BORED Pile and Pile Cap Design

download BORED Pile and Pile Cap Design

of 51

Transcript of BORED Pile and Pile Cap Design

  • 8/15/2019 BORED Pile and Pile Cap Design

    1/51

    Prepared By

    Mohamad Shakri bin Mohmad Shariff

    2009106705

     

  • 8/15/2019 BORED Pile and Pile Cap Design

    2/51

      Proposed by Kementerian Pengajian inggi

    Ma!aysia to "onstr#"t a Komp!eks $PPP and

    Makma! Penye!idikan Berp#sat %&esear"h

    'aboratory (enter) at *ni+ersity Ma!aya, K#a!a

    '#mp#r-

      . soi! in+estigation programme "onsists of 7

    boreho!es ha+e been s#nk /ith a!! the

    asso"iated dist#rbed and #ndist#rbed

    samp!ings and asso"iated !aboratory tests

      5 ma"kintosh probing and 5 hand a#ger ho!es

    been "arried o#t by Messrs K#mp#!an $kram

    Sdb Bhd %$K&.M)-

  • 8/15/2019 BORED Pile and Pile Cap Design

    3/51

    Geological Map of the Project

    Proposed Site

  • 8/15/2019 BORED Pile and Pile Cap Design

    4/51

      rom the eo!ogi"a! map, the site may be in geo!ogi"a! formations, /hi"h are granite,phy!!ite and !imestone-

     

    he phy!!ite formation may "onsist of state,sha!e and sandstone-

      By site +isit, the area most !ike!y /ithin the"arbonifero#s age phy!!ite, s!ate, sha!e and

    sandstone area-

  • 8/15/2019 BORED Pile and Pile Cap Design

    5/51

      he gro#nd !e+e! at proje"t site rangefrom &' 31-4 to &' 52--

      he p#rposed !e+e! is aro#nd &' 31-4 -

    he s!ope /i!! "#t to standardie of !e+e!-  or the drainage, perimeter drainage

    eist aro#nd the area and a!so inside thebo#ndary a""ording the staggered stages

    of the eisting "ar park-

  • 8/15/2019 BORED Pile and Pile Cap Design

    6/51

    $*& .1 8 S$' P&$' .(&SS B&:' B:1;B:3

  • 8/15/2019 BORED Pile and Pile Cap Design

    7/51

    $*& .2 8 S$' P&$' .(&SS B&:' B:5;B:7

  • 8/15/2019 BORED Pile and Pile Cap Design

    8/51

    $*& . 8 S$' P&$' .(&SS B&:' B:1;B:3

  • 8/15/2019 BORED Pile and Pile Cap Design

    9/51

      he dri!!ing of boreho!es /as terminated after a minim#m of-0m of "ontin#o#s ro"k "oring or 5 time SP +a!#es ? 50b!o/s

      Based on boreho!e res#!ts, the s#bsoi! main!y "onsist of sandyS$'-

      he standard Penetration test had been p!ot based on 5boreho!es %B: 1 @ B: 5) /hi"h are abo#t the same !e+e!-

      he soi! !ayer and parameters had been ana!ysis and design basedon S$ res#!t-

      (hemi"a! est, .tterberg 'imit est :ydrometer .na!ysis are

    eamp!e tests that had been "ond#"ted-  he si!t basi"a!!y ha+e !iA#id !imit aro#nd 25 to 62- si!t in B: 5

    indi"ated +ery high !iA#id !imit as high as 62-

      here /as no ro"k en"o#ntered in a!! the boreho!es /hi"h /ereterminated /ithin depth of 0 meter from the eisting gro#nd!e+e!-

  • 8/15/2019 BORED Pile and Pile Cap Design

    10/51

  • 8/15/2019 BORED Pile and Pile Cap Design

    11/51

  • 8/15/2019 BORED Pile and Pile Cap Design

    12/51

    Prepared By

     eh Maisara Binti Mohd :assan

    2009762251

    =or .iyatimah Binti .bd#! M#ta!ib

    200990599

  • 8/15/2019 BORED Pile and Pile Cap Design

    13/51

      'arge iameter (ast;$n $n;Sit# Pi!es %Bored

    Pi!es)

      Sie 8 350mm to 2m

    %*p to -0m for spe"ia! "ase)  'engths 8 Caries

      Str#"t#ra! (apa"ity 8 40on to 2,00ons %a!!

    b#i!dings or massi+e ind#stria! "omp!ees)

      (on"rete rade 8 20MPa to 5MPa %remie)

      Doints 8 =one

      $nsta!!ation Method 8 ri!! then (ast;$n;Sit#

  • 8/15/2019 BORED Pile and Pile Cap Design

    14/51

    .ia! 'oad (apa"ity(on"rete, (" 8 0-25 f"#

    ."

