Bowmer & Kirkland . Town Centre Redevelopment, South Shields€¦ · Bowmer & Kirkland. Town Centre...

2
Bowmer & Kirkland . Town Centre Redevelopment, South Shields . . Issue 10 . May 2016 . Bowmer & Kirkland Limited, High Edge Court, Heage, Derbyshire, DE56 2BW 01773 853131 W elcome to the tenth edition of the Bowmer and Kirkland community newsletter. Project Programme - The Word Building Works are still progressing well and we are still on programme to complete the construction works in Autumn 2016. The external envelope is now fully weather tight following the completion of the glazed façade that faces out towards the river Tyne. The internal fit out is also progressing well on each of the floors with joinery, ceilings and wall finishes. External concrete retaining walls are progressing around the perimeter of the building and the hard landscaping works are progressing to all areas around the building including the new footpath works which have now started on Dean Street. Ferry Street We will be starting the installation of the new Puffin crossing on Ferry Street from Monday 23rd May 2016. When complete this will provide the link from Dean Street across Ferry Street heading to the Ferry terminal. The civil and paving works will be carried out over a three week period from Monday 23rd May 2016 and will be constructed in two halves in order to maintain a single lane live under temporary traffic lights as noted on the plan above. Traffic light installations will follow and will be operational once all of the external areas are complete in Autumn 2016. We apologise in advance for any inconvenience this may cause during this period. Future Communications We will keep you all updated regularly on progress as the project develops with: Further newsletters Site Notice board Press releases 365 progress web site www.southshields365progress.com Bowmer & Kirkland Ltd is an Associate member of the Considerate Constructors’ Scheme. Only a select number of high performing contractors achieve Associate status in the scheme, which now registers more than 400 sites a month. Associates are companies which have proved their commitment to improving the image of the industry through a large number of registered sites that have consistently performed to a high level. Launched nationwide in 1997, the scheme was set up by the industry to improve the image of construction. Sites registering with the scheme are given marks following a Code of Considerate Practice, designed to encourage best practice beyond statutory requirements. The main areas of concern are: the environment, the workforce and the general public. Individual site performance and monitoring is carried out by an experienced industry professional who will assess the site’s performance in the following categories: workforce, safety, community, appearance and environment. www.considerateconstructorsscheme.org.uk Considerate Constructors Scheme For further information about Bowmer & Kirkland, visit our website www.bandk.co.uk, scan the QR code with your smartphone or contact our PR Manager, Sarah Millington on 01773 857514 or sarah.millington@ bandk.co.uk. Site Contacts Our site team is headed by our Project Manager John Osborne; Email: [email protected] Contact Number: 07766 441892 K10 K10 K10 K10 K2 K5 K7 Flush pedestrian crossing point Services/ Drop-off Bay Motorcycles Pay Meter Ramp 1:10 Ramp 1:10 01 02 03 05 06 07 08 09 10 11 12 13 14 15 16 17 31 30 29 28 27 26 25 24 23 22 20 19 18 40 39 38 37 36 35 34 33 32 1100mm Upstand Wall 900mm Upstand Wall Tarmac finish to match existing Harton Quays landscape Tarmac finish to match existing Harton Quays landscape 21 Pay Meter ElectricVehicle Covered Cycle Parking (40 spaces) 04 For detailed landscape design please refer to dwg no: V12569 L01 900mm Upstand Wall ElectricVehicle For detailed landscape design please refer to dwg no: V12569 L01 Repositioned existing lamppost Existing lamppost 900mm Upstand Wall Existing lamppost Sign Sign For detailed landscape design please refer to dwg no: V12569 L01 For detailed design please refer to highways engineer dwg no: NEA1239/CH/PC01 Rev A For detailed design please refer to highways engineers dwg no: NEA1239/CH/DE01 Rev A 7.70 Flush pedestrian crossing point Bollards Sign Sign Sign Sign Sign C-c D-d T1 LIBRARY AND DIGITAL MEDIA CENTRE Site Fencing 2 Access maintained to Dean Street crossing 1 Area 1 - The works will be carried out for 2 weeks in this area keeping Ferry Street traffic on a single lane on the North bound carriage way on temporary traffic lights. Area 2 - The works will be carried out for 2 weeks in this area keeping Ferry Street traffic on a single lane on the South bound carriage way on temporary traffic lights.

