Brasfield & Gorrie Cogeneration and Energy Experience
description
Transcript of Brasfield & Gorrie Cogeneration and Energy Experience
OFFICES
STATES
RALEIGHNASHVILLEATLANTACOLUMBUSBIRMINGHAMDALLASJACKSONVILLEORLANDO
CURRENT WORKPERFORMED WORK
EMR Work Hours RIR LTIR
2013 .52 6,134,233 1.66 .07
2012 .55 6,044,245 2.22 .26
2011 .55 5,071,776 2.25 .39
SAFETY PERFORMANCEINDICATORS
SELECT EXPERIENCE
NUCLEAR POWER FOSSIL FUEL—COALHYDROPOWER
OIL AND GAS MINING FOSSIL FUEL—GAS
MARKETSECTORSCommercial
Education
Energy
Government
Healthcare
Industrial
Sports andEntertainment
Transportation
Water
#22TOP 400CONTRACTORS
by ENR for 2014
EXPERIENCEBY THE NUMBERS
2,600EMPLOYEES
EST. 1964
MORE THAN37years of infrastructure, heavy civil, and power project experience
$3.3 billion in infrastructure, heavy civil, and power projects
#22Top Fossil Fuel Power Contractor by ENR National
#6Top Power Contractor by ENR Southeast
#1Top Green Contractor by ENR Southeast #13
Top Wastewater Treatment Plants Contractor by ENR National (2013)
#6Top CM-at-Risk Contractor by ENR Southeast .46
Brasfield & Gorrie’s Current Safety EMR (2014)
Energy
ANNIVERSARY
th50FOSSIL
NUCLEAR
HYDRO
MININGDrummond Coal Mine Bathhouse—Oakman, AL
APAC Mid-South Warren County Quarry—Camak, GA
SouthernCo Lake Martin Dam Arch Replacement—Tallassee, AL
SouthernCo Goat Rock Dam Turbine Installation—Smith’s Station, AL
Duke Energy Crystal River Nuclear Plant Unit 3 Independent Spent Fuel Installation—Crystal River, FL
Duke Energy Brunswick Plant Fukushima Warehouse—Southport, NC
Duke Energy Harris Plant Warehouse—New Hill, NC
Duke Energy Robinson Plant Warehouse—Southport, NC
Southern Nuclear Plant Vogtle ISFSI Pad, Heavy Haul Road, Cask Transfer Facility, and High Bay Support Building—Waynesboro, GA
SouthernCo Plant Farley Nuclear Plant Operations Building and ISFSI Expansion—Columbia, SC
Holtec Contracts Supporting Spent Fuel Transport and Storage
AEP Flint Creek Power Plant Civil and Site Development—Gentry, AR
AEP Welsh Power Plant Civil Package—Pittsburg, TX
SouthernCo Plant Wansley Limestone Unloading and Handling—Franklin, GA
SouthernCo Plant Crist Concrete Package 8C—Pensacola, FL
SouthernCo Plant Hammond Wet Flue Gas Desulfurization—Rome, GA
SouthernCo Kemper County IGCC Power Plant Concrete Foundation and Underground Package—DeKalb, MS
SouthernCo Plant Miller Limestone Preparation and Gypsum Dewatering—Quinton, AL
SouthernCo Plant Stanton Combined Cycle Unit B Fuel Oil Conversion—Orlando, FL
SouthernCo Plant Bowen MATS Ball Mill & Limestone Foundations, Administration Building, and Sewage Treatment Plant & Lift Station—Euharlee, GA
Alstom Power Balancing Facility and High Bays Renovation—Chattanooga, TN
El Paso Energy Land Based Test—Trussville, AL
CPS Energy Rotary Plow and Conveyors Installation—San Antonio, TX
Coal Emissions Reduction Technology Projects—13 states
#1CONTRACTOR
by ENR Southeast
Experience
Brasfield & Gorrie is
one of the largest privately-held
contracting firms in the Southeast.
Engineering News Record ranks the
company No. 22 among the nation’s
Top 400 Contractors.
50 years in business
8 regional offices
2,600 employees
$2.3 billion revenue in 2013
2014 #1 Top Contractorby Engineering News-Record Southeast
Self-Perform Contractor
CP
S E
nergy Rotary P
low and C
onveyors
About usBrasfield & Gorrie is one of the largest
privately held construction firms in the nation.
Headquartered in Birmingham, Alabama, our
company is the successor to the Thomas C.
Brasfield Company, a general contractor operating
as a sole proprietor from 1921. Miller Gorrie
purchased the company’s construction assets in
1964 and changed the name to Brasfield & Gorrie
in 1967.
Initially, the new company continued within the
Thomas C. Brasfield niche of small commercial and
remodeling projects. As profitability increased, the
company shifted its emphasis to larger commercial,
institutional, healthcare, and industrial projects,
and in 1984, Brasfield & Gorrie opened full-
service offices in Atlanta and Orlando. In 1998,
we opened offices in Raleigh and Nashville to
better serve our clients in those areas, and we
continued our forward momentum by opening
offices in Jacksonville in 2006, Dallas in 2010, and
Columbus, Georgia, in 2012.
Brasfield & Gorrie’s success is the result of
a strong work ethic and industry knowledge
combined with innovation and collaboration. In
the first full year after Miller Gorrie purchased the
assets of the Thomas C. Brasfield Company, our
annual revenue was less than $1 million. Today,
our annual revenue is more than $2 billion, and
we are a nationally respected general contractor
and the builder of the world’s largest aquarium,
the Georgia Aquarium, which is a model of project
efficiency, superior quality, and exceptional service
from start to finish. Frequently recognized for
excellence in our industry, we build more than
exceptional buildings: we build relationships.
M. MILLER GORRIEChairman
JIM GORRIEPresident & CEO
Brasfield & Gorrie’s 2,200
employees provide General
Contracting, Construction
Management and Design-
Build services to our clients.
Our company operates
as a non-union and merit
shop that supports a
substantial craft following.
We are currently working
on projects in 15 states and
qualified to work in 49.
Services
SAFETY PROGRAMWe are proud of our safety record.
Our current experience modification rate (EMR) of 0.46 is almost
half the national average. We have
received multiple safety awards,
including the Associated Builders
and Contractors (ABC) Safety
Training and Evaluation Process
(STEP) Platinum or Gold Award
for safety for the last nine years. In
addition, we are designated an ABC
Accredited Quality Contractor for
our commitment to safety, training,
employee benefits, and community
relations.
