BSC6900 GSM N68E-22 Cabinet Installation Guide(V900R012C01_02)

95
BSC6900 GSM V900R012C01 N68E-22 Cabinet Installation Guide Issue 02 Date 2011-05-19 HUAWEI TECHNOLOGIES CO., LTD.

Transcript of BSC6900 GSM N68E-22 Cabinet Installation Guide(V900R012C01_02)

  • BSC6900 GSMV900R012C01

    N68E-22 Cabinet Installation Guide

    Issue 02Date 2011-05-19

    HUAWEI TECHNOLOGIES CO., LTD.

  • Copyright Huawei Technologies Co., Ltd. 2011. All rights reserved.No part of this document may be reproduced or transmitted in any form or by any means without prior writtenconsent of Huawei Technologies Co., Ltd. Trademarks and Permissions

    and other Huawei trademarks are trademarks of Huawei Technologies Co., Ltd.All other trademarks and trade names mentioned in this document are the property of their respective holders. NoticeThe purchased products, services and features are stipulated by the contract made between Huawei and thecustomer. All or part of the products, services and features described in this document may not be within thepurchase scope or the usage scope. Unless otherwise specified in the contract, all statements, information,and recommendations in this document are provided "AS IS" without warranties, guarantees or representationsof any kind, either express or implied.

    The information in this document is subject to change without notice. Every effort has been made in thepreparation of this document to ensure accuracy of the contents, but all statements, information, andrecommendations in this document do not constitute the warranty of any kind, express or implied. Huawei Technologies Co., Ltd.Address: Huawei Industrial Base

    Bantian, LonggangShenzhen 518129People's Republic of China

    Website: http://www.huawei.comEmail: [email protected]

    Issue 02 (2011-05-19) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    i

  • About This Document

    OverviewThis document contains information related to the installation of the N68E-22 cabinet. Theinformation consists of how to install the cabinet, accessories, external power cables, and PGNDcables, how to attach engineering labels to the power cables and PGND cables, and otherreference information.

    Product VersionThe following table lists the product version related to this document.

    Product Name Product VersionBSC6900 V900R012C01

    Intended AudienceThis document is intended for installation personnel.

    Organization1 Changes in the N68E-22 Cabinet Installation GuideThis chapter describes the changes in the N68E-22 Cabinet Installation Guide.2 Overview of the N68E-22 CabinetThe N68E-22 cabinet features a modular design. It provides sufficient space for installingdevices such as subracks and power distribution box to facilitate capacity expansion andmaintenance.3 Preparing for the N68E-22 Cabinet InstallationBefore installing the N68E-22 cabinet, you need to unpack the cases and check the items in thecases. Ensure that all the tools required for the installation are available.

    BSC6900 GSMN68E-22 Cabinet Installation Guide About This Document

    Issue 02 (2011-05-19) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    iii

  • 4 Installing the N68E-22 CabinetInstalling the N68E-22 cabinet involves installing the cabinet and the accessories. It also involvesattaching engineering labels to the cabinet.5 Installing the N68E-22 Cabinet on the Concrete FloorThis chapter describes how to install the N68E-22 cabinet on the concrete floor.6 Installing the N68E-22 Cabinet on the ESD FloorThis chapter describes how to install the N68E-22 cabinet on the ESD floor by using the N6Xseries support assembly.7 Installing the Accessories for the N68E-22 CabinetThis chapter describes how to install the front and back doors as well as side panels for theN68E-22 cabinet. This chapter also describes how to install the PGND cables for the doors andside panels.8 Attaching the Engineering Labels to the CabinetsThis chapter describes how to attach the engineering labels, including row and column labels,to the cabinets.9 Checklist for the Cabinet InstallationThis chapter describes the items and specifications for checking the cabinet installation.

    ConventionsSymbol ConventionsThe symbols that may be found in this document are defined as follows.

    Symbol DescriptionIndicates a hazard with a high level of risk, which if notavoided, will result in death or serious injury.

    Indicates a hazard with a medium or low level of risk, whichif not avoided, could result in minor or moderate injury.

    Indicates a potentially hazardous situation, which if notavoided, could result in equipment damage, data loss,performance degradation, or unexpected results.Indicates a tip that may help you solve a problem or savetime.Provides additional information to emphasize or supplementimportant points of the main text.

    General ConventionsThe general conventions that may be found in this document are defined as follows.

    About This DocumentBSC6900 GSM

    N68E-22 Cabinet Installation Guide

    iv Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    Issue 02 (2011-05-19)

  • Convention DescriptionTimes New Roman Normal paragraphs are in Times New Roman.Boldface Names of files, directories, folders, and users are in

    boldface. For example, log in as user root.Italic Book titles are in italics.Courier New Examples of information displayed on the screen are in

    Courier New.

    Command ConventionsThe command conventions that may be found in this document are defined as follows.

    Convention DescriptionBoldface The keywords of a command line are in boldface.Italic Command arguments are in italics.[ ] Items (keywords or arguments) in brackets [ ] are optional.{ x | y | ... } Optional items are grouped in braces and separated by

    vertical bars. One item is selected.[ x | y | ... ] Optional items are grouped in brackets and separated by

    vertical bars. One item is selected or no item is selected.{ x | y | ... }* Optional items are grouped in braces and separated by

    vertical bars. A minimum of one item or a maximum of allitems can be selected.

    [ x | y | ... ]* Optional items are grouped in brackets and separated byvertical bars. Several items or no item can be selected.

    GUI ConventionsThe GUI conventions that may be found in this document are defined as follows.

    Convention DescriptionBoldface Buttons, menus, parameters, tabs, window, and dialog titles

    are in boldface. For example, click OK.> Multi-level menus are in boldface and separated by the ">"

    signs. For example, choose File > Create > Folder.

    Keyboard OperationsThe keyboard operations that may be found in this document are defined as follows.

    BSC6900 GSMN68E-22 Cabinet Installation Guide About This Document

    Issue 02 (2011-05-19) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    v

  • Format DescriptionKey Press the key. For example, press Enter and press Tab.Key 1+Key 2 Press the keys concurrently. For example, pressing Ctrl+Alt

    +A means the three keys should be pressed concurrently.Key 1, Key 2 Press the keys in turn. For example, pressing Alt, A means

    the two keys should be pressed in turn.

    Mouse OperationsThe mouse operations that may be found in this document are defined as follows.

    Action DescriptionClick Select and release the primary mouse button without moving

    the pointer.Double-click Press the primary mouse button twice continuously and

    quickly without moving the pointer.Drag Press and hold the primary mouse button and move the

    pointer to a certain position.

    About This DocumentBSC6900 GSM

    N68E-22 Cabinet Installation Guide

    vi Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    Issue 02 (2011-05-19)

  • Contents

    About This Document...................................................................................................................iii1 Changes in the N68E-22 Cabinet Installation Guide..........................................................1-12 Overview of the N68E-22 Cabinet...........................................................................................2-13 Preparing for the N68E-22 Cabinet Installation...................................................................3-1

    3.1 Unpacking the Cases and Checking the Items................................................................................................3-23.2 Tools Required for Installing the N68E-22 Cabinet.......................................................................................3-8

    4 Installing the N68E-22 Cabinet................................................................................................4-15 Installing the N68E-22 Cabinet on the Concrete Floor.......................................................5-1

    5.1 Materials for Installing the N68E-22 Cabinet on the Concrete Floor.............................................................5-35.2 Template Files for Installing the N68E-22 Cabinet........................................................................................5-35.3 Positioning the N68E-22 Cabinet on the Concrete Floor................................................................................5-55.4 Securing the N68E-22 Cabinet on the Concrete Floor..................................................................................5-105.5 Testing the Insulation of the N68E-22 Cabinet.............................................................................................5-155.6 Combining the N68E-22 Cabinets................................................................................................................5-17

    6 Installing the N68E-22 Cabinet on the ESD Floor...............................................................6-16.1 Materials for Installing the N68E-22 Cabinet on the ESD Floor....................................................................6-36.2 Template Files for Installing the N68E-22 Cabinet........................................................................................6-36.3 N6X Series Support Assembly........................................................................................................................6-56.4 Positioning the N68E-22 Cabinet on the ESD Floor.......................................................................................6-76.5 Installing the N6X Series Support and the Guide Rails................................................................................6-126.6 Securing the N68E-22 Cabinet on the ESD Floor.........................................................................................6-166.7 Testing the Insulation of the N68E-22 Cabinet.............................................................................................6-216.8 Combining the N68E-22 Cabinets................................................................................................................6-236.9 Placing the ESD Floor in the Original Position............................................................................................6-27

    7 Installing the Accessories for the N68E-22 Cabinet............................................................7-17.1 Accessories to Be Installed for the N68E-22 Cabinet.....................................................................................7-37.2 Installing the Side Panels for the N68E-22 Cabinet........................................................................................7-37.3 Installing the Front and Back Doors for the N68E-22 Cabinet.......................................................................7-57.4 Installing the PGND Cables for the Doors of the N68E-22 Cabinet..............................................................7-6

    8 Attaching the Engineering Labels to the Cabinets..............................................................8-1

    BSC6900 GSMN68E-22 Cabinet Installation Guide Contents

    Issue 02 (2011-05-19) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    vii

