    Light Gauge Metal Roofand Wall Panels

    Installation Guide for Delta Rib, Delta Rib III,

    Nor-Clad, Strata Rib & 212 Corrugated

  • 7/27/2019 BR128_LtGaugeInstall

    2/50

    lih gau Ma R a Wa Pas Isaai April 2013 1

    SC Building ProductsA Division of ASC Profiles LLC

    Table of Contents

    Section

    Iruci 2

    Miimum Rcmm ts & euipm 2-3

    divry, Hai & Sra 3

    Say Csirais 3

    R Prparai 4

    Map typica R Ciis 5

    trim lcais 6

    fasr P acm 6

    fasr Sci 7

    Pa Isaai 8

    Hip/Ri fashi 9

    Uivrsa Ri trmiai 10

    V Ri fashi 11

    V Ri trmiai 12

    Vay fashi 13

    Vay trmiai 14

    eav a V eav fashis 15

    eav fashi Prparai 16

    gur a V gur fashi 17

    gab fashi 18

    gab/Ri trasii 19

    gab Crr a eav 19

    gab fashi Prparai 20

    gab fashi Prparai a Ri 21

    Pak fashi 22

    Siwa fashi 23

    ewa fashi 24

    V ewa fashi 25

    Section

    Sp trasii - Hih lw Sp 26

    Sp trasii - lw Hih Sp 27

    Cha gab fashi 28

    Ajusab gab fashi 29

    V fashi 30

    V/Pip fashi Isaai Prcur 31

    Sky ih f ash i 32

    Skyih fashi (Si) 32

    Skyih fashi (Uphi Si) 33

    Skyih fashi (dwhi Si) 34

    Prcur r h Isaai

    Skyih fashis 35

    Skyih fashi Prparai 35-36

    Chimy fashi 37

    Chimy fashi (Si) 38

    Chimy fashi (Uphi Si) 39

    Chimy fashi (dwhi Si) 40

    Vay tp e 41

    Vay drmr 42

    Pa e lap 43

    Sai e laps & lappi h Hms 44

    Wiw/dr trim Crr Wa dai 45

    Bas trim, Wa Sp, Pa tp Wa dai 46

    Isi Crr Wa dai 47

    ousi Crr Wa dai 48

    Light Gauge Metal Roof & Wall Panels

  • 7/27/2019 BR128_LtGaugeInstall

    3/50

    2 April 2013 www.ascbp.com

    Light Gauge Metal Roof and Wall Panels

    Installation Guide for Delta Rib, Delta Rib III, Nor-Clad, Strata Rib

    & 2 Corrugated

    I aii wahr ihss, i, ks

    a cmy, ASC Buii Prucs lih gau R

    a Wa Pas ar si wih as isaai

    as a primary csirai this ui is i

    hp h isar achiv a hih v uaiy i h

    iish pruc Pas hsia cac a

    ASC Buii Prucs rprsaiv r assisac

    Important Notice

    Be sure to read this manual in its entirety before

    beginning installation.

    this maua is prvi h cusmrs ASC Buii

    Prucs as a ui assis i h isaai lih

    gau Ma R a Wa Pas Us r ay hr

    purps is prhibi this maua rmais h prpry

    ASC Buii Prucs

    ths isrucis cai sus appicai

    prcurs y a ca rpac h r

    cmm ss a xpric Rspsibiiy r

    crmac sa a ca buii cs, as w as

    ay hr appicab prjc ruirms rss wih h

    isar, as s h rspsibiiy bsrv rasab

    say prcurs

    ASC Buii Prucs assums rspsibiiy r

    ay prbms which mih aris as a rsu imprpr

    isaai r ay prsa ijury r prpry ama ha

    may ccur wih h prucs us

    Introduction

    Screw Gun:

    Cuch yp scrw u wih ph cai s pic

    awi variab ru sis is rcmm isur prpr isaai h scrws th wi

    scks wi b ruir: 1/4 a/r 5/16 hx

    Snips:

    fr miscaus pa a ashi cui

    ruirms thr pairs sips wi b ruir r

    , rih , a cri cus

    Electrical Metal Shears:

    Us r ra ma cui, such as a h hips a

    vays

    Note:Some erectors prefer to use circular power saws with

    metal cutting abrasive blades. While the use of power

    saws may be faster, there are some disadvantages

    that must be considered:

    (1) The edges of metal that have been saw cut are

    jagged and unsightly, and are more l ikely to rust

    than sheared edges.

    (2) Saw cutting will leave small particles of metal on

    the panel surface that will rust and damage the

    panel finish if not completely removed.

    Chalk Line:

    Us assis i h aim pas, ashis, c

    Neoprene Mastic Tape:

    1/16 x 1/4 r ap us r isaai isi a

    usi pri csurs a pa si aps

    Butyl Mastic Tape:

    1/16 x 1/2 r ap us r prvi war ii-

    rai i ashi sh ma appicais a Supr-

    Spa pa--pa siaps

    Caulk:Buy r urha saa us ihibi war iirai

    Caulking Gun:

    fr miscaus cauki a sai ihibi war

    iirai

    Blind Rivet Hand Tool:

    Us r miscaus ashi a rim appicais

    Marking Tools:

    Iib markrs, pcis, r scrachi s

    Minimum Recommended Tools& Equipment

    Note:

    It is recommended that Light Gauge Roofing be applied

    on roofs with a minimum slope of 3 inches per foot (3:12).

    * The details contained in this guide are shown over a ply-

    wood substrate. Details remain the same for either a solid

    substrate (plywood or steel), spaced framing or intermit-

    tent support condition with only the fastener type chang-ing. Where spaced framing is used, perimeter supports

    for flashings must be considered.

    ** Each flashing part in this guide has been assigned a part

    number. Each part number contains one or two letters

    followed by one or two numbers, for example: (EW17).

    These part numbers have been provided for you to make

    ordering these flashing parts quick and easy.

  • 7/27/2019 BR128_LtGaugeInstall

    4/50

    lih gau Ma R a Wa Pas Isaai April 2013 3

    SC Building ProductsA Division of ASC Profiles LLC

    Minimum Recommended Tools & Equipment (C)

    Scratch Awl:

    Us mark h s

    Utility Knife:

    Us r miscaus cui

    Electric Drill:

    Us ri hs such as hs ruir r riv

    isaai

    String Line:

    Us r ra aim a masuri

    Tape Measure:

    25 miimum (ahr 50 is hay)

    Locking Pliers:

    Saar a duckbi sy r miscaus campi

    a bi pars

    Delivery, Handling and Storage

    Aways chck h shipm up ivry Chck

    r ama a chck maria uaiis aais

    h shippi is n ay ama maria rshras a h im ivry

    Ha pa bus a iiviua pas wih

    car avi ama lr bus a pas

    may ruir w r mr pick pis prpry

    spac avi ama ha ca rsu rm

    bucki a/r bi h pas Rus a

    cpy h l lh Hai Isrucis a

    iarams rm ASC Buii Prucs cusmr

    srvic as ruir

    Sr h pas a hr marias i a ry, w

    via ara a away rm raic eva h bu s ha ay misur ha may

    hav accumua uri shippi ca ru B

    sur ha air wi b ab circua ry aru

    h bus avi h bui-up misur nvr

    sr marias i irc cac wih h ru

    War ca c vs wh hai upai

    Zicaum-ca pas r ashis avi

    iscrai Rrmi i marks (which appar

    back), paricuary a bs, wi b visib

    War ca, -marki, s s shs wh

    waki h pas avi sh marks rama h iish d sp h pa

    sams r ribs Sp y i h a ara h pa

    Safety Considerations

    Never use unsecured or partially installed

    panels as a working platform

    d wak pas ui hy ar i pac hr a a h asrs aachi h pas

    h r hav b isa

    Metal roofing panels are slippery when

    wet, dusty, frosty or oily

    d wak a ma r wh ay hs

    ciis ar prs Wari s s shs wi

    hp miimiz sippi a hp prv ama

    h pai suracs

    Do not walk on the panel seams or

    major ribs

    Wh waki h uy isa r pas, b

    sur sp y i h a aras h pas

    Always be aware of your position on the

    roof relative to your surroundings.

    tak h cais r pis, r

    s, uipm, c-wrkrs, c

    Always wear proper clothing and

    safety attire.