OFFICES
STATES
RALEIGHNASHVILLEATLANTACOLUMBUSBIRMINGHAMDALLASJACKSONVILLEORLANDO
CURRENT WORKPERFORMED WORK
FINANCIAL STRENGTH
With $2.3 billion in revenue in 2013, a backlog of $1.7 billion,
and a bonding capacity exceeding $3 billion, Brasfield & Gorrie
has an exceptionally strong financial position.
Services
“THINK ZERO!”This aspect of our safety system
reflects our corporate goal of
having zero incidents on each of our
projects. THINK Zero emphasizes
the importance of proactive
planning, training, communication,
and accountability on all of our
projects. Our “THINK Zero!”
initiative includes an awareness
campaign, training, and specific
safety approaches.
Plant Miller Limestone Preparation & Gypsum Dewatering
Quinton, Alabama
Safety is our top priority at Brasfield
& Gorrie. More than 1,000 of our
salaried employees have completed the
OSHA 30-hour Safety Training Program.
Power ExperienceOur goal is always to have a thorough understanding
of all intended functions and the impact of each power
project. Constructing a power project involves diligent
and detailed planning to minimize disruption during
construction as these types of projects often provide
services to entire communities. Once completed,
these projects are used by masses of people, therefore
the stringent owner requirements coupled with our
ability to effectively manage the project, ensure a
high quality end product that benefits the community.
Our power experience includes a wide range of
project types such as heavy civil, concrete, material
handling/process systems, water treatment, sitework,
hydropower and industrial projects.
Plant Franklin Unit 3 Combined Cycle ProjectSmith’s Station, Alabama
Kemper County Integrated Gasification Combined Cycle (IGCC) Power PlantDekalb, Mississippi
Plant CristPensacola, Florida
Plant Wansley Units 6 & 7 Combined Cycle ProjectRoopville, Georgia
Plant Hammond Wet Flue Gas Desulfurization (FGD) Rome, Georgia
Plant Stanton Combined Cycle Unit BOrlando, Florida
Crystal River Nuclear Plant Unit 3 Independent Spent Fuel Storage Installation (ISFSI)Crystal River, Florida
Plant Yates Cooling Tower FoundationsNewnan, Georgia
Alabama Power Gaston Synfuel PlantWilsonville, Alabama
Georgia Power Plant Branch SynfuelMilledgeville, Georgia
Plant Wansley Limestone Unloading & HandlingFranklin, Georgia
Plant Vogtle Independent Spent Fuel Storage (ISFSI)Heavy Haul RoadWaynesboro, Georgia
Alabama Power Plant Gaston Scrubber Parts WarehouseWilsonville, Alabama
Plant Farley Nuclear Plant Operations BuildingDothan, Alabama
Plant Miller Selective Catalytic Reduction (SCR) WarehouseQuinton, Alabama
Cleveland County Administrative/Maintenance WarehouseKings Mountain, North Carolina
CPS Energy Rotary Plow & Conveyors InstallationSan Antonio, Texas
CPS Energy Rotary Dumper Building Steel ReplacementSan Antonio, Texas
SE
LE
CT
PO
WE
R P
RO
JEC
TS
Capabilities & Services
Brasfield & Gorrie has
completed numerous power
projects for customers across
the Southeast. Of these clients,
many have come back to us
again and again for their
construction needs. This is
a testimony not only to our
people and our experience but
most importantly—our results.
Self-perform CapabilitiesSitework, grading and foundation excavation
Utility installation
Concrete foundations, slabs and structures
Rebar installation
Structural and miscellaneous steel
Mechanical and process piping
Process equipment coordination and installation
Power Project Services:Pre-construction and estimating
Construction management
General contracting
Engineering, procurement, and construction (EPC)
Procurement
Scheduling and logistical planning
Quality control and assurance
BIM modeling
BRASFIELD & GORRIE CAPABILITIES AND SERVICES:
Our ability to provide in-house services gives us superior control
over cost, schedule, quality and safety. Self-performance on a
project can range from 5 to 95 percent, depending on the type of
construction. On average, we self-perform about 25 percent of
the work on our projects. By self-performing work that many of
our competitors must subcontract, we are able to eliminate an
additional markup, thereby reducing project costs for the owner.
WO
RK
EX
PE
RIE
NC
E
BRASFIELD & GORRIE
Brasfield & Gorrie was awarded the Foundation and
Underground Mechanical/Electrical package for
the new IGCC Power Plant for Southern Company/
Mississippi Power in Kemper County, Mississippi.
Construction is scheduled to begin in February 2011
and is expected to peak at 610 people onsite.
This project involves 150,000 cubic yards of
concrete, 140,000 linear feet of pipe, and 750,000
linear feet of ductbank conduit.
OWNER
Mississippi Power Company
KEMPER COUNTY INTEGRATED GASIFICATION COMBINED CYCLE (IGCC) POWER PLANTDEKALB, MS
Brasfield & Gorrie was selected as the general
contractor for the installation of a cogeneration
system powered by digester gas at the Mauldin Road
Wastewater Treatment Plant. The project included
the demolition and rerouting of existing underground
process piping to clear the area for the new
cogeneration system and concrete foundations for
the gas conditioning equipment and a pre-engineered
metal building to house the new system. New
instrumentation and control system was required to
operate the gas conditioning to include the systems
integration with the plant’s SCADA system and
associated field instruments. Also included was
power and control wiring for the new I & C and
cogeneration systemsand startup assistance.
OWNER
Renewable Water Resources
MAULDIN ROAD WASTEWATER TREATMENT PLANT COGENERATIONGREENVILLE, SC
WO
RK
EX
PE
RIE
NC
E
BRASFIELD & GORRIE
Brasfield & Gorrie, acting as general contractor,
installed the concrete foundations, underground
electrical, and underground mechanical for two
new combined-cycle power plants at the Georgia
Power Plant Wansley. Units 6 & 7 included
concrete foundations totaling over 23,400 cubic
yards of concrete and 1,410 tons of reinforcing
steel.
The project included excavating and backfilling
approximately 35,000 cubic yards of soil
materials and installing 10,000 tons of stone
surfacing/roadway material.
OWNER
Georgia Power Company
PLANT WANSLEY UNITS 6 & 7 COMBINED CYCLE PROJECTROOPVILLE, GA
Brasfield & Gorrie was selected as the general
contractor for modifications to the North
Regional Wastewater Treatment Plant for
Chevron Energy Solutions. This project will
include a new Fat, Oil, and Grease (FOG)
Receiving Facility and a new Cogeneration
System. The project includes a signifi cant
amount of small diameter ductile iron pipe
and equipment installation. There is a limited
amount of concrete, mainly limited to slabs on
grade.