    Stee! , S" 8 175 .s

    ota!8 (" E ."/here,

    (on"rete strength, f"# 8 5=FmmG

    (on"rete area, ." 8 %h h) @ .s

    Pi!e sie 8 h h

    Pi!e =S=o of Pi!e, = 8 .pp!ied 'oad, Papp  Sing!e Pi!e (apa"ity,

    H a!!

    Skin ri"tion

    % k=FmG )

    (!ay F Si!t F Sand 8 2-5 .+erage

    SP, =

    ri"tiona! &esistan"e

    % k=FmG )Hs 8 I p J' f 

    /here,

    Perimeter, p 8

    epth, '

    Skin fri"tion, f

    Point Bearing (apa"ity

    % k=FmG )

    H p 8 .p  Ap/here,

    (ross;se"tion .rea, .p

    Ap 8 50 .+erage SP, =

    .!!o/ab!e 'oad;Bearing(apa"ity % k= )

    Ha!! 8 %Hs E Hp )F S

    /here,

    a"tor of safety, S

  • 8/15/2019 BORED Pile and Pile Cap Design

    15/51

    amp!e

    Pi!e ata

    Soi! Profi!e

    for B:7

  • 8/15/2019 BORED Pile and Pile Cap Design

    16/51

  • 8/15/2019 BORED Pile and Pile Cap Design

    17/51

  • 8/15/2019 BORED Pile and Pile Cap Design

    18/51

  • 8/15/2019 BORED Pile and Pile Cap Design

    19/51

    (ross;se"tion of

    bored pi!e

    P!an

    +ie/

  • 8/15/2019 BORED Pile and Pile Cap Design

    20/51

  • 8/15/2019 BORED Pile and Pile Cap Design

    21/51

    Bored pi!ing is

    #sed to remo+e

    the soi! and

    ro"k-

  • 8/15/2019 BORED Pile and Pile Cap Design

    22/51

    or "ohesion!ess

    soi!s s#"h as sands,

    gra+e!s, si!ts, pi!ebore ho!e m#st be

    s#pported #sing

    stee! "asing or

    stabi!iing m#ds

    s#"h as bentonite

    s#spension

  • 8/15/2019 BORED Pile and Pile Cap Design

    23/51

  • 8/15/2019 BORED Pile and Pile Cap Design

    24/51

    &einfor"ement bar

    /i!! be p#t into

    the bore ho!e

  • 8/15/2019 BORED Pile and Pile Cap Design

    25/51

  • 8/15/2019 BORED Pile and Pile Cap Design

    26/51

    (on"rete /i!! be

    po#red into the

    bore ho!e

  • 8/15/2019 BORED Pile and Pile Cap Design

    27/51

  • 8/15/2019 BORED Pile and Pile Cap Design

    28/51

    Prepared By

    Lan Mohd .ri Bin Lan Mohd #bir

    200991945

    Khair#! .mri Bin San#si

    2009106705

  • 8/15/2019 BORED Pile and Pile Cap Design

    29/51

      Pi!e "ap defined as a "on"rete b!o"k "ast onthe head of a pi!e, or a gro#p of pi!es totransmit !oad from str#"t#re to the pi!e-

  • 8/15/2019 BORED Pile and Pile Cap Design

    30/51

      Pi!e "ap /i!! !atera!!y stabi!ie indi+id#a!pi!es th#s in"reasing o+era!! stabi!ity of thegro#p-

      Pi!e "ap m#st be rigid to transfer !oads from"o!#mn to the pi!es-

      /o methods of design pi!e "apsNr#ss .na!ogy Method

    Beam heory Method

  • 8/15/2019 BORED Pile and Pile Cap Design

    31/51

      Pi!e "ap treated as an in+erted "anti!e+erbeam-

      esign for the #s#a! "onditions of bending

    and shear-  .pp!ied to !arger gro#ps of pi!es-

  • 8/15/2019 BORED Pile and Pile Cap Design

    32/51

      Based on tr#ss theory-

      'oad from "o!#mn transmit to pi!es bytriang#!ar tr#ss a"tion-

     

    (on"rete take as "ompressi+e members andstee! rebar as tensi!e members-

      'imited #p to fi!e pi!es-

  • 8/15/2019 BORED Pile and Pile Cap Design

    33/51

      etermine sie of pi!e "ap based on pi!espa"ing of d and edge distan"e bet/een150O250mm-

     

    Pi!e "ap depth to be ass#med as fo!!o/sN

      Lorking !oad of pi!e norma!!y based ongeote"hni"a! "apa"ity be"a#se str#"t#re"apa"ity is higher-