    War prpr chi wh wrki wih sh

    ma i rr miimiz h pia r cus,

    abrasis, a hr ijuris ASC Buii Prucs

    rcmms say asss a vs

    Use care when operating electrical and

    other power equipment.

    obsrv a mauacurrs say rcmmais\

    Roof installation on windy or stormy days

    can be dangerous

    Avi wrki wih sh ma prucs wiy

    r srmy ays

  • 7/27/2019 BR128_LtGaugeInstall

    5/50

    4 April 2013 www.ascbp.com

    Light Gauge Metal Roof and Wall Panels

    Installation Guide for Delta Rib, Delta Rib III, Nor-Clad, Strata Rib

    & 2 Corrugated

    Roof Preparation

    ASCs lih gau Ri ca b us i bh

    w csruci a rri ri appicais W

    rcmm h isaai lih gau Ri vr

    a ciuus rii subsra such as pyw, w

    cki, r vr irmi supprs Cac ASC r

    aiia irmai

    th wi sps b ak prpar h r

    r isaai lih gau Ri pas:

    New Roofs:

    1 Mak sur hr ar ais r hr bjcs

    prrui rm h subsras ha mih pucur h

    uraym r h r pas Ca a bris rm

    h r

    2 Chck a ais r pssib r praiswhich mus b a h ck prir r pa

    isaai

    3 Cvr h ir r ck wih a miimum 30

    b aspha-saura papr Sm syhic

    urayms may b us i pac wih ur

    ri Isar mus sur hy m h miimum

    saars 30 b a ha h mauacurr

    has apprv hm r us wih ma ri fr

    appicais vr spac rami hr yps

    misur barrirs may b ruir Bi a h av

    a r h hrizay (para h av)

    Aw ach cscuiv curs vrap h prvius

    3 ichs ovrap h a miimum 6 wh

    sari a w r Aras papr ha hav

    b r r cu shu b rpac r rpair prir

    isaai h ma r (S iusrai #1)

    4 Pac a aim i a h ab whr

    h irs r pa wi b isa This line must

    be parallel to the gable edge of the roof deck

    and square with the eave line. Chck h r r

    suarss by maki a 3 i acrss h av (See

    illustration #2)

    Cmpi h 3 x 4 x 5 ria shu pac h 4

    h ria para wih h ab th irs

    r pa wi b pac para wih his i Sih

    variais r u--suar ciis up 3 ca b

    cvr by h ab rims shw pa 18

    5 I is vry impra masur h ir h

    h r rm ab ab Crrc pacm

    h pas wi aw h pas ribs ach

    si b cvr by h ab ashi shw

    pa 18 this wi cra a symmrica apparac

    bh abs Shu his b impracica, h

    ajusab ab ai pa 29 ca b us

    3" SIDE LAP

    6" END LAP

    30# FELT PAPER

    ILLUSTRATION #1

    ILLUSTRATION #2

    ALIGNMENT LINE

    DIRECTION OF

    PANEL APPLICATION

    3' x 4' x 5' TRIANGLE

    4'

    5'

    3'

    Note:

    In areas where snow, ice, and heavy rain conditions exist,

    a high temperature cold-applied rubberized underlayment

    should be used in lieu of felt in the valleys. Felt on the

    remainder of the roof will lap over the membrane where

    the two meet. See Valley page 13.

    Existing Roofing:Sm jurisicis wi aw rri vr xisi ri

    wihu h r ar Chck wih yur ca cs

    r buii parm r yur spciic ruirms

    fr bs rsus, lih gau Ri ruirs a raivy

    smh a a subsra Appicai vr ruh a/r

    uv suracs is rcmm, r xamp, w

    shis

    I h r is b sripp w h xisi cki,

    w h prcurs r w rs pa 4 B sur

    chck h xisi r a rpair ay ama aras prir

    isaai h w r sysm

    Note:

    Do not apply Light Gauge Roofing over roofs with

    structural damage or trapped moisture.

  • 7/27/2019 BR128_LtGaugeInstall

    6/50

    lih gau Ma R a Wa Pas Isaai April 2013 5

    SC Building ProductsA Division of ASC Profiles LLC

    The following steps should be taken when installing

    ASCs Light Gauge Roofing over existing roofing:

    1 Ispc h r r ama a mak h cssary

    rpairs achiv a a pa r h ma r

    pas W shis shu b rmv

    2 Scur ay warp r s ri

    3 Mak sur ha hr ar ais r hr bjcs

    prrui rm h r ha mih pucur h w

    uraym r h w r pas

    4 Rmv a mss a hr bris rm h r

    5 Cu ay vrhai ri ush wih h r

    ck a rmv a hips, ri caps, a prai

    ashis

    6 Ma bris/shavis shu b rmv rm h

    r prrssivy a aiy prv immia

    crrsi a scrachi h p ca

    7 fw h ircis pa 4, #2 hruh #5 r

    prparai

    Map of Typical Roof Conditions

    fr susis hw rim ashis i h ir aras, pas rr h wi pas:

    Flashing Page(s)

    Ajusab gab 29

    Cha gab 28

    Chimy 37-40

    eav 15-16

    ewa 24-25

    gab 10, 12, 18-21

    gur 17

    Flashing Page(s)

    Pak 22

    Pich trasii 26-27

    Ri 9, 11

    Siwa fashi 23

    Skyih 32-36

    Vay 13-14, 41-42

    V 30-31

  • 7/27/2019 BR128_LtGaugeInstall

    7/50

    6 April 2013 www.ascbp.com

    Light Gauge Metal Roof and Wall Panels

    Installation Guide for Delta Rib, Delta Rib III, Nor-Clad, Strata Rib

    & 2 Corrugated

    Prevailing Weather Sheeting Direction Neoprene orButyl Mastic (Typ)

    Nor-Clad (36" Coverage)

    Strata Rib (36" Coverage)

    Delta Rib III (36" Coverage)

    Delta Rib (24" Coverage)

    2-1/2" Corrugated (24" Coverage) Wall Applications

    2-1/2" Corrugated (21-1/3" Coverage) Roof Applications

    Lap Stitch Screw (Typ)

    Woodscrew (Typ)or

    Fastener Placement

    Trim Locations

    EAVE FLASHING

    BOTTOM

    CLOSURE

    SINGLE TRACKCOVER

    DOUBLE TRACK

    COVER

    MATCHING

    FIBERGLASS

    JAMB

    TRIM

    UNIVERSAL

    ENDWALL

    GABLE TRIM

    UNIVERSAL

    RIDGE

    UNIVERSAL

    SIDEWALL

    TOP CLOSURE

    PIPE FLASHING

    BASE

    TRIM

    OUTSIDE

    CORNER

    C-METAL

    INSIDE

    CORNER

    MAXIMUM RECOMMENDED

    FASTENER ROW SPACING

    1/2 Pyw 24

    5/8 Pyw 36

    2 x 4 36

    Notes:

    Lap panels away from prevailing weather. Use only those accessories specifically designed for use with this product. Use only

    galvanized or Zincalume-coated fasteners. Isolate roofing and flashings from contact with dissimilar metals. Fastener selection

    will vary based upon substrate. The use of neoprene or butyl mastic tape along the sidelaps, as shown above, is always recom-

    mended for roofs. Lap stitch screws should be placed @ 16 o.c. maximum.

    The maximum recommended fastener row spacing applies to mild weather conditions of 80 mph winds and an exposure rating of

    B (protected) for typical buildings and substrate. For project specific wind uplift attachment, contact your ASC representative.

  • 7/27/2019 BR128_LtGaugeInstall

    8/50

    lih gau Ma R a Wa Pas Isaai April 2013 7

    SC Building ProductsA Division of ASC Profiles LLC

    n 9 x 1, 1-1/2, 2, 2-1/2, 3 W Scrw

    1/4 Hx Ha

    Pa imsia umbr

    Pa pyw mi 1/2 hick

    trim a si ap aachms

    trim a si ap aachms

    trim--rim r

    rim--pa aachms

    Pa puri r ck aachms

    n 14 x 1, 1 1/2 W Scrw

    5/16 Hx Ha

    n 12 x 3/4 Sich Scrw

    1/4 Hx Ha

    (cmpaib wih n 9 W Scrw)

    n 14 x 7/8 lap S drir

    5/16 Hx Ha

    (cmpaib wih n 14 W Scrw)

    StSt-42 Saiss S Riv

    1/8 x 1/8

    n 12 x 1, 1 1/2, 2, 2 1/2 S drir

    5/16 Hx Ha

    Fastener # Description Use

    Fastener Selection

    Notes

    The table above shows the Light Gauge panel fasteners provided by ASC Building

    Products. Refer to the panel installation, flashing details, and fastener placement

    pages of this manual for specific fastener usage. See page 6 for fastener spacing.

