BRIG.GEN.AHMED SHAHID C E D - Ministry of Finance and … · 2017-02-19 · design approval: recom....

15
A 600 300 25 150 25 50 100 50 100 50 25 25 71 71 25 25 50 50 25 25 50 25 25 B 250 400 25 150 50 50 50 75 25 38 25 25 12 50 50 25 71 84 350 400 150 50 100 125 25 50 25 25 75 25 106 71 75 25 C E 30 50 87 275 25 50 25 38 87 50 30 50 50 38 38 38 71 71 F 27 50 25 238 102 13 50 25 150 G 112 275 25 250 87 25 H 125 170 25 50 70 25 35 25 40 25 64 160 175 19 43 40 30 57 65 175 225 50 25 71 25 J 15 25 40 32 20 20 80 20 20 D 230 225 30 50 38 25 71 53 100 18 18 50 12 12 100 85 43 8 25 25 10 38 I K L M 50 MOULD DETAIL SCALE 1:10 15 / 02 / 2017 1:50 BRIG.GEN.AHMED SHAHID VICE CHIEF OF DEFENCE FORCE BANDAARAKOSHI / MALE' 9 STOREY ACCOMMODATION BUILDING SHEET CONTENT: SHEET NO: SCALE: REVISION: DRAWN: Communication Electrical & Mechanical Structural DESIGNED: Architectural Structural Architectural CHECKED: DESIGN APPROVAL: RECOM. APPROVAL: APPROVED: CHIEF OF DEFENCE FORCE MAJ.GEN. AHMED SHIYAM MALDIVES NATIONAL DEFENCE FORCE Male', Republic of Maldives L.CPL ALI MUTHASIM PTE MOHAMED SAIF OFFICER COMMANDING CPT. AHMED SHARIM WO1 AHMED SHAZEEL The drawings, concept and design contained are the properties of Military Engineers MNDF . Use of any kind or copy of whole or part of this drawing, concept or design or use on other projects or sites other than that specified on this drawing is strictly prohibited. MILITARY ENGINEERS APPROVED DATE: PTE YAMIN SAEED PTE HUSSAIN QASIM 07/08/2016 PTE MOHAMED SAIF L.CPL ALI MUTHASIM CPT MOHAMED SHIFAAU WO3 AIMINATH ALI 25/01/2017

Transcript of BRIG.GEN.AHMED SHAHID C E D - Ministry of Finance and … · 2017-02-19 · design approval: recom....

A

600

300

2515

025

5010

050

100

5025

25

71

71

25

25 50 50

25

25 50

25 25

B

250

400

2515

050

5050

75

25

38

25 25

1250 50 25

71

84

350

400 15

050

100

125 25 50

25 25

75 25

106

71

7525

C E

30

50 87

275

25

5025

38

8750

30 50 50 3838

38

71

71

F

27

50 25

238

102

1350

2515

0

G

112

275

2525

0

87 25

H

125

170

2550

70

25 35 2540

25

64

160

175

19

43

40 30

57

65

175

225

50 25

71

25

J

1525

40

32

2020

80

2020

D

230

225

30 50 38 25

71

53

100

18

18

5012

12

100

85

438

25

251038

I

K L M

50

MOULD DETAILSCALE 1:10

15 / 02 / 2017

1:50

BRIG.GEN.AHMED SHAHIDVICE CHIEF OF DEFENCE FORCE

BANDAARAKOSHI / MALE'

9 STOREY ACCOMMODATION BUILDING

SHEET CONTENT:

SHEET NO:SCALE:

REVISION:DRAWN:

CommunicationElectrical & Mechanical

Structural

DESIGNED:

Architectural

StructuralArchitectural

CHECKED:

DESIGN APPROVAL:

RECOM. APPROVAL:

APPROVED:

CHIEF OF DEFENCE FORCE

MAJ.GEN. AHMED SHIYAM

MALDIVES NATIONAL DEFENCE FORCE

Male', Republic of Maldives

L.CPL ALI MUTHASIM

PTE MOHAMED SAIF

OFFICER COMMANDING

CPT. AHMED SHARIM

WO1 AHMED SHAZEEL

The drawings, concept and design contained are the

properties of Military Engineers MNDF . Use of any kind or

copy of whole or part of this drawing, concept or design

or use on other projects or sites other than that specified on

this drawing is strictly prohibited.

MILITARY ENGINEERS

APPROVED DATE:

PTE YAMIN SAEED

PTE HUSSAIN QASIM

07/08/2016

PTE MOHAMED SAIF

L.CPL ALI MUTHASIM

CPT MOHAMED SHIFAAU WO3 AIMINATH ALI

25/01/2017

1800

450

3850

3400

RCC STAIRCASE TO ENGR'S DETAIL

TREAD: 275 MM

RISER: 154 MM

FINISHED W/300X300 CERAMIC

NON SKID STEP TILES ON 20 MM

THK. SCREED \ WITH NOSING TILES

50MM✂ SS PIPE HANDRAIL

AT1000 MM HIGH FROM FIN FLOOR

LEVEL

FINISHED WITH 300x300 CEREMIC

NON SKID TILES ON 20mm THK.

