Implementing an energy renovation approach based on a
Passeport Efficacité Énergétique (P2E)
BPIE – October 8, 2018
Jean-Noël Geist – [email protected] | 06 95 10 81 91Public affairs manager, The Shift ProjectSecretary, Expérience P2E
![Page 2: BPIE October 8, 2018bpie.eu/wp-content/uploads/2018/10/Implementing-an... · Conseil d[administration Comit de suiv i Comit de pilotage Ateliers th matiques Chef de projet Bureau](https://reader034.fdocuments.net/reader034/viewer/2022042120/5f343d0bd1ef9a327b500f78/html5/thumbnails/2.jpg)
Presentation of the Passeport P2E
« Context and approach»« Timeline and Web Platform – 2nd version »
« First results of the experimentation »
2
![Page 3: BPIE October 8, 2018bpie.eu/wp-content/uploads/2018/10/Implementing-an... · Conseil d[administration Comit de suiv i Comit de pilotage Ateliers th matiques Chef de projet Bureau](https://reader034.fdocuments.net/reader034/viewer/2022042120/5f343d0bd1ef9a327b500f78/html5/thumbnails/3.jpg)
Where we come from, who we are
3
Membres fondateurs Collège des Partenaires
Collège des Territoires
Conseil d’administration
Comité de suivi Comité de pilotage Ateliers thématiques
Chef de projet
Bureau présidé par Frank Hovorka
Membre d’honneur : Olivier Sidler
September2013
October2014
September2014
August 2015
Article 11 – Loi TECVLOGBOOK
May 2016
![Page 4: BPIE October 8, 2018bpie.eu/wp-content/uploads/2018/10/Implementing-an... · Conseil d[administration Comit de suiv i Comit de pilotage Ateliers th matiques Chef de projet Bureau](https://reader034.fdocuments.net/reader034/viewer/2022042120/5f343d0bd1ef9a327b500f78/html5/thumbnails/4.jpg)
What’s needed to deal with the context
4
What’s needed to trigger renovation
- Triggering massification
- Assisting households
- Embedding energy performance
- In line with energy and climate ambitions
16 millions individual houses in France12 millions owners living in their own houseHalf of them was built before 1975
![Page 5: BPIE October 8, 2018bpie.eu/wp-content/uploads/2018/10/Implementing-an... · Conseil d[administration Comit de suiv i Comit de pilotage Ateliers th matiques Chef de projet Bureau](https://reader034.fdocuments.net/reader034/viewer/2022042120/5f343d0bd1ef9a327b500f78/html5/thumbnails/5.jpg)
Simpler: limited data needs, high hopes
5
Life expectancyof the work packages
Projectof the owner
Effective stateof the work packages
33 Combinationsof energy performance
20202018 20502036
Initial state
Stage 1 Stage 3Stage 2
![Page 6: BPIE October 8, 2018bpie.eu/wp-content/uploads/2018/10/Implementing-an... · Conseil d[administration Comit de suiv i Comit de pilotage Ateliers th matiques Chef de projet Bureau](https://reader034.fdocuments.net/reader034/viewer/2022042120/5f343d0bd1ef9a327b500f78/html5/thumbnails/6.jpg)
6
Presentation of the Passeport P2E
« Context and approach »« Timeline and Web Platform – 2nd version »
« First results of the experimentation »
![Page 7: BPIE October 8, 2018bpie.eu/wp-content/uploads/2018/10/Implementing-an... · Conseil d[administration Comit de suiv i Comit de pilotage Ateliers th matiques Chef de projet Bureau](https://reader034.fdocuments.net/reader034/viewer/2022042120/5f343d0bd1ef9a327b500f78/html5/thumbnails/7.jpg)
Timeline of the process
7
1. Initial contact through public services, logbook, websites...
2. Online registration and visit request by households3. Contact and planning of the visit: a nearby Passportercontacts the household by email and or phone, discusses their project and sets a date for the visit.4. On-site visit
a. Discussion of the household’s project, chat on renovation ingeneral, collection of basic information on the house.
b. House inventory: the Passporter diagnoses the condition of thenine work packages and looks at technical issues
c. Selection of an energy performance combination, and of theoptimal work packages with the household
d. Submission and discussion of the individual renovation roadmap.
