BOQ-FG

2
 OWNER : MR. & MRS. ED T ARRIELA LOCA TION: FLOR'S GARDEN , ANTIPOLO RIZAL SUBJ ECT : BILL OF MA TERIALS FOR THE PROPOSED 12, 000- GALL ON CAP A REINFORCED CONCRETE WATER TAN! "UANTIT UNIT COST Portland Cement 200 bags 225.00 Sand 13 cum. 500.00 3/4" gravel 25 cum. 900.00 12 mm dia. X .0 m !S 214 #cs. 10.00 10 mm dia. X .0 m !S 23$ #cs. 112.00 1/2" %arine Pl&'ood 12 #cs. (50.00 2")3")1 2* coco lumber 40 #cs. 90.00 2")3")1 0* coco lumber 40 #cs. (5.00 2" common nail 10 +gs. 100.00 3" common nail 10 +gs. 100.00 , 1 -ir e 'ire 30 +gs. 5.00 TOTAL N#$%:  -e above materials 'ere intended or te underground 'ater tan+ onl& .  -e materials or te #ro#osed additional oor/ rooms 'ere not included. Pre#ared b& A( R. A)*+$++ Civil ngineer P!C no. (4($ P-! . 15190( Place ssued Sta. Cru6 78aguna ate ssued 01:02: 2014  ITEMS UNIT I. CONCRETING WOR!S

description

Pump Installation- 101 Caimito

Transcript of BOQ-FG

ESTIMATEOWNER : MR. & MRS. ED TARRIELALOCATION: FLOR'S GARDEN , ANTIPOLO RIZALSUBJECT : BILL OF MATERIALS FOR THE PROPOSED 12, 000- GALLON CAPACITY REINFORCED CONCRETE WATER TANK

ITEMS QUANTITY UNIT UNIT COSTTOTAL COST I. CONCRETING WORKS Portland Cement200 bags 225.0045,000.00 Sand13 cum.500.006,500.00 3/4" gravel25 cum.900.0022,500.00 12 mm dia. X 6.0 m RSB214 pcs. 160.0034,240.00 10 mm dia. X 6.0 m RSB238 pcs. 112.0026,656.00 1/2" Marine Plywood12 pcs. 750.009,000.00 2"x3"x12' coco lumber 40 pcs. 90.003,600.00 2"x3"x10' coco lumber 40 pcs. 75.003,000.00 2" common nail 10 kgs. 100.001,000.00 3" common nail 10 kgs. 100.001,000.00 # 16 Tire wire 30 kgs. 65.001,950.00TOTAL154,446.00

Note: The above materials were intended for the underground water tank only. The materials for the proposed additional floor/ rooms were not included.

Prepared by:

Aris R. AlcantaraCivil EngineerPRC no. 74768PTR NO. 1651907Place Issued : Sta. Cruz ,LagunaDate Issued: 01-02- 2014

Sheet3