Light Gauge Metal Roofand Wall Panels
Installation Guide for Delta Rib, Delta Rib III,
Nor-Clad, Strata Rib & 212 Corrugated
-
7/27/2019 BR128_LtGaugeInstall
2/50
lih gau Ma R a Wa Pas Isaai April 2013 1
SC Building ProductsA Division of ASC Profiles LLC
Table of Contents
Section
Iruci 2
Miimum Rcmm ts & euipm 2-3
divry, Hai & Sra 3
Say Csirais 3
R Prparai 4
Map typica R Ciis 5
trim lcais 6
fasr P acm 6
fasr Sci 7
Pa Isaai 8
Hip/Ri fashi 9
Uivrsa Ri trmiai 10
V Ri fashi 11
V Ri trmiai 12
Vay fashi 13
Vay trmiai 14
eav a V eav fashis 15
eav fashi Prparai 16
gur a V gur fashi 17
gab fashi 18
gab/Ri trasii 19
gab Crr a eav 19
gab fashi Prparai 20
gab fashi Prparai a Ri 21
Pak fashi 22
Siwa fashi 23
ewa fashi 24
V ewa fashi 25
Section
Sp trasii - Hih lw Sp 26
Sp trasii - lw Hih Sp 27
Cha gab fashi 28
Ajusab gab fashi 29
V fashi 30
V/Pip fashi Isaai Prcur 31
Sky ih f ash i 32
Skyih fashi (Si) 32
Skyih fashi (Uphi Si) 33
Skyih fashi (dwhi Si) 34
Prcur r h Isaai
Skyih fashis 35
Skyih fashi Prparai 35-36
Chimy fashi 37
Chimy fashi (Si) 38
Chimy fashi (Uphi Si) 39
Chimy fashi (dwhi Si) 40
Vay tp e 41
Vay drmr 42
Pa e lap 43
Sai e laps & lappi h Hms 44
Wiw/dr trim Crr Wa dai 45
Bas trim, Wa Sp, Pa tp Wa dai 46
Isi Crr Wa dai 47
ousi Crr Wa dai 48
Light Gauge Metal Roof & Wall Panels
-
7/27/2019 BR128_LtGaugeInstall
3/50
2 April 2013 www.ascbp.com
Light Gauge Metal Roof and Wall Panels
Installation Guide for Delta Rib, Delta Rib III, Nor-Clad, Strata Rib
& 2 Corrugated
I aii wahr ihss, i, ks
a cmy, ASC Buii Prucs lih gau R
a Wa Pas ar si wih as isaai
as a primary csirai this ui is i
hp h isar achiv a hih v uaiy i h
iish pruc Pas hsia cac a
ASC Buii Prucs rprsaiv r assisac
Important Notice
Be sure to read this manual in its entirety before
beginning installation.
this maua is prvi h cusmrs ASC Buii
Prucs as a ui assis i h isaai lih
gau Ma R a Wa Pas Us r ay hr
purps is prhibi this maua rmais h prpry
ASC Buii Prucs
ths isrucis cai sus appicai
prcurs y a ca rpac h r
cmm ss a xpric Rspsibiiy r
crmac sa a ca buii cs, as w as
ay hr appicab prjc ruirms rss wih h
isar, as s h rspsibiiy bsrv rasab
say prcurs
ASC Buii Prucs assums rspsibiiy r
ay prbms which mih aris as a rsu imprpr
isaai r ay prsa ijury r prpry ama ha
may ccur wih h prucs us
Introduction
Screw Gun:
Cuch yp scrw u wih ph cai s pic
awi variab ru sis is rcmm isur prpr isaai h scrws th wi
scks wi b ruir: 1/4 a/r 5/16 hx
Snips:
fr miscaus pa a ashi cui
ruirms thr pairs sips wi b ruir r
, rih , a cri cus
Electrical Metal Shears:
Us r ra ma cui, such as a h hips a
vays
Note:Some erectors prefer to use circular power saws with
metal cutting abrasive blades. While the use of power
saws may be faster, there are some disadvantages
that must be considered:
(1) The edges of metal that have been saw cut are
jagged and unsightly, and are more l ikely to rust
than sheared edges.
(2) Saw cutting will leave small particles of metal on
the panel surface that will rust and damage the
panel finish if not completely removed.
Chalk Line:
Us assis i h aim pas, ashis, c
Neoprene Mastic Tape:
1/16 x 1/4 r ap us r isaai isi a
usi pri csurs a pa si aps
Butyl Mastic Tape:
1/16 x 1/2 r ap us r prvi war ii-
rai i ashi sh ma appicais a Supr-
Spa pa--pa siaps
Caulk:Buy r urha saa us ihibi war iirai
Caulking Gun:
fr miscaus cauki a sai ihibi war
iirai
Blind Rivet Hand Tool:
Us r miscaus ashi a rim appicais
Marking Tools:
Iib markrs, pcis, r scrachi s
Minimum Recommended Tools& Equipment
Note:
It is recommended that Light Gauge Roofing be applied
on roofs with a minimum slope of 3 inches per foot (3:12).
* The details contained in this guide are shown over a ply-
wood substrate. Details remain the same for either a solid
substrate (plywood or steel), spaced framing or intermit-
tent support condition with only the fastener type chang-ing. Where spaced framing is used, perimeter supports
for flashings must be considered.
** Each flashing part in this guide has been assigned a part
number. Each part number contains one or two letters
followed by one or two numbers, for example: (EW17).
These part numbers have been provided for you to make
ordering these flashing parts quick and easy.
-
7/27/2019 BR128_LtGaugeInstall
4/50
lih gau Ma R a Wa Pas Isaai April 2013 3
SC Building ProductsA Division of ASC Profiles LLC
Minimum Recommended Tools & Equipment (C)
Scratch Awl:
Us mark h s
Utility Knife:
Us r miscaus cui
Electric Drill:
Us ri hs such as hs ruir r riv
isaai
String Line:
Us r ra aim a masuri
Tape Measure:
25 miimum (ahr 50 is hay)
Locking Pliers:
Saar a duckbi sy r miscaus campi
a bi pars
Delivery, Handling and Storage
Aways chck h shipm up ivry Chck
r ama a chck maria uaiis aais
h shippi is n ay ama maria rshras a h im ivry
Ha pa bus a iiviua pas wih
car avi ama lr bus a pas
may ruir w r mr pick pis prpry
spac avi ama ha ca rsu rm
bucki a/r bi h pas Rus a
cpy h l lh Hai Isrucis a
iarams rm ASC Buii Prucs cusmr
srvic as ruir
Sr h pas a hr marias i a ry, w
via ara a away rm raic eva h bu s ha ay misur ha may
hav accumua uri shippi ca ru B
sur ha air wi b ab circua ry aru
h bus avi h bui-up misur nvr
sr marias i irc cac wih h ru
War ca c vs wh hai upai
Zicaum-ca pas r ashis avi
iscrai Rrmi i marks (which appar
back), paricuary a bs, wi b visib
War ca, -marki, s s shs wh
waki h pas avi sh marks rama h iish d sp h pa
sams r ribs Sp y i h a ara h pa
Safety Considerations
Never use unsecured or partially installed
panels as a working platform
d wak pas ui hy ar i pac hr a a h asrs aachi h pas
h r hav b isa
Metal roofing panels are slippery when
wet, dusty, frosty or oily
d wak a ma r wh ay hs
ciis ar prs Wari s s shs wi
hp miimiz sippi a hp prv ama
h pai suracs
Do not walk on the panel seams or
major ribs
Wh waki h uy isa r pas, b
sur sp y i h a aras h pas
Always be aware of your position on the
roof relative to your surroundings.
tak h cais r pis, r
s, uipm, c-wrkrs, c
Always wear proper clothing and
safety attire.
