L B D1 2 3 4 5 6 7 8 9 10
1
Earth Work Excavation and
depositing on bank with an intital lead
of 10m and lift of 2m in case of head
load only in loamy and clayee soils
like black cotton soils, red earth and
ordinary gravel,1x1 180.00 1.10 0.60 118.80 Cum 88.84 10554.00
2
Providing of Compacted Sand Bed
complying with specification for
spreading for drains work 1 Cum
1x1 180.00 1.10 0.10 19.80 Cum 374.40 7413.00
3Plain Cement concrete (1:5:10) using20mm nominal size graded HBG metal
including cost of all materials and lablur
charges etc. complete for curved portion.
1x1 180.00 1.10 0.10 19.80 Cum 2765.99 54756.00
4
Cement concrete (1:2.5:5) using 20mm
nominal size graded HBG metalincluding cost of all materials and lablur
charges etc. complete for curved portion.
a). For walls 1x2 180.00 0.23 0.45 37.20
a). For flooring 1x1 180.00 0.45 0.05 4.05
41.25 Cum 3776.18 155767.00
5
Plastering with CM (1:3), 12 mm thick
including cost and conveyance of all
SADASIVPET MUNICIPALITY
NAME OF THE WORK: CONSTRUCTION OF CC DRAIN FROM 1 H.P. SUBMERSIBLE PUMP SET TO
YOUSUF ALI HOUSE IN WARD NO.15 AT RAVINDRA NAGAR COLONY SADASIVPET
MUNICIPALITY. UNDER BRGF FUNDS FOR THE YEAR 2011-12.
Sl.N
o.Description of work No.
MeasurementQuantity Unit
Rate
(Rs)Amount
5/13/2018 Brgf Estimates 2011-12[1]. - slidepdf.com
http://slidepdf.com/reader/full/brgf-estimates-2011-121 2/6
4
Cement concrete (1:2.5:5) using 20mm
nominal size graded HBG metal
including cost of all materials and lablur
charges etc. complete for curved portion.
a). For walls 1x2 60.00 0.23 0.45 12.42
a). For flooring 1x1 60.00 0.45 0.05 1.35
13.77 Cum 3776.18 51998.00
5
Plastering with CM (1:3), 12 mm thick
including cost and conveyance of all
materials and labour charges
etc.complete.
1x1 60.00 0.00 1.20 72.00 Sqm 953.49 6865.13
SUB TOTAL 83104.00
6 Labour Cess @ 1% 831.00
7 Vat @ 4% 3324.00
8 Add L.S. QC Charges @ 1% 831.00
9 Add L.S. Technical Person 1% 831.00
10 Add L.S. Insurance 831.00
11 Add L.S. for unforseen work 30248.00
120000.00TOTAL:
MUNICIPAL ENGINEER
SADASIVPET MUNICIPALITY
SADASIVPET MUNICIPALITY
5/13/2018 Brgf Estimates 2011-12[1]. - slidepdf.com
http://slidepdf.com/reader/full/brgf-estimates-2011-121 3/6
L B D1 2 3 4 5 6 7 8 9 10
1
Earth Work Excavation and depositing on bank
with an intital lead of 10m and lift of 2m in case
of head load only in loamy and clayee soils like
black cotton soils, red earth and ordinary
gravel, for removal of shabad flooring
1x1 160.00 5.00 0.10 80.00
1x1 160.00 5.00 0.10 80.00
160.00 Cum 88.84 14214.40
2
Forming embankment with side rarth by
mechanical means including pre-watering of
soil, removal of top soil, excavation of soils
depositing the soils on the embankment,
spreading soils, breaking clods, sectioning and
consolidation with vibratory Road Roller @
OMC to meet requirement of table 300-2 of
MORTH including all hire and operational
charges of T&P and seigniorage charges
complete for finished item of work as per
MOT&H specification 305 (4th revision)
(Payment will be made basedon leel for
finished item of work)
1x1 160.00 5.00 0.15 120.00
1x1 160.00 5.00 0.15 120.00
240.00 Cum 76.61 18386.00
Granular Sub-base/base/surface course with
local Mathilals (Table 400.13) by mix in place
method narmal construction of grannlar sub-b b idi l l th l l di i
SADASIVPET MUNICIPALITY
NAME OF THE WORK: CONSTRUCTION OF CC DRAIN AND WBM ROAD FROM CRC BUILDING TO
SIDDAPUR ROAD, CRC BUILDING TO ICDS ROOM IN WARD NO.4 AT SIDDAPUR COLONY SADASIVPET
MUNICIPALITY. UNDER BRGF FUNDS FOR THE YEAR 2011-12.
