Branch Capital Improvement Feasibility Update
Transcript of Branch Capital Improvement Feasibility Update
![Page 1: Branch Capital Improvement Feasibility Update](https://reader031.fdocuments.net/reader031/viewer/2022012408/616a37f211a7b741a3501b34/html5/thumbnails/1.jpg)
1San Francisco Public Library Commission
Branch Capital Improvement Feasibility Update | December 15, 2016Building Design & Construction
Branch Capital Improvement Feasibility Update
Ocean ViewMission
Chinatown
![Page 2: Branch Capital Improvement Feasibility Update](https://reader031.fdocuments.net/reader031/viewer/2022012408/616a37f211a7b741a3501b34/html5/thumbnails/2.jpg)
2San Francisco Public Library Commission
Branch Capital Improvement Feasibility Update | December 15, 2016Building Design & Construction
Work to date -Conducted a Survey MonkeyDesign charrettes for each branchIssue charrette findingsConceptual feasibility analysis for each branch –early 2017
![Page 3: Branch Capital Improvement Feasibility Update](https://reader031.fdocuments.net/reader031/viewer/2022012408/616a37f211a7b741a3501b34/html5/thumbnails/3.jpg)
3San Francisco Public Library Commission
Branch Capital Improvement Feasibility Update | December 15, 2016Building Design & Construction
Ocean View Branch [Built in 2000]
June 2000 Present day
![Page 4: Branch Capital Improvement Feasibility Update](https://reader031.fdocuments.net/reader031/viewer/2022012408/616a37f211a7b741a3501b34/html5/thumbnails/4.jpg)
4San Francisco Public Library Commission
Branch Capital Improvement Feasibility Update | December 15, 2016Building Design & Construction
Ocean View Branch
Present day Info Desk Present day Reading Room
![Page 5: Branch Capital Improvement Feasibility Update](https://reader031.fdocuments.net/reader031/viewer/2022012408/616a37f211a7b741a3501b34/html5/thumbnails/5.jpg)
5San Francisco Public Library Commission
Branch Capital Improvement Feasibility Update | December 15, 2016Building Design & Construction
First Floor
Second Floor
![Page 6: Branch Capital Improvement Feasibility Update](https://reader031.fdocuments.net/reader031/viewer/2022012408/616a37f211a7b741a3501b34/html5/thumbnails/6.jpg)
6San Francisco Public Library Commission
Branch Capital Improvement Feasibility Update | December 15, 2016Building Design & Construction
Mission Branch [Built in 1915, Seismic Retrofit 1999]
Built 1915, picture 1940’s Present dayOriginal Main Entry
on 24th StreetPresent Main Entry
![Page 7: Branch Capital Improvement Feasibility Update](https://reader031.fdocuments.net/reader031/viewer/2022012408/616a37f211a7b741a3501b34/html5/thumbnails/7.jpg)
7San Francisco Public Library Commission
Branch Capital Improvement Feasibility Update | December 15, 2016Building Design & Construction
Mission Branch
Interior 1915 Interior present day
![Page 8: Branch Capital Improvement Feasibility Update](https://reader031.fdocuments.net/reader031/viewer/2022012408/616a37f211a7b741a3501b34/html5/thumbnails/8.jpg)
8San Francisco Public Library Commission
Branch Capital Improvement Feasibility Update | December 15, 2016Building Design & Construction
Second Floor (Main Reading)
![Page 9: Branch Capital Improvement Feasibility Update](https://reader031.fdocuments.net/reader031/viewer/2022012408/616a37f211a7b741a3501b34/html5/thumbnails/9.jpg)
9San Francisco Public Library Commission
Branch Capital Improvement Feasibility Update | December 15, 2016Building Design & Construction
Chinatown Branch [Built in 1921, Seismic Retrofit 1996]
Built 1921, picture 1960’s Present dayPresent First Floor EntryOriginal First
Floor Entry
![Page 10: Branch Capital Improvement Feasibility Update](https://reader031.fdocuments.net/reader031/viewer/2022012408/616a37f211a7b741a3501b34/html5/thumbnails/10.jpg)
10
San Francisco Public Library Commission
Branch Capital Improvement Feasibility Update | December 15, 2016Building Design & Construction
Chinatown Branch
Built 1921 (*Photo is Sunset Branch, similar plan) Interior present day
![Page 11: Branch Capital Improvement Feasibility Update](https://reader031.fdocuments.net/reader031/viewer/2022012408/616a37f211a7b741a3501b34/html5/thumbnails/11.jpg)