SCREED

100mm CONCRETE FLOOR

40MM✂ SS PIPE SUPPORT

BALUSTERS

3400

50MM✂ SS PIPE HANDRAIL

AT1000 MM HIGH FROM FIN FLOOR

LEVEL

40MM✂ SS PIPE SUPPORT

BALUSTERS

40MM✂ SS PIPE SUPPORT HAND

RAIL

40MM✂ SS PIPE SUPPORT HAND

RAIL

STAIR CASE- A DETAILSCALE 1:50

SECTION A-A

PLUMBING

DUCT

SIGNAL ROOM

&

CABLE DUCT

CABLE

DUCT

CABLE

DUCT

6000

3000

3000

1

1B

2

6000

B C

LOBBYELEV+0.450/CL2.95

1800

1000

250 250 250250 1200

12501000

LIFT SHAFT OF 150 mm THK.

CONCRETE SHEAR WALL ( REFER

TO DETAILS)

STAIR CASE- ASCALE 1:50

FOUNDATION DEPTH

NATURAL GRND. LEV.

FINISHED FLR LEV.

1ST FIN.FLR LEV.

2ND FIN.FLR LEV.

3RD FIN.FLR LEV.

1700

L O B B YELEV+13.80/CL2.65

UP01

02

03

04

05

06

07

08

20

19

18

17

16

15

14

1309 10 11 12

21

DN

6000

B C

1200

2550 1200

1295

810

1295

1295

810

1295

1800

3850

3400

3400

3400

STAIR CASE ATREAD =250RISER =155

NO OF STEPS=21

11PERSONS

LIFT CAPACITY (800kg)

15 / 02 / 2017

1:50

BRIG.GEN.AHMED SHAHIDVICE CHIEF OF DEFENCE FORCE

BANDAARAKOSHI / MALE'

9 STOREY ACCOMMODATION BUILDING

SHEET CONTENT:

SHEET NO:SCALE:

REVISION:DRAWN:

CommunicationElectrical & Mechanical

Structural

DESIGNED:

Architectural

StructuralArchitectural

CHECKED:

DESIGN APPROVAL:

RECOM. APPROVAL:

APPROVED:

CHIEF OF DEFENCE FORCE

MAJ.GEN. AHMED SHIYAM

MALDIVES NATIONAL DEFENCE FORCE

Male', Republic of Maldives

L.CPL ALI MUTHASIM

PTE MOHAMED SAIF

OFFICER COMMANDING

CPT. AHMED SHARIM

WO1 AHMED SHAZEEL

The drawings, concept and design contained are the

properties of Military Engineers MNDF . Use of any kind or

copy of whole or part of this drawing, concept or design

or use on other projects or sites other than that specified on

this drawing is strictly prohibited.

MILITARY ENGINEERS

APPROVED DATE:

PTE YAMIN SAEED

PTE HUSSAIN QASIM

07/08/2016

PTE MOHAMED SAIF

L.CPL ALI MUTHASIM

CPT MOHAMED SHIFAAU WO3 AIMINATH ALI

25/01/2017

STAIR CASE-B DETAILSCALE 1:50

SECTION B-B

FOUNDATION DEPTH

NATURAL GRND. LEV.

FINISHED FLR LEV.

1ST F.F.L

BRICK MASONRY WALL OF 150mm

THK. PLASTERED ON BOTH SIDES

RCC STAIRCASE TO ENGR'S DETAIL

TREAD: 300 MM

RISER: 155 MM

FINISHED W/300X300 CERAMIC

NON SKID STEP TILES ON 20 MM

THK. SCREED \ WITH NOSING TILES

50MM✂ SS PIPE HANDRAIL

AT1000 MM HIGH FROM FIN FLOOR

LEVEL

FINISHED WITH 300x300 CEREMIC

NON SKID TILES ON 20mm THK.

SCREED

100mm CONCRETE FLOOR

40MM✂ SS PIPE SUPPORT

BALUSTERS

RAFT SLAB ( REFER TO ENGINEERS

DETAILS)

UP

B C

1

1B

6000

3000

2800

100

3200

01020304050607080910111213141516

212019181716

DN

D1-G

STAIR CASE BTREAD =300RISER =155

NO OF STEPS=21

FIRST FLOOR LANDING

STAIR CASE-B DETAILSCALE 1:50

STAIR-B PLAN

100

1375

1375

1200

16521175

2473

927

3400

40MM✂ SS PIPE SUPPORT HAND

RAIL

2323

FIRST FLOOR F.F.L

LANDING

GROUND FLOOR F.F.L

B C

6000

11PERSONS

LIFT CAPACITY (800kg)

15 / 02 / 2017

1:50

BRIG.GEN.AHMED SHAHIDVICE CHIEF OF DEFENCE FORCE

BANDAARAKOSHI / MALE'

9 STOREY ACCOMMODATION BUILDING

SHEET CONTENT:

SHEET NO:SCALE:

REVISION:DRAWN:

CommunicationElectrical & Mechanical

Structural

DESIGNED:

Architectural

StructuralArchitectural

CHECKED:

DESIGN APPROVAL:

RECOM. APPROVAL:

APPROVED:

CHIEF OF DEFENCE FORCE

MAJ.GEN. AHMED SHIYAM

MALDIVES NATIONAL DEFENCE FORCE

Male', Republic of Maldives

L.CPL ALI MUTHASIM

PTE MOHAMED SAIF

OFFICER COMMANDING

CPT. AHMED SHARIM

WO1 AHMED SHAZEEL

The drawings, concept and design contained are the

properties of Military Engineers MNDF . Use of any kind or

copy of whole or part of this drawing, concept or design

or use on other projects or sites other than that specified on

this drawing is strictly prohibited.