5. Continuation of the renovation process (in-depth studies,energy and economic estimates, works, follow-up, etc.).
PASS
EPO
RT
P2
E
![Page 8: BPIE October 8, 2018bpie.eu/wp-content/uploads/2018/10/Implementing-an... · Conseil d[administration Comit de suiv i Comit de pilotage Ateliers th matiques Chef de projet Bureau](https://reader034.fdocuments.net/reader034/viewer/2022042120/5f343d0bd1ef9a327b500f78/html5/thumbnails/8.jpg)
Timeline of the process
8
1. Initial contact through public services, logbook, websites...
2. Online registration and visit request by households3. Contact and planning of the visit: a nearby Passportercontacts the household by email and or phone, discusses their project and sets a date for the visit.4. On-site visit
a. Discussion of the household’s project, chat on renovation ingeneral, collection of basic information on the house.
b. House inventory: the Passporter diagnoses the condition of thenine work packages and looks at technical issues
c. Selection of an energy performance combination, and of theoptimal work packages with the household
d. Submission and discussion of the individual renovation roadmap.
5. Continuation of the renovation process (in-depth studies,energy and economic estimates, works, follow-up, etc.).
PASS
EPO
RT
P2
E
![Page 9: BPIE October 8, 2018bpie.eu/wp-content/uploads/2018/10/Implementing-an... · Conseil d[administration Comit de suiv i Comit de pilotage Ateliers th matiques Chef de projet Bureau](https://reader034.fdocuments.net/reader034/viewer/2022042120/5f343d0bd1ef9a327b500f78/html5/thumbnails/9.jpg)
Timeline of the process
9
1. Initial contact through public services, logbook, websites...
2. Online registration and visit request by households3. Contact and planning of the visit: a nearby Passportercontacts the household by email and or phone, discusses their project and sets a date for the visit.4. On-site visit
a. Discussion of the household’s project, chat on renovation ingeneral, collection of basic information on the house.
b. House inventory: the Passporter diagnoses the condition of thenine work packages and looks at technical issues
c. Selection of an energy performance combination, and of theoptimal work packages with the household
d. Submission and discussion of the individual renovation roadmap.
5. Continuation of the renovation process (in-depth studies,energy and economic estimates, works, follow-up, etc.).
PASS
EPO
RT
P2
E
![Page 10: BPIE October 8, 2018bpie.eu/wp-content/uploads/2018/10/Implementing-an... · Conseil d[administration Comit de suiv i Comit de pilotage Ateliers th matiques Chef de projet Bureau](https://reader034.fdocuments.net/reader034/viewer/2022042120/5f343d0bd1ef9a327b500f78/html5/thumbnails/10.jpg)
Timeline of the process
10
1. Initial contact through public services, logbook, websites...
2. Online registration and visit request by households3. Contact and planning of the visit: a nearby Passportercontacts the household by email and or phone, discusses their project and sets a date for the visit.4. On-site visit
a. Discussion of the household’s project, chat on renovation ingeneral, collection of basic information on the house.
b. House inventory: the Passporter diagnoses the condition of thenine work packages and looks at technical issues
c. Selection of an energy performance combination, and of theoptimal work packages with the household
d. Submission and discussion of the individual renovation roadmap.
5. Continuation of the renovation process (in-depth studies,energy and economic estimates, works, follow-up, etc.).
PASS
EPO
RT
P2
E
![Page 11: BPIE October 8, 2018bpie.eu/wp-content/uploads/2018/10/Implementing-an... · Conseil d[administration Comit de suiv i Comit de pilotage Ateliers th matiques Chef de projet Bureau](https://reader034.fdocuments.net/reader034/viewer/2022042120/5f343d0bd1ef9a327b500f78/html5/thumbnails/11.jpg)
Basic information on the house
11
![Page 12: BPIE October 8, 2018bpie.eu/wp-content/uploads/2018/10/Implementing-an... · Conseil d[administration Comit de suiv i Comit de pilotage Ateliers th matiques Chef de projet Bureau](https://reader034.fdocuments.net/reader034/viewer/2022042120/5f343d0bd1ef9a327b500f78/html5/thumbnails/12.jpg)
Timeline of the process
12
1. Initial contact through public services, logbook, websites...
2. Online registration and visit request by households3. Contact and planning of the visit: a nearby Passportercontacts the household by email and or phone, discusses their project and sets a date for the visit.4. On-site visit
a. Discussion of the household’s project, chat on renovation ingeneral, collection of basic information on the house.
b. House inventory: the Passporter diagnoses the condition of thenine work packages and looks at technical issues
c. Selection of an energy performance combination, and of theoptimal work packages with the household
d. Submission and discussion of the individual renovation roadmap.
