boq300resunits infras

download boq300resunits infras

of 12

Transcript of boq300resunits infras

  • 8/2/2019 boq300resunits infras

    1/12

    SAUDI COMMITTEE FOR UNITED NATIONS

    PALESTINIAN RELEIF DEVELOPMENT PROGRAMM

    CONSTRUCTION OF 300 RESIDENTIAL

    UNITS IN RAFAH

    Construction of Infrastructure works

    Bill of Quantity

    SAUDI COMMITTEE FOR UNITED NATIONS

    PALESTINIAN RELEIF DEVELOPMENT PROGRAMM

    CONSTRUCTION OF 300 RESIDENTIAL

    UNITS IN RAFAH

    Construction of Infrastructure works

    Bill of Quantity

  • 8/2/2019 boq300resunits infras

    2/12

    Construction of Infrastructure works

    PAL10-49740: Construction of 300 Residential Units in RafahITB 2012-099

    Bill No (1)

    1. Mobilization & Demobilization

    in Numbers In Letters

    All works according to particular specifications, and

    supervisor engineer instructions.

    1/1

    Preparation works including:1- Supply Site office, shed, equipments, and furniture for

    both supervision and contractor.

    2- Access road to and through the site.

    3- Transportation & Communication.for the supervisor

    engineers

    4- Cleaning the existing site outside the buildings, the

    work includes removing all debris around buildings and

    transmitting to approved dumping site.

    5-Determination the Road axis ,coordinates by Total

    Stationand allignment of the sewage , water and

    electrical networks.

    LS 1

    1/2Dismantle and remove all facilities, services, furniture,shed and any equipment related to the project supervisor

    and contractor office.As per the engineer instructon.

    LS 1

    Total

    Total (US$)ITEM DESCRIPTION UNIT QTYRATE (US$)

    Contractor Signature

  • 8/2/2019 boq300resunits infras

    3/12

    Construction of Infrastructure works

    PAL10-49740: Construction of 300 Residential Units in RafahITB 2012-099

    in Numbers In Letters

    2 Water Supply Works1- All works must be coordinated with the water department at the

    Municipality &CMWU.

    2- The price includes the cost of excavation to depth indicated in

    drawings not less than 1m using retaining shuttering, shoring

    according to instructions of Engineer, bedding of 20 cm clean

    sand under around and above the pipe with compaction,

    backfilling of the trench up to design level with sand in layers 25

    cm thick for each with compaction 98% MDD and all required

    tests.

    3- The work includes removal of the surplus materials outside the

    site to places as instructed by the Engineer.

    4- The work includes supply and installation of metallic warning

    tap, and other accessories and thrust blocks according to details.

    5- The covers of manholes are made of cast iron with diameter 60

    cm engraved by the word " Water " in English and Arabic. the ring

    is from cast iron square shaped with 70*70 cm dimensions. the

    concrete which used around the ring is B350 and should have a

    Basalts layer of 2 cm above the concrete and around the cover

    rings. according to drawings, specifications and Engineers

    instruction.

    6-Cleaning ,disinfection and testing all the installed pipes

    according to technical specification, Engineers instructions and

    coordinating with water department in the municipality & CMWU.

    7-All works are performed according to the drawings,

    specifications and Engineers instruction

    8-All Manholes items to be painted with hot bituminous 70/25

    paint in addition to primer coat as directed by the supervision

    Engineers & the manufacture instructions.

    9-The price include reinstate repairing any damage resulted from

    the works, all according to specification & as per engineer

    instructions

    10-The contractor must be submit detailed shop drawings of the

    coming items for the approval by the Engineer before starting the

    work.

    11-The price includs supply and lay warning tape over the pipeline

    with text indicating the exiatance of Water Pipeline.