OWNER
Chevron Energy Solutions
NORTH REGIONAL WASTEWATER TREATMENT PLANT MODIFICATIONSPOMPANO BEACH, FL
WO
RK
EX
PE
RIE
NC
E
BRASFIELD & GORRIE
Brasfield & Gorrie, acting as general contractor,
installed the concrete foundations, embedded
electrical, site grading, site paving, storm piping, and
epoxy linings for the Georgia Power Plant Hammond
Wet FGD project in Coosa, Georgia. Concrete
foundations totaled over 21,080 cubic yards of
concrete, 1,660 tons of reinforcing steel, 2,200
anchor bolts, and 15,000 tons of stone backfill for
multiple foundations.
OWNER
Georgia Power Company
PLANT HAMMOND WET FLUE GAS DESULFURIZATION (FGD) PROJECTROME, GA
This project consisted of the installation of the
support foundations, underground electrical, and
underground mechanical piping systems for a one-
on-one combined cycle unit.
Brasfield & Gorrie also installed the foundations,
mechanical piping and electrical duct for the fuel oil
conversion package.
Also included were support buildings such as a large
warehouse, administration building, and electrical
equipment shelter. Brasfield & Gorrie self-performed
all of the site work and concrete.
OWNER
Southern Company
PLANT STANTON COMBINED CYCLE UNIT B IGCC CONVERSIONORLANDO, FL
WO
RK
EX
PE
RIE
NC
E
BRASFIELD & GORRIE
Brasfield & Gorrie, acting as general contractor,
installed the underground and foundation
package for Georgia Power’s Plant Yates Units
1-5 Cooling Tower. This work included sitework,
underground fire protection, electrical, and
concrete foundations.
The project also included steel demolition/
relocation, foundation installation and
grounding-related work inside an active
switchyard, utilizing specialized switchyard
training and construction equipment grounding
procedures.
OWNER
Georgia Power Company
PLANT YATES COOLING TOWERNEWNAN, GA
• Unit 7 SCR Foundations: Foundation
project consisting of spread footings with
piers and grade beams.
• JBR Project Chimney Foundation:
Foundation package for Jet Bubbling
Reactor FGD project. 12 feet thick concrete
foundation for a chimney.
• Concrete Package 8C: Package consisted of
various foundations for JBR FGD project.
Included 11,200 cubic yards of concrete,
935 tons of reinforcing steel and over 1,600
anchor bolts.
OWNER
Gulf Power Company, Inc.
PLANT CRISTPENSACOLA, FL
WO
RK
EX
PE
RIE
NC
E
BRASFIELD & GORRIE
Brasfield & Gorrie was selected by Georgia Power
for the design-build (EPC) delivery of a synthetic
fuel plant at Branch Steam plant. This project
consisted of one reclaim coal tunnel, one synfuel
pad and all miscellaneous conveyor footings totaling
approximately 900 cubic yards of concrete.
This project also involved the installation of a 48-
inch conveyor into crusher building transfer tower; a
200 HP two-roll crusher by T.J. Gundlach; a 48-inch
conveyor into synfuel plant; a 48-inch conveyor onto
radial stacker; 48-inch radial stacker and a modular
sampling unit.
OWNER
Georgia Power Company
GEORGIA POWER PLANT BRANCH SYNFUELMILLEDGEVILLE, GA
Brasfield & Gorrie was selected by Alabama Power
for the construction of a synthetic fuel plant at
Gaston Steam plant. This project consisted of
two reclaim coal tunnels, one synfuel pad and
all miscellaneous conveyor footings totaling
approximately 1,900 cubic yards of concrete.
This project also involved the installation of eight
separate conveyor systems that moved raw coal
through the process of converting it into synfuel and
delivery to the steam plant.
OWNER
Alabama Power Company
ALABAMA POWER GASTON SYNFUEL PLANTWILSONVILLE, AL
WO
RK
EX
PE
RIE
NC
E
BRASFIELD & GORRIE
Brasfield & Gorrie was the engineering/procurement/
construction (EPC) contractor and was tasked with
designing, furnishing, installing and testing of a
limestone unloading, handling, and reclaim system for
Georgia Power’s Plant Wansley.
This system unloads and stocks-out limestone
received by rail, then reclaims and conveys the
limestone to two on-site silos. The unloading hopper
has “hot rails” for automatic bottom-discharge rail
car gate operation, aided by a side car shaker. A wet
dust extractor control system is used to maintain
dust control. Brasfield & Gorrie self-performed
overall project management, design coordination, site
preparation (30,000 cubic yards earthwork), and
concrete foundations.
OWNER
Georgia Power Company
PLANT WANSLEY LIMESTONE UNLOADING & HANDLINGFRANKLIN, GA
Brasfield & Gorrie was selected as the general contractor for the heavy haul road for Plant Vogtle’s ISFSI project. The work involves the construction of a reinforced concrete haul road, that is 24 feet wide and 24 inches thick with an 8-inch sub base, and an ISFSI pad designed to hold 20 spent fuel canisters. The work also included the installation of a below-ground cask transfer facility. The haul road will extend from the existing cask load facility to the new cask storage area. The work is located both inside and outside the existing protected area (PA). The haul road must have the capacity to withstand loads of over 300 tons, the combined weight of the crawler, canister, and protective overpack. Additional work includes excavation, storm sewer drainage and culverts, sanitary sewer relocation, sediment and erosion control, railroad spur installation, and roadway lighting.
OWNER
Southern Nuclear Operating Company
PLANT VOGTLE INDEPENDENT SPENT FUEL STORAGE (ISFSI) INSTALLATION HEAVY HAUL ROADWAYNESBORO, GA
WO
RK
EX
PE
RIE
NC
E
BRASFIELD & GORRIE
Brasfield & Gorrie was selected to construct a 6,300
sq ft, prefabricated warehouse, including all related
site work. This warehouse is the parts warehouse
for the two new scrubbers recently installed at Plant
Gaston. In order for the scrubbers to be brought on
line the, warehouse had to be ready and stocked. The
warehouse is 70 by 101 feet with a 29-foot eave
height and tied to an existing structure.
The project scope included site work such as erosion
control, removing the existing ductbank, relocating
the water line and installing new waterlines.
The building foundations are large, heavily reinforced
perimeter turndowns poured integrally with the
slab on grade. The slab is a 12-inch thick, heavily-
reinforced slab on grade.
OWNER
Alabama Power Company
ALABAMA POWER PLANT GASTON SCRUBBER PARTS WAREHOUSEWILSONVILLE, AL
Brasfield & Gorrie was selected as the General
Contractor for Plant Farley’s Operations Building.
The facility will house plant managers and
administration personnel. The four-story, 77,000 sq
ft building consists of a structural steel frame, metal
stud framing, curtain wall glazing and brick veneer
with cast stone accents.
