BOVING FOURESS HYDRO TURBINE

34
5-Mar-10 1

Transcript of BOVING FOURESS HYDRO TURBINE

Page 1: BOVING FOURESS HYDRO TURBINE

5-Mar-10 1

Page 2: BOVING FOURESS HYDRO TURBINE

5-Mar-10 2

Boving Fouress (P) Limited (BFPL) offerstotal service for small hydro electricpower stations (Up to 25 MW Singleunit) right from selection of machinesto commissioning of the power plantand is fully geared to execute theprojects on ‘Water to Wire’ basis.

About us

Page 3: BOVING FOURESS HYDRO TURBINE

5-Mar-10 3

Boving Fouress (P) Limited wasincorporated in 1984 in collaborationand with 33% equity participation fromBoving of UK. In 2008 BFPL became a100% Indian company.

About us

Page 4: BOVING FOURESS HYDRO TURBINE

To be the largest the Small Hydro company in the world by continually providing competitive solutions to the market environment and by constantly improving on our management system by involving and investing in our employees.

5-Mar-10 4

Page 5: BOVING FOURESS HYDRO TURBINE

BFPL has more than 45 model tested designs for various turbines. These models are some of the most efficient available in the world.

BFPL has a in-house design for complete engineering of every project we undertake.

5-Mar-10 5

Page 6: BOVING FOURESS HYDRO TURBINE

Because of our focus for Small Hydro our clients benefit because they get the optimized solutions at the best cost.

Our clients benefit from our unique experience gained in installing over 186units & over 587MW capacity installed and further 131 units & 223MW under execution in India and overseas.

5-Mar-10 6

Page 7: BOVING FOURESS HYDRO TURBINE

We at BFL believe in building long term relationships and trust with our clients. This is reflected in the fact that almost 30%of our machines are from repeat orders from existing clients.

The best & proven turbine design technology from General Electric for more the 40 different models.

5-Mar-10 7

Page 8: BOVING FOURESS HYDRO TURBINE

5-Mar-10 8

69% 22%

7%

75%

33%

~70%

Page 9: BOVING FOURESS HYDRO TURBINE

5-Mar-10 9

Page 10: BOVING FOURESS HYDRO TURBINE

Small Hydro refers to hydro electric projects with capacity Generation less than 25 MW

Typically canal based or run of the river type

5-Mar-10 10

Page 11: BOVING FOURESS HYDRO TURBINE

5-Mar-10 11

Page 12: BOVING FOURESS HYDRO TURBINE

5-Mar-10 12

Page 13: BOVING FOURESS HYDRO TURBINE

5-Mar-10 13

BFL - Kaplan Turbines

We offer following types of KaplanTurbines

Full KaplanSemi KaplanOpen FlumeFull Kaplan with SiphonSemi Kaplan with SiphonDry Pit

Page 14: BOVING FOURESS HYDRO TURBINE

5-Mar-10 14

Head Range 1.9 M Upto 30M

Output Range 250 kW to 20000 kW

Standard

runner sizes900, 1150, 1350, 1500,

1600, 1700, 1860, 2200,

2400, 2500, 2700, 2800,

2900, 3250, 3500

Kaplan Turbines

Page 15: BOVING FOURESS HYDRO TURBINE

5-Mar-10 15

Page 16: BOVING FOURESS HYDRO TURBINE

5-Mar-10 16

Page 17: BOVING FOURESS HYDRO TURBINE

5-Mar-10 17

Shop testing of HFK turbine

rotating assembly

Page 18: BOVING FOURESS HYDRO TURBINE

5-Mar-10 18

BFL - Francis Turbines

Head Range 30 m to 250 m

Output Range 250 kW to 20000

kW

Page 19: BOVING FOURESS HYDRO TURBINE

5-Mar-10 19

Page 20: BOVING FOURESS HYDRO TURBINE

5-Mar-1020

After Installation

At Shop floor

Page 21: BOVING FOURESS HYDRO TURBINE

5-Mar-10 21

BFL - Pelton Turbines

horizontal and vertical configurations.

