© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document. Bonding of CFRP primary Aerospace structures Boundary conditions for certification Presented by Dipl. Ing. Thomas Kruse, M. Sc., Airframe Design - Research & Technology June 2013 CFK-Vally Stade Convention 2013 - Thomas Kruse - Airframe Design R&T

Transcript of Bonding of CFRP primary Aerospace · PDF fileBonding of CFRP primary Aerospace structures...

Page 1: Bonding of CFRP primary Aerospace · PDF fileBonding of CFRP primary Aerospace structures Boundary conditions for certification Presented by Dipl. Ing. Thomas Kruse, M. Sc., Airframe

© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

Bonding of CFRP primary Aerospace structures Boundary conditions for certification

Presented by

Dipl. Ing. Thomas Kruse, M. Sc., Airframe Design - Research & Technology

June 2013 CFK-Vally Stade Convention 2013 - Thomas Kruse - Airframe Design R&T

Page 2: Bonding of CFRP primary Aerospace · PDF fileBonding of CFRP primary Aerospace structures Boundary conditions for certification Presented by Dipl. Ing. Thomas Kruse, M. Sc., Airframe

© AIRBUS Operations GmbH. All rights reserved. Confidential and proprietary document.

Agenda

Background & motivation

CFRP bonding

Certification requirements

Damage scenarios & technology fields

Design- & technology approaches

Conclusion

June 2013 CFK-Vally Stade Convention 2013 - Thomas Kruse - Airframe Design R&T

Page 3: Bonding of CFRP primary Aerospace · PDF fileBonding of CFRP primary Aerospace structures Boundary conditions for certification Presented by Dipl. Ing. Thomas Kruse, M. Sc., Airframe

© AIRBUS Operations GmbH. All rights reserved. Confidential and proprietary document.

Agenda

Background & motivation

CFRP bonding

Certification requirements

Damage scenarios & technology fields

Design- & technology approaches

Conclusion

June 2013 CFK-Vally Stade Convention 2013 - Thomas Kruse - Airframe Design R&T

Page 4: Bonding of CFRP primary Aerospace · PDF fileBonding of CFRP primary Aerospace structures Boundary conditions for certification Presented by Dipl. Ing. Thomas Kruse, M. Sc., Airframe

© AIRBUS Operations GmbH. All rights reserved. Confidential and proprietary document.

mainly build from

Composite (53%)

Introducing Fuselage

stiffened skin out of CFRP

CFK-Vally Stade Convention 2013 - Thomas Kruse - Airframe Design R&T

Introduction

June 2013

Joining Technology is a

key-technology and enabler for

next generation aircraft concepts

Page 5: Bonding of CFRP primary Aerospace · PDF fileBonding of CFRP primary Aerospace structures Boundary conditions for certification Presented by Dipl. Ing. Thomas Kruse, M. Sc., Airframe

© AIRBUS Operations GmbH. All rights reserved. Confidential and proprietary document.

Applied joining technologies:

CFK-Vally Stade Convention 2013 - Thomas Kruse - Airframe Design R&T

Introduction - Applied joining technologies

June 2013

Joining members Technology

Skin / Stringer Co-Bonding

Skin / Frame (Clip) Bolted Joints

Remark:

≈ 5km Stringer / Skin

Co-Bonded joints

applied per A350

Page 6: Bonding of CFRP primary Aerospace · PDF fileBonding of CFRP primary Aerospace structures Boundary conditions for certification Presented by Dipl. Ing. Thomas Kruse, M. Sc., Airframe

© AIRBUS Operations GmbH. All rights reserved. Confidential and proprietary document.

flat Frame / Skin Interface

joined by PI-Joint technology

Skin

Web

PI - Preform

Adhesive

Joining Principle as enabler for new Architectures

Disruptive composite build concept:

The Lockheed-Martin ACCA „Carbon Comet“

June 2013 CFK-Vally Stade Convention 2013 - Thomas Kruse - Airframe Design R&T

Page 7: Bonding of CFRP primary Aerospace · PDF fileBonding of CFRP primary Aerospace structures Boundary conditions for certification Presented by Dipl. Ing. Thomas Kruse, M. Sc., Airframe

© AIRBUS Operations GmbH. All rights reserved. Confidential and proprietary document.

Agenda

Background & motivation

CFRP bonding

Certification requirements

Damage scenarios & technology fields

Design- & technology approaches

Conclusion

June 2013 CFK-Vally Stade Convention 2013 - Thomas Kruse - Airframe Design R&T

Page 8: Bonding of CFRP primary Aerospace · PDF fileBonding of CFRP primary Aerospace structures Boundary conditions for certification Presented by Dipl. Ing. Thomas Kruse, M. Sc., Airframe

© AIRBUS Operations GmbH. All rights reserved. Confidential and proprietary document.