The facility will include a full kitchen and dining hall
which will serve the people that occupy this building
as well as others from inside the plant.
The new building will include state-of-the-art video
conference rooms, an exercise gym, aerobics room,
full shower facilities and an outside dining veranda.
OWNER
Southern Nuclear Operating Company
PLANT FARLEY NUCLEAR PLANT OPERATIONS BUILDINGDOTHAN, AL
WO
RK
EX
PE
RIE
NC
E
BRASFIELD & GORRIE
Brasfield & Gorrie was selected as the Design/
Builder for Southern Company’s Selective Catalytic
Reduction (SCR) Warehouse construction at the
J.H. Miller Electric Generating Plant of Alabama
Power Company in Quinton, Alabama.
The project consists of constructing a warehouse
building that has approximately 86,500 sq ft of
enclosed space, including office areas, restrooms,
break rooms, and mechanical mezzanine over
the offices. The building is a pre-engineered steel
structure with pre-finished insulated metal wall
panels and masonry walls.
OWNER
Alabama Power Company
PLANT MILLER SELECTIVE CATALYTIC REDUCTION (SCR) WAREHOUSEQUINTON, AL
Southern Company selected Brasfield & Gorrie as
the design-builder for the administration building and
maintenance building for the new Cleveland County
Power Generating Facility. Plant administration and
control operations are housed in these buildings. The
administration building is a 5,000 sq ftcommercial
office building consisting of the plant electrical and
control room, administration offices, a conference
room, a break room, and restrooms.
The maintenance building is a 3,000 sq ft light
industrial building that supports plant operations.
This building provides areas for equipment and tool
storage. One of the bays has a hoist to assist in the
loading and unloading of equipment.
OWNER
Southern Company Services
CLEVELAND COUNTY ADMINISTRATIVE/MAINTENANCE WAREHOUSEKINGS MOUNTAIN, NC
WO
RK
EX
PE
RIE
NC
E
BRASFIELD & GORRIE
CPS Energy selected Brasfield & Gorrie as the
general contractor for their rotary plows and
conveyors project in San Antonio, Texas. Brasfield
& Gorrie built a 1,126-foot long reclaim tunnel
32-foot deep in the ground along with associated
buildings. The tunnel is equipped with a conveyor and
coal plows. In addition, mechanical piping systems
were installed, including compressed air, service
water and a sump drainage system.
Brasfield & Gorrie’s self-performed activities
included concrete (20,983 cu yd) and sitework
(270,000 cubic yards). Modifications and upgrades
were made to the current coal conveyor system.
OWNER
CPS Energy
CPS ENERGY ROTARY PLOW & CONVEYORS INSTALLATIONSAN ANTONIO, TX
The Rotary Dumper Building Steel Replacement
Project consisted of the replacement of corroded
steel in the below grade area of the existing coal
railroad car unloading facility. The building is located
on the grounds of the CPS Energy Calaveras Lake
coal-fired power plant in San Antonio, Texas. The
components replaced included structural, electrical,
and mechanical components. All work took place
during a 60-day shutdown of the unloading facility.
In addition to the work listed above, many additional
areas of corroded structural steel and conveyor
components were also found during the shutdown and
required a designed replacement prior to the end of
outage operations.
OWNER
CPS Energy
CPS ENERGY ROTARY DUMPER BUILDING STEEL REPLACEMENTSAN ANTONIO, TX
WO
RK
EX
PE
RIE
NC
E
BRASFIELD & GORRIE
The NPPD Pulse Jet Baghouse project was a plant
expansion for the Nebraska Public Power District
at their coal powered, twin boiler power plant in
Hallam, Nebraska.
The expansion consisted of adding two new
baghouses to the plant. Brasfield & Gorrie performed
all of the excavation, demolition, electrical grounding,
site utilities, and concrete foundations for the project.
In preparing the site, Brasfield & Gorrie undercut the
areas by four feet in order to get uniform soil under
all new construction. In total for the project, we
placed over 2,300 cubic yards of concrete and placed
500+ anchor bolts.
OWNER
Nebraska Public Power District
ABB SHELDON STATION CIVIL PACK/NPPD PULSE JET BAGHOUSE HALLAM, NE
Brasfield & Gorrie was awarded a multi-structure
Limestone Handling and Gypsum Dewatering
package for Southern Company’s Plant Miller near
Quinton, Alabama. Plant Miller is Alabama’s largest
coal-fired power plant.
This project consists of constructing a gypsum
dewatering facility, completing two limestone silos,
installing associated equipment and conveyors, and
design-build for a new gypsum storage facility. There
are several concrete structures, metal buildings,
conveyors, utility bridges and electrical & fire
protection.
OWNER
Alabama Power Company
PLANT MILLER LIMESTONEAND GYPSUM HANDLINGQUINTON, AL
WO
RK
EX
PE
RIE
NC
E
• Gypsum Pond Project: Site grading, HDPE
pipe installation and HDPE liner. Sitework
and grading included two acres of clearing and
grubbing, 4,000 cu yd of cut/fill, 7,000 square
yards of fine grading and 6,400 cubic yards of ash
grading and compacting.
• Gypsum Pond Slope Stabilization: Improvements
to existing pond including rock removal on two
slopes adjacent to the pond, grading of the area
around the pond, construction of concrete drive
down a significant slope of access and grading/
surfacing an access roadway.
• Gypsum Pond Overflow Flume Project:
Reworking of the overflow of pond and storm
water drainage. It consisted of RCP installation
under roadway, construction of new concrete
drainage flume, water rerouting, and large rip rap
storm outfall.
OWNER
Alabama Power Company
PLANT GORGAS GYPSUM POND MULTIPLE PROJECTSPARRISH, AL
Brasfield & Gorrie was awarded a grading and
paving package for the Outside the Rail Loop
Grading and Paving Package for Southern
Company’s Plant Miller near Quinton, Alabama.
Plant Miller is Alabama’s largest coal fired power
plant. This project consists of an access road to
access the Gypsum Storage Building and Limestone
Silos including 27,500 sq yd of heavy duty asphalt
paving, 2,100 square yards of asphalt resurfacing,
1,500 sq yd of concrete paving and 1,000 sq yd of
aggregate paving. The project also includes almost
1,000 linear feet of fencing and gates and 2,500
linear ft of guardrail.
