Brevard CountyUtility Services Department
April 3, 2018Jim Helmer, Department Director
Brian Sorensen, W/WW Manager
1
Utility Services Department
• 9 TREATMENT PLANTS• 6 WASTEWATER, 3 WATER
• 163 EMPLOYEES COUNTYWIDE• APPROXIMATELY 59,000 SEWER
CUSTOMERS, 1,345 IN MIMS• APPROXIMATELY 8,400 WATER
CUSTOMERS, 3,182 IN MIMS
2
Capital Improvements
• IN 2013 AN INTERNAL AUDIT INDICATED DEPARTMENT REVENUE WAS INSUFFICIENT TO MAINTAIN THE INFRASTRUCTURE.
• ASSETS WERE REACHING THEIR LIFE EXPECTANCY
• MOST ASSETS WERE 40 TO 50 YEARS OLD• LAST RATE ADUSTMENT WAS IN 2008
3
• EVALUATION OF SYSTEM INFRASTRUCTURE WAS INITIATED
• SIX ENGINEERING FIRMS INSPECTED THE WATER & WASTEWATER SYSTEMS COUNTYWIDE
• AN INFRASTRUCTURE ASSET EVALUATION INDICATED APPROXIMATELY $134 MILLION IN ASSET REHABILITATION WAS REQUIRED OVER THE NEXT 10 YEARS
• A REVENUE SUFFICIENCY ANALYSIS WAS COMPLETED TO DETERMINE FUNDING REQUIREMENTS FOR THE DEPARTMENT
• RATE ADJUSTMENTS WERE INITIATED
Infrastructure Asset Evaluation
4
Capital Improvements
PROJECTS COMPLETED IN THE SOUTH BEACHES AREA IN 2017
• Several Plant improvements to the S. Beaches Plant:• Polymer Feed system – Melbourne Beach
$375,607.00• 2 filter back wash tanks- Melbourne Beach
$566,712.98• 3 MGD Aeration Basin rebuilds- Melbourne Beach
$494,733.00
• Indian Harbour Beach Yard (New Building)
$402,478.52
5
Lining Completed 2017
• B-01 - Melbourne• B-07 Partial 30” line 5,000 ft. Melbourne
Beach• S-10 50% of basin (Lift Station collection
area) Indian Harbour Beach• Some critical lining
Total Lining: $950,947.00
6
Lift Stations Completed 2017
• S-20 – Replacement – Satellite Beach$421,501.00
• B-13 – Rehabilitation – Melbourne $273,646.00• B-08 – Replacement - Melbourne Beach
$439,708.00 • B-11 – Replacement – Melbourne Beach
$398,827.00• S-15 & S-09 – Replacement - Indian Harbour Beach
$1,205,215.00
7
Projects to be Completed 2018
• South Patrick Drive 20” force main replacement $3,800,00.00
• 2MGD Clarifier & Chemical Feed System, Melbourne Beach $1,497,000.00
• Reuse pumps, Melbourne Beach$396,000.00
8
Lining to be Completed 2018
• By the end of the fiscal year 2018 we should have approximately 11 more basins completed
• S-10 2nd half Indian Harbor Beach• B-20 Indian Harbor Beach• S-08 Satellite Beach• S-13 Indian Harbor Beach• S-18 Indian Harbor Beach• S-22 Indian Harbor Beach• S-25 Satellite Beach• B-16 Melbourne• S-16 Indian Harbor Beach• S-14 Indian Harbor Beach
• B-08 Melbourne Beach
• Total $3,436,223.00 9
Lift Stations to be Completed 2018
• S-17 – Indian Harbour Beach $531,960.00• B-10 – Melbourne Beach $183,423.00• S-08 – Satellite Beach $486,250.00• S-05 – South Patrick Shores $467,500.00 • B-02 – Melbourne $347,188.00
10
Utility Services Department
11
• QUESTIONS
Satellite Beach Water System Presentation
April 3, 2018
City of Melbourne Population of approximately 81,000 Approximately 58,000 accounts Equivalent population of 170,000 in water
service area Average day demand – 16.6 MGD Maximum Day Demand – 19.5 MGD Peak Hour Demand – 24.8 MGD
Water Production Facilities
Two treatment facilities:- 20.0 MGD Surface WTP (Actiflo)- 5.0 MGD Reverse Osmosis WTP
Four (4) Booster Pump StationsSix (6) Ground Storage TanksOne (1) Elevated Storage TankTotal Storage Capacity = 15.0 MG
Water Distribution System
Overall– Approximately 150 miles of transmission mains– Approximately 730 miles of distribution mains
In Satellite Beach– Approximately 5 miles of transmission mains– Approximately 52 miles of distribution mains
Planned Projects Central Satellite Beach WM Replacement – Phase 1A –
Interconnections to US Hwy A1A Water Main to begin in April 2018
Central Satellite Beach WM Replacement – Phase 1 - $1.8M total project cost (under design, construction expected to start in the summer of 2018)
Central Satellite Beach WM Replacement – Phases 2, 3 & 4 -$2.2M total project cost (design funds budgeted for FY19, construction funds budgeted for FY21
2-Inch Galvanized WM Replacement - Bonnie Ct., HedgecockCt. Colonial Ct., Debra Ct. (2018) - $50,000
Other Planned Projects Canova Beach Booster Pump Station Emergency