MILITARY ENGINEERS

APPROVED DATE:

PTE YAMIN SAEED

PTE HUSSAIN QASIM

07/08/2016

PTE MOHAMED SAIF

L.CPL ALI MUTHASIM

CPT MOHAMED SHIFAAU WO3 AIMINATH ALI

25/01/2017

6000

CABLE

DUCT

CABLE

DUCT

3000

1

1B

DN

UP

01

02

03

04

05

06

0709 10 11 12 13 14 15 16 17 18 19 20 21

LOBBYELEV+0.450/CL2.95

STAIR CASE 2TREAD =275RISER =148

NO OF STEPS=22

B C

1000

1000

1750

1000

2750

1000 3250

4250

154.545 x 22 = 3400

100

100

100

X

1800

450

3850

1700

1700

3400

RCC STAIRCASE TO ENGR'S DETAIL

TREAD: 275 MM

RISER: 148 MM

FINISHED W/300X300 CERAMIC

NON SKID STEP TILES ON 20 MM

THK. SCREED \ WITH NOSING TILES

50MM✂ SS PIPE HANDRAIL

AT1000 MM HIGH FROM FIN FLOOR

LEVEL

FINISHED WITH 300x300 CEREMIC

NON SKID TILES ON 20mm THK.

SCREED

100mm CONCRETE FLOOR

40MM✂ SS PIPE SUPPORT

BALUSTERS

40MM✂ SS PIPE SUPPORT HAND

RAIL

STAIR CASE-C DETAILSCALE 1:50

DETAIL GROUND FLOOR PLAN

STAIR CASE-C DETAILSCALE 1:50

SECTION C-C

FOUNDATION DEPTH

NATURAL GRND. LEV.

FINISHED FLR LEV.

1ST FIN.FLR LEV.

08 22

STAIR CASE CTREAD =275RISER =154

NO OF STEPS=22

LANDING

FIRST FLOOR F.F.L

GROUND FLOOR F.F.L

2065

275[11"]

15 / 02 / 2017

1:50

BRIG.GEN.AHMED SHAHIDVICE CHIEF OF DEFENCE FORCE

BANDAARAKOSHI / MALE'

9 STOREY ACCOMMODATION BUILDING

SHEET CONTENT:

SHEET NO:SCALE:

REVISION:DRAWN:

CommunicationElectrical & Mechanical

Structural

DESIGNED:

Architectural

StructuralArchitectural

CHECKED:

DESIGN APPROVAL:

RECOM. APPROVAL:

APPROVED:

CHIEF OF DEFENCE FORCE

MAJ.GEN. AHMED SHIYAM

MALDIVES NATIONAL DEFENCE FORCE

Male', Republic of Maldives

L.CPL ALI MUTHASIM

PTE MOHAMED SAIF

OFFICER COMMANDING

CPT. AHMED SHARIM

WO1 AHMED SHAZEEL

The drawings, concept and design contained are the

properties of Military Engineers MNDF . Use of any kind or

copy of whole or part of this drawing, concept or design

or use on other projects or sites other than that specified on

this drawing is strictly prohibited.

MILITARY ENGINEERS

APPROVED DATE:

PTE YAMIN SAEED

PTE HUSSAIN QASIM

07/08/2016

PTE MOHAMED SAIF

L.CPL ALI MUTHASIM

CPT MOHAMED SHIFAAU WO3 AIMINATH ALI

25/01/2017

1OOMM THICK WALL PANNEL

PRE FABRICATED MOULDING

(SEE DETAIL)

RC WALL W/ CLAY TILE FINISH

ARCHITECTURAL COLUMN

W/ SPECIFIED FINISH

ARCHITECTURAL COLUMN

W/ SPECIFIED FINISH

HUNG / FIX WINDOW

NINTH FLOOR TERRACE SLAB

W/ SPECIFIED FINISH

C

D

C

C

D

100MM THICK

CONCRETE WALL

RC FLOOR BEAM

DRY WALL SYSTEM

2"GI PIPE FRAMING USING 1 1/2" ANGLESTUDS @600 SPACING B/W

LYSAGHT STYLE-DEK ROOFING SHEET

EIGHTH FLOOR LEVEL

NINETH FLOOR LEVEL

ELEVATIONSCALE 1:50

SECTION Y-YSCALE 1:50

PARTIAL SECTION DETAILSCALE 1:50

PRE FABRICATED MOULDING

(SEE DETAIL)

PRE FABRICATED MOULDING

(SEE DETAIL)

PRE FABRICATED MOULDING

(SEE DETAIL)

PRE FABRICATED MOULDING

(SEE DETAIL)

PRE FABRICATED MOULDING

(SEE DETAIL)

PRE FABRICATED MOULDING

(SEE DETAIL)

PRE FABRICATED MOULDING

(SEE DETAIL)

PRE FABRICATED MOULDING

(SEE DETAIL)

PRE FABRICATED MOULDING

(SEE DETAIL)

PRE FABRICATED MOULDING

(SEE DETAIL)