  • 9 Checklist for the Cabinet Installation....................................................................................9-1Index.................................................................................................................................................i-1

    ContentsBSC6900 GSM

    N68E-22 Cabinet Installation Guide

    viii Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    Issue 02 (2011-05-19)

  • Figures

    Figure 2-1 Appearance of the single-door N68E-22 cabinet ...............................................................................2-2Figure 2-2 Appearance of the double-door N68E-22 cabinet .............................................................................2-3Figure 3-1 Shockwatch label................................................................................................................................3-3Figure 3-2 Straightening the tongue.....................................................................................................................3-4Figure 3-3 Removing the cover............................................................................................................................3-5Figure 3-4 Removing side boards........................................................................................................................ 3-5Figure 3-5 Unpacking a carton.............................................................................................................................3-6Figure 5-1 Equipment room floor plan (unit: mm).............................................................................................. 5-4Figure 5-2 Marking template for installing the N68E-22 cabinet on the concrete floor (unit: mm)....................5-5Figure 5-3 Marking template for installing the N68E-22 cabinet on the ESD floor (unit: mm)..........................5-5Figure 5-4 Installation holes for one cabinet (unit: mm)......................................................................................5-7Figure 5-5 Installation holes for a row of cabinets (unit: mm).............................................................................5-7Figure 5-6 Digging a pit.......................................................................................................................................5-8Figure 5-7 Drilling a hole.....................................................................................................................................5-8Figure 5-8 Expansion bolt assembly....................................................................................................................5-9Figure 5-9 Installing the expansion bolt assembly (1).........................................................................................5-9Figure 5-10 Installing the expansion bolt assembly (2).....................................................................................5-10Figure 5-11 Removing the wooden protection boards.......................................................................................5-11Figure 5-12 State of the lock of each door.........................................................................................................5-11Figure 5-13 Removing the reinforced plate and short supporting beams..........................................................5-12Figure 5-14 Removing the air filter....................................................................................................................5-13Figure 5-15 Securing the cabinet........................................................................................................................5-14Figure 5-16 Leveling the cabinet........................................................................................................................5-14Figure 5-17 Insulation test..................................................................................................................................5-16Figure 5-18 Placing the air filter in the original position...................................................................................5-17Figure 5-19 Special connecting pieces for combining cabinets.........................................................................5-17Figure 5-20 Reinstalling the connecting piece between N68E-22 cabinets.......................................................5-18Figure 5-21 Combining two N68E-22 cabinets.................................................................................................5-19Figure 5-22 Using a level bar to check the horizontal and vertical deviations..................................................5-20Figure 5-23 Combining N68E-22 and N68-22 cabinets....................................................................................5-21Figure 6-1 Equipment room floor plan (unit: mm).............................................................................................. 6-4Figure 6-2 Marking template for installing the N68E-22 cabinet on the concrete floor (unit: mm)....................6-5Figure 6-3 Marking template for installing the N68E-22 cabinet on the ESD floor (unit: mm)..........................6-5

    BSC6900 GSMN68E-22 Cabinet Installation Guide Figures

    Issue 02 (2011-05-19) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    ix

  • Figure 6-4 N6X series support............................................................................................................................. 6-6Figure 6-5 Guide rail............................................................................................................................................6-7Figure 6-6 Front pallet..........................................................................................................................................6-7Figure 6-7 Installation holes for one cabinet (unit: mm)......................................................................................6-9Figure 6-8 Installation holes for a row of cabinets (unit: mm).............................................................................6-9Figure 6-9 Digging a pit.....................................................................................................................................6-10Figure 6-10 Drilling a hole.................................................................................................................................6-10Figure 6-11 Expansion bolt assembly................................................................................................................6-11Figure 6-12 Installing the expansion bolt assembly (1).....................................................................................6-11Figure 6-13 Installing the expansion bolt assembly (2).....................................................................................6-12Figure 6-14 Adjusting the depth of the support.................................................................................................6-13Figure 6-15 Installing the guide rails.................................................................................................................6-14Figure 6-16 Securing the support.......................................................................................................................6-15Figure 6-17 Insulating spacer.............................................................................................................................6-15Figure 6-18 Connecting the supports.................................................................................................................6-16Figure 6-19 Removing the wooden protection boards.......................................................................................6-17Figure 6-20 State of the lock of each door.........................................................................................................6-17Figure 6-21 Removing the short supporting beam.............................................................................................6-18Figure 6-22 Removing the air filter....................................................................................................................6-19Figure 6-23 Installing the cabinet.......................................................................................................................6-20Figure 6-24 Leveling the cabinet........................................................................................................................6-21Figure 6-25 Insulation test..................................................................................................................................6-22Figure 6-26 Placing the air filter in the original position...................................................................................6-23Figure 6-27 Special connecting pieces for combining cabinets.........................................................................6-23Figure 6-28 Reinstalling the connecting piece between N68E-22 cabinets.......................................................6-24Figure 6-29 Combining two N68E-22 cabinets.................................................................................................6-25Figure 6-30 Using a level bar to check the horizontal and vertical deviations..................................................6-26Figure 6-31 Combining N68E-22 and N68-22 cabinets....................................................................................6-27Figure 6-32 Installing the front pallet.................................................................................................................6-28Figure 6-33 Placing the ESD floor in the original position................................................................................6-29Figure 7-1 Installing the side panels for the N68E-22 cabinet.............................................................................7-4Figure 7-2 Installing the front and back doors for the N68E-22 cabinet..............................................................7-5Figure 7-3 Installing the PGND cables for the doors of the N68E-22 cabinet.....................................................7-7Figure 8-1 Row label............................................................................................................................................8-1Figure 8-2 Column label.......................................................................................................................................8-1

    FiguresBSC6900 GSM

    N68E-22 Cabinet Installation Guide

    x Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    Issue 02 (2011-05-19)

  • Tables

    Table 2-1 Technical specifications of the N68E-22 cabinet.................................................................................2-3Table 3-1 Common tools required for installing the N68E-22 cabinet................................................................3-8Table 6-1 Materials required for installing the N68E-22 cabinet on the ESD floor.............................................6-3Table 6-2 Two types of N6X series support.........................................................................................................6-6Table 7-1 Accessories to be installed for the N68E-22 cabinet............................................................................7-3Table 9-1 Checklist for the cabinet installation....................................................................................................9-1

    BSC6900 GSMN68E-22 Cabinet Installation Guide Tables

    Issue 02 (2011-05-19) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    xi

  • 1 Changes in the N68E-22 Cabinet InstallationGuide

    This chapter describes the changes in the N68E-22 Cabinet Installation Guide.

    02 (2011-05-19)This is the second commercial release of V900R012C01.Compared with issue 01 (2010-04-10), this issue does not include any new topics.Compared with issue 01 (2010-04-10), this issue incorporates the following changes:

    Content Description3.1 Unpacking the Cases andChecking the Items

    The procedures of unpacking the cases and checking theitems are modified.

    Compared with issue 01 (2010-04-10), this issue does not exclude any topics.

    01 (2010-04-10)This is the first commercial release of V900R012C01.Compared with issue 01 (2009-07-30) of V900R011C00, this issue does not include any newtopics.Compared with issue 01 (2009-07-30) of V900R011C00, this issue does not incorporate anychanges.Compared with issue 01 (2009-07-30) of V900R011C00, this issue does not exclude any topics.

    BSC6900 GSMN68E-22 Cabinet Installation Guide 1 Changes in the N68E-22 Cabinet Installation Guide

    Issue 02 (2011-05-19) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    1-1

  • 2 Overview of the N68E-22 CabinetThe N68E-22 cabinet features a modular design. It provides sufficient space for installingdevices such as subracks and power distribution box to facilitate capacity expansion andmaintenance.

    Appearance of the N68E-22 CabinetThe color of the N68E-22 cabinet surface is purple and gray. The N68E-22 cabinet can becategorized into two types: the single-door cabinet and the double-door cabinet. Figure 2-1shows the single-door N68E-22 cabinet. Figure 2-2 shows the double-door N68E-22 cabinet.

    BSC6900 GSMN68E-22 Cabinet Installation Guide 2 Overview of the N68E-22 Cabinet

    Issue 02 (2011-05-19) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    2-1

  • Figure 2-1 Appearance of the single-door N68E-22 cabinet

    2 Overview of the N68E-22 CabinetBSC6900 GSM

    N68E-22 Cabinet Installation Guide

    2-2 Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    Issue 02 (2011-05-19)

  • Figure 2-2 Appearance of the double-door N68E-22 cabinet

    Technical Specifications of the N68E-22 CabinetTable 2-1 describes the technical specifications of the N68E-22 cabinet.

    Table 2-1 Technical specifications of the N68E-22 cabinetItem ValueDimension (H x W x D) 2,200 mm (height) x 600 mm (width) x 800 mm

    (depth)Height of the available space 46 UWeight Rack: 59 kg; empty cabinet: 100 kg; full

    configuration: 320 kgPower supply Four routes of -48 V DC power supplyEMC l Meets the requirements of ETSI EN300 386

    l Meets the requirements of Council directive89/336/EEC

    BSC6900 GSMN68E-22 Cabinet Installation Guide 2 Overview of the N68E-22 Cabinet

    Issue 02 (2011-05-19) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    2-3

  • 3 Preparing for the N68E-22 CabinetInstallation

    About This Chapter

    Before installing the N68E-22 cabinet, you need to unpack the cases and check the items in thecases. Ensure that all the tools required for the installation are available.