Transcript of Bowmer & Kirkland . Town Centre Redevelopment, South Shields€¦ · Bowmer & Kirkland. Town Centre...

Page 1: Bowmer & Kirkland . Town Centre Redevelopment, South Shields€¦ · Bowmer & Kirkland. Town Centre Redevelopment, South Shields . ssue ay Bowmer irkand imited igh dge ourt eage ershire

Bowmer & Kirkland. Town Centre Redevelopment, South Shields .

. Issue 10 . May 2016 .

Bowmer & Kirkland Limited, High Edge Court, Heage, Derbyshire, DE56 2BW 01773 853131

Welcome to the tenth edition of the Bowmer and Kirkland

community newsletter.

Project Programme - The Word Building

Works are still progressing well and we are still on programme to complete the construction works in Autumn 2016.

The external envelope is now fully weather tight following the completion of the glazed façade that faces out towards the river Tyne. The internal fit out is also progressing well on each of the floors with joinery, ceilings and wall finishes. External concrete retaining walls are progressing around the perimeter of the building and the hard landscaping works are progressing to all areas around the building including the new footpath works which have now started on Dean Street. Ferry Street

We will be starting the installation of the new Puffin crossing on Ferry Street from Monday 23rd May 2016. When complete this will provide the link from Dean Street across Ferry Street heading to the Ferry terminal. The civil and paving works will be carried out over a three week period from Monday 23rd May 2016 and will be constructed in two halves in order to maintain a single lane live under temporary traffic lights as noted on the plan above. Traffic light installations will follow and will be operational once all of the external areas are complete in Autumn 2016.

We apologise in advance for any inconvenience this may cause during this period.

Future Communications

We will keep you all updated regularly on progress as the project develops with:

• Further newsletters• Site Notice board• Press releases • 365 progress web site www.southshields365progress.com

Bowmer & Kirkland Ltd is an Associate member of the Considerate Constructors’ Scheme.

Only a select number of high performing contractors achieve Associate status in the scheme, which now registers more than 400 sites a month. Associates are companies which have proved their commitment to improving the image of the industry through a large number of registered sites that have consistently performed to a high level.

Launched nationwide in 1997, the scheme was set up by the industry to improve the image of construction. Sites registering with the scheme are given marks following a Code of Considerate

Practice, designed to encourage best practice beyond statutory requirements.

The main areas of concern are: the environment, the workforce and the general public. Individual site performance and monitoring is carried out by an experienced industry professional who will assess the site’s performance in the following categories: workforce, safety, community, appearance and environment.

www.considerateconstructorsscheme.org.uk

Considerate Constructors Scheme

For further information about Bowmer & Kirkland, visit our website www.bandk.co.uk, scan the QR code with your smartphone or contact our PR Manager, Sarah Millington on 01773 857514 or [email protected].

Site Contacts

Our site team is headed by our Project Manager John Osborne;

Email: [email protected]

Contact Number: 07766 441892

K10

K10

K10

K10

K2K5

K7

K2

Flush

pedestrian

crossing point

Services/

Drop-off Bay

Mot

orcy

cles

Pay Meter

Ramp 1:10

Ramp 1:10

01

02

03

05

06

07

08

09

10

11

12

13

14

15

16

17

31

30

29

28

27

26

25

24

23

22

20

19

18

40

39

38

37

36

35

34

33

32

1100

mm

Ups

tand

Wal

l

900mm Upstand Wall

Tarm

ac fi

nish

to m

atch

exis

ting

Harto

n Q

uays

land

scap

e

Tarmac finish to match existing Harton Quays landscape

21

Pay Meter

ElectricVehicle

Covered Cycle Parking (40 spaces)

