New UK Head Office For The Global Market Leader in Chemical Distribution Delivered by Avanta.
Leeds based Avanta UK have just completed their largest office interior fit out contract to date for Brenntag UK who have relocated their UK Head Office from Yeadon to Lawnswood in Leeds.
fice eade
elive
Avantheir
act toocate
n to
Local: 0113 384 8777 Web: www.avantauk.com
Free: 0800 975 4933Email: [email protected]
Avanta UK Ltd - Unit B1, Astra Park, Parkside Lane,
Leeds, West Yorkshire, United Kingdom, LS11 5SZ
Brenntag is the global market leader in chemical distribution operating a global network with more than 530 locations in 74 countries and a global workforce of more than 14,000 employees.
In the UK the company had simply out grown it’s UK Headquarters and wanted to remain in a similar location to retain the 160 plus current staff and with a view to allow for expansion.
The Lawnswood site was identified as a location that could deliver what was required and over 3x floors was a blank canvass to work on. Working closely with the client and Avanta’s interior designer, a modern office interior was designed utilising many years of experience in office design, space planning and sourcing the best manufacturers.
Proposals were presented utilising 3D visuals and mood boards with the strong Brenntag corporate branding theme at the forefront. With a project of this size and nature inevitably the design goes backwards and forwards with multiple revisions to refine the design to suit.
This project encompassed everything in terms of an Office Fit Out Project including: -
Full Height Glazed & Solid Partitions - to create offices, meeting rooms and Director’s offices
Integrated Storage Wall throughout the scheme with various internal fittings
Operable walls to divide boardroom & meeting area on ground floor
Floor Coverings - Including specific zones and branding ideas
Welfare Facilities - Shower rooms, toilets etc
Multiple Social or Break Out & Kitchen Areas with instant hot water and numerous integrated appliances
Provision of all the furniture including desking, storage, board room, break out furniture & all seating
Acoustic Wall & Ceiling Panels - to create and enhance collaborative thinking area
Custom Made Reception Furniture - To fit around and incorporate building columns
Wall Art Graphics in certain areas
Heating & Cooling Solutions
Provision of Power & Data
Supply, Install & Commissioning of all AV Equipment
Building Works - Air conditioning generator compound and flagged area for a cycle shelter
Under the guidance of a dedicated site based project manager the project took 10 weeks to complete from start to finish and utilised many trades to complete the transformation from empty floors to the finished job, including: -
Plastering
Partition Erection & Fixing
Furniture Installation
Extensive Electrical & Mechanical Works
Plumbing
Carpeting & Laminate Flooring
Decorations
Tiling
Cleaning
Outside Ground works
Avanta provided all enablings which included site cabins, contractor welfare facilities, general labourers, skips, visqueen, PPE & barriers to keep the site safe, clean and tidy to promote the smooth running of the contract.
A FULL TURNKEY PACKAGE!
Andrew Chipp (Avanta) commented “I am really proud of the Avanta team on delivering this project and giving Brenntag a modern facility to be proud of. We fitted out the old Yeadon office in circa 2000 and this new project shows how much Brenntag has grown in the UK and how office design coupled with technology has progressed especially in the last decade. This site is a showcase of what we can do we hope to complete many more in the future.”
Gareth Dobinson (Brenntag) commented “We are delighted with the transformation and delivery of the Brenntag vision. Working closely with Andrew and the team at Avanta we have created a workplace with the WOW factor for our employees to thrive in.”