War prpr chi wh wrki wih sh
ma i rr miimiz h pia r cus,
abrasis, a hr ijuris ASC Buii Prucs
rcmms say asss a vs
Use care when operating electrical and
other power equipment.
obsrv a mauacurrs say rcmmais\
Roof installation on windy or stormy days
can be dangerous
Avi wrki wih sh ma prucs wiy
r srmy ays
-
7/27/2019 BR128_LtGaugeInstall
5/50
4 April 2013 www.ascbp.com
Light Gauge Metal Roof and Wall Panels
Installation Guide for Delta Rib, Delta Rib III, Nor-Clad, Strata Rib
& 2 Corrugated
Roof Preparation
ASCs lih gau Ri ca b us i bh
w csruci a rri ri appicais W
rcmm h isaai lih gau Ri vr
a ciuus rii subsra such as pyw, w
cki, r vr irmi supprs Cac ASC r
aiia irmai
th wi sps b ak prpar h r
r isaai lih gau Ri pas:
New Roofs:
1 Mak sur hr ar ais r hr bjcs
prrui rm h subsras ha mih pucur h
uraym r h r pas Ca a bris rm
h r
2 Chck a ais r pssib r praiswhich mus b a h ck prir r pa
isaai
3 Cvr h ir r ck wih a miimum 30
b aspha-saura papr Sm syhic
urayms may b us i pac wih ur
ri Isar mus sur hy m h miimum
saars 30 b a ha h mauacurr
has apprv hm r us wih ma ri fr
appicais vr spac rami hr yps
misur barrirs may b ruir Bi a h av
a r h hrizay (para h av)
Aw ach cscuiv curs vrap h prvius
3 ichs ovrap h a miimum 6 wh
sari a w r Aras papr ha hav
b r r cu shu b rpac r rpair prir
isaai h ma r (S iusrai #1)
4 Pac a aim i a h ab whr
h irs r pa wi b isa This line must
be parallel to the gable edge of the roof deck
and square with the eave line. Chck h r r
suarss by maki a 3 i acrss h av (See
illustration #2)
Cmpi h 3 x 4 x 5 ria shu pac h 4
h ria para wih h ab th irs
r pa wi b pac para wih his i Sih
variais r u--suar ciis up 3 ca b
cvr by h ab rims shw pa 18
5 I is vry impra masur h ir h
h r rm ab ab Crrc pacm
h pas wi aw h pas ribs ach
si b cvr by h ab ashi shw
pa 18 this wi cra a symmrica apparac
bh abs Shu his b impracica, h
ajusab ab ai pa 29 ca b us
3" SIDE LAP
6" END LAP
30# FELT PAPER
ILLUSTRATION #1
ILLUSTRATION #2
ALIGNMENT LINE
DIRECTION OF
PANEL APPLICATION
3' x 4' x 5' TRIANGLE
4'
5'
3'
Note:
In areas where snow, ice, and heavy rain conditions exist,
a high temperature cold-applied rubberized underlayment
should be used in lieu of felt in the valleys. Felt on the
remainder of the roof will lap over the membrane where
the two meet. See Valley page 13.
Existing Roofing:Sm jurisicis wi aw rri vr xisi ri
wihu h r ar Chck wih yur ca cs
r buii parm r yur spciic ruirms
fr bs rsus, lih gau Ri ruirs a raivy
smh a a subsra Appicai vr ruh a/r
uv suracs is rcmm, r xamp, w
shis
I h r is b sripp w h xisi cki,
w h prcurs r w rs pa 4 B sur
chck h xisi r a rpair ay ama aras prir
isaai h w r sysm
Note:
Do not apply Light Gauge Roofing over roofs with
structural damage or trapped moisture.
-
7/27/2019 BR128_LtGaugeInstall
6/50
lih gau Ma R a Wa Pas Isaai April 2013 5
SC Building ProductsA Division of ASC Profiles LLC
The following steps should be taken when installing
ASCs Light Gauge Roofing over existing roofing:
1 Ispc h r r ama a mak h cssary
rpairs achiv a a pa r h ma r
pas W shis shu b rmv
2 Scur ay warp r s ri
3 Mak sur ha hr ar ais r hr bjcs
prrui rm h r ha mih pucur h w
uraym r h w r pas
4 Rmv a mss a hr bris rm h r
5 Cu ay vrhai ri ush wih h r
ck a rmv a hips, ri caps, a prai
ashis
6 Ma bris/shavis shu b rmv rm h
r prrssivy a aiy prv immia
crrsi a scrachi h p ca
7 fw h ircis pa 4, #2 hruh #5 r
prparai
Map of Typical Roof Conditions
fr susis hw rim ashis i h ir aras, pas rr h wi pas:
Flashing Page(s)
Ajusab gab 29
Cha gab 28
Chimy 37-40
eav 15-16
ewa 24-25
gab 10, 12, 18-21
gur 17
Flashing Page(s)
Pak 22
Pich trasii 26-27
Ri 9, 11
Siwa fashi 23
Skyih 32-36
Vay 13-14, 41-42
V 30-31
-
7/27/2019 BR128_LtGaugeInstall
7/50
6 April 2013 www.ascbp.com
Light Gauge Metal Roof and Wall Panels
Installation Guide for Delta Rib, Delta Rib III, Nor-Clad, Strata Rib
& 2 Corrugated
Prevailing Weather Sheeting Direction Neoprene orButyl Mastic (Typ)
Nor-Clad (36" Coverage)
Strata Rib (36" Coverage)
Delta Rib III (36" Coverage)
Delta Rib (24" Coverage)
2-1/2" Corrugated (24" Coverage) Wall Applications
2-1/2" Corrugated (21-1/3" Coverage) Roof Applications
Lap Stitch Screw (Typ)
Woodscrew (Typ)or
Fastener Placement
Trim Locations
EAVE FLASHING
BOTTOM
CLOSURE
SINGLE TRACKCOVER
DOUBLE TRACK
COVER
MATCHING
FIBERGLASS
JAMB
TRIM
UNIVERSAL
ENDWALL
GABLE TRIM
UNIVERSAL
RIDGE
UNIVERSAL
SIDEWALL
TOP CLOSURE
PIPE FLASHING
BASE
TRIM
OUTSIDE
CORNER
C-METAL
INSIDE
CORNER
MAXIMUM RECOMMENDED
FASTENER ROW SPACING
1/2 Pyw 24
5/8 Pyw 36
2 x 4 36
Notes:
Lap panels away from prevailing weather. Use only those accessories specifically designed for use with this product. Use only
galvanized or Zincalume-coated fasteners. Isolate roofing and flashings from contact with dissimilar metals. Fastener selection
will vary based upon substrate. The use of neoprene or butyl mastic tape along the sidelaps, as shown above, is always recom-
mended for roofs. Lap stitch screws should be placed @ 16 o.c. maximum.
The maximum recommended fastener row spacing applies to mild weather conditions of 80 mph winds and an exposure rating of
B (protected) for typical buildings and substrate. For project specific wind uplift attachment, contact your ASC representative.
-
7/27/2019 BR128_LtGaugeInstall
8/50
lih gau Ma R a Wa Pas Isaai April 2013 7
SC Building ProductsA Division of ASC Profiles LLC
n 9 x 1, 1-1/2, 2, 2-1/2, 3 W Scrw
1/4 Hx Ha
Pa imsia umbr
Pa pyw mi 1/2 hick
trim a si ap aachms
trim a si ap aachms
trim--rim r
rim--pa aachms
Pa puri r ck aachms
n 14 x 1, 1 1/2 W Scrw
5/16 Hx Ha
n 12 x 3/4 Sich Scrw
1/4 Hx Ha
(cmpaib wih n 9 W Scrw)
n 14 x 7/8 lap S drir
5/16 Hx Ha
(cmpaib wih n 14 W Scrw)
StSt-42 Saiss S Riv
1/8 x 1/8
n 12 x 1, 1 1/2, 2, 2 1/2 S drir
5/16 Hx Ha
Fastener # Description Use
Fastener Selection
Notes
The table above shows the Light Gauge panel fasteners provided by ASC Building
Products. Refer to the panel installation, flashing details, and fastener placement
pages of this manual for specific fastener usage. See page 6 for fastener spacing.