3400

1500

180

3220

180

468

DOOR CABINET BASE CABINET

CEILING LINE

1500

C

D

8TH FLOOR BALCONY DETAILSCALE 1:50

1450

450

270

180

CONCRETE MOLDING

REINFORCED CONCRETE PARAPET WALL

CONCRETE MOLDING

150MM THK. DROP SLAB

15 / 02 / 2017

1:50

BRIG.GEN.AHMED SHAHIDVICE CHIEF OF DEFENCE FORCE

BANDAARAKOSHI / MALE'

9 STOREY ACCOMMODATION BUILDING

SHEET CONTENT:

SHEET NO:SCALE:

REVISION:DRAWN:

CommunicationElectrical & Mechanical

Structural

DESIGNED:

Architectural

StructuralArchitectural

CHECKED:

DESIGN APPROVAL:

RECOM. APPROVAL:

APPROVED:

CHIEF OF DEFENCE FORCE

MAJ.GEN. AHMED SHIYAM

MALDIVES NATIONAL DEFENCE FORCE

Male', Republic of Maldives

L.CPL ALI MUTHASIM

PTE MOHAMED SAIF

OFFICER COMMANDING

CPT. AHMED SHARIM

WO1 AHMED SHAZEEL

The drawings, concept and design contained are the

properties of Military Engineers MNDF . Use of any kind or

copy of whole or part of this drawing, concept or design

or use on other projects or sites other than that specified on

this drawing is strictly prohibited.

MILITARY ENGINEERS

APPROVED DATE:

PTE YAMIN SAEED

PTE HUSSAIN QASIM

07/08/2016

PTE MOHAMED SAIF

L.CPL ALI MUTHASIM

CPT MOHAMED SHIFAAU WO3 AIMINATH ALI

25/01/2017

100mm THICK WALL

100mm THICK WALL

200mm x 300mm BEAM

BOLTED MS ANGLE 6mm x 75mm x 75mm

DRY WALL WITH 9mm M BOARD

2 MS ANGLE

6mm x 75mm x 75mm BOLTED MS PLATE

6mm x 75mm x 75mm

MS PLATE 6mm THICK

SLAB 150mm THICK

200mm x 500mm BEAM

UTI

LITY

AR

EA

PLUMBING

DUCT

CABLE

DUCT

ELECT.

DUCT

DUCT DETAILSCALE 1:50

DETAIL PLAN

DUCT DETAILSECTION X-X

SCALE 1:50

GRILL

CABLE

DUCT

1600

1200

3400

900

2100

LIFT AREA ELEVATIONSCALE 1:50

11PERSONSLIFT CAPACITY (800kg)

HOMOGENOUS DECORATIVE TILE

LIFT AREA PLANSCALE 1:50

STRUCTURAL COLUMN

CEMENT FINISH

COLUMN DECORATIVE COVER50

100

750

150100

50

150100

50

PLANSCALE 1:50

ELEVATIONSCALE 1:50

SECTION D-DSCALE 1:50

50

100

750

150100

50

150100

50

15 / 02 / 2017

1:50

BRIG.GEN.AHMED SHAHIDVICE CHIEF OF DEFENCE FORCE

BANDAARAKOSHI / MALE'

9 STOREY ACCOMMODATION BUILDING

SHEET CONTENT:

SHEET NO:SCALE:

REVISION:DRAWN:

CommunicationElectrical & Mechanical

Structural

DESIGNED:

Architectural

StructuralArchitectural

CHECKED:

DESIGN APPROVAL:

RECOM. APPROVAL:

APPROVED:

CHIEF OF DEFENCE FORCE

MAJ.GEN. AHMED SHIYAM

MALDIVES NATIONAL DEFENCE FORCE

Male', Republic of Maldives

L.CPL ALI MUTHASIM

PTE MOHAMED SAIF

OFFICER COMMANDING

CPT. AHMED SHARIM

WO1 AHMED SHAZEEL

The drawings, concept and design contained are the

properties of Military Engineers MNDF . Use of any kind or

copy of whole or part of this drawing, concept or design

or use on other projects or sites other than that specified on

this drawing is strictly prohibited.

MILITARY ENGINEERS

APPROVED DATE:

PTE YAMIN SAEED

PTE HUSSAIN QASIM

07/08/2016

PTE MOHAMED SAIF

L.CPL ALI MUTHASIM

CPT MOHAMED SHIFAAU WO3 AIMINATH ALI

25/01/2017

D-11

TO

ILE

T/S

HO

WE

R-4

TO

ILE

T/S

HO

WE

R-3

3

2

J

4W

4W

D11

D11

D11

D11

D11

D11

D11

D11

D11

D1190

0

1500

SECTION X-XSCALE 1:50

PLANSCALE 1:50

800

500

2100

3400

1500 15001525

1525

500

100mm THK. RC

COUNTERTOP

6mm THK.

