurred, optionally the detail description in subject long text and task required to

be done.

Trigger

Perform this procedure when there is a need for Manpower and material requirement for

your Breakdown Maintenance Activities

Prerequisites

Technical Object ( Functional Location / Equipment)

Main Work Center

Cost Center

HR Employee List

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 228

Page 229: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

Procedure

1. Access the transaction choosing one of the following navigation options:

SAP Menu

a) Logistics --- Plant maintenance--- Maintenance

processing --- Notification --- Create (General)

b) Logistics --- Plant maintenance --- Maintenance

processing --- Notification --- Create (Special) ---

Malfunction Report

T Code Type IW21 / IW24 in Command Field and press

User Menu Select corresponding Node for IW21 / IW24 / Notification

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 229

Enter Notification Type

Page 230: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

Note :

If known, the equipment no. can directly be entered or equipment can be selected from

Equipment field F4 help by giving proper selection criteria like equipment description,

plant, plant section, planner group, Main work center etc. in selection option ‘Equipment

by equipment list’.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 230

1. Enter short Text

2.Enter Equipment code (or) Func.Location

3. Select Breakdown

4. Enter the appropriate text

Page 231: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

2. Assign Notification – Assign to responsible person for maintenance

Partner Function “Initiator” is maintained manually by the Notification creator

.“Person Responsible” is either picked from master data (if maintained) or can be

maintained manually by Notification creator.

User Status “Assigned” is set by “Initiator”.

Information flow is triggered and information is sent to “Person Responsible” via Email.

Notification can be assigned to multiple “Person Responsible”.

Open the Notification in change mode using any one navigation options shown below.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 231

System will savethis notificationwith generating aninternal number

Page 232: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

SAP Menu Logistics --- Plant maintenance --- Maintenance

processing --- Notification --- Change

T CodeType IW22 in Command Field and press

User Menu Select corresponding Node for IW22 / Notification

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 232

5. Enter Partner Details

Page 233: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 233

Click here to change the staus

Page 234: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

SAVE & MAIL IS SENT TO RESPONSIBLE PERSON

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 234

Select Assigned and proceed.

1. Status updated to ASGD

2. Save

Page 235: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 235

On saving a mail is triggered in SAP system.

The Mail carries the following details

Page 236: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

3. Re-Assign to responsible person for maintenance.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 236

1. Change the Partner no and press Enter

New Person Responsible is assigned

Page 237: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 237

Click here to change the status

Select RASG and press ENTER

Page 238: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

Information flow is triggered to all maintained “New Personal Responsible”, and

“Initiator” via Email.

4. Acknowledge Notification and “Put in Process” Notification:

Open the Notification in change mode using any one navigation option shown below.

SAP Menu Logistics --- Plant maintenance --- Maintenance

processing --- Notification --- Change

T CodeType IW22 in Command Field and press

User Menu Select corresponding Node for IW22 / Notification

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 238

1. Check the status

2. Save

Page 239: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

Note:

User Status “ACKD” is set by “Person Responsible”.

Notification is “Put in Process” by “Person Responsible”.

Information flow is triggered to “Initiator” and all “Person Responsible” about status

update.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 239

1. Click to change the staus tp ACKD

2. Click here to put the Notif ication process

3. Click to save the Notif.

Page 240: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

5) Decision on Maintenance Order Requirement

Decide on the requirement of Maintenance order, based on material to be consumed

from stores

5A) Maintenance Order for material to be consumed from stores

Follow steps from 6 to 18

5B) Maintenance Order not required as no material consumed/services used

Follow steps from 14 to 16

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 240

Page 241: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

6) Create Maintenance Order from Notification

1. An Order can be created directly from the Notification screen.

To create an Order directly from the notification screen click create order, as shown

in the above screen.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 241

Click here to create an order

Page 242: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

2. On the Create Breakdown order: Central Header Data will get copied from the

Notification e.g. Order Header, Planner Group, Maint work center, Reference object etc.

If any changes are required it can be done.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 242

Check the Order type and proceed

Page 243: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

3. According to the planning assign the operations which need to be carried out.

The first operation in the operations screen gets copied from the order header as default

by the system as shown below. It can be replaced with some other operation, or if some

similar operations are there in some task list then those operations can also be copied

directly to the order.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 243

1. First operation get copied from the order header, it can be replaced if required

2. After enteringthe operation enterthe no of manpower in No field and enter the no of proposed duration in theduration field,Based on these entries system willcalculate the duration

Page 244: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

Click - execute button at top left of the screen.

