Boulio Bridge Replacement - True North Steel
1
TrueNorthSteel.com | [email protected] Aluminized Steel Type II Coated CSP and Headwalls Owner Pembina County Highway Department Contractor Pembina County Highway Department Consulting Engineer KLJ Application Replacement of bridge with corrugated steel pipe and headwalls Why corrugated steel pipe from TrueNorth Steel? A cost effective solution for a low volume bridge crossing Project challenges Delivering the pipe to a flood ravaged area Special project elements Pembina County Highway Department crew did the installation Other TNS products used Corrugated steel headwalls Boulio Bridge Replacement | Cavalier, ND TrueNorthSteel.com | [email protected] TRANSPORTATION PROJECT PROFILE BEFORE AFTER
Transcript of Boulio Bridge Replacement - True North Steel
TrueNorthSteel.com | [email protected]
PROJECT PROFILE
Aluminized Steel Type II Coated CSP and HeadwallsOwner Pembina County Highway Department
ContractorPembina County Highway Department
Consulting EngineerKLJ
ApplicationReplacement of bridge with corrugated steel pipe and headwalls
Why corrugated steel pipe from TrueNorth Steel?A cost effective solution for a low volume bridge crossing
Project challengesDelivering the pipe to a flood ravaged area
Special project elementsPembina County Highway Department crew did the installation
Other TNS products usedCorrugated steel headwalls
Boulio Bridge Replacement | Cavalier, ND
TrueNorthSteel.com | [email protected]
TRANSPORTATION PROJECT PROFILE
BEFORE
AFTER