11
San Francisco Public Library Commission
Branch Capital Improvement Feasibility Update | December 15, 2016Building Design & Construction
M e z z a n i n e A b o v eM e z z a n i n e A b o v e
Second Floor (Main Reading)
![Page 12: Branch Capital Improvement Feasibility Update](https://reader031.fdocuments.net/reader031/viewer/2022012408/616a37f211a7b741a3501b34/html5/thumbnails/12.jpg)
12
San Francisco Public Library Commission
Branch Capital Improvement Feasibility Update | December 15, 2016Building Design & Construction
Survey Findings
![Page 13: Branch Capital Improvement Feasibility Update](https://reader031.fdocuments.net/reader031/viewer/2022012408/616a37f211a7b741a3501b34/html5/thumbnails/13.jpg)
13
San Francisco Public Library Commission
Branch Capital Improvement Feasibility Update | December 15, 2016Building Design & Construction
Ocean View Branch Library – staff survey
• Need more space for sitting and shelving
• Create a more flexible Community Room • Storage rooms on 2nd floor using up valuable space
• Interior spaces need to be more flexibility• Exterior needs secure seating and equipment close by• Better space allocation: children’s area; defined teen areas; study room
• More functional circulation• Technology hubs for group learning & creative projects• Privacy in the staff room; comfortable break room
• The Exterior needs refreshing & vegetation maintenance
![Page 14: Branch Capital Improvement Feasibility Update](https://reader031.fdocuments.net/reader031/viewer/2022012408/616a37f211a7b741a3501b34/html5/thumbnails/14.jpg)
14
San Francisco Public Library Commission
Branch Capital Improvement Feasibility Update | December 15, 2016Building Design & Construction
Mission Branch Library – staff survey• Need more space• Relocate Entry to 24th street…people don’t know it’s a library
• We need More bathrooms and computers
• We need a Program Room/Makers Space• Stairs to children's area are difficult with strollers• Lounge Area and study space needed
• A Separate Teen Area is needed
• Better Circulation and use of existing space• Outdoor Play Area for children• Staff Area not adequate
• Develop a Garden Area on the side or roof
![Page 15: Branch Capital Improvement Feasibility Update](https://reader031.fdocuments.net/reader031/viewer/2022012408/616a37f211a7b741a3501b34/html5/thumbnails/15.jpg)
15
San Francisco Public Library Commission
Branch Capital Improvement Feasibility Update | December 15, 2016Building Design & Construction
Chinatown Branch Library – staff survey
• The space is OUTDATED• It is NOISYwith the open walls from the top floor; voices echo
• We need NEW ELEVATORS, constant issues causes problems for seniors
• We need MORE RESTROOMS, complaints of cleanliness
• The LIGHTING is not great in the library
• Bad HVAC system
• A dedicated TEEN AREA is needed
• More ELECTRICAL OUTLETS for laptops and personal devices
• We need to CONCEAL SEISMIC UPGRADES
![Page 16: Branch Capital Improvement Feasibility Update](https://reader031.fdocuments.net/reader031/viewer/2022012408/616a37f211a7b741a3501b34/html5/thumbnails/16.jpg)
16
San Francisco Public Library Commission
Branch Capital Improvement Feasibility Update | December 15, 2016Building Design & Construction
Charrettes with Library
![Page 17: Branch Capital Improvement Feasibility Update](https://reader031.fdocuments.net/reader031/viewer/2022012408/616a37f211a7b741a3501b34/html5/thumbnails/17.jpg)
17
San Francisco Public Library Commission
Branch Capital Improvement Feasibility Update | December 15, 2016Building Design & Construction
Why a charrette with the Library?
• Branch staff represent their community well• Branch staff know their facility best• Managers and branch staff have open
discussions about branch facility
![Page 18: Branch Capital Improvement Feasibility Update](https://reader031.fdocuments.net/reader031/viewer/2022012408/616a37f211a7b741a3501b34/html5/thumbnails/18.jpg)
18
San Francisco Public Library Commission
Branch Capital Improvement Feasibility Update | December 15, 2016Building Design & Construction
Charrette Takeaways
What are the challenges?Ideas for improvement?