    12-All gate valves should be 16 bar working pressure Hakohav,

    Raphael made or equivalent13- All ball valves should be 16 bar working pressure Zagiv made

    or equivalent

    14- Air release valves should be 16 bar working pressure A.R.I

    made or equivalent

    2.1 Supply, and install 110mm diameter PVC-U water pipes PN 10including excavation, backfilling, elbows, angles, Tees, flanges,

    end caps, joints and accessories .The pipe should be bedded

    and covered with at les t 20 cm of clean sand around, at the top

    and bottom of the pipe . The used sand for backfilling of the

    trench will be in layers not exceeding 25cm, with compaction not

    less than 98 % , up to the design leveling of the road all according

    to the engineer's instruction, drawings and technical specifications

    L.M 800

    2.2 Ditto but 63 mm diameter MDPE (Polyethylene) water pipes . L.M 3500

    BILL NO. 2 WATER SUPPLY WORKS

    ITEM DESCRIPTION UNIT QTYRATE (US$)

    Total (US$)

    Contractor signature

  • 8/2/2019 boq300resunits infras

    4/12

    Construction of Infrastructure works

    PAL10-49740: Construction of 300 Residential Units in RafahITB 2012-099

    in Numbers In Letters

    BILL NO. 2 WATER SUPPLY WORKS

    ITEM DESCRIPTION UNIT QTYRATE (US$)

    Total (US$)

    Supply and install 80 cm internal diameter precast circular

    reinforced concrete water manhole for air release valve,

    complete with B300 cast in place reinforced concrete base,

    cast iron cover (25ton Capacity) with frame. The supplied

    concrete rings should be provided with cast iron steps @

    30cm maximum. The work includes excavation in any type

    of soil to any depth , backfilling with clean sand and

    compaction 98% MDD up to the design leveling of theroads. The manhole base should be provided with

    drainage opening with aggregate bed.

    The price shall include Tee 110x110x50mm, ball valve 2"

    diameter Sagiv or equivalent, air release valve 2" diameter

    double action ARI or equivalent, Nipples, f ittings and all

    needed tests to finish work according to drawing,

    specification and engineer's instructions.

    2.4 Ditto but Manhole 100 cm diameter for washout valve. Theprice includes supply and install gate valve 3", flanged

    dresser 3", Tee 63x63x50mm , Nipples, Jack supports,

    male connector for firefighting hose, fire fighting hose 2"

    with length 15 m and all fittings according to drawing,

    specification and engineer instructions

    No. 1

    2.5 Ditto but Manhole 80 cm diameter for Gate Valve 4" on thepipe 110 mm (MH1). The price includes Flanges, dressers,socket flange, gate valve 4" diameter, Jack supports, and

    all fittings according to drawings, specification and

    engineer's instructions

    No. 1

    2.6 Ditto but Manhole 80 cm diameter for Gate Valve 3" on thepipe 63 mm (MH2, MH3). The price includes Flanges,

    dressers, socket flange, gate valve 3" diameter, Jack

    supports and all fittings according to drawings,

    specification and engineer's instructions

    No. 2

    2.7 Ditto but Manhole 80 cm diameter for Gate Valve 4" on thepipe 110 mm (MH4,MH5,MH6,MH7)). The price includes

    Flanges, dressers, socket flange, reducer 4"/3", gate

    valve 4" diameter, Jack supports, and all fittings according

    to drawings, specification and engineer's instructions

    No. 4

    2.8 Ditto but Manhole 80 cm diameter for the fire hydrant. Theprice includes Flanges, dressers, socket flange, gate

    valve 4" diameter, Jack supports,3" & 4" galvanized steel

    pipes, galv. steel reducer 4"/3"galvanized elbow 3", f ire

    hyrant valve 3" 16 bar and all flanges and fittings. The

    galv. pipes should be painted and supprted by concrete

    thrust block ,all works as specification drawings and

    engineer's instruction.

    No. 2

    2.9 Cutting the existing 200mm UPVC pipe and connecting thenew UPVC pipe 110mm including T200X200X110mm,

    Dressers, flanges and all needed fittings and accessories.