OWNER
Alabama Power Company
PLANT MILLER OUTSIDE RAIL LOOP GRADING & PAVINGQUINTON, AL
BRASFIELD & GORRIE
WO
RK
EX
PE
RIE
NC
E
This project included the expansion of the
Independent Spent Fuel Storage Installation
(ISFSI) at the E.I. Hatch Nuclear Plant. Brasfield
& Gorrie was selected as the General Contractor
and the work involved the construction of a 97-
foot x 187-foot reinforced concrete storage pad
approximately 24 inches thick. The concrete pad and
aggregate base assembly was considered important
to Nuclear Safety, and as such had to be constructed
in a precise manor in order to meet design
requirements with little tolerance. Other related
work included site grading, a crawler crane haul
path, storm drainage systems, sidewalks, fencing,
electrical distribution systems, and a new diesel
generator shelter. Brasfield & Gorrie self-performed
all concrete reinforcing, concrete forming, concrete
placement, grading & earthwork, storm drainage,
and steel erection. The work was located inside
the existing protected area (PA) and radiation-
controlled area (RCA).
OWNER
Southern Nuclear Operating Company
PLANT HATCH INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)BAXLEY, GA
Brasfield & Gorrie was selected by Southern Nuclear
as the General Contractor for the Plant Farley
Independent Fuel Storage Installation (ISFSI)
project. The ISFSI storage is a complex designed
and constructed for the interim storage of spent
nuclear fuel and other associated radioactive
materials. Brasfield & Gorrie will be installing ISFSI
pads 4 and 5 which are adjacent to existing pads
1, 2, and 3. The new ISFSI pads are approximately
100 feet by 31 feet and will provide storage space
for 12 casks. The work is located inside the existing
protected area (PA) and radiation-controlled area
(RCA).
OWNER
Southern Nuclear Operating Company
PLANT FARLEY INDEPENDENT SPENT FUEL STORAGE INSTALLATIONCOLUMBIA, AL
BRASFIELD & GORRIE
WO
RK
EX
PE
RIE
NC
E
BRASFIELD & GORRIE
Brasfield & Gorrie was hired by El Paso Global
LNG Company to construct a temporary test facility
that will be capable of vaporizing liquefied natural
gas (LNG) while the major process components are
subjected to simulated shipboard motion. The motion
platform is 110 by 14 feet, weighs approximately
300 tons, and is capable of pitch and roll motions
while vaporizing natural gas.
Project components consist of minor site work,
foundations for the test skids and piping, electrical
system installation, the installation of the booster
pump skid, motion platform, gas heating skid,
hydraulic pump skid, and waste circulating skids,
and the demolition and restoration of the site.
OWNER
El Paso Energy
EL PASO ENERGY LAND BASED TESTTRUSSVILLE, AL
Brasfield & Gorrie was the turnkey general
contractor for the project providing detail
engineering, procurement of materials and
equipment, the installation of equipment and support
utilities, and system startup. The project scope
includes sizing the scrubber, fan and pumps, duct
sizing and routing, pipe sizing and routing, electrical
design, control and instrumentation design, DSC
configuration, and structural design.
The U.S. Alliance ClO2 Scrubber project is a
Cluster Rules compliance project. Exhaust air
from washers, seal tanks, towers from the D bleach
plant, and ClO2 generators is collected and cleaned
through a new scrubber system.
OWNER
U.S. Alliance - Coosa Pines Corporation
U.S. ALLIANCE CLO2 SCRUBBER PROJECTCOOSA PINES, AL
WO
RK
EX
PE
RIE
NC
E
The Alstom High Bays project consisted on an $84
million renovation to an existing steel structure, new
mass concrete machine foundations, a 400,000 sq
ft slab-on-grade, demolition of the existing roof, new
TPO roofing and skylights, new mechanical, electrical
and plumbing systems, and new metal siding. This
facility has the capacity to manufacture and test the
world’s largest turbines for fossil steam, nuclear, and
gas power plants.
Brasfield & Gorrie served as the general contractor
over the entire scope of work and self-performed all
concrete work which included the complex machine
tool foundations, amounting to 42,000 cubic yards.
The Alstom facility produces the world’s largest
power generation turbines.
OWNER
Alstom Power Turbomachines Group
ALSTOM HIGH BAYS RENOVATIONCHATTANOOGA, TN
Brasfield & Gorrie was selected as the general
contractor for Alstom’s Balance Facility located in
Chattanooga, Tennessee which is the world’s largest
rotor balancing facility. This is the first project by
Turbomachine Group in the United States in decades.
The Balance facility is a new, 50,000 sq ft structure
adjacent to the existing High Bays building in which
Brasfield & Gorrie was contracted to renovate.
The project includes a test chamber, the balance
machine house, and an auxiliary building. The
primary function of the Balance Facility is to spin,
test, and balance generators and rotors for gas and
steam turbines. The balancing phase is the final step
in the manufacturing process before the turbines
and generators are sent out to the customers for
installation and use. The rotors and generators are
manufactured in the High Bays facility before they
are sent to the Balance Facility for final testing.
OWNER
Alstom Power Turbomachines Group
ALSTOM BALANCING FACILITY CHATTANOOGA, TN
BRASFIELD & GORRIE
WO
RK
EX
PE
RIE
NC
E
BRASFIELD & GORRIE
The Alabama State Docks coal terminal project was
part of a phased expansion to increase the terminal’s
coal handling capacity from 10 million to 25 million
tons per year.
The 67-feet x 155-feet rein forced concrete dumper
pit was the largest such facility in the world. It
consisted of sheet piles and dewatering below the
elevation of Mobile Bay. It has 2,200 feet of 96-inch
conveyors, and 6,300 feet of 72-inch conveyors. The
system includes six transfer towers, a control room
to switch and direct the coal, and surge bins and
hoppers. The tallest tower is 170 feet high.
OWNER
Alabama State Docks
ALABAMA STATE DOCKS COAL HANDLING FACILITYMOBILE, AL
Brasfield & Gorrie replaced twenty bays of concrete
arches on Lake Martin Dam (three arches per bay,
total 60 arches). The original scope of work was to
demolish and replace all of the existing concrete
arches on the dam. In addition to complex arch
concrete removal/replacement, the project included
removing/replacing embedded power and gantry
crane rail system.
Due to the good working relationship established
on-site, several additional projects were negotiated.
The primary additional project included repairing,
rubbing, and refinishing the existing downstream-side
pier walls supporting the arches.
OWNER
Alabama Power Company
LAKE MARTIN DAM ARCH REPLACEMENTTALLASSEE, AL
WO
RK
EX
PE
RIE
NC
E
BRASFIELD & GORRIE
COAL EMISSIONS REDUCTION TECHNOLOGY (CERT) PROJECTS MULTIPLE LOCATIONS
Brasfield & Gorrie performed extensive powerhouse
modifications at Georgia Power Company’s Goat
Rock Dam to accommodate two new horizontal
bulb-type turbines, two new generators, and two new
speed increasers. This work included setting new
downstream stop logs. For each unit: modification
of the water passages, including a new steel penstock
liner, concrete flow splitter; and other balance of
plant facilities including upgrades to the lube oil,
hydraulic oil, instrument air, and cooling water
systems.
