Boston college 1989 2003

12

Transcript of Boston college 1989 2003

Page 1: Boston college 1989 2003
Page 2: Boston college 1989 2003

BOSTON COLLEGEHIGGINS HALL

Physics & Biology LabsAnimal Facility & Rooftop Greenhouse

200159.2 Million Construction

81 Million Total Project Cost5 phase construction completed with the building

fully occupied during all phases

OwnerBoston College

Owner’s Project Manager during feasibility study, schematics, design development, construction documents , bid and award, construction and

closeout documentation.

Page 3: Boston college 1989 2003

BOSTON COLLEGEHIGGINS STAIR

20002.1 Million Construction

2.4 Million Total Project Cost

OwnerBoston College

Owner’s Project Manager during feasibility study, schematics, design development, construction documents , bid and award, construction and

closeout documentation.

Page 4: Boston college 1989 2003

BOSTON COLLEGESports Complex Study

199632 Million Construction

40 Million Total Project Cost

OwnerBoston College

Owner’s Project Manager during feasibility study, schematics, design development.

Unbuilt

Page 5: Boston college 1989 2003

BOSTON COLLEGEStudent Center Study

199630 Million Construction

38 Million Total Project Cost

OwnerBoston College

Owner’s Project Manager during feasibility study, schematics and design development.

Unbuilt

Page 6: Boston college 1989 2003

BOSTON COLLEGELaw School Library

199612.1 Million Construction

15.8 Million Total Project Cost84,450 Sq Ft

OwnerBoston College

Owner’s Project Manager during feasibility study, schematics, design development, construction documents , bid and award, construction and

closeout documentation.

Page 7: Boston college 1989 2003

BOSTON COLLEGEFULTON HALL

Carroll School of ManagementComputer Labs

199517.2 Million Construction

21.9 Million Total Project Cost 134,790 Sq Ft

OwnerBoston College

Owner’s Project Manager during feasibility study, schematics, design development, construction documents , bid and award, construction and

closeout documentation.

Page 8: Boston college 1989 2003

BOSTON COLLEGEFULTON HALL

Carroll School of ManagementComputer Labs

199517.2 Million Construction

21.9 Million Total Project Cost134,790 Sq Ft

Page 9: Boston college 1989 2003

BOSTON COLLEGEALUMNI STADIUM

54,500 Seat Stadium1994

26.1 Million Construction30 Million Total Project Cost

487,835 Sq Ft.

Demolition started in February and construction was complete for first game on September 14,

1994

OwnerBoston College

Owner’s Project Manager during feasibility study, schematics, design development, construction documents , bid and award, construction and

closeout documentation.

Page 10: Boston college 1989 2003

BOSTON COLLEGEDEVLIN HALL

Geology LabsArt Department & Admissions

199314.2 Million Construction

17.3 Million Total Project Cost 92,618 Sq. Ft.

OwnerBoston College

Owner’s Project Manager during feasibility study, schematics, design development, construction documents , bid and award, construction and

closeout documentation.

Page 11: Boston college 1989 2003

BOSTON COLLEGEDEVLIN HALL

Geology LabsArt Department & Admissions

199314.2 Million Construction

17.3 Million Total Project Cost92,618 Sq. Ft.

Page 12: Boston college 1989 2003

BOSTON COLLEGEMERKERT HALL

Chemistry Labs

199123.1 Million Construction

28.7 Million Total Project Cost117,791 Sq. Ft.