    The work includes excavation and backfil ling with clean

    compacted sand all as specification drawings and

    engineer's instruction.

    No. 1

    2.10 Cutting the existing 160mm UPVC pipe and connecting thenew UPVC pipe 110mm including T160X160X110mm,

    Dressers, flanges and all needed fittings and accessories.

    The work includes excavation and backfil ling with clean

    compacted sand all as specification drawings and

    engineer's instruction.

    No. 1

    2.11 Excavation , backf illing with clean sand on layers not toexceed 25 cm each , Supply and install house connection

    32". The price includes approved Saddle 110/32mm ,

    thrust block ,MDPE pipe 32 mm diameter to be connected

    to the existing 1" steel pipe and all needed fittings

    according to drawings, specification and engineer's

    instructions.

    No. 20

    2.12 Ditto, but saddle 63/32 mm No. 80

    Total ($)

    2.3 No. 2

    Contractor signature

  • 8/2/2019 boq300resunits infras

    5/12

    Construction of Infrastructure works

    PAL10-49740: Construction of 300 Residential Units in RafahITB2012-099

    BILL NO.3

    SEWAGE WORKS

    Numbe In Letters

    3 Sewage works

    _The contractor has to submit detailed shop drawings of

    the coming items for the approval by the Rafah

    municipality and CMWU before starting the work.

    _The Contractor has to visit the site for inspection.

    _The price includes the cost of excavation to depth

    indicated in drawings and using retaining shuttering,

    shoring according to the instructions of Engineer,

    bedding of 15 cm clean sand under ,around and above

    the pipe with compaction, backfilling of the trench up to

    design level in layers 25cm thick for each with

    compaction 98% MDD and all required tests.

    _The work includes removal of the surplus materials

    outside the site to places as instructed by the Engineer.

    _The work includes connection of the manholes to the

    existing sewage line after cleaning and adjusting the

    level and orientation of the existing pipes if needed

    according to engineer instructions.

    _ The holes of the manholes have to be done using

    core machine.

    _ All the manholes have to be coated by one coat

    primer and external hot bitumen coating 75/25.

    _ Measurement of pipes and manholes depth is from

    the invert level of pipes to the design asphalt level.

    the price include erecteing Flexible Joints for manholes

    at the main line of sewage

    _Cleaning and testing all the installed pipes according

    to technical specification, Engineers instructions and

    coordinating with water department in the municipality

    _All tests costs to be included in the unit rate items,

    without any extra paid money.

    _The price include reinstate repairing any damage

    resulted from the work, all according to specification &

    as per engineer instructions

    _Covers of manholes are made of cast iron with

    diameter 60 cm for all manholes sizes 25 ton capacity,

    and engraved by the word " Sewage " in English and

    Arabic. the r ing is from cast iron square shaped with

    70*70 cm dimensions. The concrete used around the

    ring is B300 for at least 30cm width and depth, Basalt

    layer of 2 cm thick above the concrete and around the

    cover to fix the ring should be supplied and installed, all

    according to drawings, specifications and Engineers

    instruction.

    _All the above mentioned instructions are

    considered part of the next items

    UNIT QTYRATE (US$)

    Total (US$)ITEM DESCRIPTION

    Contractor Signature

  • 8/2/2019 boq300resunits infras

    6/12

    Construction of Infrastructure works

    PAL10-49740: Construction of 300 Residential Units in RafahITB2012-099

    BILL NO.3

    SEWAGE WORKS

    Numbe In LettersUNIT QTY

    RATE (US$)Total (US$)ITEM DESCRIPTION

    3-1 UPVC Pipes:-

    Supply, install and join, UPVC pipes SN8 250 mm

    outside diameter. for the sewer networks with watertight

    and flexible joints sealed with approved gasket rubber

    ring including excavation in any ground for the depth

    indicated in the drawings, shoring, shuttering, safety

    measures, testing, sand beds all according to the

    drawings, specifications and Engineers instruction.