You will get the list of Task lists fulfilling the above selection criteria.

Select your Task list and click button at top of the page or alternatively you can

double click on the task list group.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 244

These fields will becomegray based on the selectioncriteria, either Gen task list orfunction loc. Or equipment task

Page 245: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

Now system will ask you weather you want to copy the work center from the task list or

some other work center you want to choose, if you want to change the work center

according to your notification then change it accordingly.

Now System will ask you weather you want to select all the operations of the task list or

only some selected operations you want to select, choose accordingly.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 245

1. Selectthe task list

2. Click on this button or double click on the tasklist group

1. Enter yourwork center ifrequired

2. Click on all tocopy this workcenter

Page 246: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

7A) Material Planning Against Order

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 246

If you want to select allthe operations then clickon all, otherwise if youwant to select someselected operations thenselect those operations

Enter the material code / Qty / Store Location Etc., and proceed.

Page 247: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

Enter the material code no if known or select the material from the drop down, and enter

the required quantity as per the requirement. Then press enter; now system will ask you

for which operation you want to assign this material as shown below, either enter the

operation no or click on operation list and select the desired operation.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 247

Select the relevant Operation and press

Page 248: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 248

Click on General Data

Page 249: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 249

Reservation created

Page 250: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

7B) Service Planning against Order

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 250

Select operation Tab

Page 251: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 251

1. Change the control Key to PM03directly (or) Press F4

2. Click External

Maintain the following:

1. Material Group2. Purchasing Group:3. Purchasing Organization:4. Requisitioner:5. Tracking No:

Page 252: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

Select the appropriate control key and select

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 252

Select the control key PM03

Page 253: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

On saving the order a message will be displayed.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 253

Select the following

1. Service from drop down 2. Maintain quantity3. Gross Price and4. Cost Element.

Page 254: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

8) Workflow for Maintenance Order Approval

Open the Order in change mode using any one navigation shown below

SAP Menu Logistics --- Plant maintenance --- Maintenance

processing --- Order--- Change

T Code Type IW32 in Command Field and press

User Menu Select corresponding Node for IW32 / Order

8A) Order Approval

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 254

Select Enhancement Tab

Page 255: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 255

Select Notesheet

1.Enter theSAP ID of the Approver

2.Enter the text and continue

3. Click send mail.

Page 256: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

8B) Order Release

Open the order in the change mode using any one navigation option shown below

Press to release the order and press to save the order.

9) Check of material availability in storage location

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 256

1. Release the order

2. Save the order

Page 257: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

SAP Menu

Materials Management ---Purchasing ---Mater Data ---SUbsequent Settlement ---Vendor Rebate Arrangement ---Environment ---Environment ---Condition/Arrangement ---Environment ---Pricing ---Environment ---Value Assignment ---Inventory Management ---Environment ---Stock ---MB52 --- Warehouse Stock.

T Code Type MB52 in Command Field and press

User Menu Select corresponding Node for MB52 / Ware house stock

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 257

1. Enter the Plant / Storage Location, Etc

2. Execute

Page 258: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

Material Issue against Reservation (if the material is available in storage location)

9A) Material Issue against Reservation (if the material is available in storage

location)

Prerequisites - Reservation no.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 258

Material Code / Qty can be checked here

Page 259: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

SAP MenuLogistics---Material Management---Purchasing---Purchase Order---Follow On Functions---MIGO

T Code Type MIGO in Command Field and press

User Menu Select corresponding Node for MIGO / Goods Issue

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 259

Enter Reservation no and press ENTER

Page 260: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 260

Click on Material Tab

Page 261: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 261

Click on Quantity Tab and check the details

Page 262: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 262

1. Enter the no if Qty to be posted

3. Click on Where Tab and check the details

Page 263: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 263

2. Click on reservation tab to check the details

1. Check the details like Moment type / Stock type Storage Location Etc.

Page 264: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 264

After checking all the details press Account Assignment Tab.

Page 265: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

After Posting the material will be posted and document no will be generated.

9B) If the material is not available in storage location

Please refer MM Script of Material Stock transfer or Material Procurement.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 265

1.Click on Check

2. Click on Post

Page 266: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

9C) Display Material Document

Prerequisites – Material Document no (Obtained while posting a reservation).

SAP MenuLogistics---Material Management---Purchasing---Purchase Order---Follow On Functions---MIGO

T Code Type MIGO in Command Field and press

User Menu Select corresponding Node for MIGO / Goods Issue

Enter the Material Document no to display the material document.

10) Change in Material RequirementOpen the order in change mode using any navigation option shown below.

