BOTTLENECK STUDY UPDATE Pedro Orso-Delgado District Director District 11.

16
BOTTLENECK STUDY UPDATE Pedro Orso-Delgado Pedro Orso-Delgado District Director District Director District 11 District 11

Transcript of BOTTLENECK STUDY UPDATE Pedro Orso-Delgado District Director District 11.

Page 1: BOTTLENECK STUDY UPDATE Pedro Orso-Delgado District Director District 11.

BOTTLENECK STUDY UPDATE

Pedro Orso-DelgadoPedro Orso-DelgadoDistrict DirectorDistrict Director

District 11District 11

Page 2: BOTTLENECK STUDY UPDATE Pedro Orso-Delgado District Director District 11.

Presentation Outline

Review Completed Bottleneck Study and Findings

Provide Update of Improvements Completed and Underway at: Otay Mesa/Mesa de Otay Port of Entry San Ysidro/Puerta Mexico Port of Entry

Future Activities

Page 3: BOTTLENECK STUDY UPDATE Pedro Orso-Delgado District Director District 11.

Background

12/02 Caltrans Tasked by JWC to Address Transportation Infrastructure Supporting POE’s

Develop Border-wide & Multimodal Bottleneck Methodology for U.S.-Mexico

11/04 JWC approved the Final Report of Bottleneck Study - Phase I Case Study: San Diego-Tijuana Gateway

Page 4: BOTTLENECK STUDY UPDATE Pedro Orso-Delgado District Director District 11.

Study Objectives & Accomplishments

The San Diego-Tijuana gateway was used as a test-bed

Documented results of methodology including challenges and recommendations

The study can be used as a common U.S.-Mexico border-wide framework

Successfully developed a methodology to identify low-cost/high result recommendations

Page 5: BOTTLENECK STUDY UPDATE Pedro Orso-Delgado District Director District 11.

N3 N4

N1 N2 N5 N6

Methodology

Page 6: BOTTLENECK STUDY UPDATE Pedro Orso-Delgado District Director District 11.

MEXICO

U.S.A.

Otay MesaCase Example

MEXICOEXPORT

U.S.IMPORT

Page 7: BOTTLENECK STUDY UPDATE Pedro Orso-Delgado District Director District 11.

Otay Mesa/Mesa de Otay Operational, Minor Infrastructure and

Safety Improvements at Northbound & Southbound Truck Routes

Improve turning radii at various locations Pave emergency lane

Re-route empty lane Add traffic signal

Increase capacity via additional lanes Install concrete barriers

Identify Bottlenecks and Proposed Improvements

Page 8: BOTTLENECK STUDY UPDATE Pedro Orso-Delgado District Director District 11.

Otay Mesa/Mesa de Otay Northbound Key Improvements

UltimateExpansion

8 lanes

$600,000 to expand from 3 to 4 lanes

4 Lanes completed

Page 9: BOTTLENECK STUDY UPDATE Pedro Orso-Delgado District Director District 11.

OTAY MESA POENORTHBOUND INFRASTRUCTURE IMPROVEMENTS

Page 10: BOTTLENECK STUDY UPDATE Pedro Orso-Delgado District Director District 11.

San Ysidro/Puerta Mexico Operational, Minor Infrastructure and

Safety Improvements for cars and pedestrians

Increase number of SENTRI lanes Expand access to SENTRI lanes Extend Pedestrian Bridge

Better utilization of all through lanes Create secondary turn pocket

Enforce “No Parking” zones

Identify Bottlenecks and Proposed Improvements

Page 11: BOTTLENECK STUDY UPDATE Pedro Orso-Delgado District Director District 11.

13

18

1716

6

11

5

8

23

4

10

12

14

9

1

7

19

15

21

2022Southbound

Northbound

San Ysidro/Puerta Mexico

Page 12: BOTTLENECK STUDY UPDATE Pedro Orso-Delgado District Director District 11.

San Ysidro/Puerta MexicoNorthbound Key Improvements SENTRI Lanes

Mex

ico

USA

Page 13: BOTTLENECK STUDY UPDATE Pedro Orso-Delgado District Director District 11.

Existing Exit Lanes

Lane #1 Lane #2 Lane #3 Bus Lane

Proposed Exit Lanes

Caltrans Share: $300 kCBP Share: $200 k

Total Cost: $500 k

U.S. SENTRI Exit Lanes Pre Expansion

Page 14: BOTTLENECK STUDY UPDATE Pedro Orso-Delgado District Director District 11.

Improvements to relieve bottleneck at inspection area have been implemented in Mexico

Mayor of Tijuana is interested in improving border crossing time into Tijuana

San Ysidro/Puerta MexicoSouthbound Key Improvements

Page 15: BOTTLENECK STUDY UPDATE Pedro Orso-Delgado District Director District 11.

Next Steps

Continue to work with local and federal agencies to complete improvements identified in Bottleneck Study

Phase II Other Border Gateways (Unfunded)

Phase III U.S./Mexico Border-wide Bottleneck Report (Unfunded)