    3.1 Unpacking the Cases and Checking the ItemsThis section describes how to unpack the cases and check the items in the cases to facilitatesubsequent cabinet installation.3.2 Tools Required for Installing the N68E-22 CabinetThe tools required for installing the N68E-22 cabinet are tools for measuring, marking, drilling,and fastening, small tools, auxiliary tools, meters, and some special tools.

    BSC6900 GSMN68E-22 Cabinet Installation Guide 3 Preparing for the N68E-22 Cabinet Installation

    Issue 02 (2011-05-19) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    3-1

  • 3.1 Unpacking the Cases and Checking the ItemsThis section describes how to unpack the cases and check the items in the cases to facilitatesubsequent cabinet installation.

    Prerequisitel Site preparation for the installation is complete.l The cases that contain the cabinets and components are delivered to the site.

    Contextl When carrying or placing the equipment, you should ensure that it does not collide with

    doors, walls, shelves, or other objects.l When transporting or installing the equipment, components, or parts, you should avoid

    touching their uncoated metal surfaces with sweaty or dirty gloves.

    ProcedureStep 1 Unload the cases.

    CAUTIONWhen unloading the cases, you should place the cases in sequence. Ensure that the labels on thecases face the same direction.

    Step 2 Check whether the number of cases on site matches the Packing List and whether the place ofdelivery is the same as the actual installation place.

    If... Then...

    The number of cases on site matches that in the Packing List Go to Step 3.

    The number of cases on site does not match that in the Packing List Go to Step 4.

    Step 3 Check the shockwatch labels on both sides of each case to determine whether each case has beenhit.

    If... Then...

    Both labels on a case are transparent, asshown by part 1 in Figure 3-1

    The case has not been hit. Go to Step 5.

    3 Preparing for the N68E-22 Cabinet InstallationBSC6900 GSM

    N68E-22 Cabinet Installation Guide

    3-2 Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    Issue 02 (2011-05-19)

  • If... Then...

    Any label on a case becomes red, as shownby part 2 in Figure 3-1

    The case has been hit by a force greater than50g (g is the standard gravity) duringtransportation. Such hit may damage thecabinet or boards in the case. To handle thisproblem, go to Step 4.

    Figure 3-1 Shockwatch label

    Step 4 Stop unpacking the cases. Ask the project supervisor to send the Cargo Problems Report that issigned by the customer to the local Huawei office within three days.

    Step 5 Check whether the cases are intact.

    If... Then...

    Any case is seriously damaged or soaked, Go to Step 6.

    The cases are intact, Go to Step 7.

    Step 6 Stop unpacking the cases, find out the causes, and contact the local Huawei office to furtherhandle the problem.

    CAUTIONTo protect the equipment and find out the causes, perform the following actions: Move theunpacked equipment indoors for proper storage, take photos of the storage environment, therusted or corroded equipment, packing cases, and packing materials. Keep these photos for futureverification. Store the packing cases and materials properly.

    BSC6900 GSMN68E-22 Cabinet Installation Guide 3 Preparing for the N68E-22 Cabinet Installation

    Issue 02 (2011-05-19) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    3-3

  • Step 7 Unpack the wooden cases.

    CAUTIONl Before unpacking, move the wooden cases into or close to the equipment room if enough

    space is available. This prevents damage to the cabinets during the transportation.l When you unpack the wooden cases, unpack the one containing the packing list first. Then,

    you can find items rapidly according to the names, codes, positions, and quantities in thePacking List.

    l The following description takes the wooden case that contains the cabinet as an example.The methods of unpacking other types of wooden cases are similar.

    1. Place the wooden case on the ground. Ensure that the side with the wooden frame faces thebottom.

    2. Use a wrench, a flat-head screwdriver, or a claw hammer to straighten the tongues on thefour sides of the cover, as shown in Figure 3-2.

    Figure 3-2 Straightening the tongue

    3. Remove the cover. If the wooden case contains a carton, take out the carton and then open

    it according to Step 8. If the wooden case contains a cabinet, go to the next step. See Figure3-3.

    3 Preparing for the N68E-22 Cabinet InstallationBSC6900 GSM

    N68E-22 Cabinet Installation Guide

    3-4 Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    Issue 02 (2011-05-19)

  • Figure 3-3 Removing the cover

    4. Use the same method to remove the side boards from the wooden case, as shown in Figure

    3-4.

    Figure 3-4 Removing side boards

    5. Erect the cabinet with the BOTTOM side down.

    BSC6900 GSMN68E-22 Cabinet Installation Guide 3 Preparing for the N68E-22 Cabinet Installation

    Issue 02 (2011-05-19) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    3-5

  • CAUTIONThis operation needs three to five installers. Prevent the cabinet from falling during theerection to avoid personnel injury.

    6. Remove the bottom of the case, that is, the side with the wooden frame.7. Remove the packing foam from the corners and edges of the cabinet.8. Remove the vacuum plastic bag.

    Step 8 Unpack the carton, as shown in Figure 3-5.

    Figure 3-5 Unpacking a carton

    1 Carton label 2 Strap 3 Pressure-sensitive tape4 Foam plate 5 Board label 6 Board

    1. Check the types and quantities of the items in the carton according to the carton label.2. Use diagonal pliers to cut the straps.3. Rip the tape along the joint seams by using the paper knife. Do not insert the knife too deep,

    or else the items may be damaged.4. Unpack the carton and take out the items.

    Step 9 Unpack boards.

    CAUTIONl Electronic components are extremely sensitive to static electricity. When unpacking the

    boards, wear an ESD wrist strap or a pair of ESD gloves properly.l The ESD bag contains desiccant to keep the bag dry. When taking the board from a cold dry

    place to a hot damp place, wait at least 30 minutes before unpacking. Otherwise, moisturecondensed on the board surface may damage the board.

    1. Check that no evident damage is on the board packages.2. Open the packages and ensure that the boards are in good condition. For any board problem,

    contact the order management engineer at the local Huawei office.

    3 Preparing for the N68E-22 Cabinet InstallationBSC6900 GSM

    N68E-22 Cabinet Installation Guide

    3-6 Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    Issue 02 (2011-05-19)

  • Step 10 Check whether the unpacked boards need to be installed immediately, and then proceedaccordingly.

    If... Then...

    The unpacked boards need to be installedimmediately,

    Place the boards on an ESD surface anddischarge the static electricity.

    The unpacked boards need not be installedimmediately,

    Pack the boards with the original materials andplace them in a cool dry place away from directsunlight or strong electromagnetic radiation.

    Step 11 Check the items. Check the items one by one according to the names, types, and quantitiesdescribed in the Packing List.The acceptance of items covers the following aspects:l Appearance: Check whether there is any visible defect, looseness, distortion, or damage;

    check whether the labels are legible and whether the nameplates and decorating plates areavailable and meet the requirements.

    l Integrity: Ensure that all the parts and accessories required for the installation of cabinets areavailable.

    l Computer: Check whether the monitor, keyboard, and mouse are intact and in good condition.l Board: Ensure that the type and quantity of the boards are consistent with those in the Packing

    List. Ensure that no printed circuit board is broken and no component is detached from theboard.NOTEThe project supervisor should take the major role in the inspection of equipment and components whoseelectric characteristics are likely to have been affected.

    If... Then...

    The packing list indicates "shortage ofarticles",

    Inform the order management engineer at thelocal office. Then, sign the Packing List togetherwith the customer.

    There are any short, wrong, extra, ordamaged items,

    Representatives of Huawei and the customermust sign the Unpacking Inspection Memo andPacking List. The installation supervisor must fillin the Cargo Problems Report and inform theorder management engineer at the local office inthree days. The installation supervisor must keepthe problematic items intact and the inner andouter packing intact for future investigation andverification.

    The shipment is intact, Place the inspected items by type. Then,representatives of Huawei and the customer signthe Packing List.

    ----End

    BSC6900 GSMN68E-22 Cabinet Installation Guide 3 Preparing for the N68E-22 Cabinet Installation

    Issue 02 (2011-05-19) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    3-7

  • 3.2 Tools Required for Installing the N68E-22 CabinetThe tools required for installing the N68E-22 cabinet are tools for measuring, marking, drilling,and fastening, small tools, auxiliary tools, meters, and some special tools.

    Common ToolsTable 3-1 lists the common tools required for installing the N68E-22 cabinet.

    Table 3-1 Common tools required for installing the N68E-22 cabinetType ToolMeasuring tools Long tape, 50 m ribbon tape, 5 m tape measure, 400 mm level bar, and

    level instrumentMarking tools Marking pen and pencilDrilling tools Percussion drill with matching bits of 6, 8, 10, 12, 14, and 16,

    and vacuum cleanerFastening tools Flat-head screwdrivers (M3 to M6)

    Phillips screwdrivers (M3 to M6)Adjustable wrenchSocket wrenches (M6, M8, M10, M12, M14, M17, M19)Double offset ring wrenches (M6, M8, M10, M12, M14, M17, M19)Combination wrenches (M17 and M19)Long-arm wrench

    Small tools Sharp-nose pliers, diagonal pliers, pliers, hand-held electric drill, file,handsaw, crowbar, rubber hammer, and claw hammer

    Auxiliary tools Paper knife, bellows, plumb, fork, ladder, heat blower, and insulating tape

    Special ToolsThe special tools required for installing the N68E-22 cabinet are the earth resistance meter, ESDwrist strap, ESD gloves, cable peeler, safety knife, and multi-purpose crimping pliers.

