Boq- Dr Tan Residence

3
OWNER : LOCATION: SUBJECT : DESCRIPTION QTY UNIT UNIT COST TOTAL COST ( PHP) I. GENERAL REQUIREMENTS 1.0 Construction Bond 2.0 Mobilization 3.0 Protective coverings SUB-TOTAL - II. TILEWORKS A. FLOOR 1.0 Kitchen 2.0 Foyer 3.0 Toilet and Bath 3.1 Powder Room 3.2 Maid's Room 3.3 Master's Bedroom 3.4 Guest Room 1 3.5 Guest Room 2 4.0 LIVING ROOM B. WALL 1.0 Kitchen 2.0 Toilet and Bath 2.1 Maid's Room 2.2 Master's Bedroom 2.3 Guest Room 1 2.4 Guest Room 2 SUB-TOTAL - III. CARPENTRY WORKS A. REFURBISHMENT OF CABINET'S DOOR DRAWER FACE AND HANDLES 1.0 Master's Bedroom 2.0 Guest Room 1 3.0 Guest Room 2 B. CABINETS / COUNTERS 1.0 Kitchen cabinets and counter 2.0 Master's Bedroom (T&B) counter 3.0 Guest Room 1 ( T&B) counter 4.0 Guest Room 2 (T&B) counter C. REPLACEMENT OF PARQUET FLOORING ( as per actual required condition.) E. REFURBISHMENT OF EXISTING DOORS ( including hinges and knobs) SUB-TOTAL -

description

Boq- Dr Tan Residence

Transcript of Boq- Dr Tan Residence

Page 1: Boq- Dr Tan Residence

OWNER :

LOCATION:

SUBJECT :

DESCRIPTION QTY UNIT UNIT COST TOTAL COST( PHP)

I. GENERAL REQUIREMENTS 1.0 Construction Bond 2.0 Mobilization 3.0 Protective coverings

SUB-TOTAL - II. TILEWORKS A. FLOOR 1.0 Kitchen 2.0 Foyer 3.0 Toilet and Bath 3.1 Powder Room 3.2 Maid's Room 3.3 Master's Bedroom 3.4 Guest Room 1 3.5 Guest Room 2 4.0 LIVING ROOM B. WALL 1.0 Kitchen 2.0 Toilet and Bath 2.1 Maid's Room 2.2 Master's Bedroom 2.3 Guest Room 1 2.4 Guest Room 2

SUB-TOTAL - III. CARPENTRY WORKS A. REFURBISHMENT OF CABINET'S DOOR DRAWER FACE AND HANDLES 1.0 Master's Bedroom 2.0 Guest Room 1 3.0 Guest Room 2 B. CABINETS / COUNTERS 1.0 Kitchen cabinets and counter 2.0 Master's Bedroom (T&B) counter 3.0 Guest Room 1 ( T&B) counter 4.0 Guest Room 2 (T&B) counter C. REPLACEMENT OF PARQUET FLOORING ( as per actual required condition.) E. REFURBISHMENT OF EXISTING DOORS ( including hinges and knobs)

SUB-TOTAL -

Page 2: Boq- Dr Tan Residence

III. PAINTING WORKS A. WALL 1.0 Kitchen 2.0 Foyer 3.0 Living Room 4.0 Powder Room 5.0 Maid's Room 6.0 Master's Bedroom 7.0 Guest Room 1 8.0 Guest Room 2 9.0 LOFT B. CEILING 1.0 Kitchen 2.0 Foyer 3.0 Living Room 4.0 Powder Room 5.0 Maid's Room 6.0 Master's Bedroom 7.0 Guest Room 1 8.0 Guest Room 2 9.0 LOFT C. CABINETS/DRAWERS/COUNTERS 1.0 Kitchen 2.0 Master's Bedroom 3.0 Guest Room 1 4.0 Guest Room 2 5.0 LOFT

SUB-TOTAL - IV. PLUMBING WORKS A. REPLACEMENT OF PLUMBING FIXTURES 1.0 Powder Room 2.0 Maid's Room 3.0 Master's Bedroom 4.0 Guest Room 1 5.0 Guest Room 2 6.0 Kitchen sink and faucets B. INSTALLATION COST C. REPLACEMENT OF SANITARY, DRAINAGE LINE ( FROM C.I. TO PVC) D. TESTING & COMMISSIONING

SUB-TOTAL - V. ELECTRICAL WORKS

B. REPLACEMENT OF EXISTING COVER PLATES ( Switches, Outlets) C. REPLACEMENT OF BUSTED BREAKERS D. PROVISION FOR AIRCON LINE E. TESTING & COMMISSIONING

A. TRACING OF EXISTING ELECTRICAL LINES

Page 3: Boq- Dr Tan Residence

SUB-TOTAL - VI. MISCELLANEOUS WORKS A. WATERPROOFING 1.0 Kitchen,Foyer (Cement base) 2.0 TOILET & BATH (membrane) B. GRANITE COUNTER TOPS 1.0 Kitchen 2.0 Master's Bd. Room ( T&B) 3.0 Guest Room 1 ( T&B) 4.0 Guest Room 2 ( T&B) C. MIRROR PANELS @Living Room D. RELOCATION OF WATER HEATING TANK

SUB-TOTAL -

TOTAL COST -

Prepared by:

Aris R. AlcantaraCivil EngineerPRC no. 74768PTR. No. 1651907Place Issued : Sta. Cruz ,LagunaDate Issued : 01-02-2014

E. REPAIR OF WINDOWS AND REPLACEMENT OF SCREEN PANELS

F. Installation of glass partition on master's bathroom, guest bathroom 1 and 2