OWNER
Georgia Power Company
GOAT ROCK DAM UNITS 7/8 TURBINE INSTALLATION & PENSTOCK MODIFICATION SMITHS STATION, AL
The CERT projects were design/build projects consisting of eleven similar projects spread across eight states for five different power
providers. The system that was installed consisted of a combination of silos and tanks supported by structural steel platforms on a
combination of shallow & deep foundations. The tanks contained a mixture of dry and wet agents that were to be distributed onto the
coal prior to entering the plant to reduce emissions. These projects had many challenges with the most difficult issues to overcome being
related to design data compilation, project schedule, and the labor/material logistics associated with working in 8 different states at the
same time. In the end, the project team was able to complete both the design and installation of all eleven projects over a six month
period; nearly one month ahead of the overall required project completion date.
AllenDuke Energy
CayugaDuke Energy
Gibson CDuke Energy
Gibson M Duke Energy
LimestoneNRG Power
MarshallDuke Energy
Parish 1NRG Power
Parish 2NRG Power
Rush IslandAmeren
WO
RK
EX
PE
RIE
NC
E
BRASFIELD & GORRIE
Other Project Experience
GALVESTON CAUSEWAY RAILROAD BRIDGE | GALVESTON, TX
WO
RK
EX
PE
RIE
NC
E
BRASFIELD & GORRIE
Brasfield & Gorrie is the construction-manager-
at-risk for a 1.7 million-sq ft ORR facility that
will produce large and ultra-large tires for
mining and construction vehicles.
This is the first Bridgestone plant in the United
States to produce large and ultra-large ORR
tires, which have been produced exclusively at
Bridgestone’s Shimonoseki and Kitakyushu
plants in Japan.
Scheduled to open in the first half of 2014,
the plant will employ approximately 550
employees and will have a production capacity
of approximately 130 tons per day.
OWNER
Bridgestone Americas Tire Operations
ARCHITECT/ENGINEERS
Gresham Smith & Partners
BRIDGESTONE OFF-ROAD RADIAL (ORR) TIRE PLANTAIKEN, SOUTH CAROLINA
This project is a 13,000 sq ft expansion in which Brasfield & Gorrie removed or relocated more than 200 items inside the existing plant including electrical transformers and panels, water heaters, sprinkler lines/standpipes, and more. In addition, the team installed 11,000 sq ft of two-hour rated temporary drywall walls (with ice and water shield on exterior face) then demolished the same square footage of existing precast walls; installed 20,000 sq ft of new precast walls and demolished 5,000 sq ft of the temporary drywall walls; installed two 50,000 gallon fuel oil tanks roughly 20’ below grade (tanks are 12’ tall and 60’ long) that were directly next to three existing tanks of the same size; maintained fully functional on-campus CEP to CMC main campus with over 10 shutdowns scheduled with the plant; and installed 36 caissons with average depth of 40’, average 5’ deep grade beams
with tallest being over 9’ tall, and 2’ thick SOG.
OWNER
Carolinas Healthcare System
ARCHITECT/ENGINEERS
Odell Associates
CAROLINAS HEALTHCARE SYSTEM CENTRAL ENERGY PLANT EXPANSIONCHARLOTTE, NORTH CAROLINA
WO
RK
EX
PE
RIE
NC
E
The scope of work included construction of two biofilter odor control structures, two primary digesters, including a headhouse and a boiler room, a wet weather pump station, and a screening facility addition.
Also included were structural modifications and equipment additions to the existing headworks, primary clarifiers, filter building, aeration basin, sludge/scum pump stations and wet wells, sludge storage tanks, and an influent pump station.
Miscellaneous site improvements included new process and storm drainage piping, asphalt paving, and sidewalks.
OWNER
The Metropolitan Government of Nashville and
Davidson County
DRY CREEK WASTEWATER TREATMENT PLANTMADISON, TN
BRASFIELD & GORRIE
Lower Third Creek in included the construction of
a new 6.5 million gallon prestressed wastewater
storage tank, related diversion and pumping
facilities, trunk sewer piping, process equipment,
process piping, electrical and site improvements.
Process equipment included in-channel grinders,
transfer pumps, sump pumps, sluice gates, and
aeration mixers. New trunk sewer included 2,100
linear feet of 42-inch buried piping. This project
included crossing a 175-foot wide creek with three
48-inch diameter pipes.
OWNER
Knoxville Utilities Board (KUB)
LOWER THIRD CREEK WASTEWATER RECLAMATION FACILITYKNOXVILLE, TN
WO
RK
EX
PE
RIE
NC
E
This project involved the construction of a new
wastewater treatment facility to replace the existing
Main Street sewage plant. The scope of work
included supplemental site clearing, excavation,
grading, sitework, headworks, five-stage biological
nutrient removal basins, secondary clarifiers, tertiary
filtration systems, chlorine contact chambers,
RAS/WAS and scum pump stations, chlorination
generation and feed equipment, influent and effluent
EQ tankage and pump stations, sludge holding
tanks, biosolids handling facility, yard piping, valves,
fittings, and manholes. Additional work included
complete electrical and instrumentation systems and
appurtenances for a 22.5 million gallons per day
advanced wastewater treatment facility.
OWNER
Emerald Coast Utilities Authority
ECUA CENTRAL WATER RECLAMATION FACILITYCANTONMENT, FL
This project was an expansion and upgrade to the existing James B. Messerly Water Pollution Control Plant. The project contained the following new structures: four aeration basins, a sodium hypochlorite facility, a switchgear/generator building, an odor control complex, a dewatering building, and a grit removal system.
Additionally, modifications to the following existing structures were a part of the project: an existing influent pump station, a WAS holding tank, and eight
primary clarifiers.
OWNER
Augusta Utilities Department
JAMES B. MESSERLY WATER POLLUTION CONTROL PLANTAUGUSTA, GA
BRASFIELD & GORRIE
WO
RK
EX
PE
RIE
NC
E
Brasfield & Gorrie’s scope of work at the plant consisted of building a new Effluent Filter Structure, Plant Recycle Pump Station, Effluent Filter Pump Station, Reuse Pump Station, Secondary Clarifier #5, and a RAS Pump Station as well as an extension of the existing Aeration Basin. These structures included forming and placing approximately 14,200 cubic yards of concrete.
Construction also included installation of 6,800 linear of underground Ductile Iron Pipe ranging from 4 to 54 inches and 163,000 pounds of Flanged Ductile Iron Pipe with associated valves, demolition of the old Control Building, the old Blower/Electrical Building, the old Maintenance Building, the AFE Pump Station, and the old Primary Sedimentation Basins, as well as an extensive upgrade of the Plant’s SCADA System.