    MetersThe meters required for installing the N68E-22 cabinet are the multimeter and 500 Vmegohmmeter (for testing insulation resistance).

    NOTE

    The meters must be checked and certified.

    3 Preparing for the N68E-22 Cabinet InstallationBSC6900 GSM

    N68E-22 Cabinet Installation Guide

    3-8 Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    Issue 02 (2011-05-19)

  • 4 Installing the N68E-22 CabinetInstalling the N68E-22 cabinet involves installing the cabinet and the accessories. It also involvesattaching engineering labels to the cabinet.

    Prerequisitel The equipment is unpacked and accepted.l The cabinet is delivered to the site.l The tools required for the installation are available.

    ProcedureStep 1 Install the N68E-22 cabinet.

    If... Then...

    You install the N68E-22 cabinet on an ESDfloor,

    See 6 Installing the N68E-22 Cabinet on theESD Floor.

    You install the N68E-22 cabinet on aconcrete floor,

    See 5 Installing the N68E-22 Cabinet on theConcrete Floor.

    You install the N68E-22 cabinet on othertypes of floors,

    Contact Huawei for technical support.

    Step 2 Install the accessories for the N68E-22 cabinet by referring to 7 Installing the Accessories forthe N68E-22 Cabinet.

    Step 3 Attach the engineering labels to the cabinet by referring to 8 Attaching the Engineering Labelsto the Cabinets.----End

    BSC6900 GSMN68E-22 Cabinet Installation Guide 4 Installing the N68E-22 Cabinet

    Issue 02 (2011-05-19) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    4-1

  • 5 Installing the N68E-22 Cabinet on theConcrete Floor

    About This Chapter

    This chapter describes how to install the N68E-22 cabinet on the concrete floor.

    PrerequisiteThe materials required for installing the N68E-22 cabinet are available, as specified in 5.1Materials for Installing the N68E-22 Cabinet on the Concrete Floor.

    ProcedureStep 1 Position the N68E-22 cabinet on the concrete floor by referring to 5.3 Positioning the N68E-22

    Cabinet on the Concrete Floor.Step 2 Secure the N68E-22 cabinet on the concrete floor by referring to 5.4 Securing the N68E-22

    Cabinet on the Concrete Floor.Step 3 Test the insulation of the N68E-22 cabinet by referring to 5.5 Testing the Insulation of the

    N68E-22 Cabinet.Step 4 Combine the N68E-22 cabinets by referring to 5.6 Combining the N68E-22 Cabinets.

    ----End5.1 Materials for Installing the N68E-22 Cabinet on the Concrete FloorThe N68E-22 cabinet can be directly installed on the concrete floor, so other types of materialsare not required. Ensure that you have arranged sufficient N68E-22 cabinets as required.5.2 Template Files for Installing the N68E-22 CabinetThe template files for installing the N68E-22 cabinet consist of the equipment room floor planand the marking template. The equipment room floor plan is used to determine the installationposition of the N68E-22 cabinet in the equipment room. The marking template is used todetermine the drilling positions. The installation of the N68E-22 cabinet on the concrete floorand that of the N68E-22 cabinet on the ESD floor use the same equipment room floor plan butdifferent marking templates.

    BSC6900 GSMN68E-22 Cabinet Installation Guide 5 Installing the N68E-22 Cabinet on the Concrete Floor

    Issue 02 (2011-05-19) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    5-1

  • 5.3 Positioning the N68E-22 Cabinet on the Concrete FloorPositioning the N68E-22 cabinet on the concrete floor involves the following steps: determiningcabinet positions, marking the positions, drilling holes, and installing expansion bolt assemblies.5.4 Securing the N68E-22 Cabinet on the Concrete FloorThis section describes how to secure the N68E-22 cabinet on the concrete floor.5.5 Testing the Insulation of the N68E-22 CabinetThis section describes how to test the insulation of the N68E-22 cabinet and how to insulate itfrom the ground.5.6 Combining the N68E-22 CabinetsThis section describes how to combine the N68E-22 cabinets. When combining an N68E-22cabinet with another cabinet, you should use connecting pieces to secure them. The combiningof N68E-22 cabinets can be classified into the following: combining of two N68E-22 cabinetsand combining of N68E-22 and N68-22 cabinets.

    5 Installing the N68E-22 Cabinet on the Concrete FloorBSC6900 GSM

    N68E-22 Cabinet Installation Guide

    5-2 Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    Issue 02 (2011-05-19)

  • 5.1 Materials for Installing the N68E-22 Cabinet on theConcrete Floor

    The N68E-22 cabinet can be directly installed on the concrete floor, so other types of materialsare not required. Ensure that you have arranged sufficient N68E-22 cabinets as required.

    5.2 Template Files for Installing the N68E-22 CabinetThe template files for installing the N68E-22 cabinet consist of the equipment room floor planand the marking template. The equipment room floor plan is used to determine the installationposition of the N68E-22 cabinet in the equipment room. The marking template is used todetermine the drilling positions. The installation of the N68E-22 cabinet on the concrete floorand that of the N68E-22 cabinet on the ESD floor use the same equipment room floor plan butdifferent marking templates.

    Equipment Room Floor PlanThe Equipment Room Floor Plan is provided by the customer or the site survey personnel.Figure 5-1 shows an example of the Equipment Room Floor Plan.

    BSC6900 GSMN68E-22 Cabinet Installation Guide 5 Installing the N68E-22 Cabinet on the Concrete Floor

    Issue 02 (2011-05-19) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    5-3

  • Figure 5-1 Equipment room floor plan (unit: mm)

    NOTE

    See Figure 5-1. The requirements for the installation position of the N68E-22 cabinet are as follows:l The distance between two rows of cabinets should be at least 1,000 mm.l The distance between the wall and the cabinet side that is the closest to the wall should be at least

    800 mm.l The distance between the wall and the row that is the closest to the wall should be at least 800 mm

    (for double-door cabinets) and 1,000 mm (for single-door cabinets).l The width of the aisles in the equipment room should be at least 1,000 mm.

    Marking TemplateThe marking template is delivered with the cabinet. The marking template for installing theN68E-22 cabinet on the concrete floor is different from the marking template for installing theN68E-22 cabinet on the ESD floor. See Figure 5-2 and Figure 5-3.

    5 Installing the N68E-22 Cabinet on the Concrete FloorBSC6900 GSM

    N68E-22 Cabinet Installation Guide

    5-4 Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    Issue 02 (2011-05-19)

  • Figure 5-2 Marking template for installing the N68E-22 cabinet on the concrete floor (unit: mm)

    Figure 5-3 Marking template for installing the N68E-22 cabinet on the ESD floor (unit: mm)

    5.3 Positioning the N68E-22 Cabinet on the Concrete FloorPositioning the N68E-22 cabinet on the concrete floor involves the following steps: determiningcabinet positions, marking the positions, drilling holes, and installing expansion bolt assemblies.

    Prerequisitel The components required for the positioning are available. The required component is the

    M12x60 expansion bolt assembly.l The materials required for the positioning are available. The required materials are the

    marking template and Equipment Room Floor Plan.l The tools required for the positioning are available. The required tools are the tape measure,

    marking pen, percussion drill with 16 drill bit, vacuum cleaner, and hammer (for example,claw hammer).

    BSC6900 GSMN68E-22 Cabinet Installation Guide 5 Installing the N68E-22 Cabinet on the Concrete Floor

    Issue 02 (2011-05-19) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    5-5

  • Contextl Line drawing and hole drilling are the primary tasks for cabinet installation as imprecise

    drawing or drilling may hamper the installation. Therefore, it is important to ensure theirquality.

    l Before marking cabinet positions and drilling holes, check the installation position of theequipment, such as cable racks, in the equipment room for easy cabling.

    l The Equipment Room Floor Plan is provided by the customer or the site survey personnel.

    ProcedureStep 1 Ensure that the Equipment Room Floor Plan is in accordance with the requirements for installing

    the N68E-22 cabinet by referring to 5.2 Template Files for Installing the N68E-22 Cabinet.Step 2 Use a tape measure to determine the cabinet positions based on the dimensions specified in the

    Equipment Room Floor Plan.Step 3 Determine the positions of the holes for the expansion bolt assemblies on the concrete floor

    based on the installation position of the cabinet.You can use the marking template or tape measure to determine the positions of the holes forthe expansion bolt assemblies on the concrete floor. The marking template is made of paper andis prone to deformation. Before using the marking template, check whether it is deformed basedon the dimensions of marking template specified in 5.2 Template Files for Installing theN68E-22 Cabinet.

    If... Then...

    The marking template is one of the accessories delivered on site and is notdeformed,

    Go to Step 4.

    The marking template is not one of the accessories delivered on site or isdeformed,

    Go to Step 5.

