Brazosport College Architectural and Engineering Services Renovation and Expansion of the Main...

26
Brazosport College Architectural and Engineering Services Renovation and Expansion of the Main Campus Building March 1, 2010

Transcript of Brazosport College Architectural and Engineering Services Renovation and Expansion of the Main...

Page 1: Brazosport College Architectural and Engineering Services Renovation and Expansion of the Main Campus Building March 1, 2010.

Brazosport CollegeArchitectural and Engineering Services

Renovation and Expansion of the Main Campus Building

March 1, 2010

Page 2: Brazosport College Architectural and Engineering Services Renovation and Expansion of the Main Campus Building March 1, 2010.

Matrix Spencer Architecture, Planning & Interior Design

Page 3: Brazosport College Architectural and Engineering Services Renovation and Expansion of the Main Campus Building March 1, 2010.

Matrix Spencer Architecture, Planning & Interior Design

Matrix Spencer Architects, established in 1967 as Spencer Partnership Architects, is a multi-discipline architecture firm providing comprehensive planning, facility design, engineering coordination, interior architecture, interior design, project management and construction-related services.

Matrix Spencer Architects is well known throughout Texas and the Houston metropolitan region for exceptional professional architectural services. Our staff has designed more than 250 schools and secondary education facilities over our 43 year history. Matrix Spencer is comprised of architects, planners and designers with extensive education design experience. We are experts in occupied renovation projects involving complex phasing and strict schedule / budget compliance.

Page 4: Brazosport College Architectural and Engineering Services Renovation and Expansion of the Main Campus Building March 1, 2010.

Introduction of Project TeamMatrix Spencer - Prime

J. Gordon Spencer, AIA, RIBA, Principal-In-Charge

Steven L. Biegel, AIA, LEED AP, Project Manager

Ken Cvejanovich, LEED AP, Architect

Horacio Gomez, AIA, LEED AP, Architect Ray Ferrari, AIA, LEED AP, Architect

Richard Adamchak, AIA, Architect

Page 5: Brazosport College Architectural and Engineering Services Renovation and Expansion of the Main Campus Building March 1, 2010.

Introduction of Project Team

O’Malley Engineers Edward T. Addicks, P.E.

Civil Engineer

HRE, Inc. Jeffrey Parker, P.E.

MEP Engineer

Haynes Whaley Associates, Inc. Jeremy Anderson P.E., LEED AP,

Structural Engineer

4b Technology Group Geoff Basford

IT Consultant

Bennett Wagner & Grody Don Grody, AIA

Architectural Consultant

Clark Condon Associates Paul Weathers, ASLA

Landscape Architects

Page 6: Brazosport College Architectural and Engineering Services Renovation and Expansion of the Main Campus Building March 1, 2010.

Organizational ChartBrazosport College

Architectural / Engineering Services

Principal-in-Charge

J. Gordon Spencer, AIA, RIBA

Project Manager

Steven L. Biegel, AIA, LEED AP

MATRIX SPENCER PROJECT TEAM

Project Architect

Ken Cvejanovich, LEED AP

Civil Engineer Structural Engineer IT Consultant

Edward T. Addicks, P.E. Jeremy Anderson, P.E., LEED AP Geoff Basford

O’Malley Engineers Haynes Whaley Associates 4b Technology Group

Landscape Architecture MEP Engineer Architectural Consultant

Paul Weathers, ASLA Jeffrey Parker, P.E. Don Grody, AIA

Clark Condon Associates HRE, Inc. Bennett Wagner & Grody

Project Designer

Robert A. Herolz

Page 7: Brazosport College Architectural and Engineering Services Renovation and Expansion of the Main Campus Building March 1, 2010.

J. Gordon Spencer, AIA, RIBAMatrix Spencer

EducationUniversity of Alabama – 1958/1959Lamar University – 1960University of Houston – 1961/1964

Architectural RegistrationTX 3869 / CO 306238 / GA 10415 / LA 2953 / ME 1102 / MD

2548R / MO A5151 / NV 4856 / NJ 07675 / NY 14831 / OK 2151 / PARA015354B / WV 2979

Practicing Architecture in the U.S. since 1961 Currently working in Galveston Over 250 Educational Public Facilities Numerous Governmental Facilities Commercial Multi-Purpose Mid-Rise Buildings Condominiums Parking Garages Master Panned Multi Use Projects Occupied Renovation

Page 8: Brazosport College Architectural and Engineering Services Renovation and Expansion of the Main Campus Building March 1, 2010.

EducationSyracuse University School of Architecture – 1978University of Virginia, Graduate Classes, Urban Planning & Design – 1979Catholic University School of Law, Federal A/EProcurement, Continuing Education Credits – 1979George Washington School of Law, Continuing Education – 1996

Architectural RegistrationTX 16068 / LA 4801 / DC 3153 / FL 17532 / MD

5208 /NJ 13293 / NY 17995-1 / PA 8877 / GA 10443

Practicing Architecture in U.S. since 1980 Expert in Public Building Renovation Building Evaluations & Assessments Sustainable Design Authored the portion of Encyclopedia of

Architecture, Design and Construction entitled “Roofing and Roofing Systems”, published by McGraw Hill

Over 140 Occupied Renovation Projects

Steven L. Biegel, AIA, LEED AP

Page 9: Brazosport College Architectural and Engineering Services Renovation and Expansion of the Main Campus Building March 1, 2010.

