BROWN IS THE NEW GREEN
A 24 ACRE REDEVELOPMENT SITE
WITH DETAILED PLANNING CONSENT FOR
A NEW CROSS DOCKED DISTRIBUTION FACILITY
OF UP TO 447,265 SQ FT
A419
AN ECOLOGICAL STRATEGY FOR THE DEVELOPMENT OF A NEW CROSS DOCKED
DISTRIBUTION WAREHOUSE OF UP TO 447,265 SQ FT
BY THE REMOVAL AND DISPOSAL OF HAZARDOUS MATERIALS
AND THE RECYCLING OF EXISTING BUILDING MATERIALS,
ECCO WILL TRANSFORM A 24 ACRE BROWNFIELD SITE
INTO AN ENERGY EFFICIENT FACILITY DESIGNED TO MEET
GOVERNMENTAL LEGISLATION ON CO2 REDUCTIONS
50M35M
10 DOCK LEVEL LOADING
10 DOCK LEVEL LOADING
2 LEVEL ACCESS
2 LEVEL ACCESS
10 DOCK LEVEL LOADING
10 DOCK LEVEL LOADING
OFFICE POD
GATEHOUSE
TWO STOREY OFFICES
EDISON WAY
FARADAY ROAD
WITH THE CAPABILITY OF PROVIDING
A SUSTAINABLE AND ENERGY EFFICIENT BUILDING
BRIGHT IDEAS
50 BIKE RACKS
TRANSPORT 350m
8
COME
OR
PROXIMITY TO THE MOTORWAY NETWORK AND A CENTRAL LOCATION NATIONALLY WILL SAVE ON DISTRIBUTION COSTS www.eccoswindon.co.uk/location
STAFF USE OF CYCLE STORAGE AND SHELTERS OFFERS AN ECO FRIENDLY OPTION WITH 15% OF THE WORKFORCE CATCHMENT WITHIN A 30 MINUTES CYCLE www.eccoswindon.co.uk/location
USE OF LOCAL PUBLIC TRANSPORT SERVICES CAN FURTHER REDUCE A COMPANY’S CARBON FOOTPRINT www.eccoswindon.co.uk/communications
UTILISING THE POWER OF THE WIND WITH THE USE OF TURBINES CAN HELP PROVIDE SUBSTANTIAL SAVINGS ON FUEL BILLS www.eccoswindon.co.uk/the-scheme
THE HARVESTING OF RAIN WATER AND THE USE OF GREY WATER WILL HELP BOTH THE ENVIRONMENT AND SAVE MONEY www.eccoswindon.co.uk/the-scheme
INCORPORATING PHOTOVOLTAIC SOLAR SYSTEMS CAN FURTHER REDUCE A COMPANIES POWER REQUIREMENT www.eccoswindon.co.uk/the-scheme
THE FULLY SUSTAINABLE SCHEME CAN SAVE 90 TONS OF CO2 EMISSIONS A YEAR AND REPRESENT A £30,000 SAVING ON BILLS www.eccoswindon.co.uk
365 car parking spaces(including 20 disabled)
cycle storage shelter for 100 cycles
2 storey offi ces (with potential of additional offi ce pod)
Secure site with security gatehouse
35m & 50m cross dock service yards
40 dock leveller loading doors
4 level access doors
140 HGV parking spaces (including 44 in front of loading doors) and 6 trailer parking spaces
15m to underside of haunch
50 kN/sq m fl oor loading
SPECIFICATION
WITH COMPREHENSIVE RECYCLING BUILDING INITIATIVESAND WITH THE STANDARD OF SPECIFICATION TO CREATE A STATE-OF-THE
WIND POWER GENERATION RAIN WATER HARVESTING ENERGY EFFICIERECYCLE BUILDING MATERIAL
‘A’ GRADE COATED STEEL FACED CLADDING SYSTEM SUPPORTED OFF THE FRAME - CREATING A HIGHLY EFFICIENT
ENCLOSURE TO THE BUILDING
RAINWATER HARVESTING AND WATER EFFICIENT APPLIANCES - CAN SAVE UP
TO 50% IN WATER USAGE
INSTALLATION OF WIND TURBINES - CAN SUPPLY POWER
FOR 50% OF OFFICE LIGHTING
E-ART FACILITY
ACCOMMODATION
SITE AREA
23.59 ACRES 9.55 Ha
SITE DENSITY 43.5%
WAREHOUSE
420,754 SQ FT (39,089 SQ M)
TWO STOREY OFFICES
21,237 SQ FT (1,973 SQ M)
TWO STOREY OFFICE BOD [POTENTIAL]
5,080 SQ FT (472 SQ M)
GATEHOUSE
194 SQ FT (18 SQ M)
TOTAL ACCOMMODATION
447,265 SQ FT (41,552 SQ M)
NT CLADDING LOW TOXICITY FINISHES PHOTOVOLTAIC PANELS
LOW TOXICITY FINISHES THROUGHOUT
PHOTOVOLTAICS - CAN CREATE 3,800 KWH
Misrepresentation Act 1967 - Whilst all the information in these particulars is believed to be correct, neither the agent nor their clients guarantee its accuracy nor is it intended to form any part of any contract. All areas quoted are approximate. June 2011.
RICHARD [email protected]
PAUL [email protected]
JAMES [email protected]
A joint development by
For further information contact the joint letting agents:
EDISON RD
QU
EE
NS
DR
IVE
MARLB OROUGH ROAD
SW
IND
ON
RO
AD
DORCAN WAY
DO RCAN
WA
Y
DRAKE’S W
AY
OXFORD RD
CR
ICK
LA
DE
ST
MARLBOROUGH ROAD
DR
OV
E R
D
FAR
AD
AY R
D
B4006
B4006
B4006
A419
A419
A419
A4312
A4259
A4259
A420
A4361
A4289
B4192
A4312
A419
B4006
M4
SWINDON
SWINDON
DORCAN
COVINGHAM
STRATTONST MARGARET
GREENBRIDGERETAIL &
LEISURE PARK
ELGININDUSTRIAL
ESTATE
THE GREATWESTERNHOSPITAL
BROOME MANOR
A361
SOUTH MARSTONINDUSTRIAL
ESTATE
LONDON
OXFORD
CIRENCESTER & M5
BRISTOL
15
KEYPOINTSOUTH
MARSTONRAIL
TERMINAL
ECCO Swindon benefi ts from superb communication links, with
all major transport hubs falling within a 2 HOUR HGV DRIVE:
ECCO is situated within the Dorcan Industrial Estate just off of the
A419 dual carriageway, which provides direct access to junction 15
of the M4 approximately 1.5 miles to the south. To the north, the
A419/A417 runs to junction 11a of the M5 at Gloucester.
Swindon’s central situation allows a large number of nationally
important locations to be reached with a 4.5 HOUR HGV DRIVE:
MOTORWAY CONNECTIONSJunction 15 of the M4 is within 1.5 miles
RAIL FREIGHT TERMINALKeypoint - South Marston terminal is within 2 miles
AIR FREIGHTBristol International Airport is within 53 miles
AVONMOUTH DOCKSThe docks at Avonmouth are within 50 miles
M4 J15 1.5 miles
M5 J11a 31 miles
Oxford 29 miles
Reading 40 miles
London 81 miles
Birmingham 82 miles
Keypoint Rail Terminal 2 miles
Bristol Airport 53 miles
Heathrow Airport 65 miles
Gatwick Airport 103 miles
Avonmouth 50 miles
Southampton 67 miles
Portsmouth 83 miles
SN3 5HD
&
Source: www.theaa.com