    Step 4 Use the marking plate to determine the positions of the holes for the expansion bolt assemblies.1. As shown in Figure 5-4 or Figure 5-5, use measuring and marking instruments to measure

    and mark the start points for the front of a row of cabinets. From each start point, mark thebenchmark lines in the cabinet arrangement direction.

    2. Place the marking template on the floor. Ensure that the semicircle notch of the templateindicates the front of the cabinet and the edges of the template align with the benchmarklines.

    3. Mark the positions of the holes (four holes for each cabinet) for expansion bolts on the floorby using the template.

    4. After all the hole positions are marked, ensure that the distance between the holes isaccurate.

    5. Go to Step 6.Step 5 If the marking template cannot be used on site, use the tape measure to determine the positions

    of the holes for the expansion bolt assemblies.1. As shown in Figure 5-4 or Figure 5-5, use measuring and marking instruments to measure

    and mark two straight lines with 687 mm wide spacing, and ensure that the lines are parallelwith the front of the cabinet.

    5 Installing the N68E-22 Cabinet on the Concrete FloorBSC6900 GSM

    N68E-22 Cabinet Installation Guide

    5-6 Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    Issue 02 (2011-05-19)

  • Figure 5-4 Installation holes for one cabinet (unit: mm)

    Figure 5-5 Installation holes for a row of cabinets (unit: mm)

    2. As shown in Figure 5-4 or Figure 5-5, determine the position of hole for the first expansion

    bolt assembly on each of the straight lines. Taking the hole as the benchmark point, markthe installation holes for other expansion bolt assemblies in succession.

    3. After all the hole positions are marked, ensure that the distance between the holes isaccurate.

    Step 6 Drill the holes.

    BSC6900 GSMN68E-22 Cabinet Installation Guide 5 Installing the N68E-22 Cabinet on the Concrete Floor

    Issue 02 (2011-05-19) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    5-7

  • CAUTIONl The concrete floor should not be penetrated. Therefore, you should confirm the thickness of

    the concrete floor before drilling holes. For some types of concrete floors on which the drillingis not suitable, you should consult the architectural engineers and get their permission beforedrilling holes.

    l Before drilling holes, you should take dustproof measures on the electronic equipment in theequipment room. You should use a vacuum cleaner to remove the dust during the drilling.Before removing the dustproof cover from the electronic equipment, you should clean up thepieces of concrete that have accumulated during the drilling.

    l You must wear safety goggles during the drilling to protect your eyes from the dust.l While drilling holes, you must hold the drill stock firmly. You must keep the drill bit vertical

    to the floor to protect the floor from being damaged or the holes from being slanted.

    1. Dig a pit by using a chisel to help hold the drill bit to the floor, as shown in Figure 5-6.

    Figure 5-6 Digging a pit

    2. Use a percussion drill to drill holes at the marked places on the concrete floor. The depth

    of each hole must range from 52 mm to 60 mm. All the holes must have the same depth.Select a 16 drill bit in appropriate length. See Figure 5-7.

    Figure 5-7 Drilling a hole

    5 Installing the N68E-22 Cabinet on the Concrete FloorBSC6900 GSM

    N68E-22 Cabinet Installation Guide

    5-8 Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    Issue 02 (2011-05-19)

  • 3. Ensure that the depth of each hole ranges from 52 mm to 60 mm and that the holes are not

    slanting. If the depth of the hole is not appropriate or if the hole is slanting, re-drill the hole.If the slanting hole cannot be corrected, stop using the hole.

    4. Remove the dust inside and outside the holes by using a vacuum cleaner.Step 7 Install the expansion bolt assemblies.

    Figure 5-8 shows an expansion bolt assembly.

    Figure 5-8 Expansion bolt assembly

    1 Bolt 2 Spring washer 3 Flat washer 4 Expansion tube5 Nut 6 Guiding slot 7 Guiding rib

    1. Measure the distance between the holes. If the distance does not meet the specifications,

    reposition and drill new holes.2. Insert the guiding rib on the nut into the guiding slot on the expansion tube, and then screw

    the bolt slightly to ensure that the guiding rib does not move out from the guiding slot. Seepart 1 of Figure 5-9.

    3. Insert the expansion tube and the nut into the hole vertically, and then use a rubber hammerto strike the expansion tube until it is completely buried in the hole, as shown in part 2 ofFigure 5-9.

    Figure 5-9 Installing the expansion bolt assembly (1)

    BSC6900 GSMN68E-22 Cabinet Installation Guide 5 Installing the N68E-22 Cabinet on the Concrete Floor

    Issue 02 (2011-05-19) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    5-9

  • 4. Pre-tighten the expansion bolt clockwise so that the nut and the expansion tube do not get

    loose easily. See part 1 of Figure 5-10.5. Unscrew the expansion bolt counterclockwise and then remove the spring washer and flat

    washer. Keep them for future use. See part 2 of Figure 5-10.

    Figure 5-10 Installing the expansion bolt assembly (2)

    ----End

    5.4 Securing the N68E-22 Cabinet on the Concrete FloorThis section describes how to secure the N68E-22 cabinet on the concrete floor.

    Prerequisitel The components required for the installation are available. The required component is the

    N68E-22 cabinet.l The materials required for the installation are available. The required materials are the

    insulating pads, flat washers 12, spring washers 12, adjusting pads (optional), and M12x60expansion bolt assemblies.

    l The tools required for the installation are available. The required tools are the forklift, levelbar, torque wrench, socket wrench, and Phillips screwdriver.

    Context

    CAUTIONThe gravity center of the cabinet is high. Therefore, do not lift or push the cabinet alone. Movinga cabinet requires at least two persons and a forklift, so as to ensure personnel safety andequipment safety.

    5 Installing the N68E-22 Cabinet on the Concrete FloorBSC6900 GSM

    N68E-22 Cabinet Installation Guide

    5-10 Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    Issue 02 (2011-05-19)

  • ProcedureStep 1 Remove the wooden protection boards from the front and back of the cabinet.Step 2 Remove the four wooden protection boards from both the left and right parts of the rack. Pull

    down the hook pin at the upper part of both the front and back doors of the cabinet, and thenremove both doors. Store the doors for future use. See Figure 5-11.

    Figure 5-11 Removing the wooden protection boards

    NOTE

    When storing the doors, you should ensure that they are unlocked. Therefore, the lock rod at the lower partof each door does not protrude, thus preventing the lock rod from deformation. See Figure 5-12.

    Figure 5-12 State of the lock of each door

    BSC6900 GSMN68E-22 Cabinet Installation Guide 5 Installing the N68E-22 Cabinet on the Concrete Floor

    Issue 02 (2011-05-19) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    5-11

  • Step 3 Remove the reinforced plate from the cabinet front and two short supporting beams from the

    left and right. See Figure 5-13.

    Figure 5-13 Removing the reinforced plate and short supporting beams

    Step 4 Unscrew the two M6x12 screws from the air filter, as shown in part 1 of Figure 5-14. Remove

    the air filter, as shown in part 2 of Figure 5-14.

    5 Installing the N68E-22 Cabinet on the Concrete FloorBSC6900 GSM

    N68E-22 Cabinet Installation Guide

    5-12 Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    Issue 02 (2011-05-19)

  • Figure 5-14 Removing the air filter

    Step 5 Place the cabinet in the specified position. Align the installation holes in the cabinet with the

    holes on the floor.Step 6 Add the spring washer, flat washer, and insulating tube to each of the four expansion bolts. Then,

    insert each expansion bolt into the expansion tube and pretighten the expansion tube and the nut.See Figure 5-15.

    Step 7 Below the cabinet, push two insulating spacers from both the front and back sides. Ensure thatthe notch faces the inner side and is wedged in the expansion bolt. Align the installation holesof each insulating spacer with the corresponding expansion bolt holes. See Figure 5-15.

    BSC6900 GSMN68E-22 Cabinet Installation Guide 5 Installing the N68E-22 Cabinet on the Concrete Floor

    Issue 02 (2011-05-19) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    5-13

  • Figure 5-15 Securing the cabinet

    1 M12x60 bolt 2 Spring washer 12 3 Flat washer4 Insulating tube 5 Insulating spacer

    Step 8 Level the cabinet. Use a level bar to check the levelness of the cabinet. If the cabinet is not level,

    use a socket wrench to adjust the anchor bolt (adjustable range: 0-10 mm) of the cabinet andensure that the cabinet is level. See Figure 5-16.

    Figure 5-16 Leveling the cabinet

    1 Anchor bolt 2 Fixing bolt

    5 Installing the N68E-22 Cabinet on the Concrete FloorBSC6900 GSM

    N68E-22 Cabinet Installation Guide

    5-14 Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    Issue 02 (2011-05-19)

  • Step 9 Use the torque wrench to secure the four fixing bolts and tighten them to 45 Nm.

    ----End

    5.5 Testing the Insulation of the N68E-22 CabinetThis section describes how to test the insulation of the N68E-22 cabinet and how to insulate itfrom the ground.

    PrerequisiteThe tool required for the insulation test is available. The required tool is the multimeter.

    ProcedureStep 1 Set the multimeter to the megohm scale.Step 2 Measure the resistance between the M12x60 expansion bolt and the cabinet.

    If... Then...