    Panel attachment screws must be long enough to penetrate through the roof decking

    at least 3/8, or penetrate solid lumber at least one inch.

    All screws must be coated to provide protection against corrosion.

    Exposed fasteners should have sealing washers and be the same color as the parts

    they attach.

    Roofing nails will also be required, but are not furnished by ASC. They are typically

    used to temporarily hold a flashing in place that needs to be installed prior to panels.

    Screws must be properly driven to ensure proper seal and holding strength. Do not

    under \drive or overdrive the screws. Recommended drill speed is 2000 rpm. Use of a

    depth-sensing nosepiece will aid in properly driving screws.

    Prpr Isaai

    gask fasrs

    Crrcy

    driv

    Ur

    driv

    ovr

    driv

  • 7/27/2019 BR128_LtGaugeInstall

    9/50

    8 April 2013 www.ascbp.com

    Light Gauge Metal Roof and Wall Panels

    Installation Guide for Delta Rib, Delta Rib III, Nor-Clad, Strata Rib

    & 2 Corrugated

    1" 1"

    ASC'S LIGHT

    GAUGE ROOFING

    Panel Installation

    GENERAL

    Suy h ais sci his maua prir h

    isaai h pas Pay cs ai

    h wi:

    fashis ha b isa prir h

    pas icu Vay, eav, V eav,

    Ajusab gab a Cha gab

    Appy saa r masic ap h pr-isa

    ashis as shw i h ai sci his

    maua

    SEE PAGE 6 & 7 FOR

    FASTENER PLACEMENT

    AND SELECTION

    1" OVERHANG

    ILLUSTRATION #3

    ILLUSTRATION #4

    PROCEDURE

    1 Isa av rim, vay rim a isi csur prir

    pa isaai

    2 Ai h h irs pa wih h aimi csruc a h sar ab (See page 4

    item 4 and illustration #3 below.) Aw h pa

    vrha h av 1 miimum

    3 Chck h whi h pa I h pa

    h is crrc, h pa shu vrha 1

    pas h av rim as shw bw i iusrai

    #4 As, h pa shu x pas h

    cri h ri (See pg. 9)

    4 Ar h irs pa is prpry ai, as pr

    h asr pacm a spaci uiis

    pa 6

    5 lay w h sc a hir pas, chckiaim, maki sur hy ar suar this wi

    sur ha a sawh c a h av a ri

    is avi

    6 Ma bris/shavis shu b rmv rm h

    r prrssivy a aiy prv immia

    crrsi a scrachi h p ca

  • 7/27/2019 BR128_LtGaugeInstall

    10/50

    lih gau Ma R a Wa Pas Isaai April 2013 9

    SC Building ProductsA Division of ASC Profiles LLC

    2"

    1 7/8"

    3/4"

    1/2"

    1/2"

    3/8" HEM

    7"7"

    2 1/8"

    3-3/4"

    3-1/2"

    1/2"135 TYP.

    3/8" HEM

    UNIVERSAL RIDGE (R1)

    2. #14 WOOD SCREWSEE ILLUSTRATION

    ON PAGE 7

    TOP POLYETHYLENE CLOSURE SETIN SEALANT ALL AROUND

    (SEE PROCEDURES)

    ASC'S LIGHT

    GAUGE ROOFING

    3. #12 x 3/4" STITCH SCREW

    OR4. #14 x 7/8" LAP SELF DRILLER

    @ EACH RIB OR 8" O.C.

    FOR CORRUGATED

    Hip/Ridge Flashing

    Procedures

    Cauk h bm a sis h pyhycsur S h csur as shw abv a cauk

    h p th csur is pia i h pa is ur

    up a cauk a h sis ar h rib

    fas h ri cap usi sich scrw a ach rib

    r 8 c r crrua

    Cs h s h uivrsa ri cap by cui

    a i maria a ach fas wih rivs

    (see page 10)

    Cauk, ap a riv suia ri ashis

    (see pg. 44)

    R1 R3 R4

    Note: R1 is a universal hip/ridge. A standard hip/ridge,

    R3 & R4, is also available.

    Note: The gable flashing must be installed prior to

    installation of the ridge (see page 18).

  • 7/27/2019 BR128_LtGaugeInstall

    11/50

    10 April 2013 www.ascbp.com

    Light Gauge Metal Roof and Wall Panels

    Installation Guide for Delta Rib, Delta Rib III, Nor-Clad, Strata Rib

    & 2 Corrugated

    Universal Ridge Termination

    UNIVERSAL RIDGE (R1)

    BUTYL MASTIC TAPE

    OR NEOPRENE CLOSUREREMNANTS TO CLOSE

    OFF THE RIDGE

    3. STITCH SCREW 1/2"FROM EDGE OF GABLE

    GABLE

    CAULK AND RIVET

    SEE PAGE 21 FORGABLE PREPARATION

    OVERHANG UP TO 4"THEN FIELD TRIM TO

    1" USING SNIPS OR SHEAR

    1"

  • 7/27/2019 BR128_LtGaugeInstall

    12/50

    lih gau Ma R a Wa Pas Isaai April 2013 11

    SC Building ProductsA Division of ASC Profiles LLC

    1 7/8"

    6 3/4" 6 3/4"

    3/8" HEM

    1 7/8"1 1/8"

    1 1/8"3/8" HEM

    SCREEN BY OTHERS

    VENTED RIDGE (R2)

    ASC'S LIGHTGAUGE ROOFING

    2"

    TOP CLOSURE

    C-METAL (C1)

    2. #14 WOOD SCREW

    SEE ILLUSTRATIONON PAGE 7

    3. #12x3/4" STITCH SCREWOR

    4. #14x7/8" LAP SELF DRILLER@ EACH RIB OR 8" O.C.FOR CORRUGATED

    AIR

    FLOW

    7/8"

    2

    1

    3/8" HEM

    Vented Ridge/Hip Flashing

    Procedures

    Pyw shu b h back 2 rm ach si h

    ri

    Aach h scr a ach pa rib sawichi h p

    csur i pac esur scr is pu ih avisai

    fas h v ri usi sich scrw a ach rib

    r 8 c r crrua

    Cauk, ap a riv suia ashis

    (see pg. 44).

    Cs h s h ri cap by cui a i

    maria a ach fas wih rivs a cauki

    jis (see pg. 12).

    Sps rar ha 6:12 may ruir spcia

    ri imsis

    R2 C1

    Note: The gable flashing must be installed prior to

    installation of the ridge (see page 18).

    The screening shown creates a barrier for insects and

    birds while allowing for ventilation.

    For snow and heavy rain environments, please inquire

    about optional Vented Ridge details.

  • 7/27/2019 BR128_LtGaugeInstall

    13/50

    12 April 2013 www.ascbp.com

    Light Gauge Metal Roof and Wall Panels

    Installation Guide for Delta Rib, Delta Rib III, Nor-Clad, Strata Rib

    & 2 Corrugated

    Vented Ridge/Hip Termination

    CUT AND TRIM SIMILARTO GABLE (SEE PAGE 21).

    FOLD DOWN OVER END TABS.