EducationUniversity of Copenhagen, Denmark – Fall 1974Tulane University - New Orleans, LABachelor of Architecture – 1976Tulane University – New Orleans, LAMaster of Architecture - 2004

Architectural RegistrationTX 18111 / LA 2831

Practicing with firm for over 21 years Understanding of Gulf Coast design Currently working in Galveston on

Diamond Beach Schools (K-12) Condominiums Churches Office Buildings Code and Life Safety Analysis

Ken Cvejanovich, LEED AP

Page 10: Brazosport College Architectural and Engineering Services Renovation and Expansion of the Main Campus Building March 1, 2010.

Haynes Whaley Associates – Structural Engineers

Page 11: Brazosport College Architectural and Engineering Services Renovation and Expansion of the Main Campus Building March 1, 2010.

HRE, Inc. – MEP Engineers

Page 12: Brazosport College Architectural and Engineering Services Renovation and Expansion of the Main Campus Building March 1, 2010.

History of working in Galveston / Coastal areas

Diamond Beach Resort – Galveston, TX

• Size: 120 Units• Cost: $70 Million

*Diamond Beach was not affected by Hurricane Ike

Page 13: Brazosport College Architectural and Engineering Services Renovation and Expansion of the Main Campus Building March 1, 2010.

History of working in Galveston / Coastal areas

Emerald by the Sea Condominiums – Galveston, TX

• Size: 15 story building with approx. 100 units• Cost: $35 million

*The Emerald was not affected by Hurricane Ike

Page 14: Brazosport College Architectural and Engineering Services Renovation and Expansion of the Main Campus Building March 1, 2010.

History of working in Galveston / Coastal areas

Regional Professional Building – Port Arthur, TX

• Size: 5 story - 128,000 SF• Cost: $5.8 million

Page 15: Brazosport College Architectural and Engineering Services Renovation and Expansion of the Main Campus Building March 1, 2010.

Similar Project Experience

Dulles School Campus Additions and Renovations

Complete interior and exterior renovations and

additions for the district’s premier campus comprising on-site elementary, middle and high school facilities.

4,500 students remained on-campus during the

phased, two-year construction period.

Physical structures were upgraded, HVAC were completely removed and replaced, 70% of electrical was replaced, 40% of plumbing was replaced.

Classes continued with minimal interruptions.

Page 16: Brazosport College Architectural and Engineering Services Renovation and Expansion of the Main Campus Building March 1, 2010.

Similar Project Experience

Page 17: Brazosport College Architectural and Engineering Services Renovation and Expansion of the Main Campus Building March 1, 2010.

Project Understanding

Two Concurrent Projects

Infill Project to Create Library Space

Phased Construction

Swing Space Needed

Four Distinct Tasks

Page 18: Brazosport College Architectural and Engineering Services Renovation and Expansion of the Main Campus Building March 1, 2010.

Project Understanding

Temporary egress routes

Temporary utilities

Life Safety requirements

Contractor Staging and Equipment areas

Noise and Dust Migration

Security

IT and Data Cabling

Back-up Power System

Page 19: Brazosport College Architectural and Engineering Services Renovation and Expansion of the Main Campus Building March 1, 2010.

Project Understanding

Page 20: Brazosport College Architectural and Engineering Services Renovation and Expansion of the Main Campus Building March 1, 2010.

Project Approach

Program Confirmation

Code Analysis

Egress Paths

Phasing Plan

Swing Space

Surgical Construction

Page 21: Brazosport College Architectural and Engineering Services Renovation and Expansion of the Main Campus Building March 1, 2010.

Project Schedule

Page 22: Brazosport College Architectural and Engineering Services Renovation and Expansion of the Main Campus Building March 1, 2010.

Project Approach

Confirm Budget at Schematic Design

Set Schedule and Milestones

Strong Leadership + Coordination

Innovative Solutions

Page 23: Brazosport College Architectural and Engineering Services Renovation and Expansion of the Main Campus Building March 1, 2010.

Best Practices

Re-state Project Scope

Clearly Define Project Boundaries

Life Safety and Code Compliance

Energy Conservation (ASHRAE 90.1)

Natural Light and Ventilation

Confine Construction Operations

Minimize Number of Moves (Swing Space)

Page 24: Brazosport College Architectural and Engineering Services Renovation and Expansion of the Main Campus Building March 1, 2010.

Quality Control / Quality Assurance Phase / Service Matrix

Page 25: Brazosport College Architectural and Engineering Services Renovation and Expansion of the Main Campus Building March 1, 2010.

Summary

Experienced in Occupied Renovations Key Team Members in Houston Programming Expertise Extensive Existing Building Assessment

Experience Preliminary Designs Studies (PDS) Program of Requirements (PORs) Strong Project Management Construction Phasing & Scheduling Experts

Page 26: Brazosport College Architectural and Engineering Services Renovation and Expansion of the Main Campus Building March 1, 2010.

Thank You!