    The resistance is greater than or equal to fivemegohms,

    Go to Step 7.

    The resistance is smaller than five megohms, The cabinet is not insulated from the ground.Go to Step 3.

    BSC6900 GSMN68E-22 Cabinet Installation Guide 5 Installing the N68E-22 Cabinet on the Concrete Floor

    Issue 02 (2011-05-19) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    5-15

  • Figure 5-17 Insulation test

    Step 3 Remove all the installation parts between the N68E-22 cabinet and the ground.Step 4 Ensure that the insulation parts are not missing or damaged.Step 5 Secure the cabinet again.Step 6 Repeat Step 1 to test the insulation again.Step 7 Use two M6x12 screws to fix the air filter and ensure that it is in the original position. See Figure

    5-18.

    5 Installing the N68E-22 Cabinet on the Concrete FloorBSC6900 GSM

    N68E-22 Cabinet Installation Guide

    5-16 Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    Issue 02 (2011-05-19)

  • Figure 5-18 Placing the air filter in the original position

    ----End

    5.6 Combining the N68E-22 CabinetsThis section describes how to combine the N68E-22 cabinets. When combining an N68E-22cabinet with another cabinet, you should use connecting pieces to secure them. The combiningof N68E-22 cabinets can be classified into the following: combining of two N68E-22 cabinetsand combining of N68E-22 and N68-22 cabinets.

    PrerequisiteThe tools required for the installation are available. The required tools are the wrench andclimbing ladder.

    ContextIf two N68E-22 cabinets are to be combined, the connecting pieces are already installed on topof the cabinets and are delivered with the cabinets. If N68E-22 and N68-22 cabinets are to becombined, special connecting pieces for combining cabinets are required. Figure 5-19 showsthe special connecting pieces for combining cabinets.

    Figure 5-19 Special connecting pieces for combining cabinets

    BSC6900 GSMN68E-22 Cabinet Installation Guide 5 Installing the N68E-22 Cabinet on the Concrete Floor

    Issue 02 (2011-05-19) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    5-17

  • Procedurel Combining Two N68E-22 Cabinets

    1. Remove the connecting pieces from the column inside the N68E-22 cabinet, rotateeach of them by 180 degrees, and then reinstall them, as shown in Figure 5-20.

    Figure 5-20 Reinstalling the connecting piece between N68E-22 cabinets

    2. Use M8x30 bolts to connect the connecting pieces of the adjacent cabinets together.

    See part 1 of Figure 5-21.

    5 Installing the N68E-22 Cabinet on the Concrete FloorBSC6900 GSM

    N68E-22 Cabinet Installation Guide

    5-18 Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    Issue 02 (2011-05-19)

  • Figure 5-21 Combining two N68E-22 cabinets

    3. Remove the two connecting pieces from the front and back doorheads of the adjacent

    cabinets. Then, reinstall the connecting pieces, as shown in part 2 of Figure 5-21 .4. At the bottom of the combined cabinets and in front of the column, use a level bar to

    check whether the horizontal and vertical deviations of the row of cabinets meet thespecifications, as shown in Figure 5-22. If the cabinet is not level, use a socket wrenchto adjust the leveling foot.

    BSC6900 GSMN68E-22 Cabinet Installation Guide 5 Installing the N68E-22 Cabinet on the Concrete Floor

    Issue 02 (2011-05-19) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    5-19

  • Figure 5-22 Using a level bar to check the horizontal and vertical deviations

    l Combining N68E-22 and N68-22 Cabinets

    1. Remove the connecting pieces from the column inside the N68E-22 cabinet, rotateeach of them by 180 degrees, and then reinstall them, as shown in Figure 5-20.

    2. Remove the connecting piece from the middle top of the N68-22 cabinet, as shown inpart 1 of Figure 5-23. Keep the removed M6x16 screws for future use.

    5 Installing the N68E-22 Cabinet on the Concrete FloorBSC6900 GSM

    N68E-22 Cabinet Installation Guide

    5-20 Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    Issue 02 (2011-05-19)

  • Figure 5-23 Combining N68E-22 and N68-22 cabinets

    3. Fix the special connecting pieces to the N68-22 cabinet, as shown in part 1 of Figure

    5-23 .4. Use M8x30 bolts to fix the special connecting pieces of the N68-22 cabinet and the

    connecting pieces at the column in the N68E-22 cabinet, as shown in part 1 of Figure5-23 .

    5. Remove the two connecting pieces from the front and back doorheads of the adjacentcabinets. Then, reinstall the connecting pieces, as shown in part 2 of Figure 5-23 .

    6. At the bottom of the combined cabinets and in front of the column, use a level bar tocheck whether the horizontal and vertical deviations of the row of cabinets meet thespecifications. If the cabinet is not level, use a socket wrench to adjust the levelingfoot of the N68E-22 cabinet.

    ----End

    BSC6900 GSMN68E-22 Cabinet Installation Guide 5 Installing the N68E-22 Cabinet on the Concrete Floor

    Issue 02 (2011-05-19) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    5-21

  • 6 Installing the N68E-22 Cabinet on the ESDFloor

    About This Chapter

    This chapter describes how to install the N68E-22 cabinet on the ESD floor by using the N6Xseries support assembly.

    PrerequisiteThe materials required for installing the N68E-22 cabinet are available, as specified in 6.1Materials for Installing the N68E-22 Cabinet on the ESD Floor.

    ProcedureStep 1 Position the N68E-22 cabinet on the ESD floor by referring to 6.4 Positioning the N68E-22

    Cabinet on the ESD Floor.Step 2 Install the N6X series support and the guide rail by referring to 6.5 Installing the N6X Series

    Support and the Guide Rails.Step 3 Secure the N68E-22 cabinet on the ESD floor by referring to 6.6 Securing the N68E-22 Cabinet

    on the ESD Floor.Step 4 Test the insulation of the N68E-22 cabinet by referring to 6.7 Testing the Insulation of the

    N68E-22 Cabinet.Step 5 Combine the N68E-22 cabinets by referring to 6.8 Combining the N68E-22 Cabinets.Step 6 Place the ESD floor in the original position by referring to 6.9 Placing the ESD Floor in the

    Original Position.----End6.1 Materials for Installing the N68E-22 Cabinet on the ESD FloorThe materials for installing the N68E-22 cabinet on the ESD floor consist of the N68E-22 cabinetand N6X series support assembly.6.2 Template Files for Installing the N68E-22 Cabinet

    BSC6900 GSMN68E-22 Cabinet Installation Guide 6 Installing the N68E-22 Cabinet on the ESD Floor

    Issue 02 (2011-05-19) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    6-1

  • The template files for installing the N68E-22 cabinet consist of the equipment room floor planand the marking template. The equipment room floor plan is used to determine the installationposition of the N68E-22 cabinet in the equipment room. The marking template is used todetermine the drilling positions. The installation of the N68E-22 cabinet on the concrete floorand that of the N68E-22 cabinet on the ESD floor use the same equipment room floor plan butdifferent marking templates.6.3 N6X Series Support AssemblyThe N6X series support assembly consists of N6X series support, guide rail, and front pallet.To support and secure the cabinet, you need to use bolts to fix the guide rail, support, and cabinettogether and use the front pallet to support the ESD floor before and after the cabinet.6.4 Positioning the N68E-22 Cabinet on the ESD FloorPositioning the N68E-22 cabinet on the ESD floor involves the following steps: determiningcabinet positions, marking the positions, drilling holes, and installing expansion bolt assemblies.6.5 Installing the N6X Series Support and the Guide RailsThis section describes how to install the N6X series support and the guide rails.6.6 Securing the N68E-22 Cabinet on the ESD FloorUpon delivery, the N68E-22 cabinet is equipped with the front and back doors. Therefore, youshould remove the doors first and then secure the cabinet on the N6X series support.6.7 Testing the Insulation of the N68E-22 CabinetThis section describes how to test the insulation of the N68E-22 cabinet and how to insulate itfrom the ground.6.8 Combining the N68E-22 CabinetsThis section describes how to combine the N68E-22 cabinets. When combining an N68E-22cabinet with another cabinet, you should use connecting pieces to secure them. The combiningof N68E-22 cabinets can be classified into the following: combining of two N68E-22 cabinetsand combining of N68E-22 and N68-22 cabinets.6.9 Placing the ESD Floor in the Original PositionAfter securing the N68E-22 cabinet on the ESD floor, you need to install the front pallet tosupport the ESD floor around the cabinet and place the ESD floor around the cabinet in theoriginal position.

    6 Installing the N68E-22 Cabinet on the ESD FloorBSC6900 GSM

    N68E-22 Cabinet Installation Guide

    6-2 Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    Issue 02 (2011-05-19)

  • 6.1 Materials for Installing the N68E-22 Cabinet on the ESDFloor

    The materials for installing the N68E-22 cabinet on the ESD floor consist of the N68E-22 cabinetand N6X series support assembly.Table 6-1 lists the materials required for installing the N68E-22 cabinet on the ESD floor.