FACIAL MIRROR

300x450 CERAMIC

WALL TILES

500 1525 1500 1525 500

200x7 mm thk. 19'long PVC ceiling board

30 x 40 mm thk. batten

1' wood-screw

40x40x2mm thik. angle cleat

40x40xmm thik. vertical support.@900c/c

30 x 40 mm thk. batten

1" wood-screw

40x40x2mm thik. angle cleat

40x40mm thik. vertical support @ 900mm c/c

38x24mm thik. perimeter support3" concrete screw

200x7 mm thk. 19'long PVC ceiling board

30 x 40 mm thk. batten40x40x2mm thik. angle cleat40x40mm thik. vertical support @ 900mm c/c

38x24mm thik. perimeter support

3" concrete screw

wall plug

PVC ceiling boarder

1" concrete screw w/ wall plug

LONGITUDINAL SECTION

CROSS SECTIONSCALE 1:50

FIXING DETAIL

wall plug

PVC ceiling boarder200x7 mm thk. 19'long PVC ceiling board

1" concrete screw w/ wall plug

SCALE 1:50

SCALE 1:50

CEILING DETAILSSCALE 1:50

SECOND TO SEVENTH FLOOR TOILET

D-10

S TOILET-3

200

3400

CERAMIC

WALL TILES

6MM THICK FACIAL MIRROR

150MM THICK MASONRY WALL

PVC CEILING

1100

350

600

8251450

132519

50

440

1400

2100

150

225

1500

1100

2100

SECTION Y-YSCALE 1:50

15 / 02 / 2017

1:50

BRIG.GEN.AHMED SHAHIDVICE CHIEF OF DEFENCE FORCE

BANDAARAKOSHI / MALE'

9 STOREY ACCOMMODATION BUILDING

SHEET CONTENT:

SHEET NO:SCALE:

REVISION:DRAWN:

CommunicationElectrical & Mechanical

Structural

DESIGNED:

Architectural

StructuralArchitectural

CHECKED:

DESIGN APPROVAL:

RECOM. APPROVAL:

APPROVED:

CHIEF OF DEFENCE FORCE

MAJ.GEN. AHMED SHIYAM

MALDIVES NATIONAL DEFENCE FORCE

Male', Republic of Maldives

L.CPL ALI MUTHASIM

PTE MOHAMED SAIF

OFFICER COMMANDING

CPT. AHMED SHARIM

WO1 AHMED SHAZEEL

The drawings, concept and design contained are the

properties of Military Engineers MNDF . Use of any kind or

copy of whole or part of this drawing, concept or design

or use on other projects or sites other than that specified on

this drawing is strictly prohibited.

MILITARY ENGINEERS

APPROVED DATE:

PTE YAMIN SAEED

PTE HUSSAIN QASIM

07/08/2016

PTE MOHAMED SAIF

L.CPL ALI MUTHASIM

CPT MOHAMED SHIFAAU WO3 AIMINATH ALI

25/01/2017

1200

4600

1500

300

450

300

1200

3400

300

300

600

1200

1500

300

450

300

1200

4600

750

T10@200C/C

T12@150C/C

PERIMETER WALL DETAILSCALE 1:50

T12@200C/C

T12@150C/C

T12@150C/C

MASONRY WALL WITH PLASTER FINISH

� ✁

50MM THICK LEAN CONCRETE

50MM THICK LEAN CONCRETE

50MM THICK LEAN CONCRETE

SECTION Y-Y SECTION X-X

6-T12

D6 @ 150C/C

T12@150C/C

T12@150C/C50MM THICK LEAN CONCRETE

PLAN

6-T12

D6 @ 150C/C

1000

1000

15 / 02 / 2017

1:50

BRIG.GEN.AHMED SHAHIDVICE CHIEF OF DEFENCE FORCE

BANDAARAKOSHI / MALE'

9 STOREY ACCOMMODATION BUILDING

SHEET CONTENT:

SHEET NO:SCALE:

REVISION:DRAWN:

CommunicationElectrical & Mechanical

Structural

DESIGNED:

Architectural

StructuralArchitectural

CHECKED:

DESIGN APPROVAL:

RECOM. APPROVAL:

APPROVED:

CHIEF OF DEFENCE FORCE

MAJ.GEN. AHMED SHIYAM

MALDIVES NATIONAL DEFENCE FORCE

Male', Republic of Maldives

L.CPL ALI MUTHASIM

PTE MOHAMED SAIF

OFFICER COMMANDING

CPT. AHMED SHARIM

WO1 AHMED SHAZEEL

The drawings, concept and design contained are the

properties of Military Engineers MNDF . Use of any kind or

copy of whole or part of this drawing, concept or design

or use on other projects or sites other than that specified on

this drawing is strictly prohibited.

MILITARY ENGINEERS

APPROVED DATE:

PTE YAMIN SAEED

PTE HUSSAIN QASIM

07/08/2016

PTE MOHAMED SAIF

L.CPL ALI MUTHASIM

CPT MOHAMED SHIFAAU WO3 AIMINATH ALI

25/01/2017

GROUND FLOOR PLAN (GROUND SLAB TO BE CASTED)SCALE 1:200

RAMP UP RAMP UP

STEP UP STEP UP

RAMP UP RAMP UP RAMP UPRAMP UP

DN

UP

01

02

03

04

05

06

07

0809 10 11 12 13 14 15 16 17 18 19 20 21

154.545 x 22 = 3400

11PERSONS

LIFT CAPACITY (800kg)

11PERSONS

LIFT CAPACITY (800kg)

�1W

3W

3W

D3-

A UP

STEP UP

D-2

D-2

D-13

D-5

D-5

3W

3W

1W

A B C D E F

3

G H I J K L M

1

2

L1A1

1A

1B

72000

6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000

6000

6000

5375

3000

5375

1200

0

FFL +0.15m

FFL +0.15m

FFL +0.45m FFL +0.45m

FFL +0.45m

FFL +0.45m

FFL +0.15m

FFL +0.45m

FFL +0.50m

2650

1500 600 3200

TYPICAL

TRENCH

SCALE 1:200

CROSS SECTION X-X

FINISHED FLR LEV.