Generator/Transfer Switch - $331k (design/build under way, completion expected in Spring 2018)
Ocean Boulevard WM Replacement - $800k Annual Fire Hydrant Maintenance Program (ongoing) Annual Valve Exercising/Maintenance Program
(ongoing) Annual Pipe Replacement Program (ongoing)
Other Planned Projects Pineda Causeway WM Construction – approximately $12M
(under design, construction funds requested for FY19-20)
Recently Completed Projects• Ocean Spray Boulevard 6” HDPE –Kale St. to
A1A, 2016-2017 - $200,000• New 16” Isolation Valve on Ocean Spray and
A1A - $100,000• 2” Galvanized replaced on Charles Ct, Jason
Ct, Carol Ct, Price Ct. - $50,000• Roosevelt Avenue Water Main Relocations
due to Drainage Conflicts
Precautionary Boil Water Advisories
Recent Events– February 2018– October 2017
– July 2017
– October 2016
Caused By– 12” Cast Iron WM Break– Water Production facility
valve failure– Valve failure in
distribution system– Hurricane Matthew
Notification Process – Door knockers, news media, CodeRed and government agency notifications
CodeRED Registration
Residents can sign up for CodeRED emergency notifications on the City’s website or call the ECO Division at 321-608-5080
Thank You!Any questions?
Stormwater Management System
City of Satellite Beach
The System
(insert map) (describe general lay of the
land)
Primarily City owned, operated and funded
System includes pipes/culverts, ditches, swales ponds, inlets, structures, baffle boxes, etc.
17.83 miles or 94,141 feet of pipe ranging from 6” to equivalent 8’ diameter along with 791 inlets and structures
Replacement value of pipe is $14,168,212
Much of system was built by developers that had different goals and regulations to abide by
What is Stormwater Management?
Operation of facilities (pipes, inlets, ditches, ponds, etc.) Maintenance of facilities Renewal and replacement of facilities Compliance with evolving State and Federal regulations NPDES MS4 Permit Indian River/Banana River Lagoon BMAP
Compliance with City Comprehensive Plan Goals/Objectives Addressing environmental changes Sea level rise
Near Future Concerns/Needs
Renewal and replacement Large portion of existing pipe was installed
in 1960’s/1970’s Much of this pipe has reached its useful
life BMAP compliance Established in January 2013 Allocated City pollutant load reductions 15 year compliance
Flood alleviation Sea level rise of up to 8 inches by 2040
and 13 inches by 2070 More intense and frequent large rainfall
events
Current Stormwater Masterplan Update
Update of 2001 Masterplan Incorporating 2013 Stormwater Quality Master Plan Inventory and condition assessment of faciliites Update of facility mapping Computer modeling of storm events (existing condition,
future conditions and proposed improvements)Cassia Basin - Ocean Spray and Willow
(Roadway elevation +/- 4.0)Mean
Annual Oct. 1, 2017 25 YearHurricane Irma, 2017
T.S. Fay, 2008 100 Year
5" in 24 hours
7.39" in 3 hours
9.5" in 24 hours
12.9" in 90 hours
22.6" in 120 hours
13" in 24 hours
Existing Conditions
3.97 4.79 5.06 5.13 5.13 5.6
2040 Sea Level Rise (8")
4.10 4.84 5.11 5.16 5.16 5.63
2070 Sea Level Rise (13")
4.18 4.87 5.14 5.18 5.18 5.64
Funding - Revenue
City stormwater utility fee Established in 1997 Currently $104 per year per ERU or $2.89 per 1,000 SF of
impervious per month $512,000 in revenue per year Average rate in Florida is currently $2.78 per 1,000 SF of
impervious per month, average rate in Brevard County is $1.92 Rates for barrier island cities generally higher due to low
elevations, limited available land and tidal impacts Loans Grants
Funding – Expenditures
$160K debt service through 2020 Recommended five year renewal/replacements of $700K or
$140K per year BMAP compliance previously estimated at $566K per year
through 2028 Flood alleviation/capacity improvements can usually be
accomplished concurrently with renewal/replacement and treatment projects Assuming 25% grant funding for treatment projects, $423K
per year is needed Typical large scale project like Desoto or Cassia costs $1M to