BREAKING GROUND 1Q 2019 - - Hopewell Development

4
GARY ANDERSON Senior Director +1 602 224 4439 [email protected] JUSTIN LEMASTER Director +1 602 229 5926 [email protected] MIKE GILBERT Senior Associate +1 602 468 8540 [email protected] NWC 67 th Ave & Van Buren St | Phoenix, AZ 85043 BREAKING GROUND 1Q 2019

Transcript of BREAKING GROUND 1Q 2019 - - Hopewell Development

Page 1: BREAKING GROUND 1Q 2019 - - Hopewell Development

GARY ANDERSONSenior Director+1 602 224 [email protected]

JUSTIN LEMASTER Director+1 602 229 [email protected]

MIKE GILBERTSenior Associate +1 602 468 8540 [email protected]

NWC 67th Ave & Van Buren St | Phoenix, AZ 85043

PAGE

20 9 . 2 6 . 2 0 1 8HOPEWELL 67TH AND VAN BUREN

PHOENIX, AZ - PHX17-0070-00

PERSPECTIVE RENDERINGThis conceptual design is based upon a preliminary review of entitlement requirements and on unverified and possibly incomplete site and/or building information, and is intended merely to assist in exploring how the project might be developed. Signage shown is for illustrative purposes only and does not necessarily reflect municipal code compliance.

BREAKING GROUND 1Q 2019

Page 2: BREAKING GROUND 1Q 2019 - - Hopewell Development

THE PROPERTY

WH

R

F.E.C.

OFFICE

103

OFFICE

102

LOBBY

100

OPEN OFFICE

101

CORRIDOR

108

UNISEX

RESTROOM

106

CONFERENCE

104

8'-10 1/4"9'-9 7/8"

3'-6

"

4'-5"

BREAK ROOM

107

PROPOSAL SPEC OFFICE

N. 67

TH A

VE

VAN BUREN ST.

Page 3: BREAKING GROUND 1Q 2019 - - Hopewell Development

UNDER CONSTRUCTIONEST. LATE 2019 COMPLETION

DOWNTOWNPHOENIX

MIDTOWNPHOENIX

DOWNTOWNSCOTTSDALE

DOWNTOWNTEMPE

VAN

BU

REN

STR

EET

67TH AVENUE

75TH AVENUE

59TH AVENUE

PROJECT FEATURES

6750 W VAN BUREN ST | BUILDING 1

6800 W VAN BUREN ST | BUILDING 2

Project Location:Project Size:Zoning:Clear Height:Lighting:Sprinklers:Parking:Truck Court Depth:Truck Court:Power:Floor Slab:Location:

Building Size:Divisibility:Office SF:Dock High Positions:Grade Positions:

Building Depth:Column Spacing:

Building Size:Divisibility:Office SF:Dock High Positions:Grade Positions:

Building Depth:Column Spacing:

78,150 SF18,000 SF

To Suit17

6 (12’ x 14’) 2 (14’ x 14’)

180’50’ x 60’

84,690 SF18,000 SF

To Suit24

2 (12’ x 14’) 2 (14’ x 14’)

180’50’ x 50’

NWC 67th Ave & Van Buren St.162,840 SF

CP/GCP (City of Phoenix)28’LED

ESFR1.67/1,000 SF

180’Full Concrete

6,000 Amp 277/480v (3,000 Amps per building)7” Slab

0.8 Miles Interstate 10 1.0 Miles 202 Freeway

Page 4: BREAKING GROUND 1Q 2019 - - Hopewell Development

XYXYXYXY

#*

MCDOWELL RD

VAN BUREN ST

59TH

AV

E

67TH

AV

E

75TH

AV

E

83RD

AV

E

FLOODDISTRICT

MANUEL PENA JR SCHOOL

AK-CHINPAVILION

SUPERCENTER

DESERT SKY MALL

RAUL H. CASTRO MIDDLE SCHOOL

SITE

± 3 MINS0.8 MILES

± 4 MINS1.0 MILES

GARY ANDERSONSenior Director+1 602 224 [email protected]

JUSTIN LEMASTER Director+1 602 229 [email protected]

MIKE GILBERTSenior Associate +1 602 468 8540 [email protected]

Cushman & Wakefield Copyright 2019. The information contained herein was lawfully obtained from sources we consider reliable. Cushman & Wakefield is not responsible and expressly disclaims all liability, for errors, omis-sions, prior sales, withdrawal from the market or change in price. Seller (or Lessor, as the case may be) and broker make no representation as to the environmental condition of the property and recommend Purchaser’s (or Lessee’s) independent investigation.

2555 E. Camelback Rd, Suite 400 Phoenix, Arizona 85016 ph: +1 602 954 9000  |  fx :+1 602 253 0528www.cushmanwakefield.com

1 Mile to Loop 202

20 Minutes to Sky Harbor Airport

0.8 Mile to I-10