    L.M 150

    3-2

    200 mm outside diameter UPVC PipesL.M

    120

    3-3160 mm outside diameter UPVC Pipes L.M

    1200

    3-4 Manholes: -

    Supply, install precast circular reinforced concreteB300

    kg/cm2 Sewage manholes 1.25m internal diameter and

    wall thicness 15 cm with reinforced base, cast iron

    steps @30cm spacing, cast iron manhole cover,(25 ton

    capacity), outlet pipes for future connection with end

    cap where shown or necessary. The price including twoexternal bitumen coating, shuttering, excavation in any

    ground to the depth indicated in the drawings, shoring,

    safety measures, formwork, backfilling with sand,

    removing the surplus soil to the tip ..etc. The price

    includes also supply and install 10cm plain concrete

    B200 under the base of the manhole and for benching.

    The price includes also erecteing Flexible Joint 80-50

    cm at connection btween pipe and manhole . All are as

    per drawings , specifications and the engineer

    instructions.

    No 3

    3-5

    Ditto but Manholes with internal dia. 1. 0 m wall thicness

    14 cm and 25 ton capacityNo 68

    3-6

    Ditto but Manholes with internal dia. 0.80 m wall

    thicness 12.5 cm and 25 ton capacity No 62

    3-6

    Ditto but Manholes with internal dia. 0.60 m wall

    thicness 7.5 cm and 40 cm opening with 8 ton capacity

    cover

    No 66

    total

    Contractor Signature

  • 8/2/2019 boq300resunits infras

    7/12

    Construction of Infrastructure works

    PAL10-49740: Construction of 300 Residential Units in RafahITB 2012-099

    BILL NO.4

    COMMUNICATION WORKS

    Numbe In Letters

    4 Communication Works

    _The contractor has to submit detailed shop drawings of

    the coming items for the approval by the PalTel

    Company before starting the work.

    _The Contractor has to visit the site for inspection.

    _The price includes the cost of excavation to depth

    indicated in drawings and using retaining shuttering,

    shoring according to the instructions of Engineer,

    bedding of 15 cm clean sand under ,around and above

    the pipe with compaction, backfilling of the trench up to

    design level in layers 25cm thick for each with

    compaction 98% MDD and all required tests.

    _The work includes removal of the surplus materials

    outside the site to places as instructed by the Engineer.

    _The work includes connection of the manholes to the

    existing PalTel line after cleaning and adjusting the level

    and orientation of the existing pipes if needed according

    to engineer instructions.

    _ The holes of the manholes have to be done using

    core machine.

    _ All the manholes have to be coated by one coat

    primer and external hot bitumen coating 75/25.

    _ Measurement of pipes and manholes depth is from

    the invert level of pipes to the design asphalt level.

    _Cleaning and testing all the installed pipes according

    to technical specification, Engineers instructions and

    coordinating with PalTel.

    _All tests costs to be included in the unit rate items,

    without any extra paid money.

    The price includs supply and lay warning tape over the

    pipe with text indicating the exiatance of PalTel line.

    _The price includes installation of pulling ropes inside

    the the PVC pipes

    _The price includes reinstate repairing any damage

    resulted from the work, all according to specification &

    as per engineer instructions

    _Covers of manholes are made of cast iron with

    diameter 70 cm for all manholes sizes 25 ton capacity,

    and engraved by the word " PalTel " in English and

    Arabic. the r ing is from cast iron square shaped with

    80*80 cm dimensions. The concrete used around the

    ring is B350 for at least 30cm width and depth, Basalt

    layer of 2 cm thick above the concrete and around the

    cover to fix the ring should be supplied and installed, all

    according to drawings, specifications and Engineers

    instruction.