    Table 6-1 Materials required for installing the N68E-22 cabinet on the ESD floorName Sub-Item QuantityN68E-22 cabinet - Depends on the site

    requirementsN6X series support assembly Support Twice the number of cabinets

    Guide rail Twice the number of cabinetsFront pallet Twice the number of cabinets

    6.2 Template Files for Installing the N68E-22 CabinetThe template files for installing the N68E-22 cabinet consist of the equipment room floor planand the marking template. The equipment room floor plan is used to determine the installationposition of the N68E-22 cabinet in the equipment room. The marking template is used todetermine the drilling positions. The installation of the N68E-22 cabinet on the concrete floorand that of the N68E-22 cabinet on the ESD floor use the same equipment room floor plan butdifferent marking templates.

    Equipment Room Floor PlanThe Equipment Room Floor Plan is provided by the customer or the site survey personnel.Figure 6-1 shows an example of the Equipment Room Floor Plan.

    BSC6900 GSMN68E-22 Cabinet Installation Guide 6 Installing the N68E-22 Cabinet on the ESD Floor

    Issue 02 (2011-05-19) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    6-3

  • Figure 6-1 Equipment room floor plan (unit: mm)

    NOTE

    See Figure 6-1. The requirements for the installation position of the N68E-22 cabinet are as follows:l The distance between two rows of cabinets should be at least 1,000 mm.l The distance between the wall and the cabinet side that is the closest to the wall should be at least

    800 mm.l The distance between the wall and the row that is the closest to the wall should be at least 800 mm

    (for double-door cabinets) and 1,000 mm (for single-door cabinets).l The width of the aisles in the equipment room should be at least 1,000 mm.

    Marking TemplateThe marking template is delivered with the cabinet. The marking template for installing theN68E-22 cabinet on the concrete floor is different from the marking template for installing theN68E-22 cabinet on the ESD floor. See Figure 6-2 and Figure 6-3.

    6 Installing the N68E-22 Cabinet on the ESD FloorBSC6900 GSM

    N68E-22 Cabinet Installation Guide

    6-4 Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    Issue 02 (2011-05-19)

  • Figure 6-2 Marking template for installing the N68E-22 cabinet on the concrete floor (unit: mm)

    Figure 6-3 Marking template for installing the N68E-22 cabinet on the ESD floor (unit: mm)

    6.3 N6X Series Support AssemblyThe N6X series support assembly consists of N6X series support, guide rail, and front pallet.To support and secure the cabinet, you need to use bolts to fix the guide rail, support, and cabinettogether and use the front pallet to support the ESD floor before and after the cabinet.

    N6X Series SupportThe support is used to raise the cabinets so that the installation personnel can easily lay the floorand route the cables in the equipment room. Figure 6-4 shows the N6X series support.

    BSC6900 GSMN68E-22 Cabinet Installation Guide 6 Installing the N68E-22 Cabinet on the ESD Floor

    Issue 02 (2011-05-19) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    6-5

  • Figure 6-4 N6X series support

    1 Half support 2 Expansion lever 3 M8 screw assembly connecting thehalf support and the expansion lever

    4 Holes for connecting the supportand the guide rail

    5 Holes for connecting the supportand the front pallet

    6 Height scale of the ESD floor

    7 Height locking bolt 8 Hole for connecting the supportand the ground

    The length of the N6X series support can be adjusted by adjusting the length of the expansionlever.There are two types of N6X series support: height-adjustable and height-fixed. For details, seeTable 6-2.

    Table 6-2 Two types of N6X series supportType ESD Floor Height RemarksI Height-adjustable

    296-465 mm l Stepless regulation of height canbe performed within the range.

    l The height of the ESD floorrefers to the distance betweenthe concrete floor and the uppersurface of the ESD floor.

    II Height-fixed Customized according to the heightof the ESD floor

    Mainly applicable to the scenariowhere the floor is very high or verylow, with the minimum floor heightof 100 mm

    Guide RailThe guide rail is used to connect the cabinet and the support. Figure 6-5 shows the guide rail.

    6 Installing the N68E-22 Cabinet on the ESD FloorBSC6900 GSM

    N68E-22 Cabinet Installation Guide

    6-6 Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    Issue 02 (2011-05-19)

  • Figure 6-5 Guide rail

    1 Holes for connecting the cabinet 2 Holes for connecting the support

    Front PalletThe front pallet is used to support the floor around the cabinet. Figure 6-6 shows the front pallet.

    Figure 6-6 Front pallet

    1 Holes for connecting the support

    6.4 Positioning the N68E-22 Cabinet on the ESD FloorPositioning the N68E-22 cabinet on the ESD floor involves the following steps: determiningcabinet positions, marking the positions, drilling holes, and installing expansion bolt assemblies.

    Prerequisitel The components required for the positioning are available. The required components are

    the M12x60 expansion bolt assemblies.l The materials required for the positioning are available. The required materials are the

    marking template and Equipment Room Floor Plan.l The tools required for the positioning are available. The required tools are the tape measure,

    panel lifter, electric saw, marking pen, percussion drill with 16 drill bit, vacuum cleaner,safety goggles, dustproof cover for electronic equipment, and rubber hammer.

    BSC6900 GSMN68E-22 Cabinet Installation Guide 6 Installing the N68E-22 Cabinet on the ESD Floor

    Issue 02 (2011-05-19) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    6-7

  • ProcedureStep 1 Ensure that the Equipment Room Floor Plan is in accordance with the requirements for installing

    the N68E-22 cabinet by referring to 6.2 Template Files for Installing the N68E-22 Cabinet.Step 2 Use a tape measure to determine the cabinet positions based on the dimensions specified in the

    Equipment Room Floor Plan.Step 3 Use the panel lifter to remove the ESD floor in the installation area.Step 4 Remove the supporting pieces of the ESD floor.Step 5 Clean the installation area.Step 6 Choose a method of determining the positions of the holes for the expansion bolt assemblies on

    the concrete floor.You can use the marking template or tape measure to determine the positions of the holes forthe expansion bolt assemblies on the concrete floor. The marking template is made of paper andis prone to deformation. Before using the marking template, check whether it is deformed basedon the dimensions of marking template specified in 6.2 Template Files for Installing theN68E-22 Cabinet.

    If... Then...

    The marking template is one of the accessories delivered on site and is notdeformed,

    Go to Step 7.

    The marking template is not one of the accessories delivered on site or isdeformed,

    Go to Step 8.

    Step 7 Use the marking plate to determine the positions of the holes for the expansion bolt assemblies.1. As shown in Figure 6-7 or Figure 6-8, use measuring and marking instruments to measure

    and mark the start points for the front of a row of cabinets. From each start point, mark thebenchmark lines in the cabinet arrangement direction.

    2. Place the marking template on the floor. Ensure that the semicircle notch of the templateindicates the front of the cabinet and the edges of the template align with the benchmarklines.

    3. Mark the positions of the holes (four holes for each cabinet) for expansion bolts on the floorby using the template.

    4. After all the hole positions are marked, ensure that the distance between the holes isaccurate.

    5. Go to Step 9.Step 8 Use the tape measure to determine the positions of the holes for the expansion bolt assemblies.

    1. As shown in Figure 6-7 or Figure 6-8, use measuring and marking instruments to measureand mark two straight lines with 704 mm wide spacing, and ensure that the lines are parallelwith the front of the cabinet.

    6 Installing the N68E-22 Cabinet on the ESD FloorBSC6900 GSM

    N68E-22 Cabinet Installation Guide

    6-8 Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    Issue 02 (2011-05-19)

  • Figure 6-7 Installation holes for one cabinet (unit: mm)

    Figure 6-8 Installation holes for a row of cabinets (unit: mm)

    2. As shown in Figure 6-7 or Figure 6-8, determine the position of hole for the first expansion

    bolt assembly on each of the straight lines. Taking the hole as the benchmark point, markthe installation holes for other expansion bolt assemblies in succession.

    3. After all the hole positions are marked, ensure that the distance between the holes isaccurate.

    Step 9 Drill the holes.

    BSC6900 GSMN68E-22 Cabinet Installation Guide 6 Installing the N68E-22 Cabinet on the ESD Floor

    Issue 02 (2011-05-19) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    6-9

  • CAUTIONl The concrete floor should not be penetrated. Therefore, you should confirm the thickness of

    the concrete floor before drilling holes. For some types of concrete floors on which the drillingis not suitable, you should consult the architectural engineers and get their permission beforedrilling holes.

    l Before drilling holes, you should take dustproof measures on the electronic equipment in theequipment room. You should use a vacuum cleaner to remove the dust during the drilling.Before removing the dustproof cover from the electronic equipment, you should clean up thepieces of concrete that have accumulated during the drilling.

    l You must wear safety goggles during the drilling to protect your eyes from the dust.l While drilling holes, you must hold the drill stock firmly. You must keep the drill bit vertical

    to the floor to protect the floor from being damaged or the holes from being slanted.

    1. Dig a pit by using a chisel to help hold the drill bit to the floor, as shown in Figure 6-9.

    Figure 6-9 Digging a pit

    2. Use a percussion drill to drill holes at the marked places on the concrete floor. The depth

    of each hole must range from 52 mm to 60 mm. All the holes must have the same depth.Select a 16 drill bit. See Figure 6-10.