Panel attachment screws must be long enough to penetrate through the roof decking
at least 3/8, or penetrate solid lumber at least one inch.
All screws must be coated to provide protection against corrosion.
Exposed fasteners should have sealing washers and be the same color as the parts
they attach.
Roofing nails will also be required, but are not furnished by ASC. They are typically
used to temporarily hold a flashing in place that needs to be installed prior to panels.
Screws must be properly driven to ensure proper seal and holding strength. Do not
under \drive or overdrive the screws. Recommended drill speed is 2000 rpm. Use of a
depth-sensing nosepiece will aid in properly driving screws.
Prpr Isaai
gask fasrs
Crrcy
driv
Ur
driv
ovr
driv
-
7/27/2019 BR128_LtGaugeInstall
9/50
8 April 2013 www.ascbp.com
Light Gauge Metal Roof and Wall Panels
Installation Guide for Delta Rib, Delta Rib III, Nor-Clad, Strata Rib
& 2 Corrugated
1" 1"
ASC'S LIGHT
GAUGE ROOFING
Panel Installation
GENERAL
Suy h ais sci his maua prir h
isaai h pas Pay cs ai
h wi:
fashis ha b isa prir h
pas icu Vay, eav, V eav,
Ajusab gab a Cha gab
Appy saa r masic ap h pr-isa
ashis as shw i h ai sci his
maua
SEE PAGE 6 & 7 FOR
FASTENER PLACEMENT
AND SELECTION
1" OVERHANG
ILLUSTRATION #3
ILLUSTRATION #4
PROCEDURE
1 Isa av rim, vay rim a isi csur prir
pa isaai
2 Ai h h irs pa wih h aimi csruc a h sar ab (See page 4
item 4 and illustration #3 below.) Aw h pa
vrha h av 1 miimum
3 Chck h whi h pa I h pa
h is crrc, h pa shu vrha 1
pas h av rim as shw bw i iusrai
#4 As, h pa shu x pas h
cri h ri (See pg. 9)
4 Ar h irs pa is prpry ai, as pr
h asr pacm a spaci uiis
pa 6
5 lay w h sc a hir pas, chckiaim, maki sur hy ar suar this wi
sur ha a sawh c a h av a ri
is avi
6 Ma bris/shavis shu b rmv rm h
r prrssivy a aiy prv immia
crrsi a scrachi h p ca
-
7/27/2019 BR128_LtGaugeInstall
10/50
lih gau Ma R a Wa Pas Isaai April 2013 9
SC Building ProductsA Division of ASC Profiles LLC
2"
1 7/8"
3/4"
1/2"
1/2"
3/8" HEM
7"7"
2 1/8"
3-3/4"
3-1/2"
1/2"135 TYP.
3/8" HEM
UNIVERSAL RIDGE (R1)
2. #14 WOOD SCREWSEE ILLUSTRATION
ON PAGE 7
TOP POLYETHYLENE CLOSURE SETIN SEALANT ALL AROUND
(SEE PROCEDURES)
ASC'S LIGHT
GAUGE ROOFING
3. #12 x 3/4" STITCH SCREW
OR4. #14 x 7/8" LAP SELF DRILLER
@ EACH RIB OR 8" O.C.
FOR CORRUGATED
Hip/Ridge Flashing
Procedures
Cauk h bm a sis h pyhycsur S h csur as shw abv a cauk
h p th csur is pia i h pa is ur
up a cauk a h sis ar h rib
fas h ri cap usi sich scrw a ach rib
r 8 c r crrua
Cs h s h uivrsa ri cap by cui
a i maria a ach fas wih rivs
(see page 10)
Cauk, ap a riv suia ri ashis
(see pg. 44)
R1 R3 R4
Note: R1 is a universal hip/ridge. A standard hip/ridge,
R3 & R4, is also available.
Note: The gable flashing must be installed prior to
installation of the ridge (see page 18).
-
7/27/2019 BR128_LtGaugeInstall
11/50
10 April 2013 www.ascbp.com
Light Gauge Metal Roof and Wall Panels
Installation Guide for Delta Rib, Delta Rib III, Nor-Clad, Strata Rib
& 2 Corrugated
Universal Ridge Termination
UNIVERSAL RIDGE (R1)
BUTYL MASTIC TAPE
OR NEOPRENE CLOSUREREMNANTS TO CLOSE
OFF THE RIDGE
3. STITCH SCREW 1/2"FROM EDGE OF GABLE
GABLE
CAULK AND RIVET
SEE PAGE 21 FORGABLE PREPARATION
OVERHANG UP TO 4"THEN FIELD TRIM TO
1" USING SNIPS OR SHEAR
1"
-
7/27/2019 BR128_LtGaugeInstall
12/50
lih gau Ma R a Wa Pas Isaai April 2013 11
SC Building ProductsA Division of ASC Profiles LLC
1 7/8"
6 3/4" 6 3/4"
3/8" HEM
1 7/8"1 1/8"
1 1/8"3/8" HEM
SCREEN BY OTHERS
VENTED RIDGE (R2)
ASC'S LIGHTGAUGE ROOFING
2"
TOP CLOSURE
C-METAL (C1)
2. #14 WOOD SCREW
SEE ILLUSTRATIONON PAGE 7
3. #12x3/4" STITCH SCREWOR
4. #14x7/8" LAP SELF DRILLER@ EACH RIB OR 8" O.C.FOR CORRUGATED
AIR
FLOW
7/8"
2
1
3/8" HEM
Vented Ridge/Hip Flashing
Procedures
Pyw shu b h back 2 rm ach si h
ri
Aach h scr a ach pa rib sawichi h p
csur i pac esur scr is pu ih avisai
fas h v ri usi sich scrw a ach rib
r 8 c r crrua
Cauk, ap a riv suia ashis
(see pg. 44).
Cs h s h ri cap by cui a i
maria a ach fas wih rivs a cauki
jis (see pg. 12).
Sps rar ha 6:12 may ruir spcia
ri imsis
R2 C1
Note: The gable flashing must be installed prior to
installation of the ridge (see page 18).
The screening shown creates a barrier for insects and
birds while allowing for ventilation.
For snow and heavy rain environments, please inquire
about optional Vented Ridge details.
-
7/27/2019 BR128_LtGaugeInstall
13/50
12 April 2013 www.ascbp.com
Light Gauge Metal Roof and Wall Panels
Installation Guide for Delta Rib, Delta Rib III, Nor-Clad, Strata Rib
& 2 Corrugated
Vented Ridge/Hip Termination
CUT AND TRIM SIMILARTO GABLE (SEE PAGE 21).
FOLD DOWN OVER END TABS.