SAP Menu Logistics --- Plant maintenance --- Maintenance

processing --- Order--- Change

T Code Type IW32 in Command Field and press

User Menu Select corresponding Node for IW32 / Order

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 266

Add new component and proceed.

Page 267: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 267

Select Enhancement Tab

Select Notesheet

Page 268: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

10B) Material Requirement change

10C) Material Issue against Reservation

Please refer steps 9 to 9C.

10D) Create Reservation for Return of Material to Store

If material issued is not consumed, returning is done as per steps 10 to 10C.

The quantity in the case of return will be negative.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 268

1. Enter the SAP ID of the Approver

2. Enter the text and continue

3. Click send mail.

Page 269: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

11) View Purchase Requisition number

Open the order in change mode using any one navigation option shown below.

SAP Menu Logistics --- Plant maintenance --- Maintenance

processing --- Order--- Change

T Code Type IW32 in Command Field and press

User Menu Select corresponding Node for IW32 / Order

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 269

Page 270: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 270

Purchase. Requisition no can be viewed

Page 271: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

11A) Initiate and Release Purchase Requisition

SAP Menu Go to EASY ACCESS Screen by /n

T Code /n

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 271

Go to SAP Business Workplace

Page 272: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

Now release the PR as per workflow procedure.

13) Purchase Order Process

13)A Create Purchase Order.

Maintain Additional information required

SAP Menu Logistics---Materials Management---Purchasing---Purchase Order --- Create---ME21N – Vendor / Supplying Plant Known.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 272

Double click on INBOX – It will display the list of Messages .

Open a notesheet for “Purchase. Requisition”

Page 273: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

T Code ME21N

User Menu Select corresponding Node for ME21N / Create Purchasing Order.

Maintain Header text as per Requirement

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 273

Page 274: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 274

1. Enter the Purchase req. no

2. Execute

Page 275: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 275

Page 276: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

13B) Change Purchase Order

SAP Menu Logistics---Materials Management---Purchasing---Purchase Order ---

Change---ME22N – Change.

T Code ME22N

User Menu Select corresponding Node for ME22N / Change Purchasing Order.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 276

Page 277: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 277

Click here to change the Purchase order no.

Eneter the relevant Purch.Order

Page 278: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

Change the Description (or) details you want to change and Save.

13C) Display Purchase Order

SAP Menu Logistics---Materials Management---Purchasing---Purchase Order---

Display---ME23N – Vendor / Supplying Plant Known.

T Code ME23N - Display

User Menu Select corresponding Node for ME23N / Display Purchase Order.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 278

Page 279: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

All the required details can be viewed from this transactions.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 279

Click here to enter the Purchase order no.

Enter the Purchase order no.

Page 280: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

13D) Release Purchase Order. Initiate PO release for next level

SAP Menu Logistics---Materials Management---Purchasing---Purchase Order

--- Release---ME29N – Vendor / Supplying Plant Known.

T Code ME29N

User Menu Select corresponding Node for ME29N /Individual Release

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 280

Page 281: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

13E) Print PO

SAP Menu Logistics---Materials Management---Purchasing---Purchase Order

--- Messages---ME9F – Individual Release.

T Code Type ME9F and in Command Field and press

User Menu Select corresponding Node for ME9F / Release

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 281

1. Enter the Purchase Order no

2. Execute

Page 282: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

Work Order is printed. Plz click the icon to view the format.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 282

Click Trial Print Out

Select the no of copies req.

Press here

Page 283: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

14) Post Down Payment (Optional)

SAP Menu Logistics---Accounts Payable---Document Entry---Down

Payment---F-48-Down Payment

T Code Type F-48 in Command Field and press

User Menu Select corresponding Node for F-48 / Down Payment.

This step is optional. Follow the steps in case down payment is requested.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 283

Page 284: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 284

Enter the following details Company CodePosting dateCurrencyVendor CodeHeader TextPurchase orderBank NumberRequest no (Optional)

Page 285: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

15) Call /inform the Vendor:

Open the notification in change mode using any one of the Navigation option.

SAP Menu Logistics --- Plant maintenance --- Maintenance

processing --- Notification --- Change

T CodeType IW22 in Command Field and press

User Menu Select corresponding Node for IW22 / Notification

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 285

Page 286: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 286

Enter all the Communication details

Click here to change the status to vend

Page 287: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

Service vendor details will be updated . Information to Vendor is sent to Vendor’s Email

ID thru SAP as per the details maintained in Vendor Docket Screen.

