I. GENERAL REQUIREMENTS 1.0 Construction Bond 2.0 Mobilization 3.0 Protective coverings
SUB-TOTAL - II. TILEWORKS A. FLOOR 1.0 Kitchen 2.0 Foyer 3.0 Toilet and Bath 3.1 Powder Room 3.2 Maid's Room 3.3 Master's Bedroom 3.4 Guest Room 1 3.5 Guest Room 2 4.0 LIVING ROOM B. WALL 1.0 Kitchen 2.0 Toilet and Bath 2.1 Maid's Room 2.2 Master's Bedroom 2.3 Guest Room 1 2.4 Guest Room 2
SUB-TOTAL - III. CARPENTRY WORKS A. REFURBISHMENT OF CABINET'S DOOR DRAWER FACE AND HANDLES 1.0 Master's Bedroom 2.0 Guest Room 1 3.0 Guest Room 2 B. CABINETS / COUNTERS 1.0 Kitchen cabinets and counter 2.0 Master's Bedroom (T&B) counter 3.0 Guest Room 1 ( T&B) counter 4.0 Guest Room 2 (T&B) counter C. REPLACEMENT OF PARQUET FLOORING ( as per actual required condition.) E. REFURBISHMENT OF EXISTING DOORS ( including hinges and knobs)
SUB-TOTAL -
III. PAINTING WORKS A. WALL 1.0 Kitchen 2.0 Foyer 3.0 Living Room 4.0 Powder Room 5.0 Maid's Room 6.0 Master's Bedroom 7.0 Guest Room 1 8.0 Guest Room 2 9.0 LOFT B. CEILING 1.0 Kitchen 2.0 Foyer 3.0 Living Room 4.0 Powder Room 5.0 Maid's Room 6.0 Master's Bedroom 7.0 Guest Room 1 8.0 Guest Room 2 9.0 LOFT C. CABINETS/DRAWERS/COUNTERS 1.0 Kitchen 2.0 Master's Bedroom 3.0 Guest Room 1 4.0 Guest Room 2 5.0 LOFT
SUB-TOTAL - IV. PLUMBING WORKS A. REPLACEMENT OF PLUMBING FIXTURES 1.0 Powder Room 2.0 Maid's Room 3.0 Master's Bedroom 4.0 Guest Room 1 5.0 Guest Room 2 6.0 Kitchen sink and faucets B. INSTALLATION COST C. REPLACEMENT OF SANITARY, DRAINAGE LINE ( FROM C.I. TO PVC) D. TESTING & COMMISSIONING
SUB-TOTAL - V. ELECTRICAL WORKS
B. REPLACEMENT OF EXISTING COVER PLATES ( Switches, Outlets) C. REPLACEMENT OF BUSTED BREAKERS D. PROVISION FOR AIRCON LINE E. TESTING & COMMISSIONING
A. TRACING OF EXISTING ELECTRICAL LINES
SUB-TOTAL - VI. MISCELLANEOUS WORKS A. WATERPROOFING 1.0 Kitchen,Foyer (Cement base) 2.0 TOILET & BATH (membrane) B. GRANITE COUNTER TOPS 1.0 Kitchen 2.0 Master's Bd. Room ( T&B) 3.0 Guest Room 1 ( T&B) 4.0 Guest Room 2 ( T&B) C. MIRROR PANELS @Living Room D. RELOCATION OF WATER HEATING TANK
SUB-TOTAL -
TOTAL COST -
Prepared by:
Aris R. AlcantaraCivil EngineerPRC no. 74768PTR. No. 1651907Place Issued : Sta. Cruz ,LagunaDate Issued : 01-02-2014
E. REPAIR OF WINDOWS AND REPLACEMENT OF SCREEN PANELS
F. Installation of glass partition on master's bathroom, guest bathroom 1 and 2