    Figure 6-10 Drilling a hole

    6 Installing the N68E-22 Cabinet on the ESD FloorBSC6900 GSM

    N68E-22 Cabinet Installation Guide

    6-10 Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    Issue 02 (2011-05-19)

  • 3. Ensure that the depth of each hole ranges from 52 mm to 60 mm and that the holes are not

    slanting. If the depth of the hole is not appropriate or if the hole is slanting, re-drill the hole.If the slanting hole cannot be corrected, stop using the hole.

    4. Remove the dust inside and outside the holes by using a vacuum cleaner.Step 10 Install the expansion bolt assemblies.

    Figure 6-11 shows an expansion bolt assembly.

    Figure 6-11 Expansion bolt assembly

    1 Bolt 2 Spring washer 3 Flat washer 4 Expansion tube5 Nut 6 Guiding slot 7 Guiding rib

    1. Measure the distance between the holes. If the position of a hole is not correct, re-position

    and drill a new hole.2. Insert the guiding rib on the nut into the guiding slot on the expansion tube, and then screw

    the bolt slightly to ensure that the guiding rib does not move out from the guiding slot. Seepart 1 of Figure 6-12.

    3. Insert the expansion tube and the nut into the hole vertically, and then use a rubber hammerto strike the expansion tube until it is completely buried in the hole, as shown in part 2 ofFigure 6-12.

    Figure 6-12 Installing the expansion bolt assembly (1)

    BSC6900 GSMN68E-22 Cabinet Installation Guide 6 Installing the N68E-22 Cabinet on the ESD Floor

    Issue 02 (2011-05-19) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    6-11

  • 4. Pre-tighten the expansion bolt clockwise so that the nut and the expansion tube do not get

    loose easily. See part 1 of Figure 6-13.5. Unscrew the expansion bolt counterclockwise and then remove the spring washer and flat

    washer. Keep them for future use. See part 2 of Figure 6-13.

    Figure 6-13 Installing the expansion bolt assembly (2)

    ----End

    6.5 Installing the N6X Series Support and the Guide RailsThis section describes how to install the N6X series support and the guide rails.

    Prerequisitel The components required for the installation are available. The required components are

    guide rails, M12x35 assembling bolt, and M12x60 assembling bolt.l The materials required for the installation are available. The required materials are flat

    washer 12, spring washer 12, and large flat washer.l The tools required for the installation are available. The required tools are torque wrench

    and ruler.

    ProcedureStep 1 Adjust the depth of the support. Move the two half supports so that the tail end of each half

    support is flush with the 800 silkscreen on the expansion lever. Then, fasten the six M8x20 screwassemblies on the expansion lever. See Figure 6-14.

    6 Installing the N68E-22 Cabinet on the ESD FloorBSC6900 GSM

    N68E-22 Cabinet Installation Guide

    6-12 Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    Issue 02 (2011-05-19)

  • Figure 6-14 Adjusting the depth of the support

    1 Half support 2 M8 assembling bolt connecting the half support and the expansion lever3 Expansion lever 4 Height locking bolt

    Step 2 Adjust the height of the support.

    1. Loosen the height locking bolts. Figure 6-14 shows the positions of the height lockingbolts.

    2. Adjust the height of the support until it is equal to the measured height of the ESD floor.

    CAUTIONl The height of the ESD floor shall be in accordance with the site survey report.l The value read on the height scale of each support must be the same as the measured

    height of the ESD floor. Otherwise, the heights of the cabinets in the same row may bedifferent after capacity expansion.

    3. Tighten the height locking bolts to 45 Nm by using a torque wrench. Note that the twobolts in the middle should be tightened before the four bolts on the two sides.

    Step 3 Install the guide rails. See Figure 6-15.

    BSC6900 GSMN68E-22 Cabinet Installation Guide 6 Installing the N68E-22 Cabinet on the ESD Floor

    Issue 02 (2011-05-19) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    6-13

  • Figure 6-15 Installing the guide rails

    1 Support 2 Guide rail 3 M12x35 bolt4 Spring washer 5 Flat washer

    1. Place the guide rail on the support and align the installation holes for the guide rail with

    those for the support.2. Assemble the support and the guide rail by using the M12x35 assembling bolts, spring

    washers, and flat washers.3. Adjust the position of the support so that the diagonals of the four-sided shape formed by

    the two guide rails have nearly the same length, with a deviation of not more than 2 mm.4. Use a wrench to tighten the assembling bolts diagonally.

    Step 4 Level and secure the support.1. Align the installation holes for the support with those for the expansion bolt assemblies in

    the ground, and then place the support assembled with the guide rail on the floor.2. Install the spring washers and flat washers on the M12x60 bolts. Through the installation

    holes for the support, vertically insert the bolts into the holes for the expansion boltassemblies. See Figure 6-16.

    6 Installing the N68E-22 Cabinet on the ESD FloorBSC6900 GSM

    N68E-22 Cabinet Installation Guide

    6-14 Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    Issue 02 (2011-05-19)

  • Figure 6-16 Securing the support

    1 Support 2 Guide rail 3 M12x60 bolt4 Spring washer 5 Large flat washer 6 Adjusting pad7 Expansion tube 8 Nut 9 Level bar

    3. Place the level bar on the support to check whether the support is level. If it is not level,

    add adjusting pads under the support.4. Tighten the four bolts to 45 Nm one diagonal pair after another.

    Step 5 Connect the supports if the N68E-22 cabinets are to be combined.To ensure that you can combine cabinets smoothly, use the insulating spacers to help locateadjacent two supports. Figure 6-17 shows an insulating spacer.

    Figure 6-17 Insulating spacer

    1 Hole for locating adjacent supports 2 Hole for fixing the cabinet

    1. Place the insulating spacer on the guide rails of the adjacent two supports. Align the half-

    circle gaps of the insulating spacer with the installation holes for the two guide rails, andthen insert the M12x35 assembling bolts into the holes. See Figure 6-18. Use the insulatingspacers to connect all the supports.

    BSC6900 GSMN68E-22 Cabinet Installation Guide 6 Installing the N68E-22 Cabinet on the ESD Floor

    Issue 02 (2011-05-19) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    6-15

  • Figure 6-18 Connecting the supports

    1 Insulating spacer 2 M12x35 bolt

    2. Use the level bar to check the levelness of the supports. If the supports are not level, use

    the adjusting pads to level them. See Figure 6-18.3. Use the wrench to tighten the height locking bolts to secure the supports.4. Remove the M12x35 assembling bolts and the insulating spacers. Keep them for future use.

    ----End

    6.6 Securing the N68E-22 Cabinet on the ESD FloorUpon delivery, the N68E-22 cabinet is equipped with the front and back doors. Therefore, youshould remove the doors first and then secure the cabinet on the N6X series support.

    Prerequisitel The components required for the installation are available. The required components are

    cabinet and M12x35 bolts.l The materials required for the installation are available. The required materials are

    insulating spacer, flat washer 12, and spring washer 12.l The tools required for the installation are available. The required tools are level bar, torque

    wrench, socket wrench, and Phillips screwdriver.

    Context

    CAUTIONThe gravity center of the cabinet is high. Therefore, do not lift or push the cabinet alone. Movinga cabinet requires at least two persons and a forklift, so as to ensure personnel safety andequipment safety.

    6 Installing the N68E-22 Cabinet on the ESD FloorBSC6900 GSM

    N68E-22 Cabinet Installation Guide

    6-16 Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    Issue 02 (2011-05-19)

  • ProcedureStep 1 Remove the wooden protection boards from the front and back of the cabinet.Step 2 Remove the four wooden protection boards from both the left and right parts of the rack. Pull

    down the hook pin at the upper part of both the front and back doors of the cabinet, and thenremove both doors. Store the doors for future use. See Figure 6-19.

    Figure 6-19 Removing the wooden protection boards

    NOTE

    When storing the doors, you should ensure that they are unlocked. Therefore, the lock rod at the lower partof each door does not protrude, thus preventing the lock rod from deformation. See Figure 6-20.

    Figure 6-20 State of the lock of each door

    BSC6900 GSMN68E-22 Cabinet Installation Guide 6 Installing the N68E-22 Cabinet on the ESD Floor

    Issue 02 (2011-05-19) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    6-17

  • Step 3 Remove the two short supporting beams on the left and right of the cabinet front. Figure 6-21

    shows how to remove the short supporting beam.

    Figure 6-21 Removing the short supporting beam

    Step 4 Unscrew the two M6x12 screws from the air filter, as shown in part 1 of Figure 6-22. Then,

    remove the air filter and store it properly for future use, as shown in part 2 of Figure 6-22.

    6 Installing the N68E-22 Cabinet on the ESD FloorBSC6900 GSM

    N68E-22 Cabinet Installation Guide

    6-18 Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    Issue 02 (2011-05-19)

  • Figure 6-22 Removing the air filter

    Step 5 Determine the position of the cabinet front. Then, lift the cabinet onto the guide rail. Align the

    installation holes at the bottom of the cabinet with the four holes on the guide rail.

    Step 6 Add the spring washer, flat washer, and insulating tube to each of the four expansion bolts. Then,insert each expansion bolt into the expansion tube and pretighten the expansion tube and the nut.See Figure 6-23.

    Step 7 Below the cabinet, push two insulating spacers from both the front and back sides. Ensure thatthe notch faces the inner side and is wedged in the expansion bolt. Align the installation holesof each insulating spacer with the corresponding expansion bolt holes. See Figure 6-23.