    Pilesize

      150 200 300 350 450 600 750

    epth 350 600 700 900 1000 1300 1400

  • 8/15/2019 BORED Pile and Pile Cap Design

    34/51

      etermine rebar by Beam Method or r#ssMethod-

      (he"king for shear at "o!#mn fa"e and"riti"a! se"tion %20 or 1F5 of pi!e diameter)-.!!o/ shear enhan"ement-

      (he"king for p#n"hing shear if pi!e spa"ingmore than d%diameter of pi!e)-

     

    (he"king detai!ing reA#irements s#"h asan"horage, bar spa"ing and "o+er-

  • 8/15/2019 BORED Pile and Pile Cap Design

    35/51

    P$' (.P S$=

  • 8/15/2019 BORED Pile and Pile Cap Design

    36/51

      Based on BS 4110

      esign "on"ept Beam heory Method

      Strength of "on"rete, f"#? 0=Fmm2

      Strength of reinf-, fy ? 360 =Fmm2-  Min- "o+er to main reinf-, " ? 50mm

      (o!#mn ser+i"e !oad, ? 1660 K=

      (o!#mn sie ? 300mm 300mm

      Bored pi!e diameter ? 600mm

  • 8/15/2019 BORED Pile and Pile Cap Design

    37/51

      Min- "ap design %!ength)

    ? 2%to!eran"e of pi!e) E bored pi!e diameter

    ? 150mm E 600mm

    ? 750mm say #se 1000mm-

      Min- "ap design %breadth)

    ? bored pi!e diameter E 2%to!eran"e of pi!e)

    ? 600mm E 150mm

    ? 750mm say #se 1000mm-

  • 8/15/2019 BORED Pile and Pile Cap Design

    38/51

      (he"k !ength to determine min- depthN

    ' ? 2d%diameter of bored pi!e) E 100mm

    ? 2 %600mm) E 100mm

    ? 100mm say 1500 mmr /e "an #se ab!e Pi!e (ap epth depends on

    Sie of Pi!esN

      So #se 1300mm for 600mm bored pi!ediameter-

    Pile size   150 200 300 350 450   600   750

    epth 350 600 700 900 1000 1300 1400

  • 8/15/2019 BORED Pile and Pile Cap Design

    39/51

      :en"e, adopt sing!e bored;pi!e "ap sie

    ? 1000mm 1000mm 1300mm

      ffe"ti+e depthN%ass- dia- of bar ? 25mm)

    ? 1300mm @ 75mm ; 25mm? 100mm

  • 8/15/2019 BORED Pile and Pile Cap Design

    40/51

      Main bar ? 0-15 bd

    ? 0-15 %1000)%100)

    ? 1950 mm2

    Pro+ide 625% 2950 mm2 Q 1950 mm2)  Pro+ide simi!ar bar for both /ays 625 and

    tie bars for 16-

      Pro+ide anti;"ra"k bar at top of pi!e "ap for

    more than 0-9m ? 0-1 bh? 0-1 %1000)%1300)

    ? 1420mm2

    Pro+ide 625% 2950 mm2 Q 1420 mm2)

  • 8/15/2019 BORED Pile and Pile Cap Design

    41/51

      etai!ingN

  • 8/15/2019 BORED Pile and Pile Cap Design

    42/51

      etai!ingN

  • 8/15/2019 BORED Pile and Pile Cap Design

    43/51

    P$' (.P S$=

  • 8/15/2019 BORED Pile and Pile Cap Design

    44/51

  • 8/15/2019 BORED Pile and Pile Cap Design

    45/51

  • 8/15/2019 BORED Pile and Pile Cap Design

    46/51

  • 8/15/2019 BORED Pile and Pile Cap Design

    47/51

      etai!ingN

  • 8/15/2019 BORED Pile and Pile Cap Design

    48/51

      etai!ingN

  • 8/15/2019 BORED Pile and Pile Cap Design

    49/51

    BH 2

    BH 3

    BH 4

    BH 5

    BH 1

    BH 7

    BH 6

  • 8/15/2019 BORED Pile and Pile Cap Design

    50/51

      . +ery good soi! /ere fo#nd at approimate!y7-5 m from gro#nd !e+e! for B:1, B:2, B:and B:3-

      . bored pi!e system /ere adopted to "aterfor the !arge "o!#mn !oad and estimatedsha!!o/ penetration for pre"ast pi!e-

      Bored pi!e /ith sies +arying from 500mmdia- to 750mm dia- /ere adopted in thiseer"ise-

  • 8/15/2019 BORED Pile and Pile Cap Design

    51/51