    CUT AT BENDS 1"AND FOLD IN 90

    VENTED RIDGE (R2)

    CAULK

    CAULK AND RIVET

    GABLE

    SEE GABLE PREPARATION@ RIDGE (PAGE 21)

  • 7/27/2019 BR128_LtGaugeInstall

    14/50

    lih gau Ma R a Wa Pas Isaai April 2013 13

    SC Building ProductsA Division of ASC Profiles LLC

    2"

    3"

    4"2"

    2"

    1"

    13" 13"

    'W' VALLEY (V1)

    2 ROWS BUTYL MASTIC TAPE

    ASC'S LIGHTGAUGE ROOFING

    2. #14 WOOD SCREW

    SEE ILLUSTRATIONON PAGE 7

    INSTALL EMSEAL CLOSURES

    DIAGONALLY ACROSS THE BOTTOMSIDE OF THE PANEL AND

    SET IN SEALANT ALL AROUND

    SEENOT

    E

    BELOW

    1" TYP

    IF PAINTED,THIS SIDE

    19-7/16"19-7/16"

    Valley Flashing

    V1 V2

    Procedures

    Pac a sc ayr 36 r i h vay

    cr i wih 18 r ach si

    Sari a h w , rim a pac h vay

    ashi s i vrhas h avs 1 (see pg. 14)

    Cauk a ap h subsu vay ashis a

    miimum 8

    Para h vay, pac w rws 1/2 buy

    masic ap saa spac as shw

    th pyhy csurs ca b isa iaay

    acrss a pa A mir cus, us msa csurs a a

    rih a h pa ribs

    fi cu h pas hi a miimum 4 back

    rm h vay as shw larr vays wihu

    h cr V, may b ruir i sw cury

    isaais

    Aach h pas h r a hru-as a

    h bm usi a #14 x 1 wscrw

    a 8 up rm h vay ai wih h sc rw

    buy masic ap

    Wh vays ar ruir, isa siap pr

    masic ap a h siap a miimum 10-0 up

    rm h pa

    Note: In areas where snow, ice and heavy rain con-

    ditions exist, panels may need to be held back more

    than 4 and the valley flashing overall width must be

    increased. A high temperature cold-applied rubberized

    underlayment should be used extending at least 3 up

    from the center of the valley on each side.

  • 7/27/2019 BR128_LtGaugeInstall

    15/50

    14 April 2013 www.ascbp.com

    Light Gauge Metal Roof and Wall Panels

    Installation Guide for Delta Rib, Delta Rib III, Nor-Clad, Strata Rib

    & 2 Corrugated

    1"

    1"

    4"

    MIN

    VALLEY

    FOLD TABS DOWN 90

    REMOVE THIS MATERIAL

    SEE VALLEY (PAGE 13) FORFASTENING & SEALING REQUIREMENTS

    EAVE

    FILL ENDWITH SEALANT

    Valley Termination

    Note: Emseal closures not shown for clarity.

  • 7/27/2019 BR128_LtGaugeInstall

    16/50

    lih gau Ma R a Wa Pas Isaai April 2013 15

    SC Building ProductsA Division of ASC Profiles LLC

    ASC'S LIGHT

    GAUGE ROOFING

    2. #14 WOOD SCREWSEE ILLUSTRATIONON PAGE 7

    1"O.H.

    2X BLOCKING

    PERFORATEFASCIA ASREQUIRED

    EAVE (E1)

    BOTTOM POLYETHYLENECLOSURE SET INSEALANT ALL AROUND

    ROOFING NAILS@ 24" O.C.

    1/2"

    1 3/8"

    1 3/8"

    2"

    1/2"

    3/8" HEM

    3-3/8"

    4-3/8"

    3/8" HEM

    1/2"

    3"

    2"

    1/2"

    3"

    1/2"

    3"

    1/2"

    4 3/8"

    2"

    1 1/2"

    1/2"

    3"

    2"

    Procedures

    Carpry mus b cmp as iica prir

    isaai h V eav

    Aach h av ashi usi ri ais vy

    spac a 24 c

    Cauk a ap h ashi a miimum 3

    (see pg. 44)

    Pas shu vrha h av 1 miimum

    Eave and Vented Eave Flashingsthis ashi mus b isa prir h pas

    ER1 ER2

    E2E1 E4 E5E3

    Vented Eave

  • 7/27/2019 BR128_LtGaugeInstall

    17/50

    16 April 2013 www.ascbp.com

    Light Gauge Metal Roof and Wall Panels

    Installation Guide for Delta Rib, Delta Rib III, Nor-Clad, Strata Rib

    & 2 Corrugated

    1"

    1"

    REMOVE THIS MATERIAL

    EAVE

    REMOVE THIS MATERIAL

    EAVE

    BEND TABSHERE @ 90

    Eave Flashing PreparationUs his ashi whr av ms ab

    STEP 1

    STEP 2

    Note: Length of eave must allow

    1 to extend past gable fascia.

  • 7/27/2019 BR128_LtGaugeInstall

    18/50

    lih gau Ma R a Wa Pas Isaai April 2013 17

    SC Building ProductsA Division of ASC Profiles LLC

    Gutter and Vented Gutter Flashingsn: this ashi mus b isa prir h pas

    Procedures

    f shu vr p av (e3)

    ( shw)

    Carpry mus b cmp as iica prir

    isaai h V gur

    Aach av ashi usi ri ais vy spac

    a 24 c

    Cauk a ap h ashi a miimum 3

    (see pg. 44)

    Pas shu vrha h av a miimum 1

    ASC Buii Prucs rcmms ha a

    ics ur cracr isa urs

    Vented Gutter

    1 3/8"

    1 3/8"

    1/2"

    ROOFING NAILS@ 24" O.C.

    2. #14 WOOD SCREW

    SEE ILLUSTRATIONON PAGE 7

    1"O.H.

    PERFORATEFASCIA ASREQUIRED

    2X BLOCKING@ 12" O.C.

    BOTTOM POLYETHYLENECLOSURE SET IN SEALANT

    GUTTER

    ATTACH PER

    MANUFACTURER'SRECOMMENDATIONS

    METAL SCREENAS REQUIRED

    EAVE (E3)

    MASTIC TAPE, TOP & BOTTOM

    E3

  • 7/27/2019 BR128_LtGaugeInstall

    19/50

    18 April 2013 www.ascbp.com

    Light Gauge Metal Roof and Wall Panels

    Installation Guide for Delta Rib, Delta Rib III, Nor-Clad, Strata Rib

    & 2 Corrugated

    5" 5/8"

    3/8" HEM

    4"

    5/8"

    3/8" HEM

    1 1/8"

    1/2"

    2 3/4"

    4"

    1/2"

    1 1/4"

    2"

    1-1/8"

    3/8" HEM

    5/8"4"

    3/8" HEM

    1/2"

    Gable Flashing

    BUTYL MASTIC TAPE

    2. #14 WOOD SCREW@ 24" O.C.

    ASC'S LIGHTGAUGE ROOFING

    3. #12 x 3/4" STITCH SCREW

    OR

    4. #14 x 7/8" LAP SELF DRILLER@ 24" O.C.

    GABLE (G4)

    2. #14 x 1" METAL WOOD@ 24" O.C.

    G1

    G3 G4

    Procedures

    Pac h irs r pa accri h

    isrucis pas 4 a 8

    Pac buy masic ap a h p h pa

    rib as shw

    Isa h ab ashi by paci i irmy vr h

    rib Us sich scrws as ashi h pa

    a us cr mach wscrws a 24 c

    as ashi srucur

    Cauk a ap h ashi a miimum 3

    (see pg. 44)

    Mir cu h ashi a h pak ji ach si a

    h ri (see pg. 21)

    Sip a h ab a h av cs h

    Us rivs as

    Notes: G1 is a standard gable. Narrower gables,

    G3 and G4, are also available.

  • 7/27/2019 BR128_LtGaugeInstall

    20/50

    lih gau Ma R a Wa Pas Isaai April 2013 19

    SC Building ProductsA Division of ASC Profiles LLC

    Gable/Ridge Transition(simiar ewa)

    GABLE OR SIDEWALL

    2" BUTYL MASTIC TAPEWITH FASTENERS @ 2" O.C.

    RIDGE OR ENDWALL

    ASC'S LIGHT

    GAUGE ROOFING

    GABLE

    BEND HERE 90

    RIVET

    INSERT EAVE TABBEHIND GABLE

    EAVE

    Gable Corner at Eave

  • 7/27/2019 BR128_LtGaugeInstall

    21/50

    20 April 2013 www.ascbp.com

    Light Gauge Metal Roof and Wall Panels

    Installation Guide for Delta Rib, Delta Rib III, Nor-Clad, Strata Rib

    & 2 Corrugated

    Gable Flashing Preparation

    STEP 1

    STEP 2

    STEP 3

    GABLE

    REMOVE THIS MATERIAL

    * SEE TABLE

    FOR DIMENSION

    21/

    2"

    1

    1/2"

    GABLE

    SNIP HERE

    REMOVE THIS MATERIAL

    1 1/2"

    SNIP HERE

    1"

    1"

    GABLE

    FOLD 90

    REMOVE THIS MATERIAL

    Roof Pitch Dimension

    3:12 2

    4:12 17

    85:12 11116

    6:12 1616

    12:12 58

    Note: Length of uncut

    gable must extend 2

    1/2 past eave fascia.