16) Change in Service Planning against Order

Open the Order in change mode using any one navigation option below.

SAP Menu Logistics --- Plant maintenance --- Maintenance

processing --- Order--- Change

T Code Type IW32 in Command Field and press

User Menu Select corresponding Node for IW32 / Order

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 287

Set the status as VEND

Page 288: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 288

Select Operations

Maintain new Operation with Control Key “PM03”. operation and click on “External”.

Page 289: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 289

1. Select the Operation

2. Select External

Page 290: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

On saving the order following message will be displayed.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 290

Select the following

1. Service from drop down 2. Maintain quantity3. Gross Price and4. Cost Element.

Maintain the following:

1. Material Group2. Purchasing Group:3. Purchasing Organization:4. Requisitioner:5. Tracking No

Maintain APO no and continue

Page 291: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

17) Service procurement process for new requirement

Please refer steps 11 to 13.

18) Create Reservation for Return of Material to Store

19) Order Confirmation

SAP Menu Logistics----Plant Maintenance---Maintenance Processing---Completion Confirmation----Entry—IW41 Individual Time Confirmation

T CodeType IW41 in Command Field and press

User Menu Select corresponding Node for IW41 / Completion Confirmation

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 291

Enter Order no. and press ENTER

Page 292: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

A pop window will open as mentioned below.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 292

After entering the time confirmation details ( Actual Work ) SAVE IT.

Page 293: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 293

Check the details like Final Confirmation and other details and press ENTER

Page 294: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 294

Number of confirmation is displayed below.

Page 295: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

20) Complete Order

Open the order in change mode using any navigation option shown below.

SAP Menu Logistics --- Plant maintenance --- Maintenance

processing --- Order--- Change

T Code Type IW32 in Command Field and press

User Menu Select corresponding Node for IW32 / Order

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 295

Enter the Order no and press Enter

Page 296: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 296

Click on Flag

Page 297: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 297

Check the date and time and press ENTER

Page 298: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 298

Order saved and message is displayed.

Page 299: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

21) Process Notification

Open the notification on change mode and set user status as Work Completed in

Notification

SAP Menu Logistics --- Plant maintenance --- Maintenance

processing --- Notification --- Change

T Code Type IW22 in Command Field and press

User Menu Select corresponding Node for IW22 / Notification

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 299

Enter the Notification No and proceed

Page 300: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 300

1. Maintain “Vendor Docket Details”

2. Click to change the user status

Page 301: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 301

Set the status to COMP

Page 302: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

22) Process Notification

Set user status as Confirmed Or Set user status as Rework

(follow all the Steps from 3 to 15)

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 302

Click to change the User Status

Page 303: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

If the user status is set as rework (follow all the Steps from 3 to 15)

User Status “Confirmed” or “Rework” is set by “Initiator”.

Information flow is triggered to all “Person Responsible” about status update via

Email.

23) Complete Notification

Open the Notification in the change mode using transaction code IW22 or from the SAP

menu as mentioned in the earlier steps.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 303

Status can either be changed to 1. REWK or 2. CNFR

Page 304: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

Fiiup the all catalog data – Object Parts & Damage / Causes / Activities etc.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 304

Click the Flag to complete the Notif.

Page 305: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 305

Page 306: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 306

Page 307: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 307

Status is updated to NOCO. Check the same and proceed

Page 308: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

24) Service Entry sheet Process

Please refer P.O. issued for this maintenance

24A) Create Service entry sheet with reference to Purchase order

Use any one of the navigation mode to create the Service Entry Sheet with Reference

to Purchase Order

SAP MenuLogistics---Material Management---Purchasing---Purchasing Order---

Follow On Functions---Service Entry Sheet---ML81N-Maintain

T Code ML81N

User Menu Select corresponding Node for ML81N / Service Entry Sheet.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 308

Page 309: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 309

Enter Purchase order no.

Page 310: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

After saving a message is displayed as shown below.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 310

Press create.

1. Enter the service details

2. Save

Page 311: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 311

Creation of Service Entry Sheet triggers a auto generated mail

Enter the Mai Id of the Approver.

Page 312: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

24B) Release Service entry sheet Initiate SES release for next level.

Prerequisites

Service Entry Sheet no.

Use any one of the navigation mode to release the Service Entry Sheet.

SAP MenuLogistics---Material Management---Purchasing---Purchasing Order---

Follow On Functions---Service Entry Sheet---ML81N-Maintain

T Code ML81N

User Menu Select corresponding Node for ML81N / Service Entry Sheet.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 312

Page 313: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 313

1. Enter the service Entry Sheet no

2. Execute

Page 314: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

On Saving following Message is displayed

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 314

1.Select the Relevant Doc.