CUT AT BENDS 1"AND FOLD IN 90
VENTED RIDGE (R2)
CAULK
CAULK AND RIVET
GABLE
SEE GABLE PREPARATION@ RIDGE (PAGE 21)
-
7/27/2019 BR128_LtGaugeInstall
14/50
lih gau Ma R a Wa Pas Isaai April 2013 13
SC Building ProductsA Division of ASC Profiles LLC
2"
3"
4"2"
2"
1"
13" 13"
'W' VALLEY (V1)
2 ROWS BUTYL MASTIC TAPE
ASC'S LIGHTGAUGE ROOFING
2. #14 WOOD SCREW
SEE ILLUSTRATIONON PAGE 7
INSTALL EMSEAL CLOSURES
DIAGONALLY ACROSS THE BOTTOMSIDE OF THE PANEL AND
SET IN SEALANT ALL AROUND
SEENOT
E
BELOW
1" TYP
IF PAINTED,THIS SIDE
19-7/16"19-7/16"
Valley Flashing
V1 V2
Procedures
Pac a sc ayr 36 r i h vay
cr i wih 18 r ach si
Sari a h w , rim a pac h vay
ashi s i vrhas h avs 1 (see pg. 14)
Cauk a ap h subsu vay ashis a
miimum 8
Para h vay, pac w rws 1/2 buy
masic ap saa spac as shw
th pyhy csurs ca b isa iaay
acrss a pa A mir cus, us msa csurs a a
rih a h pa ribs
fi cu h pas hi a miimum 4 back
rm h vay as shw larr vays wihu
h cr V, may b ruir i sw cury
isaais
Aach h pas h r a hru-as a
h bm usi a #14 x 1 wscrw
a 8 up rm h vay ai wih h sc rw
buy masic ap
Wh vays ar ruir, isa siap pr
masic ap a h siap a miimum 10-0 up
rm h pa
Note: In areas where snow, ice and heavy rain con-
ditions exist, panels may need to be held back more
than 4 and the valley flashing overall width must be
increased. A high temperature cold-applied rubberized
underlayment should be used extending at least 3 up
from the center of the valley on each side.
-
7/27/2019 BR128_LtGaugeInstall
15/50
14 April 2013 www.ascbp.com
Light Gauge Metal Roof and Wall Panels
Installation Guide for Delta Rib, Delta Rib III, Nor-Clad, Strata Rib
& 2 Corrugated
1"
1"
4"
MIN
VALLEY
FOLD TABS DOWN 90
REMOVE THIS MATERIAL
SEE VALLEY (PAGE 13) FORFASTENING & SEALING REQUIREMENTS
EAVE
FILL ENDWITH SEALANT
Valley Termination
Note: Emseal closures not shown for clarity.
-
7/27/2019 BR128_LtGaugeInstall
16/50
lih gau Ma R a Wa Pas Isaai April 2013 15
SC Building ProductsA Division of ASC Profiles LLC
ASC'S LIGHT
GAUGE ROOFING
2. #14 WOOD SCREWSEE ILLUSTRATIONON PAGE 7
1"O.H.
2X BLOCKING
PERFORATEFASCIA ASREQUIRED
EAVE (E1)
BOTTOM POLYETHYLENECLOSURE SET INSEALANT ALL AROUND
ROOFING NAILS@ 24" O.C.
1/2"
1 3/8"
1 3/8"
2"
1/2"
3/8" HEM
3-3/8"
4-3/8"
3/8" HEM
1/2"
3"
2"
1/2"
3"
1/2"
3"
1/2"
4 3/8"
2"
1 1/2"
1/2"
3"
2"
Procedures
Carpry mus b cmp as iica prir
isaai h V eav
Aach h av ashi usi ri ais vy
spac a 24 c
Cauk a ap h ashi a miimum 3
(see pg. 44)
Pas shu vrha h av 1 miimum
Eave and Vented Eave Flashingsthis ashi mus b isa prir h pas
ER1 ER2
E2E1 E4 E5E3
Vented Eave
-
7/27/2019 BR128_LtGaugeInstall
17/50
16 April 2013 www.ascbp.com
Light Gauge Metal Roof and Wall Panels
Installation Guide for Delta Rib, Delta Rib III, Nor-Clad, Strata Rib
& 2 Corrugated
1"
1"
REMOVE THIS MATERIAL
EAVE
REMOVE THIS MATERIAL
EAVE
BEND TABSHERE @ 90
Eave Flashing PreparationUs his ashi whr av ms ab
STEP 1
STEP 2
Note: Length of eave must allow
1 to extend past gable fascia.
-
7/27/2019 BR128_LtGaugeInstall
18/50
lih gau Ma R a Wa Pas Isaai April 2013 17
SC Building ProductsA Division of ASC Profiles LLC
Gutter and Vented Gutter Flashingsn: this ashi mus b isa prir h pas
Procedures
f shu vr p av (e3)
( shw)
Carpry mus b cmp as iica prir
isaai h V gur
Aach av ashi usi ri ais vy spac
a 24 c
Cauk a ap h ashi a miimum 3
(see pg. 44)
Pas shu vrha h av a miimum 1
ASC Buii Prucs rcmms ha a
ics ur cracr isa urs
Vented Gutter
1 3/8"
1 3/8"
1/2"
ROOFING NAILS@ 24" O.C.
2. #14 WOOD SCREW
SEE ILLUSTRATIONON PAGE 7
1"O.H.
PERFORATEFASCIA ASREQUIRED
2X BLOCKING@ 12" O.C.
BOTTOM POLYETHYLENECLOSURE SET IN SEALANT
GUTTER
ATTACH PER
MANUFACTURER'SRECOMMENDATIONS
METAL SCREENAS REQUIRED
EAVE (E3)
MASTIC TAPE, TOP & BOTTOM
E3
-
7/27/2019 BR128_LtGaugeInstall
19/50
18 April 2013 www.ascbp.com
Light Gauge Metal Roof and Wall Panels
Installation Guide for Delta Rib, Delta Rib III, Nor-Clad, Strata Rib
& 2 Corrugated
5" 5/8"
3/8" HEM
4"
5/8"
3/8" HEM
1 1/8"
1/2"
2 3/4"
4"
1/2"
1 1/4"
2"
1-1/8"
3/8" HEM
5/8"4"
3/8" HEM
1/2"
Gable Flashing
BUTYL MASTIC TAPE
2. #14 WOOD SCREW@ 24" O.C.
ASC'S LIGHTGAUGE ROOFING
3. #12 x 3/4" STITCH SCREW
OR
4. #14 x 7/8" LAP SELF DRILLER@ 24" O.C.
GABLE (G4)
2. #14 x 1" METAL WOOD@ 24" O.C.
G1
G3 G4
Procedures
Pac h irs r pa accri h
isrucis pas 4 a 8
Pac buy masic ap a h p h pa
rib as shw
Isa h ab ashi by paci i irmy vr h
rib Us sich scrws as ashi h pa
a us cr mach wscrws a 24 c
as ashi srucur
Cauk a ap h ashi a miimum 3
(see pg. 44)
Mir cu h ashi a h pak ji ach si a
h ri (see pg. 21)
Sip a h ab a h av cs h
Us rivs as
Notes: G1 is a standard gable. Narrower gables,
G3 and G4, are also available.
-
7/27/2019 BR128_LtGaugeInstall
20/50
lih gau Ma R a Wa Pas Isaai April 2013 19
SC Building ProductsA Division of ASC Profiles LLC
Gable/Ridge Transition(simiar ewa)
GABLE OR SIDEWALL
2" BUTYL MASTIC TAPEWITH FASTENERS @ 2" O.C.
RIDGE OR ENDWALL
ASC'S LIGHT
GAUGE ROOFING
GABLE
BEND HERE 90
RIVET
INSERT EAVE TABBEHIND GABLE
EAVE
Gable Corner at Eave
-
7/27/2019 BR128_LtGaugeInstall
21/50
20 April 2013 www.ascbp.com
Light Gauge Metal Roof and Wall Panels
Installation Guide for Delta Rib, Delta Rib III, Nor-Clad, Strata Rib
& 2 Corrugated
Gable Flashing Preparation
STEP 1
STEP 2
STEP 3
GABLE
REMOVE THIS MATERIAL
* SEE TABLE
FOR DIMENSION
21/
2"
1
1/2"
GABLE
SNIP HERE
REMOVE THIS MATERIAL
1 1/2"
SNIP HERE
1"
1"
GABLE
FOLD 90
REMOVE THIS MATERIAL
Roof Pitch Dimension
3:12 2
4:12 17
85:12 11116
6:12 1616
12:12 58
Note: Length of uncut
gable must extend 2
1/2 past eave fascia.