  • 7/27/2019 BR128_LtGaugeInstall

    22/50

    lih gau Ma R a Wa Pas Isaai April 2013 21

    SC Building ProductsA Division of ASC Profiles LLC

    EQUAL

    EQUAL

    VERTICAL CUT

    * SEE TABLEREMOVE THIS

    MATERIAL WITH SNIPS

    OR POWER SHEARS

    REMOVE THIS

    MATERIAL WITH SNIPS

    OR POWER SHEARS

    RIDGE LINE

    14"@STANDARDRIDGE

    17"@VENTEDRIDGE

    RIDGE LINE

    GABLE

    RIVET

    GABLE

    REMOVE THIS

    MATERIAL WITH SNIPS

    OR POWER SHEARS

    Gable Flashing Preparation at Ridge

    STEP 1 STEP 2

    STEP 3 STEP 4

    Roof Pitch Dimension*

    3:12 1116

    35:12 114

    4:12 1716

    5:12 134

    6:12 2316

    12:12 4716

    * Dimensions only apply to

    G4 Gable Flashing

  • 7/27/2019 BR128_LtGaugeInstall

    23/50

    22 April 2013 www.ascbp.com

    Light Gauge Metal Roof and Wall Panels

    Installation Guide for Delta Rib, Delta Rib III, Nor-Clad, Strata Rib

    & 2 Corrugated

    2. #14 WOOD SCREW

    SEE ILLUSTRATIONON PAGE 7

    PEAK (PF2)

    2. #14 x 1" WOOD SCREW@ 24" O.C.

    TOP POLYETHYLENECLOSURE SET INSEALANT ALL AROUND

    3. #12 x 3/4" STITCH SCREW

    OR

    4. #14 x 7/8" LAP SELF DRILLER@ EACH RIB OF 8" O.C.

    FOR CORRUGATED

    ASC'S LIGHTGAUGE ROOFING

    6"

    1/2"

    3/8" HEM

    3/8" HEM

    5"

    Peak Flashing

    PF2

    Procedures:

    Cauk h bm a sis h pyhy

    csur S h csur as shw abv a cauk

    h p th csur is pia i h pa is ur

    up a cauk a h sis ar h rib

    fas h pak ashi as shw abv

    Cauk a ap h ashi a miimum 3

    (see pg. 44).

  • 7/27/2019 BR128_LtGaugeInstall

    24/50

    lih gau Ma R a Wa Pas Isaai April 2013 23

    SC Building ProductsA Division of ASC Profiles LLC

    4"

    1 1/8"

    2"

    1/2"

    1/2"

    3/4"

    ASC'S LIGHTGAUGE WALL PANEL

    ROOFING NAILS@ 24" O.C.

    2. #14 x 1" WOOD SCREWSEE ILLUSTRATIONON PAGE 7

    BOTTOM POLYETHYLENE CLOSURESET IN SEALANT ALL AROUND

    UNIVERSAL SIDEWALL (SW1)

    BUTYL MASTIC TAPE

    ASC'S LIGHTGAUGE ROOFING

    2. #14 WOOD SCREW@ 24" O.C.

    1-1/8"

    3/8" HEM

    5/8"

    3"

    4"

    Sidewall Flashingthis ashi mus b isa prir wa pas

    SW1 SW2

    Procedures

    th r shu b isa prir h sii

    Pac buy masic ap a h p h pa

    as shw

    Isa h si wa ashi by paci i irmy

    h ri pa a asi wih h

    asr iica

    Cauk a ap h ashi a miimum 3

    (see pg. 44)

  • 7/27/2019 BR128_LtGaugeInstall

    25/50

    24 April 2013 www.ascbp.com

    Light Gauge Metal Roof and Wall Panels

    Installation Guide for Delta Rib, Delta Rib III, Nor-Clad, Strata Rib

    & 2 Corrugated

    4"

    1/2"

    1 1/8"

    2"

    3/4"

    1/2"

    ROOFING NAILS@ 24" O.C.

    2. #14 x 1" WOOD SCREWSEE ILLUSTRATION

    ON PAGE 7

    ASC'S LIGHTGAUGE WALL PANEL

    BOTTOM POLYETHYLENE CLOSURESET IN SEALANT ALL AROUND

    3.

    4.

    #12 x 3/4" STITCH SCREW

    #14 x 7/8" LAP SELF DRILLER@ EACH RIB OR 8" O.C.FOR CORRUGATED

    OR

    UNIVERSAL ENDWALL (EW1)

    ASC'S LIGHTGAUGE ROOFING

    TOP POLYETHYLENE CLOSURESET IN SEALANT ALL AROUND

    2. #14 x 1" WOOD SCREWSEE ILLUSTRATION

    ON PAGE 7

    3/8" HEM

    5"4"

    EW1 EW2

    Procedures

    Isa saa h bm a p h

    pyhy csur S h csur as shw

    abv

    fas h wa ashi h wa wih ri

    ais a 24 c

    Cauk a ap h ashi a miimum 3

    (see pg. 44)

    Endwall Flashingthis ashi mus b isa prir wa pas

  • 7/27/2019 BR128_LtGaugeInstall

    26/50

    lih gau Ma R a Wa Pas Isaai April 2013 25

    SC Building ProductsA Division of ASC Profiles LLC

    Vented End Wall Flashingthis ashi mus b isa prir wa pas

    Procedures

    Pyw shu b h back 2 rm h wa

    Isa saa h bm a p h

    pyhy csur S h csur as shw abv

    fas h wa ashi h wa wih ri

    ais a 24 c max

    fas h ashi ach rib wih #12 x 3/4 sich

    scrws Pac a sma h saa p ach

    rib as shw

    Cauk a ap h ashi a miimum 3

    (see pg. 44)

    fr Pri V, us (eW1) r v wa

    ashi ai

    6 3/4"

    1 7/8"

    3/8" HEM

    1 1/8"

    4"

    2"

    ASC'S LIGHTGAUGE WALL PANEL

    BOTTOM POLYETHYLENE CLOSURESET IN SEALANT ALL AROUND

    VENTED ENDWALL (EW17)

    BUTYL MASTIC TAPE

    ASC'S LIGHTGAUGE ROOFING

    3. #12 x 3/4" STITCH SCREWOR

    4. #14 x 7/8" LAP SELF DRILLER@ EACH RIB OR 8" O.C.FOR CORRUGATED

    AIRFLO

    W

    SCREEN BY OTHERS

    TOP POLYETHYLENE CLOSURESET IN SEALANT ALL AROUND

    ROOFING NAILS@ 24" O.C.

    2. #14 x 1" WOOD SCREW

    SEE ILLUSTRATIONON PAGE 7

    OPTIONAL FIBER FILLFOR SNOW COUNTRY

    2. #14 WOOD SCREWSEE ILLUSTRATION

    ON PAGE 7

    EW17

  • 7/27/2019 BR128_LtGaugeInstall

    27/50

    26 April 2013 www.ascbp.com

    Light Gauge Metal Roof and Wall Panels

    Installation Guide for Delta Rib, Delta Rib III, Nor-Clad, Strata Rib

    & 2 Corrugated

    ROOFING NAILS@ 24" O.C.

    2. #14 WOOD SCREWSEE ILLUSTRATIONON PAGE 7

    ROW OFBUTYL MASTIC TAPE

    BOTTOM POLYETHYLENE CLOSURE

    SET IN SEALANT ALL AROUND

    PITCH BREAK (PB3)

    3. #12 x 3/4" STITCH SCREWOR

    4. #14 x 7/8" LAP SELF DRILLER@ EACH RIB OR EVERY THIRDRIB FOR CORRUGATED

    ASC'S LIGHTGAUGE ROOFING

    TOP POLYETHYLENE CLOSURESET IN SEALANT ALL AROUND

    2. #14 WOOD SCREWSEE ILLUSTRATIONON PAGE 7

    WOOD BLOCKING

    3/8" HEM

    SLOPE(S1)

    SLOPE(S2)

    6"5"

    SPECIFYANGLE

    Slope Transition - High Slope to Low Slopethis ashi mus b isa prir uphi pas

    Procedures

    Isa saa h bm a p h

    pyhy csur S h csur as shw

    abv

    fas h rasii ashi h subsra wih

    ri ais a 24 c

    Cauk a ap h ashi a miimum 3

    (see pg. 44)

    Para h rasii, pac rws 1/2

    buy masic ap as shw abv

    Aach h uphi pas as shw

    Isa w bcki as r suppr

    Pac a sma h saa h p ach

    rib as shw

    PB3

  • 7/27/2019 BR128_LtGaugeInstall

    28/50

    lih gau Ma R a Wa Pas Isaai April 2013 27

    SC Building ProductsA Division of ASC Profiles LLC

    1"

    ASC'S LIGHTGAUGE ROOFING

    ROOFING NAILS@ 24" O.C.