CFK-Vally Stade Convention 2013 - Thomas Kruse - Airframe Design R&T

Main driver for joining of composite parts

June 2013

Cost & Lead time

System Integration

Structure

Mechanics

Weight

Page 9: Bonding of CFRP primary Aerospace · PDF fileBonding of CFRP primary Aerospace structures Boundary conditions for certification Presented by Dipl. Ing. Thomas Kruse, M. Sc., Airframe

© AIRBUS Operations GmbH. All rights reserved. Confidential and proprietary document.

cured

un-cured

Classification of CFRP-bonding technologies

June 2013 CFK-Vally Stade Convention 2013 - Thomas Kruse - Airframe Design R&T

co-curing:

co-bonding:

secondary bonding:

un-cured

un-cured

cured

cured

adhesive

earl

y i

nte

gra

tio

n

late

in

teg

rati

on

adhesive

adhesive

Page 10: Bonding of CFRP primary Aerospace · PDF fileBonding of CFRP primary Aerospace structures Boundary conditions for certification Presented by Dipl. Ing. Thomas Kruse, M. Sc., Airframe

© AIRBUS Operations GmbH. All rights reserved. Confidential and proprietary document.

Main technology fields for bonding for large civil aircraft

Material Qualification

Process safety

NDT / NDI

Design Concepts & Sizing Approach

June 2013 CFK-Vally Stade Convention 2013 - Thomas Kruse - Airframe Design R&T

Page 11: Bonding of CFRP primary Aerospace · PDF fileBonding of CFRP primary Aerospace structures Boundary conditions for certification Presented by Dipl. Ing. Thomas Kruse, M. Sc., Airframe

© AIRBUS Operations GmbH. All rights reserved. Confidential and proprietary document.

Agenda

Background & motivation

CFRP bonding

Certification requirements

Damage scenarios & technology fields

Design- & technology approaches

Conclusion

June 2013 CFK-Vally Stade Convention 2013 - Thomas Kruse - Airframe Design R&T

Page 12: Bonding of CFRP primary Aerospace · PDF fileBonding of CFRP primary Aerospace structures Boundary conditions for certification Presented by Dipl. Ing. Thomas Kruse, M. Sc., Airframe

© AIRBUS Operations GmbH. All rights reserved. Confidential and proprietary document.

Certification boundary conditions acc. AC 20-107B

I. Repeatable and reliable non-destructive inspection techniques

must be established that ensure the strength of each joint.

II. Full single part testing of bonded joints

III. Disbonds of each bonded joint greater than the maximum critical

disbonding must be prevented by design features

Need of advanced special design features

Changing or challenging of this rules is not an option! Airbus/EADS was involved to define the actual regulations based in AC 20-107B.

Bud: regulations are leaving degrees of freedom for improvement.

technology not available

effort not practical

e.g. chicken fasteners

June 2013 CFK-Vally Stade Convention 2013 - Thomas Kruse - Airframe Design R&T

Page 13: Bonding of CFRP primary Aerospace · PDF fileBonding of CFRP primary Aerospace structures Boundary conditions for certification Presented by Dipl. Ing. Thomas Kruse, M. Sc., Airframe

© AIRBUS Operations GmbH. All rights reserved. Confidential and proprietary document.

Agenda

Background & motivation

CFRP bonding

Certification requirements

Damage scenarios & technology fields

Design- & technology approaches

Conclusion

June 2013 CFK-Vally Stade Convention 2013 - Thomas Kruse - Airframe Design R&T

Page 14: Bonding of CFRP primary Aerospace · PDF fileBonding of CFRP primary Aerospace structures Boundary conditions for certification Presented by Dipl. Ing. Thomas Kruse, M. Sc., Airframe

© AIRBUS Operations GmbH. All rights reserved. Confidential and proprietary document.

Bondline failure-types

Failure within Bondline

(Disbond)

Weak bond

(not sufficient adhesion)

Manufacturing Process

Damage of Bondline

(Impact event)

Manufacturing Manufacturing Process

occurr

ence:

Detectable

by NDI/NDT (if > method-threshold)

Implementation of a

suitable Qualitycontrol System

In Service

Addressed by

Certification requirements

acc. AC 20-107B

Limitation of Disbond

occurr

ence:

occurr

ence:

June 2013 CFK-Vally Stade Convention 2013 - Thomas Kruse - Airframe Design R&T

Page 15: Bonding of CFRP primary Aerospace · PDF fileBonding of CFRP primary Aerospace structures Boundary conditions for certification Presented by Dipl. Ing. Thomas Kruse, M. Sc., Airframe

© AIRBUS Operations GmbH. All rights reserved. Confidential and proprietary document.

