Breakout session day 2 ftth in italy ermanno berruto

18
FTTH architecture: P2P, an up-to-date reassessment FTTH Conference 2011 Milan, 9 th -10 th February 2011 Ermanno Berruto WIND Telecomunicazioni S.p.A.

description

FTTH Conference Milan 2011 Day 2

Transcript of Breakout session day 2 ftth in italy ermanno berruto

Page 1: Breakout session day 2 ftth in italy ermanno berruto

FTTH architecture: P2P, an up-to-date reassessment

FTTH Conference 2011Milan, 9th-10th February 2011

Ermanno BerrutoWIND Telecomunicazioni S.p.A.

Page 2: Breakout session day 2 ftth in italy ermanno berruto

- Page 2 -

Agenda

• Copper network in Italy: LLU Success Story

• Fiber optic unbundling in FTTH

• P2P Architecture

• FTTH Business Issues

• Conclusions

Page 3: Breakout session day 2 ftth in italy ermanno berruto

- Page 3 -- Page 3 -

Copper network in Italy: LLU Success Story

The Unbundling model used with the classical copper access network has been a case of great success in opening the access network and has allowed great development of competition and created great advantages for the consumers.

Copper Network is unique as:

Why not FTTH?

electricity distribution motorway railway sewers water ducts………

Page 4: Breakout session day 2 ftth in italy ermanno berruto

- Page 4 -

Fiber optic unbundling in FTTH

Point to point architecture, one fiber for user from the exchange to the home. The fiber optic unbundling can be provided at the exchange side.Solution is similar to copper unbundling.

GPO

NP

2P

Central Office

MDF

Access Node

Splitter

SameInfrastructure

Access Node

DifferentAccess Model

Operator 1

Operator 2

Operator3

Page 5: Breakout session day 2 ftth in italy ermanno berruto

- Page 5 -

A Future Proof Network

Maximum flexibility and ease in passing from one operator to another

Technology agnostic (the access network is single passive fibre that can support any technology such as ethernet, GPON, etc.)

Symmetric services

Zero touch: no further infrastructure up-grade

Low maintenance cost

P2P Architecture

Page 6: Breakout session day 2 ftth in italy ermanno berruto

- Page 6 -

P2P needs a lot of fibers but:

New micro-cables technologies allow higher existing infrastructure reuse (not only Telco)

New digging technique make easier new infrastructure development (micro trench, one day dig…)

P2P needs space in Central office but:

New High density Optical Distribution Frame allows to manage up to 10k fibers in about 30-40 m2

No need of thousands of cabinets installed in curb or building

P2P Architecture

Page 7: Breakout session day 2 ftth in italy ermanno berruto

- Page 7 -- Page 7 -

No Dig Perforation with georadar Microtubes

Underground Compact Junctions

Yesterday Today

New technologies to support Fibre Implementation

Page 8: Breakout session day 2 ftth in italy ermanno berruto

- Page 8 -- Page 8 -

Mini cables with up-to 144 fibres with only 7.8 mm diameter

Cables

New technologies to support Fibre Implementation

Page 9: Breakout session day 2 ftth in italy ermanno berruto

- Page 9 -- Page 9 -

New technologies to support Fibre Implementation

In alternative to traditional fibre trench excavation various new low impact excavation ( 5 cm x 30 cm ) alternatives are available .

Microtrenches

One day Dig continous cicle using small machines requiring one day work

Digging Technologies

Page 10: Breakout session day 2 ftth in italy ermanno berruto

- Page 10 -- Page 10 -

High Density Optical Distribution Frames are becoming available

For example :

Application Footprint: max. 1536-ports/frameApplication Density: max. 3353-ports/m²

New technologies in support to Fibre Implementation

In Rome we are testing jointly with Fastweb and Vodafone an Optical distribution Frame for 10k fiber with 36m2 footprint in an LLU scenario

Page 11: Breakout session day 2 ftth in italy ermanno berruto

- Page 11 -- Page 11 -

FTTH has long term viability

Pay back investment not less than 7-10 years

Crucial issue for credible business model is Copper Total Replacement.

Copper fees totally transferred to the fiber network.

Other solutions for enhancing the FTTH business model can be found by introducing new broadband services and by decreasing the cost per home passed (100% take rate)

FTTH Business Issues

Page 12: Breakout session day 2 ftth in italy ermanno berruto

- Page 12 -- Page 12 -

FTTH Business Issues

Many studies show that one P2P infrastructure can optimize the global investment and the TCO

The total amount of available money is limited. Instead of overlapping several networks, the overall coverage could be enlarged with a single network, using the same amount of money

Overlapping NO-Overlapping

Page 13: Breakout session day 2 ftth in italy ermanno berruto

- Page 13 -

FTTH DeploymentConsiderations© 2008 Cisco Systems, Wolfgang Fischer

Investment for only one open P2P infrastructure seems the best way

Final Report for Ofcom Competitive models in GPON 1 December 2009 Ref: 15340-493

WW FTTx access – market view and theneeds for fibre accessAll Rights Reserved © 2 | High leverage Network | Alcatel-Lucent 2009

Infrastrutture a Banda Ultra Larga per“Italia Digitale”Tavolo Tecnico “Operatori –Governo” 28 Ottobre 2010

European FTTH Forecast, 2009-2014 Graham FinnieChief Analyst Heavy Reading24 February, 2010FTTH Council Conference, Lisbon

FTTH Business Caseand ImplicationsFTTH Business Caseand Implications

Page 14: Breakout session day 2 ftth in italy ermanno berruto

Pure P2P cost VS Multi-GPON

Memorandum Of Understanding Italia Digitale Sviluppo dell’infrastruttura per Reti a Banda Ultra LargaRoma, 10 novembre 2010

A MOU has been undersigned between Operators and the Government who has promoted it , in order to stimulate the development of Ultra Broad band Networks in Italy.

From the evaluations carried out within the MOU, it can be deduced that the additional capex needed to implement a fully P2P architecture would be around 10% vs multi-GPON

- Page 14 -

Page 15: Breakout session day 2 ftth in italy ermanno berruto

Average Capex difference between Base Case (Std GPON) and Exchange Flexi Point(1 fiber per user from the Exchange to the Household, PtP like) is about 23%

P2P +23% vs Single GPON, but Multi-GPON +47% vs P2P

- Page 15 -

Δ +23%

Δ +47%

Single GPON

Multi-GPONP2P

Page 16: Breakout session day 2 ftth in italy ermanno berruto

Single GPON

P2P

- Page 16 -

Multi-GPON: the worst scenario also from Opex point of view

Single GPON

Multi-GPON

P2P

Multi-GPON

Page 17: Breakout session day 2 ftth in italy ermanno berruto

P2P represents a viable solution in high take rate area and small to medium CO

- Page 17 -

Page 18: Breakout session day 2 ftth in italy ermanno berruto

- Page 18 -- Page 18 -

The opportunity is to build only one fiber agnostic infrastructure(P2P) with copper total replacement in order to:

Avoid duplication

Enlarge as much as possible FTTH area

Enable services ecosystem and Country economy

Reduce TCO and guarantee future profness

Infrastructure could be a premium only in start-up phase

Lesson Learned in Mobile Tower is clear: now each operator tries to share sites as much as possible

Conclusion