    2. #14 x 1" WOOD SCREWSEE ILLUSTRATIONON PAGE 7

    PITCH BREAK (PB4)

    BOTTOM POLYETHYLENE CLOSURESET IN SEALANT ALL AROUND

    TOP POLYETHYLENE CLOSURESET IN SEALANT ALL AROUND

    ROW OF BUTYL MASTIC TAPE

    WOOD BLOCKING

    2. #14 WOOD SCREWSEE ILLUSTRATIONON PAGE 7

    3. #12 x 3/4" STITCH SCREWOR

    4. #14 x 7/8" LAP SELF DRILLER@ EACH RIB OR EVERY THIRDRIB FOR CORRUGATED

    SLOPE(S1)

    SLOPE(S2)

    5"6"

    3/8" HEM

    SPECIFY ANGLE

    Slope Transition - Low Slope to High Slopethis ashi mus b isa prir uphi pas

    Procedures

    Isa saa h bm a p h

    pyhy csur S h csur as shw abv

    fas h rasii ashi h subsra wih

    ri ais a 24 c, prir isai h uphi

    pas

    Cauk a ap h ashi a miimum 3

    (see pg. 44)

    Para h rasii, pac rws 1/2 buy

    masic ap as shw abv

    Aach h uphi pas wih a 1 vrha

    Isa w bcki as r suppr

    Pac a sma h saa h p ach rib

    as shw

    PB4

  • 7/27/2019 BR128_LtGaugeInstall

    29/50

    28 April 2013 www.ascbp.com

    Light Gauge Metal Roof and Wall Panels

    Installation Guide for Delta Rib, Delta Rib III, Nor-Clad, Strata Rib

    & 2 Corrugated

    5"

    3/8" HEM

    3 7/8"

    5/8"

    3/4"

    1 5/8"

    6"

    2 1/2"

    BOTTOM POLYETHYLENE

    CLOSURE SET IN SEALANTALL AROUND

    ASC'S LIGHTGAUGE ROOFINGSLOPE

    2. #14 WOOD SCREWSEE ILLUSTRATION

    ON PAGE 7

    ROW OF MASTIC TAPE

    * THIS FLASHING IS ALSO KNOWN ASA "PROW" OR "DUTCH" GABLE ROOF.

    CHALET GABLE (G18)

    2. #14 x 1" WOOD SCREW

    @ 24" O.C.

    Chalet Gable Flashingthis ashi mus b isa prir pas

    Procedures

    Aach h cha ashi usi cr mach

    wscrws spac a 24 c

    Para h ac h ashi, pac 1/2 buy

    masic ap as shw

    th pyhy csurs ca b isa iaay

    acrss a pa A mir cus, us msa csurs a a

    rih a h pa ribs

    fi cu h pas hi 5 back rm h ac h

    ashi as shw

    Aach h pas h r a hru-as a h

    bm usi #14-10 wscrws wih washr

    vy spac a 4 c a a apprximay 7 1/2

    i rm h ac h ashi s hy ai wih h

    sc rw ap saa

    Cha ab b us wih saar av e1

    (see pg. 15)

    G18

    End of mitre-cut panel

    (See Roof Map pg. 5)

  • 7/27/2019 BR128_LtGaugeInstall

    30/50

    lih gau Ma R a Wa Pas Isaai April 2013 29

    SC Building ProductsA Division of ASC Profiles LLC

    3/8" HOOK

    6"

    1/2"

    4"

    1" HOOK

    2 1/2"

    ASC'S LIGHTGAUGE ROOFING

    ADJUSTMENT AREA

    2. #14 WOOD SCREW

    SEE ILLUSTRATIONON PAGE 7 ROOFING NAILS@ 12" O.C.

    STARTER STRIP (SS1)

    FIELD CAULK

    2. #14 x 1" WOOD SCREW

    @ 24" O.C.

    ADJUSTABLE GABLE (G5)

    Adjustable Gable Flashing

    G5SS1

    Procedures

    I may isacs, h r sh wi hav b i

    mii (majr rib rmv a h ab) S r

    map pa 5 a ca ajusab ab I ab

    rims ar us i his cai, a as h r rais

    rm h ri, war wi w isi h ab rims

    shw pa 17 th ajusab ab rim pics

    shw abv ca assis i a prpr r isaai

    Wh a majr rib a lih gau pa ccurs vr

    h r ara wihi 3 h h ab, cu h

    pa a rmv h majr rib rm h h

    sh rm h w av aw r h pacm

    h sarr srip

    Isa h ab rim, xi h hriza 6

    uphi a urah h av h pri h

    r sh a h ab/av irsci

    lca h pacm h sarr srip isur ha

    h cu h r sh ca b isr i h

    1 h sarr srip

    fi cauk isi h p hm a h ur si

    h sarr srip pr h ai his pa a isa

    para ab

    Note: Locate starter strip to allow proper installation of

    adjustable gable trim as shown.

  • 7/27/2019 BR128_LtGaugeInstall

    31/50

    30 April 2013 www.ascbp.com

    Light Gauge Metal Roof and Wall Panels

    Installation Guide for Delta Rib, Delta Rib III, Nor-Clad, Strata Rib

    & 2 Corrugated

    Vent Flashing

    Procedures

    trim h pi i h ashi 20% smar

    ha h pip iamr

    Si h ashi w vr h pip

    Sa bw h v ashi a h ri wih

    uab cauk a s h ashi

    frm h ashi i h pri h r fas h ashi wih asrs a 1 c Rr

    h asr sci ui pa 7

    Prais ccurri vr spac supprs

    ruir aiia suppr rami

    A saiss s raw ba shu b isa a

    h p h v/pip ashi

    A miimum raia ara 2 shu b

    maiai bw h bas h xib v/

    pip ashi a h r pas majr ribs

    Wh a prai ccurs hruh a nr-Ca

    pa siap, uab cauk s b isa

    i h capiary rv rm h prai hri this wi prv war rm rui whi

    i h capiary rv a i h r pi

    Refer to illustration #5, above

    VENT / PIPE FLASHING

    FASTEN @ 1" O.C.

    NOR-CLAD

    ROOF PANEL

    GUNNABLE CAULK

    IN CAPILLARY GROOVE

    SEE PROCEDURES BELOW

    ILLUSTRATION #5

    Note: For the best drainage when a square-based pipe

    flashing is used, one corner of the flexible pipe flashing

    should be oriented to the high-side of the roof.

  • 7/27/2019 BR128_LtGaugeInstall

    32/50

    lih gau Ma R a Wa Pas Isaai April 2013 31

    SC Building ProductsA Division of ASC Profiles LLC

    Vent/Pipe Flashing Installation Procedure

    STEP 1: Cut

    Cu pip iamr mark

    fashrs (his is apprximay

    20% smar ha h iamr

    h pip)

    STEP 2: Slide

    Si h fashrs w h

    pip, usi war ubrica

    i cssary

    STEP 4: Seal

    Sa h fashrs by appyi

    urha/siic saa bw

    h fashr a h r Us a

    ar s scrwrivr prss hbas w ihy

    STEP 5: Fasten

    fas h fashrs wih wahr-

    rsisa asrs cmp h

    sa

    STEP 3: Form

    frm a b h aumium bas

    h fashrs i h surac

    h r

    Note: For the best drainage when a square-based

    pipe flashing is used, one corner of the flexible pipe

    flashing should be oriented to the high-side of the roof.

  • 7/27/2019 BR128_LtGaugeInstall

    33/50

    32 April 2013 www.ascbp.com

    Light Gauge Metal Roof and Wall Panels

    Installation Guide for Delta Rib, Delta Rib III, Nor-Clad, Strata Rib

    & 2 Corrugated

    DOWNHILL

    SEE PAGE 34

    UPHILL

    SEE PAGE 33

    SIDE

    SEE BELOW1.