-
7/27/2019 BR128_LtGaugeInstall
22/50
lih gau Ma R a Wa Pas Isaai April 2013 21
SC Building ProductsA Division of ASC Profiles LLC
EQUAL
EQUAL
VERTICAL CUT
* SEE TABLEREMOVE THIS
MATERIAL WITH SNIPS
OR POWER SHEARS
REMOVE THIS
MATERIAL WITH SNIPS
OR POWER SHEARS
RIDGE LINE
14"@STANDARDRIDGE
17"@VENTEDRIDGE
RIDGE LINE
GABLE
RIVET
GABLE
REMOVE THIS
MATERIAL WITH SNIPS
OR POWER SHEARS
Gable Flashing Preparation at Ridge
STEP 1 STEP 2
STEP 3 STEP 4
Roof Pitch Dimension*
3:12 1116
35:12 114
4:12 1716
5:12 134
6:12 2316
12:12 4716
* Dimensions only apply to
G4 Gable Flashing
-
7/27/2019 BR128_LtGaugeInstall
23/50
22 April 2013 www.ascbp.com
Light Gauge Metal Roof and Wall Panels
Installation Guide for Delta Rib, Delta Rib III, Nor-Clad, Strata Rib
& 2 Corrugated
2. #14 WOOD SCREW
SEE ILLUSTRATIONON PAGE 7
PEAK (PF2)
2. #14 x 1" WOOD SCREW@ 24" O.C.
TOP POLYETHYLENECLOSURE SET INSEALANT ALL AROUND
3. #12 x 3/4" STITCH SCREW
OR
4. #14 x 7/8" LAP SELF DRILLER@ EACH RIB OF 8" O.C.
FOR CORRUGATED
ASC'S LIGHTGAUGE ROOFING
6"
1/2"
3/8" HEM
3/8" HEM
5"
Peak Flashing
PF2
Procedures:
Cauk h bm a sis h pyhy
csur S h csur as shw abv a cauk
h p th csur is pia i h pa is ur
up a cauk a h sis ar h rib
fas h pak ashi as shw abv
Cauk a ap h ashi a miimum 3
(see pg. 44).
-
7/27/2019 BR128_LtGaugeInstall
24/50
lih gau Ma R a Wa Pas Isaai April 2013 23
SC Building ProductsA Division of ASC Profiles LLC
4"
1 1/8"
2"
1/2"
1/2"
3/4"
ASC'S LIGHTGAUGE WALL PANEL
ROOFING NAILS@ 24" O.C.
2. #14 x 1" WOOD SCREWSEE ILLUSTRATIONON PAGE 7
BOTTOM POLYETHYLENE CLOSURESET IN SEALANT ALL AROUND
UNIVERSAL SIDEWALL (SW1)
BUTYL MASTIC TAPE
ASC'S LIGHTGAUGE ROOFING
2. #14 WOOD SCREW@ 24" O.C.
1-1/8"
3/8" HEM
5/8"
3"
4"
Sidewall Flashingthis ashi mus b isa prir wa pas
SW1 SW2
Procedures
th r shu b isa prir h sii
Pac buy masic ap a h p h pa
as shw
Isa h si wa ashi by paci i irmy
h ri pa a asi wih h
asr iica
Cauk a ap h ashi a miimum 3
(see pg. 44)
-
7/27/2019 BR128_LtGaugeInstall
25/50
24 April 2013 www.ascbp.com
Light Gauge Metal Roof and Wall Panels
Installation Guide for Delta Rib, Delta Rib III, Nor-Clad, Strata Rib
& 2 Corrugated
4"
1/2"
1 1/8"
2"
3/4"
1/2"
ROOFING NAILS@ 24" O.C.
2. #14 x 1" WOOD SCREWSEE ILLUSTRATION
ON PAGE 7
ASC'S LIGHTGAUGE WALL PANEL
BOTTOM POLYETHYLENE CLOSURESET IN SEALANT ALL AROUND
3.
4.
#12 x 3/4" STITCH SCREW
#14 x 7/8" LAP SELF DRILLER@ EACH RIB OR 8" O.C.FOR CORRUGATED
OR
UNIVERSAL ENDWALL (EW1)
ASC'S LIGHTGAUGE ROOFING
TOP POLYETHYLENE CLOSURESET IN SEALANT ALL AROUND
2. #14 x 1" WOOD SCREWSEE ILLUSTRATION
ON PAGE 7
3/8" HEM
5"4"
EW1 EW2
Procedures
Isa saa h bm a p h
pyhy csur S h csur as shw
abv
fas h wa ashi h wa wih ri
ais a 24 c
Cauk a ap h ashi a miimum 3
(see pg. 44)
Endwall Flashingthis ashi mus b isa prir wa pas
-
7/27/2019 BR128_LtGaugeInstall
26/50
lih gau Ma R a Wa Pas Isaai April 2013 25
SC Building ProductsA Division of ASC Profiles LLC
Vented End Wall Flashingthis ashi mus b isa prir wa pas
Procedures
Pyw shu b h back 2 rm h wa
Isa saa h bm a p h
pyhy csur S h csur as shw abv
fas h wa ashi h wa wih ri
ais a 24 c max
fas h ashi ach rib wih #12 x 3/4 sich
scrws Pac a sma h saa p ach
rib as shw
Cauk a ap h ashi a miimum 3
(see pg. 44)
fr Pri V, us (eW1) r v wa
ashi ai
6 3/4"
1 7/8"
3/8" HEM
1 1/8"
4"
2"
ASC'S LIGHTGAUGE WALL PANEL
BOTTOM POLYETHYLENE CLOSURESET IN SEALANT ALL AROUND
VENTED ENDWALL (EW17)
BUTYL MASTIC TAPE
ASC'S LIGHTGAUGE ROOFING
3. #12 x 3/4" STITCH SCREWOR
4. #14 x 7/8" LAP SELF DRILLER@ EACH RIB OR 8" O.C.FOR CORRUGATED
AIRFLO
W
SCREEN BY OTHERS
TOP POLYETHYLENE CLOSURESET IN SEALANT ALL AROUND
ROOFING NAILS@ 24" O.C.
2. #14 x 1" WOOD SCREW
SEE ILLUSTRATIONON PAGE 7
OPTIONAL FIBER FILLFOR SNOW COUNTRY
2. #14 WOOD SCREWSEE ILLUSTRATION
ON PAGE 7
EW17
-
7/27/2019 BR128_LtGaugeInstall
27/50
26 April 2013 www.ascbp.com
Light Gauge Metal Roof and Wall Panels
Installation Guide for Delta Rib, Delta Rib III, Nor-Clad, Strata Rib
& 2 Corrugated
ROOFING NAILS@ 24" O.C.
2. #14 WOOD SCREWSEE ILLUSTRATIONON PAGE 7
ROW OFBUTYL MASTIC TAPE
BOTTOM POLYETHYLENE CLOSURE
SET IN SEALANT ALL AROUND
PITCH BREAK (PB3)
3. #12 x 3/4" STITCH SCREWOR
4. #14 x 7/8" LAP SELF DRILLER@ EACH RIB OR EVERY THIRDRIB FOR CORRUGATED
ASC'S LIGHTGAUGE ROOFING
TOP POLYETHYLENE CLOSURESET IN SEALANT ALL AROUND
2. #14 WOOD SCREWSEE ILLUSTRATIONON PAGE 7
WOOD BLOCKING
3/8" HEM
SLOPE(S1)
SLOPE(S2)
6"5"
SPECIFYANGLE
Slope Transition - High Slope to Low Slopethis ashi mus b isa prir uphi pas
Procedures
Isa saa h bm a p h
pyhy csur S h csur as shw
abv
fas h rasii ashi h subsra wih
ri ais a 24 c
Cauk a ap h ashi a miimum 3
(see pg. 44)
Para h rasii, pac rws 1/2
buy masic ap as shw abv
Aach h uphi pas as shw
Isa w bcki as r suppr
Pac a sma h saa h p ach
rib as shw
PB3
-
7/27/2019 BR128_LtGaugeInstall
28/50
lih gau Ma R a Wa Pas Isaai April 2013 27
SC Building ProductsA Division of ASC Profiles LLC
1"
ASC'S LIGHTGAUGE ROOFING
ROOFING NAILS@ 24" O.C.