    _All the above mentioned instructions are

    considered part of the next items

    ITEM DESCRIPTION UNIT QTYRATE (US$)

    Total (US$)

    Contractor signature

  • 8/2/2019 boq300resunits infras

    8/12

    Construction of Infrastructure works

    PAL10-49740: Construction of 300 Residential Units in RafahITB 2012-099

    BILL NO.4

    COMMUNICATION WORKS

    Numbe In LettersITEM DESCRIPTION UNIT QTY

    RATE (US$)Total (US$)

    4-1 PVC Pipes:-

    Supply, install and join single line of PVC pipes 4"

    diameter V1. for the PalTel network with approved

    gasket rubber ring including excavation in any ground

    for min. 1.5m depth, shoring, shuttering, safety

    measures, testing, sand beds all according to the

    drawings, specifications and Engineers instruction.

    L.M 800

    4-2

    Ditto but double lines of PVC pipes 4" V2L.M

    620

    4-3

    Ditto but trible lines of PVC pipes 4" V3L.M

    150

    4-4Ditto but four lines of PVC pipes 4" V4 L.M

    850

    4-5

    Supply, install and join single line of flexible PVC pipes

    3" diameter for the PalTel house connection including

    excavation in any ground for min. 1.5m depth, shoring,

    shutter ing, safety measures, testing, sand beds all

    according to the drawings, specifications and

    Engineers instruction.

    L.M 1000

    Manholes: -

    4-6 Supply, install precast circular reinforced concrete B300

    kg/cm2 manhole 100cm internal diameter and wall

    thicness 15 cm with cast iron manhole cover,(25 ton

    capacity . The price includes two coats of external hot

    bitumen, shuttering, excavation in any ground to the

    depth of 1.5-2.0m, shoring, safety measures, formwork,

    backfilling with sand, removing the surplus soil to

    approved site ..etc. all as per drawings , specifications

    and the engineer instructions.

    No 31

    4-7 Supply and cast in situe reinforced concrete B300

    kg/cm2 for the manholes M1 with cast iron manhole

    cover,(25 ton capacity . The price includes two coats of

    external hot bitumen, shutter ing, excavation in any

    ground to the internal height of 2.0 m, shoring, safetymeasures, formwork, backfilling with sand, removing

    the surplus soil to approved site ..etc. all as per

    drawings , specifications and the engineer instructions.

    No 25

    total

    Contractor signature

  • 8/2/2019 boq300resunits infras

    9/12

    Construction of Infrastructure works

    PAL10-49740: Construction of 300 Residential Units in RafahITB 2012-099

    Bill No (5)

    Electricity Works

    in Numbers In Letters

    A- Steel Poles and Bases:

    5.1

    Supply and Install Lattice Steel Pole L.S.P 70/80 12 m

    long. with Steel Base ,Arms &brackets , B200 Concrete

    Foundation, Lattice Pole Suspension Side Arm, K7972,1.5m, 1.st Phase. Auxiliary Steel Arm K160/3.

    Transformer Isolator Side Arm , K1558 , 3m, Protection

    Arm, K81. Anti-Climbing Steel Arm K113/8, for (L.S.P).

    22 kV Pin & Tension type Insulators, Complete Low

    Tension Insulator Unit, Wire KHF CU 95 mm2 Stranded

    (Hard Drawn).

    Line KHF CU 35 mm2 Stranded (Soft drawn). 22 kV

    Cable 1*50 mm2 CU, XLPE.

    With Steel bolts , Nuts , Washers ,Clamps, Earth Rod

    15mm Diameter, 1.5 m. Wire PN CU 70 mm2 PVC

    Yellow/Green and Master lock key.and all needed

    fittings and accessories to hand over the work in clean

    tested and good workmanship and operable Condition.