5. Continuation of the renovation process (in-depth studies,energy and economic estimates, works, follow-up, etc.).
PASS
EPO
RT
P2
E
![Page 13: BPIE October 8, 2018bpie.eu/wp-content/uploads/2018/10/Implementing-an... · Conseil d[administration Comit de suiv i Comit de pilotage Ateliers th matiques Chef de projet Bureau](https://reader034.fdocuments.net/reader034/viewer/2022042120/5f343d0bd1ef9a327b500f78/html5/thumbnails/13.jpg)
Work package 1: Walls
13
Nine work packages: Walls Openings VentilationFloors Heating ProgrammationRoof Hot water Air tightness
![Page 14: BPIE October 8, 2018bpie.eu/wp-content/uploads/2018/10/Implementing-an... · Conseil d[administration Comit de suiv i Comit de pilotage Ateliers th matiques Chef de projet Bureau](https://reader034.fdocuments.net/reader034/viewer/2022042120/5f343d0bd1ef9a327b500f78/html5/thumbnails/14.jpg)
Anticipating technical issues
14
![Page 15: BPIE October 8, 2018bpie.eu/wp-content/uploads/2018/10/Implementing-an... · Conseil d[administration Comit de suiv i Comit de pilotage Ateliers th matiques Chef de projet Bureau](https://reader034.fdocuments.net/reader034/viewer/2022042120/5f343d0bd1ef9a327b500f78/html5/thumbnails/15.jpg)
Timeline of the process
15
1. Initial contact through public services, logbook, websites...
2. Online registration and visit request by households3. Contact and planning of the visit: a nearby Passportercontacts the household by email and or phone, discusses their project and sets a date for the visit.4. On-site visit
a. Discussion of the household’s project, chat on renovation ingeneral, collection of basic information on the house.
b. House inventory: the Passporter diagnoses the condition of thenine work packages and looks at technical issues
c. Selection of an energy performance combination, and of theoptimal work packages with the household
d. Submission and discussion of the individual renovation roadmap.
5. Continuation of the renovation process (in-depth studies,energy and economic estimates, works, follow-up, etc.).
PASS
EPO
RT
P2
E
![Page 16: BPIE October 8, 2018bpie.eu/wp-content/uploads/2018/10/Implementing-an... · Conseil d[administration Comit de suiv i Comit de pilotage Ateliers th matiques Chef de projet Bureau](https://reader034.fdocuments.net/reader034/viewer/2022042120/5f343d0bd1ef9a327b500f78/html5/thumbnails/16.jpg)
Selecting (and refining manually)
16
![Page 17: BPIE October 8, 2018bpie.eu/wp-content/uploads/2018/10/Implementing-an... · Conseil d[administration Comit de suiv i Comit de pilotage Ateliers th matiques Chef de projet Bureau](https://reader034.fdocuments.net/reader034/viewer/2022042120/5f343d0bd1ef9a327b500f78/html5/thumbnails/17.jpg)
Timeline of the process
17
1. Initial contact through public services, logbook, websites...
2. Online registration and visit request by households3. Contact and planning of the visit: a nearby Passportercontacts the household by email and or phone, discusses their project and sets a date for the visit.4. On-site visit
a. Discussion of the household’s project, chat on renovation ingeneral, collection of basic information on the house.
b. House inventory: the Passporter diagnoses the condition of thenine work packages and looks at technical issues
c. Selection of an energy performance combination, and of theoptimal work packages with the household
d. Submission and discussion of the individual renovation roadmap.
5. Continuation of the renovation process (in-depth studies,energy and economic estimates, works, follow-up, etc.).
PASS
EPO
RT
P2
E
![Page 18: BPIE October 8, 2018bpie.eu/wp-content/uploads/2018/10/Implementing-an... · Conseil d[administration Comit de suiv i Comit de pilotage Ateliers th matiques Chef de projet Bureau](https://reader034.fdocuments.net/reader034/viewer/2022042120/5f343d0bd1ef9a327b500f78/html5/thumbnails/18.jpg)
Timeline of the process
18
1. Initial contact through public services, logbook, websites...
2. Online registration and visit request by households3. Contact and planning of the visit: a nearby Passportercontacts the household by email and or phone, discusses their project and sets a date for the visit.4. On-site visit
a. Discussion of the household’s project, chat on renovation ingeneral, collection of basic information on the house.
b. House inventory: the Passporter diagnoses the condition of thenine work packages and looks at technical issues
c. Selection of an energy performance combination, and of theoptimal work packages with the household
d. Submission and discussion of the individual renovation roadmap.