2. #14 x 1" WOOD SCREWSEE ILLUSTRATIONON PAGE 7
PITCH BREAK (PB4)
BOTTOM POLYETHYLENE CLOSURESET IN SEALANT ALL AROUND
TOP POLYETHYLENE CLOSURESET IN SEALANT ALL AROUND
ROW OF BUTYL MASTIC TAPE
WOOD BLOCKING
2. #14 WOOD SCREWSEE ILLUSTRATIONON PAGE 7
3. #12 x 3/4" STITCH SCREWOR
4. #14 x 7/8" LAP SELF DRILLER@ EACH RIB OR EVERY THIRDRIB FOR CORRUGATED
SLOPE(S1)
SLOPE(S2)
5"6"
3/8" HEM
SPECIFY ANGLE
Slope Transition - Low Slope to High Slopethis ashi mus b isa prir uphi pas
Procedures
Isa saa h bm a p h
pyhy csur S h csur as shw abv
fas h rasii ashi h subsra wih
ri ais a 24 c, prir isai h uphi
pas
Cauk a ap h ashi a miimum 3
(see pg. 44)
Para h rasii, pac rws 1/2 buy
masic ap as shw abv
Aach h uphi pas wih a 1 vrha
Isa w bcki as r suppr
Pac a sma h saa h p ach rib
as shw
PB4
-
7/27/2019 BR128_LtGaugeInstall
29/50
28 April 2013 www.ascbp.com
Light Gauge Metal Roof and Wall Panels
Installation Guide for Delta Rib, Delta Rib III, Nor-Clad, Strata Rib
& 2 Corrugated
5"
3/8" HEM
3 7/8"
5/8"
3/4"
1 5/8"
6"
2 1/2"
BOTTOM POLYETHYLENE
CLOSURE SET IN SEALANTALL AROUND
ASC'S LIGHTGAUGE ROOFINGSLOPE
2. #14 WOOD SCREWSEE ILLUSTRATION
ON PAGE 7
ROW OF MASTIC TAPE
* THIS FLASHING IS ALSO KNOWN ASA "PROW" OR "DUTCH" GABLE ROOF.
CHALET GABLE (G18)
2. #14 x 1" WOOD SCREW
@ 24" O.C.
Chalet Gable Flashingthis ashi mus b isa prir pas
Procedures
Aach h cha ashi usi cr mach
wscrws spac a 24 c
Para h ac h ashi, pac 1/2 buy
masic ap as shw
th pyhy csurs ca b isa iaay
acrss a pa A mir cus, us msa csurs a a
rih a h pa ribs
fi cu h pas hi 5 back rm h ac h
ashi as shw
Aach h pas h r a hru-as a h
bm usi #14-10 wscrws wih washr
vy spac a 4 c a a apprximay 7 1/2
i rm h ac h ashi s hy ai wih h
sc rw ap saa
Cha ab b us wih saar av e1
(see pg. 15)
G18
End of mitre-cut panel
(See Roof Map pg. 5)
-
7/27/2019 BR128_LtGaugeInstall
30/50
lih gau Ma R a Wa Pas Isaai April 2013 29
SC Building ProductsA Division of ASC Profiles LLC
3/8" HOOK
6"
1/2"
4"
1" HOOK
2 1/2"
ASC'S LIGHTGAUGE ROOFING
ADJUSTMENT AREA
2. #14 WOOD SCREW
SEE ILLUSTRATIONON PAGE 7 ROOFING NAILS@ 12" O.C.
STARTER STRIP (SS1)
FIELD CAULK
2. #14 x 1" WOOD SCREW
@ 24" O.C.
ADJUSTABLE GABLE (G5)
Adjustable Gable Flashing
G5SS1
Procedures
I may isacs, h r sh wi hav b i
mii (majr rib rmv a h ab) S r
map pa 5 a ca ajusab ab I ab
rims ar us i his cai, a as h r rais
rm h ri, war wi w isi h ab rims
shw pa 17 th ajusab ab rim pics
shw abv ca assis i a prpr r isaai
Wh a majr rib a lih gau pa ccurs vr
h r ara wihi 3 h h ab, cu h
pa a rmv h majr rib rm h h
sh rm h w av aw r h pacm
h sarr srip
Isa h ab rim, xi h hriza 6
uphi a urah h av h pri h
r sh a h ab/av irsci
lca h pacm h sarr srip isur ha
h cu h r sh ca b isr i h
1 h sarr srip
fi cauk isi h p hm a h ur si
h sarr srip pr h ai his pa a isa
para ab
Note: Locate starter strip to allow proper installation of
adjustable gable trim as shown.
-
7/27/2019 BR128_LtGaugeInstall
31/50
30 April 2013 www.ascbp.com
Light Gauge Metal Roof and Wall Panels
Installation Guide for Delta Rib, Delta Rib III, Nor-Clad, Strata Rib
& 2 Corrugated
Vent Flashing
Procedures
trim h pi i h ashi 20% smar
ha h pip iamr
Si h ashi w vr h pip
Sa bw h v ashi a h ri wih
uab cauk a s h ashi
frm h ashi i h pri h r fas h ashi wih asrs a 1 c Rr
h asr sci ui pa 7
Prais ccurri vr spac supprs
ruir aiia suppr rami
A saiss s raw ba shu b isa a
h p h v/pip ashi
A miimum raia ara 2 shu b
maiai bw h bas h xib v/
pip ashi a h r pas majr ribs
Wh a prai ccurs hruh a nr-Ca
pa siap, uab cauk s b isa
i h capiary rv rm h prai hri this wi prv war rm rui whi
i h capiary rv a i h r pi
Refer to illustration #5, above
VENT / PIPE FLASHING
FASTEN @ 1" O.C.
NOR-CLAD
ROOF PANEL
GUNNABLE CAULK
IN CAPILLARY GROOVE
SEE PROCEDURES BELOW
ILLUSTRATION #5
Note: For the best drainage when a square-based pipe
flashing is used, one corner of the flexible pipe flashing
should be oriented to the high-side of the roof.
-
7/27/2019 BR128_LtGaugeInstall
32/50
lih gau Ma R a Wa Pas Isaai April 2013 31
SC Building ProductsA Division of ASC Profiles LLC
Vent/Pipe Flashing Installation Procedure
STEP 1: Cut
Cu pip iamr mark
fashrs (his is apprximay
20% smar ha h iamr
h pip)
STEP 2: Slide
Si h fashrs w h
pip, usi war ubrica
i cssary
STEP 4: Seal
Sa h fashrs by appyi
urha/siic saa bw
h fashr a h r Us a
ar s scrwrivr prss hbas w ihy
STEP 5: Fasten
fas h fashrs wih wahr-
rsisa asrs cmp h
sa
STEP 3: Form
frm a b h aumium bas
h fashrs i h surac
h r
Note: For the best drainage when a square-based
pipe flashing is used, one corner of the flexible pipe
flashing should be oriented to the high-side of the roof.
-
7/27/2019 BR128_LtGaugeInstall
33/50
32 April 2013 www.ascbp.com
Light Gauge Metal Roof and Wall Panels
Installation Guide for Delta Rib, Delta Rib III, Nor-Clad, Strata Rib
& 2 Corrugated
DOWNHILL
SEE PAGE 34
UPHILL
SEE PAGE 33
SIDE
SEE BELOW1.