    No. 1

    5.2

    Supply and Instal 24 kV, 630A Switchgear, and 16 kA

    Short Circuit Current Ring Main Unit SF6, 2 incoming

    switch Disconnectors, one Transformer Protection fuse

    switch combination (CTC) With 22 kV Porcelain Fuses

    63 A. Including cables Trench.and chaqar cover

    No. 0

    5.3

    Supply and Install hermetically sealed Type,

    1250KVA,22/0.4KV, ,Mineral oil Low losses

    Transformer With Bushings and Arms for Fixing the

    Cable, Beside the Transformer with cable ladder. The

    Works Includes Transformer Concrete base B250 , And

    all needed Lugs, Clamps ,Wires and Earthling system

    for transformer and chaqar Plate cover for trenchs.

    According to

    Engineer Instructions and Approval of Gedco

    No. 0

    5.4

    Supply and Install L.V Distribution Board 2000A with

    Main CB IZM 2000A (8 Feeder).with Bus Bars 2000A,

    NZM Circuit Breakers , KWH Meters , Current and

    Voltage Instruments With CTs , wires , Clamps and all

    needed Accessorizes Per drawings and Engineer

    Instructions .

    No. 0

    5.5

    Supply and Install Underground 22 kV Cable 1*240

    mm2

    AL, XLPE.The Works including Excavation 150

    cm under ground Cable Trench and Backfilling with

    Clean sand ,Warning Tape and concrete Slabs

    (45x45x5)cm entire the length of trench ,6 inch UPVC

    Pipes With compression lugs, Shrink Insulator for Lugs

    (Color). PVC& Buckle Clamps with all needed wires

    and Accessories as per Drawings .

    L.m. 1200

    5.6

    Supply and Install LV Panel with main Vertical

    Disconnect or switch LTL 630/400 Amps and 6 Vertical

    Disconnector switch LTL 160/100 A including Earthing ,

    civil structure 10 Nos ,4 Inch Pvc sleeves pipes and all

    needed to fix and connect the Panel as per drawings.

    No. 0

    5.7

    Supply and Install LV Panel with main Vertical

    Disconnect or switch LTL 400//250 Amps With

    LTL(3X63/40A) With Bus bars including earthing , civil

    structure with 6mm thick chaqar plate cover with hand

    held ,10 Nos ,4 Inch sleeves and all needed wires and

    PVC Terminals connections to fix and connect

    consumers Cables .with Electricity

    No. 0

    Total (US$)ITEM DESCRIPTION UNIT QTYRATE (US$)

    Contractor Signature

  • 8/2/2019 boq300resunits infras

    10/12

    Construction of Infrastructure works

    PAL10-49740: Construction of 300 Residential Units in RafahITB 2012-099

    Bill No (5)

    Electricity Works

    in Numbers In LettersTotal (US$)ITEM DESCRIPTION UNIT QTY

    RATE (US$)

    5.8

    Supply and Install LV Panel with main Vertical

    Disconnect or switch LTL 400//200 Amps with

    LTL(3x63/40)A With Bus bars including earthing , civil

    structure with 6mm thick Chaqar plate cover with hand

    held ,8 No S,4 Inch Sleeves and all needed wires andPVC Terminals connections to fix and connect