Technology fields & damage tolerance

Material Qualification

Process safety

NDT / NDI

Design & Sizing

Capability to handle / avoid (in future): Weak Bonds In Service

Damages

( )

June 2013 CFK-Vally Stade Convention 2013 - Thomas Kruse - Airframe Design R&T

Page 16: Bonding of CFRP primary Aerospace · PDF fileBonding of CFRP primary Aerospace structures Boundary conditions for certification Presented by Dipl. Ing. Thomas Kruse, M. Sc., Airframe

© AIRBUS Operations GmbH. All rights reserved. Confidential and proprietary document.

Agenda

Background & motivation

CFRP bonding

Certification requirements

Damage scenarios & technology fields

Design- & technology approaches

Conclusion

June 2013 CFK-Vally Stade Convention 2013 - Thomas Kruse - Airframe Design R&T

Page 17: Bonding of CFRP primary Aerospace · PDF fileBonding of CFRP primary Aerospace structures Boundary conditions for certification Presented by Dipl. Ing. Thomas Kruse, M. Sc., Airframe

© AIRBUS Operations GmbH. All rights reserved. Confidential and proprietary document.

Design & Technology - approaches

June 2013 CFK-Vally Stade Convention 2013 - Thomas Kruse - Airframe Design R&T

Certification of Bonding

Limitation of Disbond

Increase Process Safety

Avoid adhesion as joining

mechanism

Direct contribution

to enable certification

Page 18: Bonding of CFRP primary Aerospace · PDF fileBonding of CFRP primary Aerospace structures Boundary conditions for certification Presented by Dipl. Ing. Thomas Kruse, M. Sc., Airframe

© AIRBUS Operations GmbH. All rights reserved. Confidential and proprietary document.

Design & Technology-approach:

Limit Disbond Z-Pinning

Modified Z-Pinning

June 2013 CFK-Vally Stade Convention 2013 - Thomas Kruse - Airframe Design R&T

Page 19: Bonding of CFRP primary Aerospace · PDF fileBonding of CFRP primary Aerospace structures Boundary conditions for certification Presented by Dipl. Ing. Thomas Kruse, M. Sc., Airframe

© AIRBUS Operations GmbH. All rights reserved. Confidential and proprietary document.

Additional technology approaches:

June 2013 CFK-Vally Stade Convention 2013 - Thomas Kruse - Airframe Design R&T

Under investigation e.g. within EU Project

Design & Technology-approach:

Limit Disbond

Surface interfering Features Surface and Geometry

Modification

Mechanical through-thickness

features

Adhesive bondline

architecturing

Identified technology streams:

Page 20: Bonding of CFRP primary Aerospace · PDF fileBonding of CFRP primary Aerospace structures Boundary conditions for certification Presented by Dipl. Ing. Thomas Kruse, M. Sc., Airframe

© AIRBUS Operations GmbH. All rights reserved. Confidential and proprietary document.

June 2013 CFK-Vally Stade Convention 2013 - Thomas Kruse - Airframe Design R&T

Basic M&P

Design & Stress

Surface

Preparation

Automation Skills

Technology-approach:

Increase Process Safety

Page 21: Bonding of CFRP primary Aerospace · PDF fileBonding of CFRP primary Aerospace structures Boundary conditions for certification Presented by Dipl. Ing. Thomas Kruse, M. Sc., Airframe

© AIRBUS Operations GmbH. All rights reserved. Confidential and proprietary document.

June 2013 CFK-Vally Stade Convention 2013 - Thomas Kruse - Airframe Design R&T

Design & Technology-approach:

Increase Process Safety

Skin

Web

PI - Preform

Adhesive

Modular Joints (developed e.g. in EU Projects MoJo & CERFAC)

• Joining of two cured

components

• Local Co-Bonding

by uncured (textile)

Joining element

• Different shapes

(e.g. PI / H) investigated

Page 22: Bonding of CFRP primary Aerospace · PDF fileBonding of CFRP primary Aerospace structures Boundary conditions for certification Presented by Dipl. Ing. Thomas Kruse, M. Sc., Airframe

© AIRBUS Operations GmbH. All rights reserved. Confidential and proprietary document.