450

NATURAL GRND. LEV.

1800

FOUNDATION DEPTH

MDU STORAGEFIRE

TYPICAL

TRENCH

TYPICAL

TRENCH

600

800 800

1300

WATER

RESERVOIR 1

WATER

RESERVOIR 2WELL

55601150

7490764078657915

2550

STEP UP

100MM THICK SLAB

BOTTOM RFMT * B1-T10 @200 c/c

* B2-T10 @ 200 c/c* BOTTOM AND TOP COVER = 35MM

*END COVER = 40MM

GROUND SLAB TO BE CASTED

15 / 02 / 2017

1:50

BRIG.GEN.AHMED SHAHIDVICE CHIEF OF DEFENCE FORCE

BANDAARAKOSHI / MALE'

9 STOREY ACCOMMODATION BUILDING

SHEET CONTENT:

SHEET NO:SCALE:

REVISION:DRAWN:

CommunicationElectrical & Mechanical

Structural

DESIGNED:

Architectural

StructuralArchitectural

CHECKED:

DESIGN APPROVAL:

RECOM. APPROVAL:

APPROVED:

CHIEF OF DEFENCE FORCE

MAJ.GEN. AHMED SHIYAM

MALDIVES NATIONAL DEFENCE FORCE

Male', Republic of Maldives

L.CPL ALI MUTHASIM

PTE MOHAMED SAIF

OFFICER COMMANDING

CPT. AHMED SHARIM

WO1 AHMED SHAZEEL

The drawings, concept and design contained are the

properties of Military Engineers MNDF . Use of any kind or

copy of whole or part of this drawing, concept or design

or use on other projects or sites other than that specified on

this drawing is strictly prohibited.

MILITARY ENGINEERS

APPROVED DATE:

PTE YAMIN SAEED

PTE HUSSAIN QASIM

07/08/2016

PTE MOHAMED SAIF

L.CPL ALI MUTHASIM

CPT MOHAMED SHIFAAU WO3 AIMINATH ALI

25/01/2017

11PERSONS

LIFT CAPACITY (800kg)

11PERSONS

LIFT CAPACITY (800kg)

O P E N T E R R A C E P L A N O P E N T E R R A C E P L A N

DN21

12111009 13

14

15

16

17

18

19

20

08

07

06

05

04

03

02

01

UP DN21

12 11 10 0913

14

15

16

17

18

19

20

08

07

06

05

04

03

02

01

UP

A B C D E F

3

G H I J K L M

1

2

L1A1

1A

1B

72000

6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000

6000

6000

5375

3000

5375

1200

0

3000 3000 3000 3000 3000 3000 3000 3000

3000 3000 3000 3000 3000 3000 3000 3000

2412

2412

2775

2775

2412

2412

2775

2775

SCALE 1:200

PORTAL FRAME

300 300

PLAN

ANCHOR PLATE FIXING DETAIL (EXISTING)SCALE 1:20

SECTION VIEW

SECTION VIEW

200 x 200 x 10mm MS plate

500500

150

4 nos. 20mm Threaded rod

200 x 200 x 10mm MS plate

150

4nos 20mm Threaded rod18

018

0

600

[2']

700

[2'-

4"]

3775

[12'

-5"] ISOMETRIC VIEW

(HOW STEEL I SECTION TO BE FIXED TO

THE EXISTING EMBEDDED ANCHORAGE)

PORTAL FRAMESCALE 1:100

STEEL I-SECTIONSTEEL I-SECTION

15 / 02 / 2017

AS SHOWN

BRIG.GEN.AHMED SHAHIDVICE CHIEF OF DEFENCE FORCE

BANDAARA KOSHI

9 STOREY ACCOMODATION BUILDING

SHEET CONTENT:

SHEET NO:SCALE:

REVISION:DRAWN:

CommunicationElectrical & Mechanical

Structural

DESIGNED:

Architectural

StructuralArchitectural

CHECKED:

DESIGN APPROVAL:

RECOM. APPROVAL:

APPROVED:

CHIEF OF DEFENCE FORCE

MAG.GEN. AHMED SHIYAM

MALDIVES NATIONAL DEFENCE FORCE

Male', Republic of Maldives

PTE MOHAMED SAIF

L.CPL ALI MUTHASIM

CPT. AHMED SHARIM

WO1 AHMED SHAZEEL

The drawings, concept and design contained are the

properties of Military Engineers MNDF . Use of any kind or

copy of whole or part of this drawing, concept or design

or use on other projects or sites other than that specified on

this drawing is strictly prohibited.

