Scope of Work Analysis

Determine project parameters.

Define scope of work to be performed.

Establish project documentation procedures.

• 410 Herman Miller Ethospace Workstations

• Target Project Completion August 2002

• Union Installation

• Consolidation Project

Scope of Work

Project Process

Page 3: Borg Warner Presentation

End Show

- 3800 automation drive - auburn hills, mi. 48326

Manufacture Evaluation

Develop detailed product

specifications from approved final

furniture plans.

Establish a CAD/CAP database

for use in order entry.

Page 4: Borg Warner Presentation

End Show

- 3800 automation drive - auburn hills, mi. 48326

Drawing & Specification Development

Develop detailed product specifications from approved final

furniture plans.

Establish a CAD/CAP database for use in order entry.

Page 5: Borg Warner Presentation

End Show

- 3800 automation drive - auburn hills, mi. 48326

Design and Product Application Consulting

Furniture Specifications

Application Guide Lines.

Page 6: Borg Warner Presentation

End Show

Borg Warner Powertrain Technical Center

CHANGE ORDER

Owners Name: Borg Warner Date: June 5, 2002

Address: 3800 Automation Drive, Auburn Hills, MI 48326

Attention: Greg Wruck

Project Address: 3800 Automation Ave, Auburn Hills, MI. 48326

CONSTRUCTION CHANGE ORDER NUMBER: 2

Change order #2 due to the unloading and staging of non-combustible furnishings

on jobsite, all combustible furnishings will be reloaded and sent to Furniture

Management Service’s warehouse in Pontiac, Michigan. Combustible furnishing will

stay at FMS’s warehouse until the city of Auburn Hills issues a Temporary

Certificate of Occupancy. When TCO has been issued the combustible furniture will

be redelivered to the jobsite.

GENERAL SCOPE OF WORK DESCRIPTION:

Pursuant to the Construction Agreement between Contractor and Owner dated April 2002, The

Contractor performed the following changes:

GENERAL CONDITIONS: 1) PAYMENT

Payment for this Change Order is due upon completion of the work described above,

and submittal of invoice by the Contractor.

2) INCORPORATION

This Change Order, by agreement of Owner and Contractor, is incorporated by

reference into the Construction Agreement between Owner and Contractor. All terms

and conditions in the General Conditions section of the Construction Agreement

between Owner and Contractor apply to this Change Order.

Bruce Tharp _________________________________

Project Director

Client Signature

Facility Matrix Group

__________

_______

Date

Change Order Management

Process all change orders due to:

Field changes / Layout revisions / Order modifications.

- 3800 automation drive - auburn hills, mi. 48326

Page 7: Borg Warner Presentation

End Show

- 3800 automation drive - auburn hills, mi. 48326

Delivery Scheduling/Status Reports

Create a master schedule and critical path plan.

Develop phasing plans to match occupancy dates.

Page 8: Borg Warner Presentation

End Show

Project Manager: Bruce Tharp Issue Date: 19-Jul-02

* The items identif ied herein shall be corrected by the General Contractor or by their sub-contractor(s) prior to f inal acceptance of the w ork by the tenant and/or tenant's landlord/ow ner. Any omission of items

from this punchlist does not w aiver the General Contractor's responsibilities for f inish quality w orkmanship, materials, quarantees, etc.

* If any of the items or parts listed are to be considered additional w ork (i.e., not part of the contract) by the General Contractor or sub-contractor(s) , the landlord/ow ner and tenant must be notif ied in w riting no

later than 10 days after issue date, identifying costs for such, prior to proceeding w ith the w ork.

* All repair w ork shall be done in an expeditious manner w ith due respect to tenant's w ork schedule and personnel. If required by the landlord/tenant, a schedule for repairs shall be submitted for use in

coordinating the same w ith the landlord/tenant.

* The General Contractor shall notify the Architect and Landlord/Ow ner of his completion of repairs in order that f inal approval inspection may be provided

Location / Punchlist Punchlist Date Approval

Date Room # Dwg Code Item Y or N Description Resource Completed Signature Comments

7/19 G-33 A Y Scratched mobile pedestal FMS 7/25/2002

G-35 B Y Loose end panel base FMS 7/25/2002

G-39 B Y Loose end panel base FMS 7/25/2002

G-21 B Y Loose end panel base FMS 7/25/2002

G-24 B Y Loose end panel base FMS 7/25/2002

G-7 B Y Loose end panel base FMS 7/25/2002

Borg Warner3800 Automation Dr

Auburn Hills, MI 48326

Project Punchlist - Ground Floor West Side

- 3800 automation drive - auburn hills, mi. 48326

Punchlist Development

Identified all products that were damaged,

shipped or installed incorrectly.

Assigned resources and completion dates.