BP 08 ALUMINUM CURTAIN WALL, STOREFRONTS, GLASS AND GLAZING & SKYLIGHTS SCOPE OF WORK ALUMINUM CURTAIN WALL, STOREFRONTS AND GLASS AND GLAZING & SKYLIGHTS DEFINITION OF PROJECT AREA: The Scope of Work includes the aluminum curtain wall, storefronts, skylights, windows, doors and glass and glazing work at the Mount Pleasant Library which is located at 3160 16th Street, NW, Washington, DC. Offeror shall be responsible for providing all labor, material, equipment, and Trade Subcontractor management and coordination to fully execute the requirements of all new and modified construction as specifically described in this scope of work with no exceptions or exclusions, and as indicated in bid documents, Attachment J.1, Issued for Bid Drawings and Specifications dated January 13, 2010. Reference Sections G and H for additional information on Project Team roles and responsibilities and Special Contract Requirements. Also reference Division 1 Specifications for general project references, requirements, procedures and documentation. Work includes but is not limited to the following specifications sections: DIVISION 1 Section 01310 Project Management and Coordination, as applies to the work of this contract. Additionally, reference Section 01351 Special Procedures for Historic Treatment for impact to the work of this contract. DIVISION 5 Section 05120 Structural Steel, and Section 05500 Metal Fabrications, as applies to the work of this contract. DIVISION 6 WOOD AND PLASTICS, as applies to the work of this contract DIVISION 7 THERMAL AND MOISTURE PROTECTION, as applies to the work of this contract including Section 07415 Composite Metal Wall Panels and Section 07620 Sheet Metal Flashing and Trim DIVISION 8 DOORS AND WINDOWS, as applies to the work of this contract and including, but not limited to Section 08411 Aluminum-Framed Entrances and Storefronts, Section 08520 Aluminum Windows, Section 08630 Metal Framed Skylights, Section 08800 Glazing, Section 08830 Mirrors, Section 8911 Glazed Aluminum Curtain Walls, and 08710 Door Hardware, as applicable. CBE SET-ASIDE REQUIREMENTS The minimum CBE Set-Aside Requirement for this Scope of Work is 35%. ALUMINUM CURTAIN WALL, STOREFRONTS, GLASS AND GLAZING

description

BP 08 - Aluminum Curtain Wall, Storefronts, Glass & Glazing

Transcript of BP 08 - Aluminum Curtain Wall, Storefronts, Glass & Glazing

Page 1: BP 08 - Aluminum Curtain Wall, Storefronts, Glass & Glazing

BP 08

ALUMINUM CURTAIN WALL, STOREFRONTS, GLASS AND

GLAZING & SKYLIGHTS

SCOPE OF WORK – ALUMINUM CURTAIN WALL,

STOREFRONTS AND GLASS AND GLAZING & SKYLIGHTS

DEFINITION OF PROJECT AREA:

The Scope of Work includes the aluminum curtain wall, storefronts, skylights, windows,

doors and glass and glazing work at the Mount Pleasant Library which is located at 3160

16th Street, NW, Washington, DC.

Offeror shall be responsible for providing all labor, material, equipment, and Trade

Subcontractor management and coordination to fully execute the requirements of all new

and modified construction as specifically described in this scope of work with no

exceptions or exclusions, and as indicated in bid documents, Attachment J.1, Issued for

Bid Drawings and Specifications dated January 13, 2010. Reference Sections G and H

for additional information on Project Team roles and responsibilities and Special

Contract Requirements. Also reference Division 1 Specifications for general project

references, requirements, procedures and documentation.

Work includes but is not limited to the following specifications sections:

DIVISION 1 – Section 01310 – Project Management and Coordination, as applies to the

work of this contract. Additionally, reference Section 01351 – Special Procedures for

Historic Treatment for impact to the work of this contract.

DIVISION 5 – Section 05120 – Structural Steel, and Section 05500 – Metal Fabrications,

as applies to the work of this contract.