    2.

    3.

    SLOP

    E

    LENGTHWIDTH

    3 1/2"

    2"

    3/8" HEM

    SIDE SKYLIGHT (SK18)

    2. #14 WOOD SCREW@ 4" O.C.

    BUTYL MASTIC TAPE

    ASC'S LIGHTGAUGE ROOFING

    Skylight Flashing

    Whrvr pssib, psii h skyih curb s h ribs

    h r pas irr wih h ashi

    Cu h ih au r pas as cs h , rih

    a whi sis h curb as pssib Cu h uphi

    si 6 up rm h curb as iica abv

    Prais ccurri vr spac supprs ruir

    aiia suppr rami

    SK18

    (Side)

    1 Skylight Flashing (Side)

    Note: Do not fasten the

    panels within 24 uphill

    from the skylight until the

    penetration flashing is

    installed.

  • 7/27/2019 BR128_LtGaugeInstall

    34/50

    lih gau Ma R a Wa Pas Isaai April 2013 33

    SC Building ProductsA Division of ASC Profiles LLC

    6" MIN

    21/2"

    3 1/2"

    12"

    BOTTOM POLYETHYLENE CLOSURESET IN SEALANT ALL AROUND

    ASC'S LIGHTGAUGE ROOFING

    2. #14 WOOD SCREW@ EACH SIDE OF EACH RIBOR 8" O.C. FOR CORRUGATED

    UPHILL SKYLIGHT (SK16)

    SK16

    (Uphill)

    2 Skylight Flashing (Uphill Side)

  • 7/27/2019 BR128_LtGaugeInstall

    35/50

    34 April 2013 www.ascbp.com

    Light Gauge Metal Roof and Wall Panels

    Installation Guide for Delta Rib, Delta Rib III, Nor-Clad, Strata Rib

    & 2 Corrugated

    5"

    2 1/2"

    3/8" HEM

    3. #12 x 3/4" STITCH SCREW@ EACH RIB OR 8" O.C.FOR CORRUGATED

    TOP POLYETHYLENE CLOSURESET IN SEALANT ALL AROUND

    DOWNHILL SKYLIGHT (SK17)

    ASC'S LIGHTGAUGE ROOFING

    2. #14 WOOD SCREWSEE ILLUSTRATION

    ON PAGE 7

    SK17

    (Downhill)

    3 Skylight Flashing (Downhill Side)

  • 7/27/2019 BR128_LtGaugeInstall

    36/50

    lih gau Ma R a Wa Pas Isaai April 2013 35

    SC Building ProductsA Division of ASC Profiles LLC

    6"

    2 1/16"

    2"

    2"

    2"

    2"

    2

    1/2"

    SKYLIGHT

    ASC'S LIGHTGAUGE ROOFING

    SLOPE

    LENGTH

    SLOPE

    FOLD HERE 90CUT HERE

    CUT HERE

    REMOVE THIS MATERIAL

    CUT HERE

    Procedure for the Installation of Skylight Flashings

    DOWNHILL

    ILLUSTRATION #6

    Skylight Flashing Preparation

    RIGHT SIDE

    UPHILL

    Trim and bend the right side skylight flashing as

    indicated. Trim the left side in a similar fashion.

    The skylight flashing will be 4 wider than

    the width of the curb (2 on each side).

    Cut a 1/8 slot in the two uphill corners

    of the Light Gauge Roofing Panel slightly

    wider than 2, so the uphill flashing can

    slide through the two slots.

    (See illustration #6).Adjustments to the horizontal leg

    dimension and length of slit may have to

    be modified depending on the location of

    the panels major rib.

  • 7/27/2019 BR128_LtGaugeInstall

    37/50

    36 April 2013 www.ascbp.com

    Light Gauge Metal Roof and Wall Panels

    Installation Guide for Delta Rib, Delta Rib III, Nor-Clad, Strata Rib

    & 2 Corrugated

    2"

    1"

    1"

    FOLD HERE 90

    CUT HERE

    REMOVE THIS MATERIAL

    CUT HERE

    FOLD HERE 90 REMOVE THIS MATERIAL

    CUT HERE

    REMOVE HEM

    TO FOLD LINE

    Skylight Flashing Preparation (continued)

    trim bh s h uphi a whi sis h

    skyih ashi as iica

    Si h uphi ashi i h ss h lih gau

    Ri a appy ibra amu uab cauki

    Assmb h skyih as iica pages 33-36.

    trim a assmb chimy ashi simiary

    DOWNHILL

    UPHILL

  • 7/27/2019 BR128_LtGaugeInstall

    38/50

    lih gau Ma R a Wa Pas Isaai April 2013 37

    SC Building ProductsA Division of ASC Profiles LLC

    Chimney Flashing

    3. 1.

    2.

    SLOPE

    UPHILL

    SEE PAGE 39

    DOWNHILL

    SEE PAGE 40

    SIDE

    SEE PAGE 38

    1.

    2.

    3.

    LENGTH

    WIDTH

    SLOP

    E

    Note: Procedures for the installation of chimney flash-

    ings are similar to the skylights. (see pgs. 33-36).

    The reglet** shown may be deleted if the chimney is

    clad with siding. (Lap the siding over the flashing and

    caulk). Be sure to specify the slope and the orientation

    of the chimney dimensions when ordering this assem-

    bly.

    ** A reglet is a two-piece flashing found on the side of

    a wall, chimney or other similar roof penetration.

    (see flashing drawing pg. 40).

  • 7/27/2019 BR128_LtGaugeInstall

    39/50

    38 April 2013 www.ascbp.com

    Light Gauge Metal Roof and Wall Panels

    Installation Guide for Delta Rib, Delta Rib III, Nor-Clad, Strata Rib

    & 2 Corrugated

    3/8" HEM

    1/2"3"

    3/8" HEM

    3/4"3/8" HEM

    6"

    2"

    GUNNABLE CAULK

    ANCHOR BY OTHERS

    REGLET (RG16)

    GUNNABLE CAULK

    SIDE CHIMNEY (CH18)

    BUTYL MASTIC TAPE

    ASC'S LIGHTGAUGE ROOFING

    2. #14 WOOD SCREW@ 4" O.C.

    CH18

    (Side)

    RG16

    (Reglet)

    1 Chimney Flashing (Side)

  • 7/27/2019 BR128_LtGaugeInstall

    40/50

    lih gau Ma R a Wa Pas Isaai April 2013 39

    SC Building ProductsA Division of ASC Profiles LLC

    6" MIN

    21/2

    "

    6"

    12"

    3/8" HEM

    1/2" 3"

    3/8" HEM

    3/4"

    GUNNABLE CAULK

    ANCHORS BY OTHERS

    REGLET (RG16)

    GUNNABLE CAULK

    UPHILLCHIMNEY(CH16)

    BOTTOM POLYETHYLENE CLOSURESET IN SEALANT ALL AROUND

    ASC'S LIGHTGAUGE ROOFING

    2. #14 WOOD SCREW@ EACH SIDE OF EACH RIBOR 8" O.C. FOR CORRUGATED

    CH16

    (Side)

    RG16

    (Reglet)

    2 Chimney Flashing (Uphill)

  • 7/27/2019 BR128_LtGaugeInstall

    41/50

    40 April 2013 www.ascbp.com

    Light Gauge Metal Roof and Wall Panels

    Installation Guide for Delta Rib, Delta Rib III, Nor-Clad, Strata Rib

    & 2 Corrugated

    3/8" HEM

    5"

    5"3"

    1/2"

    3/4"

    3/8" HEM

    3/8" HEM

    GUNNABLE CAULK

    ANCHORS BY OTHERS

    REGLET (RG16)

    GUNNABLE CAULK

    TOP POLYETHYLENE CLOSURESET IN SEALANT ALL AROUND

    DOWNHILL CHIMNEY (CH17)

    ASC'S LIGHTGAUGE ROOFING

    3. #12 x 3/4" STITCH SCREW

    @ EACH RIB OR 8" O.C.FOR CORRUGATED

    2. #14 WOOD SCREWSEE ILLUSTRATION

    PAGE 7

    CH17(Downhill) RG16(Reglet)