Head Range 200 m to 500 m

Output Range 500 kW to 20000

kW

Page 22: BOVING FOURESS HYDRO TURBINE

5-Mar-10 22

Pelton runner

Page 23: BOVING FOURESS HYDRO TURBINE

5-Mar-10 23

Hor. 2 Jet Pelton being Installed

Page 24: BOVING FOURESS HYDRO TURBINE

5-Mar-10 24

BFL – Quality Assurance

BFL Assures Quality Through:

•A Supply chain committed to small Hydro business

•System engineering and integration of E & M equipment on Water-to-Wire basis

•All activities of BFL are certified under ISO 9001:2000

•Post Warranty service support

Page 25: BOVING FOURESS HYDRO TURBINE

5-Mar-10 25

BFPL – Quality Assurance

Product Makes

•Turbine •Boving Fouress

•Generator •WEG / MARELLI MOTORI / TDPS / KEC / UCMR /Cantary

•Main Inlet Valve •Fouress

•Hydraulic Power Pack •Rexroth / Yuken

•Gear box •Triveni / WIL / Lufkin / Costameccanica / Elecon / Echesa / Premium Transmission / Equivalent

•PLC / Governor / SCADA

•Allen Bradley / GE Fanuc / Modicon

BFPL has developed a strategic supply chain that is committed to Small Hydro Business and is responsive to customer needs

Page 26: BOVING FOURESS HYDRO TURBINE

5-Mar-10 26

BFPL – Quality AssuranceProduct Makes

• Transformers • KEC / Voltamp / Indotech / Rima / SPEC / Emco / Kanohar / Shilchar

•SF6 Breakers / VCBs •ABB / Siemens / CGL

•MCCB / MCB / OLRs / Contactors

•L & T / GEC Alsthom / ABB / Siemens

•LT Panels •Vee Vee / ABN Energo / Esseseltech / Power Control

•HT Panels •ABB / ABB Systems House / Vee Vee / Power Control

•Battery + Charger •Standard / Exide / AMCO / Amarraja / HBL

•Pumps • Kirloskar / KSB Pumps / Crompton Greaves / Stork / Bharat Bijlee

•Relays •Areva / AVK-SEGC / ABB / L&T / GE Multilin / EssunReyrollayce

Page 27: BOVING FOURESS HYDRO TURBINE

5-Mar-10 27

Engineering / Procurement, Installation and Commissioning of the following:

•Butterfly Valves•Turbine

•Cooling Water system

•Siphon system

•Hydraulic Power Pack

•Speed increasing gear box•Generator

•Power house crane (EOT/HOT)

•Electrical system

•Governors / SCADA

•Control & Protection Panels•Indoor Switchgear

•Transformers

•Outdoor switchyard equipment

•De-watering and Drainage system

Page 28: BOVING FOURESS HYDRO TURBINE

5-Mar-10 28

Project Management Process

Project Execution by a FOCUSSED Project Team

Project Team consists of:

•Project Manager (Team Leader)

•Mechanical Design Engineer

•Electrical Design Engineer

•Drafting Engineer

•Procurement team (common resource)

•Erection and Commissioning team (common resource)

Project Execution Process

• PERT / CPM chart prepared in consultation with client

Page 29: BOVING FOURESS HYDRO TURBINE

5-Mar-10 29

Deliveries offered by BFPL

Capacity Delivery Time

1 Upto 5 MW 10 to 15 months

2 5 to 10 MW 15 to 18 months

3 10 to 20 MW 18 to 24 months

Page 30: BOVING FOURESS HYDRO TURBINE

5-Mar-10 30

BFPL – Expanding Globally

Countries where BFL has SHP projects (on-going & completed)•Sri Lanka•Vietnam•Laos•Malaysia•South Africa•Zimbabwe•Turkey• Philippines• Indonesia

Page 31: BOVING FOURESS HYDRO TURBINE

5-Mar-10 31

Data required for Budgetary offer

•Name and address of the purchaser

•Location where the Plant is to be installed.

• Minimum and maximum temperatures.

•Seismic zone (Low/High seismic activity)

•No. of Units and Project rating

•Available Water Discharge

i) Maximum

ii) Rated

iii) Minimum

Page 32: BOVING FOURESS HYDRO TURBINE

5-Mar-10 32

•Elevation of power house in Meters

•Tail water level

i) Maximum

ii) Rated

iii) Minimum

•Head

i) Maximum

ii) Rated

iii) Minimum

• Penstock – Length & Diameter with bifurcation etc.

Data required for Budgetary offer – Contd…..

Page 33: BOVING FOURESS HYDRO TURBINE

5-Mar-10 33

•Generation Voltage requirement

(415/3300/6600/11000Volts -other)

•Grid voltage 11kV/33 kV/66kV/132 kV – Other.

•Information regarding system to which the plant is to

be connected (large capacity transmission line /

isolated operation)

•Method of operation (Manual / auto/remote control)

•Desired location of operation (remote/local )

Data required for Budgetary offer – Contd…..

Page 34: BOVING FOURESS HYDRO TURBINE

-THANK YOU –CONTACT PERSON (Re-presentatives in Indonesia)

Mr. Subari Rudi(+62 812 8776484)