OWNER
Cobb County Water Systems
SOUTH COBB WATER RECLAMATION FACILITYAUSTELL, GA
This project consists of the expansion of the County’s existing Shady Hills Subregional Wastewater Treatment Facility from 2 MGD to 14 MGD. The project includes: one 5 million gallon ground storage tank; one headworks structure; two splitter boxes; four anoxic basins; three aeration basins; modifications to an existing aeration basin; two internal recycle pump stations; one mixed splitter box; four clarifiers; modifications to existing clarifiers; two RAS pump stations; two sludge holding basins; seven deep bed filters; a chlorine contact chamber; a chemical feed building; an administration building; a blower building; a high service pump station; a drain pump station and mud well pump station; a 14-MG reject water pond; an effluent metering and controls; a truck scale system; a standby power generator system; electrical buildings, instrumentation and controls and a SCADA system; and modifications to the existing roadways.
OWNER
Board of Pasco County Commissioners
SHADY HILLS WASTEWATER TREATMENT FACILITY EXPANSIONSPRING HILL, FL
BRASFIELD & GORRIE
WO
RK
EX
PE
RIE
NC
E
Brasfield & Gorrie provided general contracting services for the South Wastewater Treatment Plant Immediate Action Plan (IAP) combined projects. This project was divided into three sections:
Phase #2 - Primary Treatment Improvements. This phase installed a polymer and ferric chloride chemical system to include foundation, equipment and piping.
Phase #3 - Trickling Filter Improvements. The work included the construction of a trickling filter influent pump station that is divided into a recirculation side and an effluent side.
Phase #5 - Sludge Handling Improvements. Consisted of rehabilitation and equipment upgrade of four sludge thickeners that were originally inoperable.
OWNER
City of Baton Rouge, LA
SOUTH WASTEWATER TREATMENT PLANT IMMEDIATE ACTION PLAN (IAP)BATON ROUGE, LA
BRASFIELD & GORRIE
Phase I: Secondary Plant Expansion
Phase II: a new sludge dewatering building, a filtrate
pump station, and a cast-in-place bridge
Phase III: a 8,354 sq ft generator building, an 8,967
sq ft blower building, eight 160-foot diameter primary
clarifiers, and sixteen 140-foot intermediate clarifiers.
Phase V: a pump Station
Phase VI: a peak flow handling facility
Phase VII: biological filtration
Total Value of all Phases: $354.3 million
OWNER
Jefferson County Department of Environmental
Services
VALLEY CREEK WASTEWATER TREATMENT PLANT - MULTIPLE PHASESBESSEMER, AL
American Cast Iron Pipe hired Brasfield &
Gorrie to provide construction services for their
new 60,000 sq ft Contiarc Furnace Facility.
The scope included installing a new Contiarc
furnace to mix and melt raw materials to make
cast iron pipe; material handling systems; a new
cooling tower and associated piping; furnace
building structural steel with three house
cranes; siding and roofing systems; electrical
power supply and distribution systems; and site
demolition.
The completed project required the placement
of more than 4,100 cubic yards of concrete and
more than 1,100 tons of structural steel.
OWNER
American Cast Iron Pipe (ACIPCO)
ACIPCO CONTIARC FURNACE FACILITYBIRMINGHAM, AL
WO
RK
EX
PE
RIE
NC
E
This design-build project is a new greenfield
aggregate quarry facility; a state-of-the-art rock
crushing and rail load out facility.
Brasfield & Gorrie managed the construction
activities including the use of overburden earthen
fill from the pit development required to provide
the foundation for the rail and processing plant
areas as well as construction of water impoundment
structures and the entrance road at the Warren
County Quarry. The total earthwork quantity for this
project is over 1,000,000 cubic yards.
Now completed, the facility processes and ships
granite aggregate products for construction
materials, via rail to multiple states.
OWNER
APAC Mid-south, Inc.
APAC MID-SOUTH WARREN COUNTY QUARRYCAMAK, GA
BRASFIELD & GORRIE
The railroad bridge is a 382-foot main lift span that rises 80 feet to allow intercoastal waterway traffic on the Galveston Bay to pass under the BNSF Railroad. The project also included an 800-foot long tunnel under the bay to carry new waterlines. All of the bridge work, including electrical work is being self-performed by Brasfield & Gorrie/Cianbro joint venture.
One of the unique challenges of the project is that the main span was built on barges at the port and then floated in to replace the old bridge. This float-out/float-in phase of the lift span had to be completed within a 72-hour marine channel shutdown, with only a 12-hour window to close the bridge from rail traffic.
OWNERSGalveston County, BNSF Railroad, and the U.S. Coast Guard
GALVESTON CAUSEWAY RAILROAD BRIDGE LIFT SPANGALVESTON, TX
Brasfield & Gorrie was awarded this I-65 project as the General Contractor in a hard-bid project delivery. This complex, multi-phased project involved widening approximately 3.5 miles of I-65 in Montgomery, including adding lanes from Catoma Creek Bridge to Mill Street Bridge and widening the three bridges from Mill Street to the Alabama River Bridge. Where additional lanes were added, demolition and reconstruction of eight existing bridge decks was required, as well as jacking the existing bridges to match the new roadway elevations. A total of 14 bridges were widened on the project, one precast, and six steel bridges. Other major areas of work included grading, concrete rubbilization, storm drainage, asphalt paving, concrete barrier walls, lighting,
signage, and traffic signals.
OWNER
Alabama Department of Transportation
I-65 WIDENING AND BRIDGESMONTGOMERY, AL
BRASFIELD & GORRIE
WO
RK
EX
PE
RIE
NC
E
WO
RK
EX
PE
RIE
NC
E
BRASFIELD & GORRIE
The University of Alabama awarded Brasfield &
Gorrie the South End Zone expansion of Bryant-
Denny Stadium, increasing the seating capacity to
more than 101,000 seats.
The expansion mirrors the north end-zone, with
video scoreboards in the corners. Included in the
expansion were 8,500 upper-deck seats, 1,700
club seats, 36 luxury suites, an upper concourse
with restrooms, Crimson Tide Foundation offices,
a Donors Hall of Fame and an outdoor market on
street level for food and merchandise. It increased
seating for UA students and renovated the existing
lower bowl at the south Endzone.
Brasfield & Gorrie self-performed more than 30%
of the work through the construction of the concrete
structure, sitework improvements, and erection of
400 structural precast, upper deck seating units.