June 2013 CFK-Vally Stade Convention 2013 - Thomas Kruse - Airframe Design R&T

Welding Process Thermoplast - Layer

(Co-cured)

Thermoset Part

Thermoset Part

Activities ongoing - Airbus & EADS-IW with CRC-ACS (Australia) & DLR

No Structural application today

Design & Technology-approach:

Avoid adhesion as joining mechanism

Page 23: Bonding of CFRP primary Aerospace · PDF fileBonding of CFRP primary Aerospace structures Boundary conditions for certification Presented by Dipl. Ing. Thomas Kruse, M. Sc., Airframe

© AIRBUS Operations GmbH. All rights reserved. Confidential and proprietary document.

June 2013 CFK-Vally Stade Convention 2013 - Thomas Kruse - Airframe Design R&T

Design & Technology-approach:

Avoid adhesion as joining mechanism

Partially un-cured zones – joined by co-curing

Partially cured parts – joined by co-curing

Page 24: Bonding of CFRP primary Aerospace · PDF fileBonding of CFRP primary Aerospace structures Boundary conditions for certification Presented by Dipl. Ing. Thomas Kruse, M. Sc., Airframe

© AIRBUS Operations GmbH. All rights reserved. Confidential and proprietary document.

Agenda

Background & motivation

CFRP bonding

Certification requirements

Damage scenarios & technology fields

Design- & technology approaches

Conclusion

June 2013 CFK-Vally Stade Convention 2013 - Thomas Kruse - Airframe Design R&T

Page 25: Bonding of CFRP primary Aerospace · PDF fileBonding of CFRP primary Aerospace structures Boundary conditions for certification Presented by Dipl. Ing. Thomas Kruse, M. Sc., Airframe

© AIRBUS Operations GmbH. All rights reserved. Confidential and proprietary document.

Roadmap to certification

June 2013 CFK-Vally Stade Convention 2013 - Thomas Kruse - Airframe Design R&T

Certification process safety

NDT capabilities

enabling technologies

design concepts

sizing approach

Page 26: Bonding of CFRP primary Aerospace · PDF fileBonding of CFRP primary Aerospace structures Boundary conditions for certification Presented by Dipl. Ing. Thomas Kruse, M. Sc., Airframe

© AIRBUS Operations GmbH. All rights reserved. Confidential and proprietary document.

June 2013 CFK-Vally Stade Convention 2013 - Thomas Kruse - Airframe Design R&T

Today certification of bonded joints w/o additional fasteners is not possible

Further research and technology development needed and addressed at Airbus

New novel ideas & technologies can act as future enabler for secured certification

Process Safety

• Significant Progress

• Still not sufficient for certification w/o fasteners

Limitation of Disbond

• Derived from Certification Requirements

• Investigated in EU-Project BOPACS

Alternative joining

mechanism

• Target: Utilize alternative mechanism to adhesion

• Promising technologies under investigation

Conclusion

Page 27: Bonding of CFRP primary Aerospace · PDF fileBonding of CFRP primary Aerospace structures Boundary conditions for certification Presented by Dipl. Ing. Thomas Kruse, M. Sc., Airframe

© AIRBUS Operations GmbH. All rights reserved. Confidential and proprietary document.

Thank you for the attention….

Questions?

June 2013 CFK-Vally Stade Convention 2013 - Thomas Kruse - Airframe Design R&T

Dipl. Ing. Thomas KRUSE, M.Sc.

Airframe Design - Research & Technology

Phone: +49 40 743 83469

[email protected]

Page 28: Bonding of CFRP primary Aerospace · PDF fileBonding of CFRP primary Aerospace structures Boundary conditions for certification Presented by Dipl. Ing. Thomas Kruse, M. Sc., Airframe

© AIRBUS Operations GmbH. All rights reserved. Confidential and proprietary document.

June 2013 CFK-Vally Stade Convention 2013 - Thomas Kruse - Airframe Design R&T

© AIRBUS Operations GmbH. All rights reserved. Confidential and proprietary document. This document and all information contained herein is the sole property of AIRBUS Operations GmbH. No intellectual property

rights are granted by the delivery of this document or the disclosure of its content. This document shall not be reproduced or disclosed to a third party without the express written consent of AIRBUS Operations GmbH. This

document and its content shall not be used for any purpose other than that for which it is supplied. The statements made herein do not constitute an offer. They are based on the mentioned assumptions and are expressed

in good faith. Where the supporting grounds for these statements are not shown, AIRBUS Operations GmbH will be pleased to explain the basis thereof.

AIRBUS, its logo, A300, A310, A318, A319, A320, A321, A330, A340, A350, A380, A400M are registered trademarks.