Avanta UK Ltd - Unit B1, Astra Park, Parkside Lane,
Leeds, West Yorkshire, United Kingdom, LS11 5SZ
ut thngs
ddrooooorr
ng sp
Shohoww
al or Bnstan
integ
on ofnnnng,g,g,g sss
nitittititttururuurru
Acouananannnnnd
UUUUU
d neneraraaaallll
to o mmotototototo ee
CKKAAA
mene tttaa tett
giigigigigiggiiggigigiviiviivivivivvvvvrooouououououououououudddddddddddd
cececee iiiiiiiiinnnnss hhhhhhoo
anaannnnnnnddololollollllogog
aassssstssst dddddddattttttttt wwwwwwwww
yyy yy mmmommm
nniininnnnnnnnssosoeeelilililililighgggggg
veveeeeeveeryryyyyyng ggggg gggg g ccccclclccc o
antntnttttttaaaah tttttheheeehee
ririiiiiriivevevevevevvvvev ii
m &
cifific
r roo
dedededederrrr trrojooojece
commmmttrtraaee
Meeting
Shower
ES
DA
SS
EM
BLY
BE
NC
H
Stationary
Tea
Poi
nt
Pol
ar p
artit
ion
with
aut
o -f
rost
ing
V/P
Dry Line outer walls - 30 min FR. Heatreflective backing to out side
ES
DA
SS
EM
BLY
BE
NC
H
Fridge
DishWash
Watercooler
Hig
h B
ack
Sof
a
Mobile Chat Board Mobile Chat Board
High B
ack S
ofa
PROPOSED SECOND FLOOR PLANAN
Boardo rd
Hig
hH
h B
ah
Avanta UK Ltd - Unit B1, Astra Park, Parkside Lane,
Leeds, West Yorkshire, United Kingdom, LS11 5SZ
Meeting
Tea
Poi
nt
Stationary
Tiled &sealedAccessPanel
Shower
Pol
ar p
artit
ion
with
aut
o -f
rost
ing
Fridge
DishWash
Watercooler
High B
ack S
ofa
Hig
h B
ack
Sof
a
Mobile Chat BoardMobile Chat Board
Acoustic CeilingBaffles Over
PROPOSED FIRST FLOOR PLAN
Hig
hig
Local: 0113 384 8777 Web: www.avantauk.com
Free: 0800 975 4933Email: [email protected]
Meeting
Break Out Area
Boardroom
Meeting
A.V
. UN
IT
Ope
rabl
e W
all
Stationary
Polar partition with auto - frosting
Mail RoomTiled &sealedAccessPanel
Shower
V/P
Cyc
le L
ock-
Up
(to b
e de
taill
ed)
Dro
p D
own
Pro
ject
or S
cree
n
Dro
p D
own
Pro
ject
or S
cree
n
V/P
DishWash
Fridge
Fridge
Watercooler
Vending
Mobile Chat Board
Mobile Chat Board
PROPOSED GROUND FLOOR PLAN
tion wiion w
ANN
Polar
Avanta UK Ltd - Unit B1, Astra Park, Parkside Lane,
Leeds, West Yorkshire, United Kingdom, LS11 5SZ
“This is exciting times for all of us at Brenntag UK & Ireland. Our teams worked hard to design a facility with greatly increased capacity for visitors, training and networking opportunities.
The primary aim however was always on achieving a great working environment for our teams, as People Focus continues to be a pillar for our strategy”.
Russel ArgoPresident of Brenntag Uk & Ireland
Local: 0113 384 8777 Web: www.avantauk.com
Free: 0800 975 4933Email: [email protected]
Avanta UK Ltd - Unit B1, Astra Park, Parkside Lane,
Leeds, West Yorkshire, United Kingdom, LS11 5SZ
Avanta UK Ltd is an independent company with 20 years experience in designing and sourcing equipment. Long term partnership arrangements and rigorous appraisal of our portfolio of extensive manufacturing partners ensures that our clients have access to high quality and competitively priced standard and non-standard products.
We cover the whole of the UK and work closely
peace of mind and on going support.
See more case studies atwww.avantauk.com
Call - 0800 975 4933Email: [email protected]
Avanta UK Ltd • Unit B1 • Astra Park • Parkside Lane • Leeds • West Yorkshire • LS11 5SZ
Tel: 0800 975 4933 / 0113 384 8777 Fax: 0113 384 8778Email: [email protected] Web: www.avantauk.com
Mezzanine Floors
Office Interiors
Pallet Racking
Shelving Systems
Steel Partitions