OWNER
University of Alabama
THE GEORGIA AQUARIUMATLANTA, GEORGIA
BRYANT-DENNY STADIUM SOUTH END ZONE EXPANSIONTUSCALOOSA, ALABAMA
The Georgia Aquarium, located in downtown
Atlanta, is the largest in the world. This 1,040,000
sq ft facility occupies eight acres on a nine acre
site and holds approximately eight million gallons
of fresh and salt water. Visitors are able to view
more than 100,000 aquatic animals that represent
approximately 500 species from around the world.
After Brasfield & Gorrie completed the Georgia
Aquarium in 2005, we were contracted in September
of 2008 to complete a new 80,000 sq ft expansion
that is home to bottlenose dolphins. Brasfield &
Gorrie self-performed all 30,000 cubic yards of
concrete work. The new space is about the size of
two football fields and features a 1.3 million gallon
exhibit to accommodate up to four dolphins, viewing
windows and stadium seating for dolphin shows.
OWNER
The Georgia Aquarium, Inc.
WO
RK
EX
PE
RIE
NC
E
The Birmingham-Shuttlesworth International Airport Terminal Modernization is a 291,000 sq ft renovation and a 220,000 sq ft addition to the existing airport. This project expands the existing airport to three concourses with 23 gates, including two international gates. Brasfield & Gorrie, with joint venture partner BLOC, is the Construction Manager at Risk on this project. Once completed, all of the existing structure will be renovated and the construction of the new addition will nearly double the size of the airport. New passenger and baggage screening systems will be installed to meet the
current federal guidelines.
OWNER
Birmingham Airport Authority
BIRMINGHAM-SHUTTLESWORTH INTERNATIONAL AIRPORT BIRMINGHAM, ALABAMA
Brasfield & Gorrie was selected to construct several
projects in support of production expansion that
included office, laboratories, substation enclosures,
locker rooms, shower rooms, and similar facilities
within the Body & Assembly buildings. Also included
were infrastructure improvements and parking.
OWNER
Mercedes-Benz International, Inc.
MERCEDES-BENZ BODY & ASSEMBLY PLANT FACILITIESVANCE, AL
BRASFIELD & GORRIE
WO
RK
EX
PE
RIE
NC
E
BRASFIELD & GORRIE
Situated in the epicenter of Midtown Atlanta, Loews Atlanta Hotel features 414 guest rooms including 44 suites and 52 luxury condos in an upscale 40-story hotel/condo structure. One of Atlanta’s only four-star hotels, Loews Atlanta features a restaurant, a bar and cafe, a fitness room, and a business center. There are also 12 meeting rooms and more than 40,000 sq ft of flexible conference center and meeting space capable of accommodating up to 1,580 people. This makes it one of the largest conference spaces in the city and it is the only one with a city view from the 14th floor.
Loews Atlanta is part of the 12th & Midtown development, a $2 billion mixed-use project. Coinciding with the hotel, the structure houses 60,000 sq ft of street retail space and a 14-story parking garage.
OWNER
Daniel Realty Company, LLC
LOEWS HOTEL ATLANTAATLANTA, GEORGIA
This project is a phase of work at the South Wastewater Treatment Plant (WWTP) to improve the handling of peak flows during wet weather events. The work includes modifications to the existing Gravity Influent Pump Station to increase the peak capacity of the pump station to 67 million gallons per day (MGD). A new force main raw wastewater and equalization pump stations will also be constructed.
Also included in the work is the construction of a new Preliminary Treatment Facility. The plant will also have extensive new odor control additions, including both bio-trickling filter towers and activated carbon systems. Lastly, four new equalization tanks will be constructed. One tank will have a volume of 6 million gallons and three tanks will have a volume of 20 million gallons.
OWNER
City of Baton Rouge, Louisiana
SOUTH WASTEWATER TREATMENT PLANT PHASE 1BATON ROUGE, LOUISIANA
Rankings & Awards
ENGINEERINGNEWS-RECORD
(2014 NATIONAL)
ASSOCIATED BUILDERS AND CONTRACTORS (ABC) (2013)
ENGINEERING NEWS-RECORD TEXAS & LOUISIANA (2013)
MODERN HEALTHCARE (2013)
ENGINEERING NEWS-RECORDSOUTHEAST (2014)
No. 22 in “The Top 400 Contractors”No. 12 in “The Top 50 in Domestic Building/Mfg Revenue:No. 31 in “Top Contractors by New Contracts”
Four national ABC Eagle awards Two national ABC Pyramid awardsFifteen ABC Excellence or Merit in Construction awards (Alabama, Carolinas, Central Florida, Georgia, Mid-Tennessee, and North Alabama Chapters)
No. 1 in “Top Contractors” No. 1 in “Private Contractors” No. 1 in “General Building” No. 1 in “Green” No. 1 in “New Construction” No. 1 in “Negotiated” No. 1 in “Hard-Bid” No. 1 in “Georgia Contractors” No. 2 in “Commercial” No. 2 in “Sports and Recreation” No. 3 in “Manufacturing” No. 3 in “Cultural Facilities” No. 4 in “Entertainment” No. 5 in “Sewerage/Solid Waste” No. 6 in “Water Supply” No. 7 in “Telecommunications” No. 9 in “Power” No. 10 in “Public Contractors” No. 10 in “Industrial Process” No. 12 in “Educational” No. 13 in “CM-at-Risk” No. 16 in “Distribution/Warehouse Facilities” No. 18 in “Retail” No. 20 in “Design-Builder”
No. 1 in “Top Sewer/Solid Waste Contractors” No. 12 in “Louisiana Top Contractors” No. 20 in “Top Health Care Contractors” No. 45 in “Top Contractors”
No. 2 in “Top Healthcare General Contractors in the Nation”
BRASFIELD & GORRIE
MISSION
TO BUILD WITH
INTEGRITY WHILE
EXCEEDING THE
EXPECTATIONS OF OUR
CLIENTS, BUSINESS
PARTNERS, EMPLOYEES
AND COMMUNITIES.
VISION
TO BE THE BEST
GENERAL CONTRACTOR
IN THE UNITED STATES.
VALUES
SAFETY
PEOPLE
REWARDING WORK
ENVIRONMENT
COMMITMENT TO
EXCELLENCE
INTEGRITY
TEAMWORK
STEWARDSHIP
Plant W
ansley Lim
estone Unloading and H
andling
ATLANTA | Georgia
BIRMINGHAM | Alabama
COLUMBUS | Georgia
DALLAS | Texas
JACKSONVILLE | Florida
NASHVILLE | Tennessee
ORLANDO | Florida
RALEIGH | North Carolina
Eric Perkinson, LEED AP BD+C
Vice President/Division Manager
3700 Glenwood Avenue
Suite 300
Raleigh, North Carolina 27612
919.790.9272
brasfieldgorrie.com