DIVISION 6 – WOOD AND PLASTICS, as applies to the work of this contract

DIVISION 7 – THERMAL AND MOISTURE PROTECTION, as applies to the work of

this contract including Section 07415 – Composite Metal Wall Panels and Section 07620

Sheet Metal Flashing and Trim

DIVISION 8 – DOORS AND WINDOWS, as applies to the work of this contract and

including, but not limited to Section 08411 – Aluminum-Framed Entrances and

Storefronts, Section 08520 – Aluminum Windows, Section 08630 Metal Framed

Skylights, Section 08800 – Glazing, Section 08830 – Mirrors, Section 8911 – Glazed

Aluminum Curtain Walls, and 08710 – Door Hardware, as applicable.

CBE SET-ASIDE REQUIREMENTS

The minimum CBE Set-Aside Requirement for this Scope of Work is 35%.

ALUMINUM CURTAIN WALL, STOREFRONTS, GLASS AND GLAZING

Page 2: BP 08 - Aluminum Curtain Wall, Storefronts, Glass & Glazing

Contractor shall provide all labor, material and equipment necessary for all new glass and

glazing systems including but not limited aluminum curtain wall, storefronts, glass and

glazing, metal-framed skylights and composite metal wall panels at the existing building

and the new addition as indicated in bid documents.

The Contractor shall be required to provide all labor, material and equipment to perform

the scope of work including but not limited to the following tasks:

1. Structurally glazed and aluminum curtain wall systems;

2. Interior and exterior aluminum storefront systems, complete;

3. Interior and exterior glass door systems, complete including finish

hardware; Permanent cylinders provided by hardware contractor (BP10).

4. Automatic ADA concealed closer equipment.

5. Meeting Room and Elevator glass partitions and backpainted glass

partition/cladding.

6. Metal-framed skylights/skyroofs including integral gutter and drainage

systems;

7. Fixed aluminum-framed windows;

8. Glass in hollow metal frames;

9. Glass in hollow metal and wood doors;

10. Composite metal panels including all supports, closures and caulking;

11. Edge trim around openings and at top of stone;

12. Expansion joint systems as required;

13. Sill flashings;

14. Exterior caulking between aluminum frames and masonry;

15. All flashings as required for the addition to tie into the existing building to

maintain a weather tight enclosure.

16. Coordination of transitions between glazed skylight systems integrated

gutters where interfacing with the scope of this contract to ensure weather

tight enclosure.

17. Independent Testing & Inspection Services required for this Work,

including materials testing, weld and connection testing and inspections;

18. During the period of this work, contractor agrees that all employees must

be experienced in the performance of this work.

19. Contractor is required to provide pre-existing surveying (photographs or

video taping).

20. Contractor shall coordinate this work with other work in progress.

21. The Contractor shall ensure that no elements determined to be unstable are

left unsupported. Any and all required temporary protection for follow on

systems work to remain shall be included in this scope of work.

22. Contractor shall remove and transport debris resulting from erection

operations and materials to site disposal area. Recyclable materials shall

be separated and stored or stockpiled without intermixing with other

surplus materials before transporting to recycling facilities in accordance

with a recycling program consistent with the Project LEED Certification

Program.

Page 3: BP 08 - Aluminum Curtain Wall, Storefronts, Glass & Glazing

23. Contractor shall comply with all requirements to achieve LEED points

toward the Silver certification goal as indicated in the bid documents.

24. In the area where proposed protection and/or removal may conflict with

existing utilities, Contractor shall take all necessary precautions to avoid

damage to said utilities.

25. It is Contractor’s responsibility to read the Hazardous Materials Survey

Report for Mount Pleasant Library.

26. Contractor shall submit bids detailing their proposed means and methods

for this scope of work, and shall include evidence of their experience with

similar projects as well as references who may be contacted by the Client.

27. Labor for incidental project clean-up

28. Miscellaneous temporary protection of existing conditions during

construction as specifically specified herein and OSHA safety barricades,

rails and floor coverings, for this Work.

29. Engineering, site survey and layout for this Work.

30. Provide monthly Project construction progress documentation &

photographs, including existing building pre-construction condition

documentation.

31. Contractor shall leave the workplace in a clean and presentable condition

ready for subsequent trades including label removal.

32. Submittals will be required for approval prior to execution of the work.

33. Contractor shall provide all hoisting and lifting required for the

performance of the work of this contract.