    3 Chimney Flashing (Downhill)

  • 7/27/2019 BR128_LtGaugeInstall

    42/50

    lih gau Ma R a Wa Pas Isaai April 2013 41

    SC Building ProductsA Division of ASC Profiles LLC

    Valley Top End

    FIELD MITER AND ASSEMBLE

    USE EMSEAL CLOSURETO CLOSE OFF VALLEY FLASHING

    ASC'S LIGHTGAUGE ROOFING

    ROOFING NAIL

    2 ROWS OF BUTYL

    MASTIC TAPE

    VALLEY (V1)

    INSTALL EMSEAL CLOSURESDIAGONALLY ACROSS THE BOTTOM

    SIDE OF THE PANEL ANDSET IN SEALANT ALL AROUND

  • 7/27/2019 BR128_LtGaugeInstall

    43/50

  • 7/27/2019 BR128_LtGaugeInstall

    44/50

    lih gau Ma R a Wa Pas Isaai April 2013 43

    SC Building ProductsA Division of ASC Profiles LLC

    6"MIN

    SLOPE

    BUTYL MASTIC TAPE OR

    GUNNABLE SEALANT

    ASC'S LIGHT

    GAUGE ROOFING

    2. #14 WOOD SCREW

    SEE ILLUSTRATION

    ON PAGE 7

    Panel End Lap

    Long Panel End Lapfr pas 28 r r

    12"2"

    2"#10-12 x 1"

    PANCAKE HEAD

    2 ROWS

    BUTYL MASTIC TAPE OR

    GUNNABLE SEALANT

    ASC'S LIGHT

    GAUGE ROOFING

    SLOPE

    2. #14 WOOD SCREW

    SEE ILLUSTRATION

    ON PAGE 7

    Note: Use this detail so that panels can expand and

    contract independently.

  • 7/27/2019 BR128_LtGaugeInstall

    45/50

    44 April 2013 www.ascbp.com

    Light Gauge Metal Roof and Wall Panels

    Installation Guide for Delta Rib, Delta Rib III, Nor-Clad, Strata Rib

    & 2 Corrugated

    1/8"

    3"

    3"

    2"

    SNIP HERE

    OPEN THE HEM OF BOTH

    FLASHINGS TO BE JOINEDUSING A SCREWDRIVER OR

    SCRATCH AWL.

    REMOVE THIS MATERIAL FROMTHE 'INSIDE' FLASHING ONLY.

    RE-CLOSE HEMS WITH

    'DUCKBILL' PLIERS

    CAULK AND RIVET

    AS REQUIRED

    Sealing End Laps & Lapping the HemsTypical Flashing Lap

    STEP 1

    STEP 2

    Note: Flashing expansion joints may be required for

    long flashing runs (i.e. 40 ft. +).

  • 7/27/2019 BR128_LtGaugeInstall

    46/50

    lih gau Ma R a Wa Pas Isaai April 2013 45

    SC Building ProductsA Division of ASC Profiles LLC

    Procedures

    Wh isai lih gau pas, B1, h drip

    fashi, is prrr a h ha

    A hriza cu, 1 , s b ma i h wa

    pa a h irsci h jamb a ha rim ex

    h ha rim i his s, awi r prpr raia

    h usi h buii

    Cca pr csurs u r cariy Pac

    isi csur bhi pa a C-ma (C-1) r bas rim

    (B1)

    C1 B1

    Wall DetailsWindow/Door Trim Corner

    3/8" HEM

    1"

    7/8"2 1/8"

    1"

    1/2"

    3/8" HEM

    2"

    C-METAL (C1) ORBASE TRIM (B1)

    FOR CORRUGATED

    ASC'S LIGHTGAUGE WALL PANEL

    C-METAL (C1)

    GLAZING AND WINDOWFRAME BY OTHERS

    1. #9 WOOD SCREW

    OR

    2. #14 WOOD SCREW@ 24" O.C. MAX

    Note: C1 is shown at head location. B1, Base Trim,

    can also be used.

  • 7/27/2019 BR128_LtGaugeInstall

    47/50

    46 April 2013 www.ascbp.com

    Light Gauge Metal Roof and Wall Panels

    Installation Guide for Delta Rib, Delta Rib III, Nor-Clad, Strata Rib

    & 2 Corrugated

    Procedures

    op rami shw I isai vr pyw, us a

    #14 x 1 wscrw r pa aachm

    Cca pr csurs u r cariy Pac

    bm csur bhi pa a bas rim a p

    csur p sh bhi C1 a pa p, i

    ruir

    Wall DetailsTop and Bottom Trim

    3/8" HEM

    1"

    7/8"2 1/8"

    1"

    1/2"

    3/8" HEM

    2"

    ASC'S LIGHT

    GAUGE WALL PANEL

    BASE TRIM (B1)

    C-METAL (C1)

    BASE TRIM (B1)(If required)

    C-METAL (C1)(If required)

    3. #12 x 3/4" STITCH SCREWOR

    4. #14 x 7/8" SELF DRILLER@ EACH RIB OR EVERY 8" O.C.FOR CORRUGATED

    OR

    1. #9 WOOD SCREW

    2. #14 WOOD SCREW

    @ 24" O.C. MAX

    TOP OF WALL

    C1 B1

  • 7/27/2019 BR128_LtGaugeInstall

    48/50

    lih gau Ma R a Wa Pas Isaai April 2013 47

    SC Building ProductsA Division of ASC Profiles LLC

    3/8" HEM

    3/8" HEM

    3 1/2"

    3 1/2"4"

    5/8"

    3/8" HEM

    1 1/8"

    SYMMET

    RICAL

    BUTYL MASTIC TAPE

    ASC'S LIGHTGAUGE WALL PANEL

    3. #12 x 3/4" STITCH SCREWOR

    4. #14 x 7/8" LAP SELF DRILLER@ 24" O.C. MAX

    INSIDE CORNER (IC1)

    1. #9 WOOD SCREWOR

    2. #14 WOOD SCREWSEE ILLUSTRATIONON PAGE 7

    IC1

    Procedures

    op rami shw I isai vr pyw,

    us a #14 x 1 wscrw r pa aachm

    nr-Ca r Supr-Spa pa shw Wh

    isai hr lih gau pas, us h

    Uivrsa Isi Crr IC2

    I may siuais, h as pa isa a h

    crr wi ruir ha h pa b cu i wih Aw h

    cu b cvr by h isi crr rim

    Wall DetailsInside Corner

    IC2

  • 7/27/2019 BR128_LtGaugeInstall

    49/50

    48 April 2013 www.ascbp.com

    Light Gauge Metal Roof and Wall Panels

    Installation Guide for Delta Rib, Delta Rib III, Nor-Clad, Strata Rib

    & 2 Corrugated

    1 1/8"

    3/8" HEM

    5/8"

    4"

    3/8" HEM

    3/8" HEM

    3 1/2"

    3 1/2"

    SYMMET

    RICAL

    BUTYL MASTIC TAPE

    OUTSIDE CORNER (OC1)

    ASC'S LIGHTGAUGE WALL PANEL

    1. #9 WOOD SCREWOR

    2. #14 WOOD SCREWSEE ILLUSTRATIONON PAGE 7

    3. #12 x 3/4" STITCH SCREWOR

    4. #14 x 7/8" LAP SELF DRILLER@ 24" O.C. MAX

    Wall DetailsOutside Corner

    OC1

    OC2

    Procedures

    op rami shw I isai vr pyw, us a #14

    x 1 wscrw r pa aachm

    nr-Ca pa shw Wh isai hr lih

    gau pas,us h Uivrsa ousi Crr oC2

    I may siuais, h as pa ach si wi prjc

    by h buii crr, ruiri h pa b cu

    i wih Aw h cu b cvr by h usi

    crr rim

  • 7/27/2019 BR128_LtGaugeInstall

    50/50

    MAnUfACtURIng fACIlItIeS:

    Anchorage, Alaska

    2441 Cinnabar Loop

    Anchorage, AK 99507

    McClellan, California

    5001 Bailey Loop

    McClellan, California 95652

    Salem, Oregon

    4063 Salem Industrial Drive NE

    Salem, OR 97303

    800-272-7023 503-390-7174

    Salt Lake City, Utah

    4228 West 1730 South

    Salt Lake City, UT 84104

    Spokane, Washington

    4111 East Ferry

    Spokane, Washington 99202

    800-776-8771 509-536-4097

    CoRPoRAte HeAdqUARteRS:

    ASC Profiles, Inc.

    2110 Enterprise Boulevard

    West Sacramento, CA 95691

    Visit us at:www.ascbp.com