2.
3.
SLOP
E
LENGTHWIDTH
3 1/2"
2"
3/8" HEM
SIDE SKYLIGHT (SK18)
2. #14 WOOD SCREW@ 4" O.C.
BUTYL MASTIC TAPE
ASC'S LIGHTGAUGE ROOFING
Skylight Flashing
Whrvr pssib, psii h skyih curb s h ribs
h r pas irr wih h ashi
Cu h ih au r pas as cs h , rih
a whi sis h curb as pssib Cu h uphi
si 6 up rm h curb as iica abv
Prais ccurri vr spac supprs ruir
aiia suppr rami
SK18
(Side)
1 Skylight Flashing (Side)
Note: Do not fasten the
panels within 24 uphill
from the skylight until the
penetration flashing is
installed.
-
7/27/2019 BR128_LtGaugeInstall
34/50
lih gau Ma R a Wa Pas Isaai April 2013 33
SC Building ProductsA Division of ASC Profiles LLC
6" MIN
21/2"
3 1/2"
12"
BOTTOM POLYETHYLENE CLOSURESET IN SEALANT ALL AROUND
ASC'S LIGHTGAUGE ROOFING
2. #14 WOOD SCREW@ EACH SIDE OF EACH RIBOR 8" O.C. FOR CORRUGATED
UPHILL SKYLIGHT (SK16)
SK16
(Uphill)
2 Skylight Flashing (Uphill Side)
-
7/27/2019 BR128_LtGaugeInstall
35/50
34 April 2013 www.ascbp.com
Light Gauge Metal Roof and Wall Panels
Installation Guide for Delta Rib, Delta Rib III, Nor-Clad, Strata Rib
& 2 Corrugated
5"
2 1/2"
3/8" HEM
3. #12 x 3/4" STITCH SCREW@ EACH RIB OR 8" O.C.FOR CORRUGATED
TOP POLYETHYLENE CLOSURESET IN SEALANT ALL AROUND
DOWNHILL SKYLIGHT (SK17)
ASC'S LIGHTGAUGE ROOFING
2. #14 WOOD SCREWSEE ILLUSTRATION
ON PAGE 7
SK17
(Downhill)
3 Skylight Flashing (Downhill Side)
-
7/27/2019 BR128_LtGaugeInstall
36/50
lih gau Ma R a Wa Pas Isaai April 2013 35
SC Building ProductsA Division of ASC Profiles LLC
6"
2 1/16"
2"
2"
2"
2"
2
1/2"
SKYLIGHT
ASC'S LIGHTGAUGE ROOFING
SLOPE
LENGTH
SLOPE
FOLD HERE 90CUT HERE
CUT HERE
REMOVE THIS MATERIAL
CUT HERE
Procedure for the Installation of Skylight Flashings
DOWNHILL
ILLUSTRATION #6
Skylight Flashing Preparation
RIGHT SIDE
UPHILL
Trim and bend the right side skylight flashing as
indicated. Trim the left side in a similar fashion.
The skylight flashing will be 4 wider than
the width of the curb (2 on each side).
Cut a 1/8 slot in the two uphill corners
of the Light Gauge Roofing Panel slightly
wider than 2, so the uphill flashing can
slide through the two slots.
(See illustration #6).Adjustments to the horizontal leg
dimension and length of slit may have to
be modified depending on the location of
the panels major rib.
-
7/27/2019 BR128_LtGaugeInstall
37/50
36 April 2013 www.ascbp.com
Light Gauge Metal Roof and Wall Panels
Installation Guide for Delta Rib, Delta Rib III, Nor-Clad, Strata Rib
& 2 Corrugated
2"
1"
1"
FOLD HERE 90
CUT HERE
REMOVE THIS MATERIAL
CUT HERE
FOLD HERE 90 REMOVE THIS MATERIAL
CUT HERE
REMOVE HEM
TO FOLD LINE
Skylight Flashing Preparation (continued)
trim bh s h uphi a whi sis h
skyih ashi as iica
Si h uphi ashi i h ss h lih gau
Ri a appy ibra amu uab cauki
Assmb h skyih as iica pages 33-36.
trim a assmb chimy ashi simiary
DOWNHILL
UPHILL
-
7/27/2019 BR128_LtGaugeInstall
38/50
lih gau Ma R a Wa Pas Isaai April 2013 37
SC Building ProductsA Division of ASC Profiles LLC
Chimney Flashing
3. 1.
2.
SLOPE
UPHILL
SEE PAGE 39
DOWNHILL
SEE PAGE 40
SIDE
SEE PAGE 38
1.
2.
3.
LENGTH
WIDTH
SLOP
E
Note: Procedures for the installation of chimney flash-
ings are similar to the skylights. (see pgs. 33-36).
The reglet** shown may be deleted if the chimney is
clad with siding. (Lap the siding over the flashing and
caulk). Be sure to specify the slope and the orientation
of the chimney dimensions when ordering this assem-
bly.
** A reglet is a two-piece flashing found on the side of
a wall, chimney or other similar roof penetration.
(see flashing drawing pg. 40).
-
7/27/2019 BR128_LtGaugeInstall
39/50
38 April 2013 www.ascbp.com
Light Gauge Metal Roof and Wall Panels
Installation Guide for Delta Rib, Delta Rib III, Nor-Clad, Strata Rib
& 2 Corrugated
3/8" HEM
1/2"3"
3/8" HEM
3/4"3/8" HEM
6"
2"
GUNNABLE CAULK
ANCHOR BY OTHERS
REGLET (RG16)
GUNNABLE CAULK
SIDE CHIMNEY (CH18)
BUTYL MASTIC TAPE
ASC'S LIGHTGAUGE ROOFING
2. #14 WOOD SCREW@ 4" O.C.
CH18
(Side)
RG16
(Reglet)
1 Chimney Flashing (Side)
-
7/27/2019 BR128_LtGaugeInstall
40/50
lih gau Ma R a Wa Pas Isaai April 2013 39
SC Building ProductsA Division of ASC Profiles LLC
6" MIN
21/2
"
6"
12"
3/8" HEM
1/2" 3"
3/8" HEM
3/4"
GUNNABLE CAULK
ANCHORS BY OTHERS
REGLET (RG16)
GUNNABLE CAULK
UPHILLCHIMNEY(CH16)
BOTTOM POLYETHYLENE CLOSURESET IN SEALANT ALL AROUND
ASC'S LIGHTGAUGE ROOFING
2. #14 WOOD SCREW@ EACH SIDE OF EACH RIBOR 8" O.C. FOR CORRUGATED
CH16
(Side)
RG16
(Reglet)
2 Chimney Flashing (Uphill)
-
7/27/2019 BR128_LtGaugeInstall
41/50
40 April 2013 www.ascbp.com
Light Gauge Metal Roof and Wall Panels
Installation Guide for Delta Rib, Delta Rib III, Nor-Clad, Strata Rib
& 2 Corrugated
3/8" HEM
5"
5"3"
1/2"
3/4"
3/8" HEM
3/8" HEM
GUNNABLE CAULK
ANCHORS BY OTHERS
REGLET (RG16)
GUNNABLE CAULK
TOP POLYETHYLENE CLOSURESET IN SEALANT ALL AROUND
DOWNHILL CHIMNEY (CH17)
ASC'S LIGHTGAUGE ROOFING
3. #12 x 3/4" STITCH SCREW
@ EACH RIB OR 8" O.C.FOR CORRUGATED
2. #14 WOOD SCREWSEE ILLUSTRATION
PAGE 7
CH17(Downhill) RG16(Reglet)
3 Chimney Flashing (Downhill)
-
7/27/2019 BR128_LtGaugeInstall
42/50
lih gau Ma R a Wa Pas Isaai April 2013 41
SC Building ProductsA Division of ASC Profiles LLC
Valley Top End
FIELD MITER AND ASSEMBLE
USE EMSEAL CLOSURETO CLOSE OFF VALLEY FLASHING
ASC'S LIGHTGAUGE ROOFING
ROOFING NAIL
2 ROWS OF BUTYL
MASTIC TAPE
VALLEY (V1)
INSTALL EMSEAL CLOSURESDIAGONALLY ACROSS THE BOTTOM
SIDE OF THE PANEL ANDSET IN SEALANT ALL AROUND
-
7/27/2019 BR128_LtGaugeInstall
43/50
-
7/27/2019 BR128_LtGaugeInstall
44/50
lih gau Ma R a Wa Pas Isaai April 2013 43
SC Building ProductsA Division of ASC Profiles LLC
6"MIN
SLOPE
BUTYL MASTIC TAPE OR
GUNNABLE SEALANT
ASC'S LIGHT
GAUGE ROOFING
2. #14 WOOD SCREW
SEE ILLUSTRATION
ON PAGE 7
Panel End Lap
Long Panel End Lapfr pas 28 r r
12"2"
2"#10-12 x 1"
PANCAKE HEAD
2 ROWS
BUTYL MASTIC TAPE OR
GUNNABLE SEALANT
ASC'S LIGHT
GAUGE ROOFING
SLOPE
2. #14 WOOD SCREW
SEE ILLUSTRATION
ON PAGE 7
Note: Use this detail so that panels can expand and
contract independently.