    consumers Cables .with Electricity

    No. 0

    5.9

    Supply and Install LV Panel with main Vertical

    Disconnector switch LTL400//160 Amps with

    LTL(3x63/40)A and three phases Bus bars including

    Neutral and Earthl ing Buses , civil structure with 6mm

    thick Chaqar plate cover with hand held ,8 No S,4 Inch

    Sleeves and all needed wires and PVC Terminals

    connections to fix and connect consumers Cables .with

    Electricity

    No. 18

    5.10Supply, Install and connect 0.6/1KV ,L.V Cable

    3*240+120 mm2

    CU, XLPE.L.m. 200

    5.11Supply, install and connect 0.6/1KV,L.V Cable

    3*150+75 mm2

    CU, XLPE. L.m. 350

    5.12Supply, Install and connect 0.6/1KV,L.V Cable

    3*120+60 mm2

    CU, XLPEL.m. 300

    5.13Supply, Install and connect 0.6/1KV,L.V Cable 3*95+50

    mm2

    CU, XLPEL.m. 665

    5.14Supply, Install and connect 0.6/1KV,L.V Cable 3*70+50

    mm2

    CU, XLPEL.m. 450

    5.15Supply, Install and connect 0.6/1KV,L.V Cable 3*50+25

    mm2

    CU, XLPEL.m. 800

    5.16Supply, Install and connect 0.6/1KV,L.V Cable 3*16+10

    mm2

    CU, XLPEL.m. 100

    5.17

    Supply, Install and connect L.V Cable 4*16 mm2

    Cu.,

    XLPE, including spring pipe 2", Civil works to lay the

    cables and all needed to connect the dwelling unitsM.D.Bs with electricity .The work includes Excavation

    80cm depth in soil and back filling with clean sand ,

    warning tape and 80cm diameter manholes every 25

    meter distance as per drawings and Engineer approval

    .

    L.m. 6000

    5.18

    Supply and Install materials for future installation of

    Hot galvanized octagonal street light pole 8m long

    including bolts galvanized steel base and B200

    concrete foundations 1*1*1m.

    No. 50

    5.19Supply and Install 3" spring pipe dumped at 80cm deep

    as following (pipe then 30cm soft sand then warning

    tape then 50cm sand).as per drawings.L.m. 3500

    5.2

    Supply and Install N 8-4" UPVC pipe dumped at 80cm

    deep as following (pipe then 30cm soft sand then

    warning tape then 50cm sand) for low voltage Cables

    crossings at The Roads.

    L.m. 300

    5.21 Supply and Install N2XY cable 3*35+16mm 2. L.m. 200

    5.22 Supply and Install N2XY cable 5*16mm 2. L.m. 200

    5.23 Supply and Install N2XY cable 5*6mm2. L.m. 500

    5.24Supply and Install Cu stranded wire 35mm

    2for

    Earthing.L.m. 100

    5.25

    Excavation under ground high voltage cable trench 150

    cm from finishing floor level in different soil levels at

    road crossing and laying 6 inch pipes covered with 50

    cm B200, concrete above the pipes and backfilling with

    clean sand and compaction for cables trenches.

    including warning tape and concrete slab 45x45x5 cm

    entire the length of the trench as Per drawings .

    L.m. 200

    Contractor Signature

  • 8/2/2019 boq300resunits infras

    11/12

    Construction of Infrastructure works

    PAL10-49740: Construction of 300 Residential Units in RafahITB 2012-099

    Bill No (5)

    Electricity Works

    in Numbers In LettersTotal (US$)ITEM DESCRIPTION UNIT QTY

    RATE (US$)

    5.26

    Supply and Construct transformer room buildings with

    two

    lighting fixtures (2x36W) ,IP65 With lighting switch and

    one socket , The work includes Transformer Base

    foundation , High Voltage switchgear and low voltagemain trenches covered with 6 mm galvanized steel

    chaqar plate entire the trenches . The room shall be

    provided with painted galvanized steel door and

    window with louvers, plastered internally and externally,

    tiled and internally and externally painted . All the work

    should be according to GEDCO Regulations, drawings,

    specifications and approval of Engineer .

    No. 2

    Total

    Contractor Signature

  • 8/2/2019 boq300resunits infras

    12/12

    Construction of Infrastructure works

    PAL10-49740: Construction of 300 Residential Units in RafahITB 2012-099

    Bill No (1)

    Bill No (2)

    Bill No (3)

    Bill No (4)

    Bill No (5)

    Telephone.

    Fax .

    Mobile .

    Name of the contractor ......

    Authorized signature ......

    Signature and Sealing.

    Title ...

    Total in numbers ......................................................................

    Total in letters ..............................................................................

    Mobilization

    Water Works

    Sewage Works

    Communication Works (PalTel)

    Electricity Works

    Bill No Description Total

    Grand Total (US$) Not including ValueAdded Tax (VAT)

    Summary

    Contractor Signature