04

For detailed landscapedesign please refer todwg no: V12569 L01

900mm

Upstand W

all

ElectricVehicle

For detailed landscapedesign please refer todwg no: V12569 L01

Repositioned existing lamppost

Existinglamppost 90

0mm

Ups

tand

Wal

l

Existing lamppost

Sign

Sign

Sign

For detailed landscapedesign please refer todwg no: V12569 L01

Existing

Bus Shelter

For detailed designplease refer tohighways engineerdwg no:NEA1239/CH/PC01Rev A

For detailed designplease refer tohighways engineersdwg no:NEA1239/CH/DE01Rev A

7.70

P1

P2

ST HILDA'S SQUARE

Flush pedestrian

crossing point

Flush pedestrian

crossing point

Yorkstone setts provide

vehicle overun areas and

layby for market drop off

Crossing island amended to enhance

agress manouvre from square

Full kerb upstand within

entrance area to shared

surface environment.

Bollards

Bollards

Improved bus stop on Church

Way as phase 1 works

Bollards

Bollards

Cantilever

Bus Shelter

Bollards

10.26

10.20

10.27

K5

ED

Existing finished levels to

Union Alley access to be

retained to ensure height

clearance for vehicles

Line of existing bollards

replaced to match proposed

bollards within the square

New Post Box relocation

K2

Sign

Sign

Sign

Sign

Sign

Sign

Sign

Sign

Sign

Sign

Cantilever

Bus Shelter

MM

2qty utility meter boxes

located on the north edge of

the Woodhalve 2 site area.

See M&E specification for

details

New paving set out to suit the

existing threshold levels of all

existing units surrounding the site

New paving set out to suit the

existing threshold levels of all

existing units surrounding the site

New paving set out to suit the

existing threshold levels of all

existing units surrounding the site

A-a12569A

227

A-a12569A

227

A-a12569A

227

A-a12569A

227

B-b12569A

227

C-c12569A

227

C-c12569A

227

C-c12569A

227

D-d12569A

227

E-e12569A

227

F-f12569A

227

P-p12569A

227

G-g12569A

227

G-g12569A

227

G-g12569A

227

G-g12569A

227

H-h12569A

227

H-h12569A

227

K-k12569A

227

J-j12569A

227

L-l12569A

227

N-n12569A

227

N-n12569A

227

N-n12569A

227

M-m12569A

227

Q-q12569A

229

R-r12569A

229

S-s12569A

229

T112569A

223

T112569A

213

T112569A

213

T112569A

223

T212569A

223

T212569A

213

T212569A

223

T212569A

223

T212569A

223

A12569A

235

C12569A

235

B12569A

235

1-312569A

223

1-312569A

223

1-312569A

223

1-312569A

224

1-312569A

224

1-312569A

224

LIBRARY AND

DIGITAL MEDIA

CENTRE

10.08

10.06

SB

This drawing is copyright and may not be reproduced in whole or part without written authority. Do not scale off this drawing.

Status

Project Title

Scale

Drawn By

A R C H I T E C T S THE HARRIS PARTNERSHIP READING

THE HARRIS PARTNERSHIP MILTON KEYNES

t. 0118 950 7700 f. 0118 956 8642101 London Road, Reading, RG1 5BY

t. 01908 211 577 f. 01908 211 722Newport Pagnell, MK16 8AB

t. 01924 291 800 f. 01924 290 0722 St. Johns North, Wakefield, WF1 3QATHE HARRIS PARTNERSHIP WAKEFIELD

Client

Rev

Checked By

Drawing Size

The Old Rectory, 79 High Street

DateCAD file reference

A R C H I T E C T S

Drawing Title

Job-Dwg No

www.harrispartnership.com

Rev

t. 0161 238 8555 f. 0161 244 5809

THE HARRIS PARTNERSHIP MANCHESTER

77 Dale Street, Manchester, M1 2HG2nd Floor, Carvers Warehouse,

t. 0161 238 8555 f. 0161 244 5809

Market PlaceSouth Shields 365 Regeneration Church RowSouth Shields

Proposed Coordinated GA Site Plan

Muse Developments / STC

12569A-206 G

SJD CB

CONSTRUCTION

1:250

03/15CAD FILE REFERENCE

A0

Rev Date Description Rev By Chk'd By

18.03.15A. Drawing references updated to construction series. SJD CAB

NORTH

NOTE:

ALL WORKS TO BE IN ACCORDANCE WITH THESPECIFIED MANUFACTURERS INSTALLATIONREQUIREMENTS AND CURRENT BRITISH STANDARDS

THE DRAWING IS DESIGNED ON TOPOGRAPHICALSURVEY INFORMATION. THE SURROUNDINGCONTEXTUAL BUILDINGS AND INFORMATION AREBASED ON RECEIVED ORDINANCE SURVEY DRAWINGSAND ARE SHOWN FOR ILLUSTRATIVE PURPOSES ONLY.ASSUMED SITE BOUNDARY IS SUBJECT TOCONFIRMATION.

01.04.15B. Service Bollard spec developed. SJD CAB01.04.15C. Rise and fall bollarrd control cabinets added. SJD CAB

08.06.15D. Anchor points for market stalls removed. 2no. benchesomitted. Lighting to town hall repositioned.

SJD CAB

31.07.15E. SJDChristmas tree pit and Gifas unit located, 2no cctv pointsadded for rise and fall bollards.

05.08.15F. SJDChristmas tree pit and Gifas unit relocated. CAB

12.08.15G. Waterpoints & multi use cols removed, additional accessroutes, kerb and fixed bollards inc. and benches relocated tosuit.

SJD

Site Fencing

2Access maintained to Dean Street crossing

1

Area 1 - The works will be carried out for 2 weeks in this area keeping Ferry Street traffic on a single lane on the North bound carriage way on temporary traffic lights.

Area 2 - The works will be carried out for 2 weeks in this area keeping Ferry Street traffic on a single lane on the South bound carriage way on temporary traffic lights.

Page 2: Bowmer & Kirkland . Town Centre Redevelopment, South Shields€¦ · Bowmer & Kirkland. Town Centre Redevelopment, South Shields . ssue ay Bowmer irkand imited igh dge ourt eage ershire

Bowmer & Kirkland. Town Centre Redevelopment, South Shields .

. Issue 10 . May 2016 .

Bowmer & Kirkland Limited, High Edge Court, Heage, Derbyshire, DE56 2BW 01773 853131

Improving the image of construction

Considerate constructors seek to improve the image of the construction industry by striving to promote and achieve best practice under the Code.

Enhancing the AppearanceConstructors should ensure sites appear professional and well managed.

• Ensuring that the external appearance of sitesenhances the image of the industry.

• Being organised, clean and tidy.

• Enhancing the appearance of facilities, storedmaterials, vehicles and plant.

• Raising the image of the workforce by their appearance.

Respecting the CommunityConstructors should give utmost considerationto their impact on neighbours and the public.

• Informing, respecting and showing courtesyto those affected by the work.

• Minimising the impact of deliveries, parkingand work on the public highway.

• Contributing to and supporting the localcommunity and economy.

• Working to create a positive and enduringimpression, and promoting the Code.

Protecting the EnvironmentConstructors should protect and enhance the environment.

• Identifying, managing and promotingenvironmental issues.

• Seeking sustainable solutions, and minimisingwaste, the carbon footprint and resources.

• Minimising the impact of vibration, and air,light and noise pollution.

• Protecting the ecology, the landscape,wildlife, vegetation and water courses.

Securing everyone’s SafetyConstructors should attain the highest levelsof safety performance.

• Having systems that care for the safety of the public, visitors and the workforce.

• Minimising security risks to neighbours.

• Having initiatives for continuous safetyimprovement.

• Embedding attitudes and behaviours thatenhance safety performance.

Caring for the WorkforceConstructors should provide a supportive andcaring working environment.

• Providing a workplace where everyone is respected, treated fairly, encouraged and supported.

• Identifying personal development needs and promoting training.

• Caring for the health and wellbeing of the workforce.

• Providing and maintaining high standards of welfare.

Considerate Constructors SchemeCode of Considerate Practice

The Code of Considerate Practice outlines the Scheme’s expectations of allregistered sites and companies, describingthose areas that are considered fundamentalby the Scheme in helping improve theimage of construction.

For more information, call 0800 783 1423or visit www.ccscheme.org.uk