MILITARY ENGINEERS

APPROVED DATE:

PTE YAMIN SAEED

PTE HUSSAIN QASIM

07/08/2016

PTE MOHAMED SAIF

L.CPL ALI MUTHASIM

CPT MOHAMED SHIFAAU WO3 AIMINATH ALI

25/01/2017

OFFICER COMMANDING

9mm LAMINATED BLOCK BOARD

WITH TEAK AROUND

CABLE BOX

50MM THIK SHERA BOARD PARTITION

DOUBLE DECKER BED

13A SOCKET SWITCH WITH USB PORT

600

588

350

330

600

282

100

600

368

600

282

SELF DRILLING SCREW

9MM PLYWOOD

QUANTITYNAME: BED SET

332

ELEVATION 1SCALE :NTS

ELEVATION 2 ELEVATION 3

ISOMETRIC VIEW ISOMETRIC VIEW

SCALE :NTS SCALE :NTS

SCALE :NTS (REFERENCE ONLY)SCALE :NTS

PLANSCALE :NTS

BUNK BEDSCALE :NTS

TOTAL BUNK BED

TOTAL HEAD BOARD

TOTAL PARTITION BOARD

64

256

HEAD BOARD

1880 1880

50

805

805

9

2400

1585

100

772

1008

770

1548

3MM THICK 100MM X 50MM SS HOLLOW PIPE

6MM THICK SS PLATE

1880

13A SOCKET SWITCH WITH USB PORT

350

2400

9mm LAMINATED BLOCK BOARD

WITH TEAK AROUND

350

772

1585100

ADJUSTABLE

FURNITURE GLIDE

1008

ADJUSTABLE

FURNITURE GLIDE

6OOMM MINIMUM CABLE LENGHT WITH

16A INDUSTRIAL PLUG SOCKET(MALE)

15 / 02 / 2017

1:50

BRIG.GEN.AHMED SHAHIDVICE CHIEF OF DEFENCE FORCE

BANDAARAKOSHI / MALE'

9 STOREY ACCOMMODATION BUILDING

SHEET CONTENT:

SHEET NO:SCALE:

REVISION:DRAWN:

CommunicationElectrical & Mechanical

Structural

DESIGNED:

Architectural

StructuralArchitectural

CHECKED:

DESIGN APPROVAL:

RECOM. APPROVAL:

APPROVED:

CHIEF OF DEFENCE FORCE

MAJ.GEN. AHMED SHIYAM

MALDIVES NATIONAL DEFENCE FORCE

Male', Republic of Maldives

L.CPL ALI MUTHASIM

PTE MOHAMED SAIF

OFFICER COMMANDING

CPT. AHMED SHARIM

WO1 AHMED SHAZEEL

The drawings, concept and design contained are the

properties of Military Engineers MNDF . Use of any kind or

copy of whole or part of this drawing, concept or design

or use on other projects or sites other than that specified on

this drawing is strictly prohibited.

MILITARY ENGINEERS

APPROVED DATE:

PTE YAMIN SAEED

PTE HUSSAIN QASIM

07/08/2016

PTE MOHAMED SAIF

L.CPL ALI MUTHASIM

CPT MOHAMED SHIFAAU WO3 AIMINATH ALI

25/01/2017

QUANTITY

NAME SHOE RACK

20

2120

100

196

290

2400

CO

MB

AT

BO

OT

S 3

2 N

OS

SP

OR

TS

SH

OE

S

32 N

OS

290

ELEVATION

PLAN VIEW

PLAN VIEW350

2400

18MM LAMINATED BLOCK BOARD

9MM LAMINATED BLOCK BOARD

SCALE :NTS

SCALE :NTS

SCALE :NTS

15 / 02 / 2017

1:50

BRIG.GEN.AHMED SHAHIDVICE CHIEF OF DEFENCE FORCE

BANDAARAKOSHI / MALE'

9 STOREY ACCOMMODATION BUILDING

SHEET CONTENT:

SHEET NO:SCALE:

REVISION:DRAWN:

CommunicationElectrical & Mechanical

Structural

DESIGNED:

Architectural

StructuralArchitectural

CHECKED:

DESIGN APPROVAL:

RECOM. APPROVAL:

APPROVED:

CHIEF OF DEFENCE FORCE

MAJ.GEN. AHMED SHIYAM

MALDIVES NATIONAL DEFENCE FORCE

Male', Republic of Maldives

L.CPL ALI MUTHASIM

PTE MOHAMED SAIF

OFFICER COMMANDING

CPT. AHMED SHARIM

WO1 AHMED SHAZEEL

The drawings, concept and design contained are the

properties of Military Engineers MNDF . Use of any kind or

copy of whole or part of this drawing, concept or design

or use on other projects or sites other than that specified on

this drawing is strictly prohibited.

MILITARY ENGINEERS

APPROVED DATE:

PTE YAMIN SAEED

PTE HUSSAIN QASIM

07/08/2016

PTE MOHAMED SAIF

L.CPL ALI MUTHASIM

CPT MOHAMED SHIFAAU WO3 AIMINATH ALI

25/01/2017

QUANTITY

NAME DRYING RACK 2

4

PLAN VIEW

ELEVATION

PLAN VIEW

52526

3

1850

1842

1000

1000

525 26

3

50X50MM SQUARE SECTION

�✁✂✄✄ ☎✆ ✝✆✝✞

SCALE :NTS

SCALE :NTS

SCALE :NTS

15 / 02 / 2017

1:50

BRIG.GEN.AHMED SHAHIDVICE CHIEF OF DEFENCE FORCE

BANDAARAKOSHI / MALE'