![Page 19: Branch Capital Improvement Feasibility Update](https://reader031.fdocuments.net/reader031/viewer/2022012408/616a37f211a7b741a3501b34/html5/thumbnails/19.jpg)
19
San Francisco Public Library Commission
Branch Capital Improvement Feasibility Update | December 15, 2016Building Design & Construction
Ocean View Branch Library – challenges• Very small building• Second Floor too separate – hard to oversee• Floor plans too “chopped up”, poor sight lines• Entry & building function hard to discern from street• Insufficient staff work areas in many locations• Computer Lab – difficult to monitor• Underutilized Program Room• Not designed for two language collections
![Page 20: Branch Capital Improvement Feasibility Update](https://reader031.fdocuments.net/reader031/viewer/2022012408/616a37f211a7b741a3501b34/html5/thumbnails/20.jpg)
20
San Francisco Public Library Commission
Branch Capital Improvement Feasibility Update | December 15, 2016Building Design & Construction
Ocean View Branch Library – ideas• Improve entry – more visible and better location• Improve site lines across floor plan• Create flexible Program Room, open to street• Visually connect Second Floor, open up the stair• Consolidate Staff Work Areas near service points• Possibly add service point on 2nd floor• Add computers with laptop lending kiosk• Enlarge rest rooms
![Page 21: Branch Capital Improvement Feasibility Update](https://reader031.fdocuments.net/reader031/viewer/2022012408/616a37f211a7b741a3501b34/html5/thumbnails/21.jpg)
21
San Francisco Public Library Commission
Branch Capital Improvement Feasibility Update | December 15, 2016Building Design & Construction
Mission Branch Library - challenges• Very heavily used by diverse community• No Meeting Room or Children’s Program Room• 100 kids at storytime – shuts down Children’s Room• Large collection but lacks program and engagement
space• Insufficient teen area• Many pinch points in floor plan, underutilized “nooks”• Poor stair location, wayfinding, and sight lines• Flooding at Building Entry when it rains• Only one public toilet, none at 2nd floor
![Page 22: Branch Capital Improvement Feasibility Update](https://reader031.fdocuments.net/reader031/viewer/2022012408/616a37f211a7b741a3501b34/html5/thumbnails/22.jpg)
22
San Francisco Public Library Commission
Branch Capital Improvement Feasibility Update | December 15, 2016Building Design & Construction
Mission Branch Library - ideas• Restore historical building entrance?• Restore historical central staircase?• Create flexible use Program Room• Rotate seasonal collections, utilize compact storage• Improve efficiency of floor plan• Add rest rooms - public and staff• Improve access to Children’s Room, stroller parking• Improve Info Desk at 2nd floor – too “monumental”• Provide dedicated Teen Area• Improve and connect fenced outdoor area
![Page 23: Branch Capital Improvement Feasibility Update](https://reader031.fdocuments.net/reader031/viewer/2022012408/616a37f211a7b741a3501b34/html5/thumbnails/23.jpg)
23
San Francisco Public Library Commission
Branch Capital Improvement Feasibility Update | December 15, 2016Building Design & Construction
Chinatown Branch Library – challenges• Very heavily used branch – “community living room”• Many shelves, not enough seating• Large Chinese language reference collection• Program Room - not suitable for after hours use• Children’s Storytime Room - too small, no windows• Poor connection between floors• Underused Mezzanine and Roof Terrace• Inefficient staff area layout • Seismic bracing disregards historic architecture• Entry to First Floor is unattractive
![Page 24: Branch Capital Improvement Feasibility Update](https://reader031.fdocuments.net/reader031/viewer/2022012408/616a37f211a7b741a3501b34/html5/thumbnails/24.jpg)
24
San Francisco Public Library Commission
Branch Capital Improvement Feasibility Update | December 15, 2016Building Design & Construction
Chinatown Branch Library – ideas• Restore historic Reading Room, could be “quiet room”• Remove Mezzanine from historic Reading Rm• Single flexible use Program Room at First Floor
• Consolidate with Children’s Storytime• Add Program Room at 2nd Floor
• For classes, teens, acoustical separation• Consolidate staff work areas – Info/Circ• Improve First Floor entrance and lobby• Consider moving scholarly collections to archival
facility
![Page 25: Branch Capital Improvement Feasibility Update](https://reader031.fdocuments.net/reader031/viewer/2022012408/616a37f211a7b741a3501b34/html5/thumbnails/25.jpg)
25
San Francisco Public Library Commission
Branch Capital Improvement Feasibility Update | December 15, 2016Building Design & Construction
Next steps -Conceptual feasibility analysisCommunity engagement and feedbackEstablish priorities and options