Sl.N
o.Description of work No.
MeasurementQuantity Unit
Rate
(Rs)Amount
5/13/2018 Brgf Estimates 2011-12[1]. - slidepdf.com
http://slidepdf.com/reader/full/brgf-estimates-2011-121 4/6
315249.00
5 Labour Cess @ 1% 3152.00
6 Vat @ 4% 12610.00
7 Add L.S. QC Charges @ 1% 3152.00
8 Add L.S. Insurance 1% 3152.00
9 Add L.S. for unforseen work 62685.00
400000.00TOTAL:
MUNICIPAL ENGINEER
SADASIVPET MUNICIPALITY
SADASIVPET MUNICIPALITY
5/13/2018 Brgf Estimates 2011-12[1]. - slidepdf.com
http://slidepdf.com/reader/full/brgf-estimates-2011-121 5/6
L B D1 2 3 4 5 6 7 8 9 10
1
Earth Work Excavation and depositing on
bank with an intital lead of 10m and lift of 2m
in case of head load only in loamy and
clayee soils like black cotton soils, red earth
and ordinary gravel, for removal of shabad
flooring
1x1 95.00 3.00 0.10 28.50 Cum 88.84 2532.00
2
Laying of CC (1:5:10) Prop using 40mm
Guage HG Metal including cost &
conveyance and labour and laying tamping
curing etc., for pot holes
1x1 95.00 3.00 0.075 21.37 Cum 2265.99 48436.00
3
Cement Concrete perminent Construction of un
± reinforced dowel jointed at expansion and
completion joint only. Plan cornet crenate
pavement thickness as per Design. Over a
prepaid sub ± base. With 43 grade cement or
my other type as per clause 1501:2.2 M30
(Grand) course and fire aggregate conforming to
15:383 Maximum in a Concrete Mixes of not
less than 0.2 cm capacity and appropriate weigh
batches using approved mix design laid in
approved form side formwork ( Steel channel,
Laying and fixing of 125 mictron thick polythene
fill wedges steel plats including laying the frame
work as per drawing ) Spreading the concrete
with should be rakes Compacted using needle,
Scared and plate Vibrators and Finished in
Continues joint applying debording strips and
SADASIVPET MUNICIPALITY
NAME OF THE WORK: LAYING OF CC ROAD FROM CH. NAGAIAH HOUSE TO LAXMAIAH IN
WARD NO. 3 AT BACK SIDE OF SHIVA SHAKTHI LODE IN SADASIVPET MUNICIPALITY. UNDER
BRGF FUNDS FOR THE YEAR 2011-12.
Sl.N
o.
Description of work No.Measurement Quanti
ty
Unit Rate (Rs) Amount
5/13/2018 Brgf Estimates 2011-12[1]. - slidepdf.com
http://slidepdf.com/reader/full/brgf-estimates-2011-121 6/6
3
Cement Concrete perminent Construction of un
± reinforced dowel jointed at expansion and
completion joint only. Plan cornet crenate
pavement thickness as per Design. Over a
prepaid sub ± base. With 43 grade cement or
my other type as per clause 1501:2.2 M30
(Grand) course and fire aggregate conforming to
15:383 Maximum in a Concrete Mixes of not
less than 0.2 cm capacity and appropriate weigh
batches using approved mix design laid in
approved form side formwork ( Steel channel,
Laying and fixing of 125 mictron thick polythene
fill wedges steel plats including laying the frame
work as per drawing ) Spreading the concrete
with should be rakes Compacted using needle,
Scared and plate Vibrators and Finished in
Continues joint applying debording strips andexpansion construction joints applying
debonding strips and expansion construction
joint. Applying debording strips primes, sealant
Dow belly approaches to bridges / culverts
construction joint admixture as approved laying
of concrete slabs for 14- days ceiling compound
( while Speeded ) and water finishing to lines
and grade as per
1x1 180.00 6.00 0.10 108.00 Cum 4094.12 442164.96
635304.87
4 Labour Cess @ 1% 6353.00
5 Vat @ 4% 25412.00
6 Add L.S. QC Charges @ 1% 6353.00
7 Add L.S. Insurance 1% 6353.00
8 Add L.S. for unforseen work 20224.13
700000.00TOTAL:
MUNICIPAL ENGINEER
SADASIVPET MUNICIPALITY