5. Continuation of the renovation process (in-depth studies,energy and economic estimates, works, follow-up, etc.).
PASS
EPO
RT
P2
E
![Page 19: BPIE October 8, 2018bpie.eu/wp-content/uploads/2018/10/Implementing-an... · Conseil d[administration Comit de suiv i Comit de pilotage Ateliers th matiques Chef de projet Bureau](https://reader034.fdocuments.net/reader034/viewer/2022042120/5f343d0bd1ef9a327b500f78/html5/thumbnails/19.jpg)
19
Presentation of the Passeport P2E
« Context and approach »« Timeline and Web Platform – 2nd version »
« First results of the experimentation »
![Page 20: BPIE October 8, 2018bpie.eu/wp-content/uploads/2018/10/Implementing-an... · Conseil d[administration Comit de suiv i Comit de pilotage Ateliers th matiques Chef de projet Bureau](https://reader034.fdocuments.net/reader034/viewer/2022042120/5f343d0bd1ef9a327b500f78/html5/thumbnails/20.jpg)
A trigger of energy performance
20
After one to three months, almost two thirds of owners (64%) made progress intheir project after getting a renovation roadmap :
• 36 % conducted further studies (economic and/or technical)• 46 % contacter craftspeople.
32 %
30 %
19 %
19 %
P2E’s influence on energy performance in the owner’srenovation projects
None (incl. confirmation of project already taking into account energy)
Performance enhancement on existing work packages
Inclusion of energy performance (initial project not taking it into account)
Performance extended to new work packages
![Page 21: BPIE October 8, 2018bpie.eu/wp-content/uploads/2018/10/Implementing-an... · Conseil d[administration Comit de suiv i Comit de pilotage Ateliers th matiques Chef de projet Bureau](https://reader034.fdocuments.net/reader034/viewer/2022042120/5f343d0bd1ef9a327b500f78/html5/thumbnails/21.jpg)
Quicker, cheaper… but who pays?
21
€€€Accordingto owners
105€ TTC
According to Passporters400€ TTC
A Passport takes less than half a day in average to a Passporter, including first contact, travelling to the home and discussing the roadmap.• No calculations at home, better use of expertise, importance of the dialogueReality goes from 2.30h for experienced Passporters to 6h for beginners lacking competencein energy and technical issues.
![Page 23: BPIE October 8, 2018bpie.eu/wp-content/uploads/2018/10/Implementing-an... · Conseil d[administration Comit de suiv i Comit de pilotage Ateliers th matiques Chef de projet Bureau](https://reader034.fdocuments.net/reader034/viewer/2022042120/5f343d0bd1ef9a327b500f78/html5/thumbnails/23.jpg)
23
Presentation of the Passeport P2E
« Context and approach »« Timeline and Web Platform – 2nd version »
« First results of the experimentation »« Opportunities »
![Page 24: BPIE October 8, 2018bpie.eu/wp-content/uploads/2018/10/Implementing-an... · Conseil d[administration Comit de suiv i Comit de pilotage Ateliers th matiques Chef de projet Bureau](https://reader034.fdocuments.net/reader034/viewer/2022042120/5f343d0bd1ef9a327b500f78/html5/thumbnails/24.jpg)
A collaborative approach
24
Providing Passporters with a validated tool and process
Connecting with Logbooks
Integrating local public renovation services
Interacting with multiple private stakeholders and softwares
Helping banks, and especially the mortgage industry, with simplified, reliable information on household’s renovation projects
Implementing national energy and climate ambitions
![Page 25: BPIE October 8, 2018bpie.eu/wp-content/uploads/2018/10/Implementing-an... · Conseil d[administration Comit de suiv i Comit de pilotage Ateliers th matiques Chef de projet Bureau](https://reader034.fdocuments.net/reader034/viewer/2022042120/5f343d0bd1ef9a327b500f78/html5/thumbnails/25.jpg)
Deployment in France?
25
Grand-EstOktave
Angers Loire Métropole
Alec49
Currently experimenting P2E
Currently joining P2E
Ongoing discussions
Département des YvelinesSoliha
Centre-Val de Loire Réseau PTRE
Occitanie
Département de l’Ardèche
Plaine Commune ALEC
Pays de la Loire
Nouvelle Aquitaine
Aix-Marseille Provence Métropole
ALEC
Grenoble Métropole
Corse
La Réunion
SavoieAGATE
Métropole du Grand Paris