2. Release

3. Save

Page 315: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 315

1. Enter the Service Entry Sheet no

2. Execute

Page 316: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

On saving, the following document is displayed.

25) Maintenance Order Settlement

Use any one of the navigation mode to release the Service Entry Sheet.

SAP MenuLogistics---Plant Maintenance----Maintenance Processing---

Notification---Maintennace Processing---Completion Confimration----

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 316

1. Select the Relevant Doc.

2. Release

3. Save

Enter Doc. Header Text and press

Page 317: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

Entry---IW41---Individual Time Confirmation

T Code K088

User Menu Select corresponding Node for K088 / Individual Time Confirmation

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 317

1. Enter Controlling area

2. Enter the following a. Settlement period b. Fiscal Year c. Processing Type

Page 318: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

26) Business Completion of Maintenance Order

Open the order in change mode using anyone of the Navigation option.

SAP Menu Logistics --- Plant maintenance --- Maintenance

processing --- Order--- Change

T Code Type IW32 in Command Field and press

User Menu Select corresponding Node for IW32 / Order

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 318

Select Complete (Business)

Page 319: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

27) Accounting entry verification

Prerequisite

Service Entry Sheet no

Use any one of the Navigation option

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 319

Status is updated to CLSD

Page 320: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

SAP MenuLogistics---Material Management---Purchasing---Purchasing Order---

Follow On Functions---Service Entry Sheet---ML81N-Maintain

T Code ML81N

User Menu Select corresponding Node for ML81N / Service Entry Sheet.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 320

Click here to enter Service sheet no

Page 321: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 321

Enter Service sheet no and press

Page 322: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

28) Print SES Document

Prerequisite

Service Entry Sheet no.

SAP MenuLogistics---Material Management---Purchasing---Purchasing Order---

Follow On Functions---Service Entry Sheet---ML83 Print / Transmit.

T Code ML83

User Menu Select corresponding Node for ML81N / Service Entry Sheet.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 322

Page 323: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 323

1. Enter Entry sheet no

2. Enter Purchase order no

3. Execute

Page 324: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 324

1. Select the relevant field

2. Select Trial Print Out

Select Print

Page 325: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

The Doc. Gets printed. Printed copy can be viewed by clicking the icon.

Work Certification Process

Please refer to work certification Manual

29) Invoice verification Process

29A) Invoice Verification for Service Performed

Use any one of the navigation mode.

SAP Menu Logistics---Material Management---Purchasing---Purchasing Order---

Follow On Functions---MIRO Logistics Invoice Verification

T Code MIRO

User Menu Select corresponding Node for SBWP / Workplace

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 325

Page 326: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

29B) Debit/ Credit Notes

29C) Adjustment of down payment.

Since, Adjustment of down payment is done already follow the next step

29D) Vendor Payment

Use any one of the Navigation option.

SAP MenuLogistics---Accounting---Financial Accounting---Accounts Payable---

Document Entry---Outgoing Payment---F-53

T CodeType F-53 in Command Field and press

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 326

1. Enter Purchase order no.

2. Enter Ref no

3. Enter Date

4. Press ENTER after filling all the details

Page 327: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

User Menu Select corresponding Node for F-53 / Outgoing Payment

In the Initial screen, plz enter the following datas.

Enter Document Date

Enter Posting Date

Enter Bank Account

Enter Amount

Select Invoice

An accounting document is generated.

29E) Display Accounting Document

Use any one of the navigation mode.

SAP MenuLogistics---Material Management---Purchasing---Purchasing Order---

Follow On Functions---MIRO Logistics Invoice Verification

T Code Type MIRO in Command Field and press

User Menu Select corresponding Node for MIRO / Logistics Invoice Verification.

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 327

Page 328: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

Note : -

In the Breakdown Maintenance process, there are processes related to other Modules

like FICO / MM. These processes are explained only in brief. For more details /

informations, respective module manuals to be referred.

For example: - Following are explained only in brief. Pl. refer the respective modules.

Account Entry Verification

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 328

1. Enter Purchase order no.

2. Enter Ref no

3. Enter Date

4. Press ENTER after filling all the details

Page 329: BSNL PM UM 05 Breakdown Maintenance Process V3.0 12042013

Invoice verification Process

Invoice Verification for Service Performed

Vendor Payment

Note : For PO, RFQ, Contract, SES creation please refer MM User Manuals

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 329