9 STOREY ACCOMMODATION BUILDING

SHEET CONTENT:

SHEET NO:SCALE:

REVISION:DRAWN:

CommunicationElectrical & Mechanical

Structural

DESIGNED:

Architectural

StructuralArchitectural

CHECKED:

DESIGN APPROVAL:

RECOM. APPROVAL:

APPROVED:

CHIEF OF DEFENCE FORCE

MAJ.GEN. AHMED SHIYAM

MALDIVES NATIONAL DEFENCE FORCE

Male', Republic of Maldives

L.CPL ALI MUTHASIM

PTE MOHAMED SAIF

OFFICER COMMANDING

CPT. AHMED SHARIM

WO1 AHMED SHAZEEL

The drawings, concept and design contained are the

properties of Military Engineers MNDF . Use of any kind or

copy of whole or part of this drawing, concept or design

or use on other projects or sites other than that specified on

this drawing is strictly prohibited.

MILITARY ENGINEERS

APPROVED DATE:

PTE YAMIN SAEED

PTE HUSSAIN QASIM

07/08/2016

PTE MOHAMED SAIF

L.CPL ALI MUTHASIM

CPT MOHAMED SHIFAAU WO3 AIMINATH ALI

25/01/2017

FRONT SIDE

FRONT SIDE W / OPEN DOORS

SIDE

ISOMETRIC VIEW (Inside)

PLAN

ISOMETRIC VIEW (Outside)

MIRROW

NOTE

12MM BLOCK BOARD

Bottom shelves Adjustable

EXHAUST

NAME

PLATE

RUBBER LEG

20MM HIGH

QUANTITY

NAME CUPBOARD

96

OFFICERS CUPBOARDSCALE :NTS

15 / 02 / 2017

1:50

BRIG.GEN.AHMED SHAHIDVICE CHIEF OF DEFENCE FORCE

BANDAARAKOSHI / MALE'

9 STOREY ACCOMMODATION BUILDING

SHEET CONTENT:

SHEET NO:SCALE:

REVISION:DRAWN:

CommunicationElectrical & Mechanical

Structural

DESIGNED:

Architectural

StructuralArchitectural

CHECKED:

DESIGN APPROVAL:

RECOM. APPROVAL:

APPROVED:

CHIEF OF DEFENCE FORCE

MAJ.GEN. AHMED SHIYAM

MALDIVES NATIONAL DEFENCE FORCEMale', Republic of Maldives

L.CPL ALI MUTHASIM

PTE MOHAMED SAIF

OFFICER COMMANDING

CPT. AHMED SHARIM

WO1 AHMED SHAZEEL

The drawings, concept and design contained are the

properties of Military Engineers MNDF . Use of any kind or

copy of whole or part of this drawing, concept or design

or use on other projects or sites other than that specified on

this drawing is strictly prohibited.

MILITARY ENGINEERS

APPROVED DATE:

PTE YAMIN SAEED

PTE HUSSAIN QASIM

07/08/2016

PTE MOHAMED SAIF

L.CPL ALI MUTHASIM

CPT MOHAMED SHIFAAU WO3 AIMINATH ALI

25/01/2017

QUANTITY

NAME BENCH

20

PLAN VIEW

ELEVATION

FOR SLIPPER FOR SLIPPER

FOR SLIPPERFOR SLIPPER

885

480

1800

415

ISOMETRIC VIEW

100X1800MM WOODEN PLANKS

50X50MM SQUARE SECTION

20X20MM SQUARE SECTION

QUANTITY

NAME TOWEL RACK

104

PLAN VIEW

ELEVATION

ISOMETRIC VIEW

20MM ALUMINUM PIPE

20X20MM SQUARE SECTION

20X20MM SQUARE SECTION

500

1800

1500

7520

0

890

1000

925

SCALE :NTS

SCALE :NTS

SCALE :NTS

SCALE :NTS

SCALE :NTS

15 / 02 / 2017

1:50

BRIG.GEN.AHMED SHAHIDVICE CHIEF OF DEFENCE FORCE

BANDAARAKOSHI / MALE'

9 STOREY ACCOMMODATION BUILDING

SHEET CONTENT:

SHEET NO:SCALE:

REVISION:DRAWN:

CommunicationElectrical & Mechanical

Structural

DESIGNED:

Architectural

StructuralArchitectural

CHECKED:

DESIGN APPROVAL:

RECOM. APPROVAL:

APPROVED:

CHIEF OF DEFENCE FORCE

MAJ.GEN. AHMED SHIYAM

MALDIVES NATIONAL DEFENCE FORCE

Male', Republic of Maldives

L.CPL ALI MUTHASIM

PTE MOHAMED SAIF

OFFICER COMMANDING

CPT. AHMED SHARIM

WO1 AHMED SHAZEEL

The drawings, concept and design contained are the

properties of Military Engineers MNDF . Use of any kind or

copy of whole or part of this drawing, concept or design

or use on other projects or sites other than that specified on

this drawing is strictly prohibited.

MILITARY ENGINEERS

APPROVED DATE:

PTE YAMIN SAEED

PTE HUSSAIN QASIM

07/08/2016

PTE MOHAMED SAIF

L.CPL ALI MUTHASIM

CPT MOHAMED SHIFAAU WO3 AIMINATH ALI

25/01/2017