-
7/27/2019 BR128_LtGaugeInstall
45/50
44 April 2013 www.ascbp.com
Light Gauge Metal Roof and Wall Panels
Installation Guide for Delta Rib, Delta Rib III, Nor-Clad, Strata Rib
& 2 Corrugated
1/8"
3"
3"
2"
SNIP HERE
OPEN THE HEM OF BOTH
FLASHINGS TO BE JOINEDUSING A SCREWDRIVER OR
SCRATCH AWL.
REMOVE THIS MATERIAL FROMTHE 'INSIDE' FLASHING ONLY.
RE-CLOSE HEMS WITH
'DUCKBILL' PLIERS
CAULK AND RIVET
AS REQUIRED
Sealing End Laps & Lapping the HemsTypical Flashing Lap
STEP 1
STEP 2
Note: Flashing expansion joints may be required for
long flashing runs (i.e. 40 ft. +).
-
7/27/2019 BR128_LtGaugeInstall
46/50
lih gau Ma R a Wa Pas Isaai April 2013 45
SC Building ProductsA Division of ASC Profiles LLC
Procedures
Wh isai lih gau pas, B1, h drip
fashi, is prrr a h ha
A hriza cu, 1 , s b ma i h wa
pa a h irsci h jamb a ha rim ex
h ha rim i his s, awi r prpr raia
h usi h buii
Cca pr csurs u r cariy Pac
isi csur bhi pa a C-ma (C-1) r bas rim
(B1)
C1 B1
Wall DetailsWindow/Door Trim Corner
3/8" HEM
1"
7/8"2 1/8"
1"
1/2"
3/8" HEM
2"
C-METAL (C1) ORBASE TRIM (B1)
FOR CORRUGATED
ASC'S LIGHTGAUGE WALL PANEL
C-METAL (C1)
GLAZING AND WINDOWFRAME BY OTHERS
1. #9 WOOD SCREW
OR
2. #14 WOOD SCREW@ 24" O.C. MAX
Note: C1 is shown at head location. B1, Base Trim,
can also be used.
-
7/27/2019 BR128_LtGaugeInstall
47/50
46 April 2013 www.ascbp.com
Light Gauge Metal Roof and Wall Panels
Installation Guide for Delta Rib, Delta Rib III, Nor-Clad, Strata Rib
& 2 Corrugated
Procedures
op rami shw I isai vr pyw, us a
#14 x 1 wscrw r pa aachm
Cca pr csurs u r cariy Pac
bm csur bhi pa a bas rim a p
csur p sh bhi C1 a pa p, i
ruir
Wall DetailsTop and Bottom Trim
3/8" HEM
1"
7/8"2 1/8"
1"
1/2"
3/8" HEM
2"
ASC'S LIGHT
GAUGE WALL PANEL
BASE TRIM (B1)
C-METAL (C1)
BASE TRIM (B1)(If required)
C-METAL (C1)(If required)
3. #12 x 3/4" STITCH SCREWOR
4. #14 x 7/8" SELF DRILLER@ EACH RIB OR EVERY 8" O.C.FOR CORRUGATED
OR
1. #9 WOOD SCREW
2. #14 WOOD SCREW
@ 24" O.C. MAX
TOP OF WALL
C1 B1
-
7/27/2019 BR128_LtGaugeInstall
48/50
lih gau Ma R a Wa Pas Isaai April 2013 47
SC Building ProductsA Division of ASC Profiles LLC
3/8" HEM
3/8" HEM
3 1/2"
3 1/2"4"
5/8"
3/8" HEM
1 1/8"
SYMMET
RICAL
BUTYL MASTIC TAPE
ASC'S LIGHTGAUGE WALL PANEL
3. #12 x 3/4" STITCH SCREWOR
4. #14 x 7/8" LAP SELF DRILLER@ 24" O.C. MAX
INSIDE CORNER (IC1)
1. #9 WOOD SCREWOR
2. #14 WOOD SCREWSEE ILLUSTRATIONON PAGE 7
IC1
Procedures
op rami shw I isai vr pyw,
us a #14 x 1 wscrw r pa aachm
nr-Ca r Supr-Spa pa shw Wh
isai hr lih gau pas, us h
Uivrsa Isi Crr IC2
I may siuais, h as pa isa a h
crr wi ruir ha h pa b cu i wih Aw h
cu b cvr by h isi crr rim
Wall DetailsInside Corner
IC2
-
7/27/2019 BR128_LtGaugeInstall
49/50
48 April 2013 www.ascbp.com
Light Gauge Metal Roof and Wall Panels
Installation Guide for Delta Rib, Delta Rib III, Nor-Clad, Strata Rib
& 2 Corrugated
1 1/8"
3/8" HEM
5/8"
4"
3/8" HEM
3/8" HEM
3 1/2"
3 1/2"
SYMMET
RICAL
BUTYL MASTIC TAPE
OUTSIDE CORNER (OC1)
ASC'S LIGHTGAUGE WALL PANEL
1. #9 WOOD SCREWOR
2. #14 WOOD SCREWSEE ILLUSTRATIONON PAGE 7
3. #12 x 3/4" STITCH SCREWOR
4. #14 x 7/8" LAP SELF DRILLER@ 24" O.C. MAX
Wall DetailsOutside Corner
OC1
OC2
Procedures
op rami shw I isai vr pyw, us a #14
x 1 wscrw r pa aachm
nr-Ca pa shw Wh isai hr lih
gau pas,us h Uivrsa ousi Crr oC2
I may siuais, h as pa ach si wi prjc
by h buii crr, ruiri h pa b cu
i wih Aw h cu b cvr by h usi
crr rim
-
7/27/2019 BR128_LtGaugeInstall
50/50
MAnUfACtURIng fACIlItIeS:
Anchorage, Alaska
2441 Cinnabar Loop
Anchorage, AK 99507
McClellan, California
5001 Bailey Loop
McClellan, California 95652
Salem, Oregon
4063 Salem Industrial Drive NE
Salem, OR 97303
800-272-7023 503-390-7174
Salt Lake City, Utah
4228 West 1730 South
Salt Lake City, UT 84104
Spokane, Washington
4111 East Ferry
Spokane, Washington 99202
800-776-8771 509-536-4097
CoRPoRAte HeAdqUARteRS:
ASC Profiles, Inc.
2110 Enterprise Boulevard
West Sacramento, CA 95691
Visit us at:www.ascbp.com