Bond Construction Update Citizen’s Oversight Committee
description
Transcript of Bond Construction Update Citizen’s Oversight Committee
Bond Construction UpdateCitizen’s Oversight Committee
Bond Construction UpdateCitizen’s Oversight Committee
Long Beach Community College District July 21, 2008
BUILDING TOMORROW TODAY 1
Agenda Completed Construction Projects Current & Upcoming Construction Projects
LAC South Quad Complex LAC Central Plant LAC Learning Resources Center LAC Building A, Student Services LAC Math Technology Building PCC Central Plant PCC Learning Resources Center PCC Industrial Tech Phase 1 PCC MDAB (Multi-Disciplinary Academic Building) LAC/PCC Building Needs Assessment Project
Toilet Improvement Projects Quick-Start Projects ADA Projects Lighting Projects Classroom Improvement Projects Infrastructure Projects
Facilities Improvements Q & A
2
Current and UpcomingConstruction Projects
Central Plant equipment, Public Safety, & Field house for Athletics
Installed (2) 600 ton Chillers and (1) 300 ton chiller with room for expansion
Installed 4 cooling towers with additional expansion space
LAC Central Plant
3
Current and UpcomingConstruction Projects
Plant ready for operation and awaiting completion of SQC
Construction 96% Complete Completion Anticipated Summer
2008
LAC Central Plant
4
Current and UpcomingConstruction Projects
Construction 70% Complete
Adds 10,000 ASF to existing building
Substantial Completion anticipated December 2008
LAC/Learning Resources Center
5
Current and UpcomingConstruction Projects
Construction Approx. 62% Complete
Space includes Approx. 68,000 ASF 32 modern classrooms and labs 38 faculty offices Executive office suites Multipurpose room State of the art Board Room
Substantial Completion Anticipated December 2008
South Quad Complex
6
Current and UpcomingConstruction Projects
Martinez Architects received Board Approval as the Architect of Record Programming work began on April 10, 2008 Completed Schematic Design (June 2008) Currently in Design Development phase Adds 4000 ASF to existing building Will house A&R, Counseling, Health Services, Cashier, Transfer Ctr., etc.
LAC Building A – Student Services Retrofit
7
Current and UpcomingConstruction Projects
Marlene Imirzian & Associates Architects received Board Approval as the Architect of Record
Will house Math and Culinary Arts instructional program as well as Reprographics
LAC Math Technology Building
8
Current and UpcomingConstruction Projects
Programming work began in May 2008 Completed Schematic Design (June 2008) Currently in Design Development phase FPP was approved by Board of Trustees and sent
to state
LAC Math Technology Building
9
Current and UpcomingConstruction Projects
LAC Math Technology Building
Currently completing Design Development Phase10
Current and UpcomingConstruction Projects
Houses Central Plant equipment and Maintenance and Operations facility
Installed (3) 300 ton Chillers
Installed 3 cooling towers
Will support LRC Construction
Approximately 67% Complete
Completion Anticipated late Summer 2008
PCC Central Plant
11
Current and UpcomingConstruction Projects
Construction 97% Complete Modern Facility with Computer Lab
and Multimedia Stand alone Data Center. Provides
District IT redundancy Bridge to Bldg. EE Design elements move towards
energy efficiencies Substantial Completion July 2008
PCC Learning Resources Center
12
Current and UpcomingConstruction Projects
Replaces Existing Antiquated Structures
Construction is 25% Complete
Modern Facility Houses Machine Tool and Welding Departments
New Northern Face of the Campus
Completion Anticipated Spring 2009
PCC Industrial Technology Center Phase 1
13
Current and UpcomingConstruction Projects
Programming is completed and submitted to the State for Approval Completed Schematic Design and Design Development phase (June 2008) Currently working on Construction Documents and Furniture Layouts Anticipated start of construction Summer 2009 Completed in Two phases
PCC Multi-Disciplinary Academic Building (MDAB)
14
PCC - LRC and MDAB (Fly-By)
p a
c i f
i c
c
o a
s t
15
Current and UpcomingConstruction Projects
Restroom Improvement Projects
Quick-Start Projects ADA Projects
LAC/PCC Building Needs Assessment Project
16
Current and UpcomingConstruction Projects
Lighting Projects Classroom Improvement Projects Infrastructure Projects
LAC/PCC Building Needs Assessment Project
17
Recently Completed Facilities
Improvements
Long Beach Community
College District18
Facilities ImprovementsLBCC
With the help of LBCC Foundation, funds were available to do the following: carpet replacement carpet added to the walls to
ensure light-control for observational needs.
AC unit independent from the building HVAC system was added to serve the server room, for proper load ventilation.
New observation seats were installed.
entire room painted new lighting installed.
Completed 06/2008
Building “D” Planetarium Improvements
19
Facilities ImprovementsLBCC
Replace existing boilers, pumps, expansion tanks and common flue with new equipment.
A newly upgraded design reflecting a mechanical engineered system was installed improving the efficiency of the boilers. This system is the main heating source serving the Auditorium.
Completed 06/2008
Building “J” Boiler Replacement
20
Facilities ImprovementsLBCC
Replacement of roofs with a 30-year Garland roof materials
Removal of radio tower on Bldg “B”
Expected Completion 07/2008
Building “B”, “C”, and “D” Roof Replacement
21
Facilities ImprovementsLBCC
Economic Resource Development Complete build out of two-hard
walled offices, a kitchenette, and a server room
Relocation of a 4,000sq. ft. office space into the newly re-designed 3,000sq ft. office space
New modular cubicle work stations were adapted and installed
Completed 05/2008
ERD Tenant Improvements and Relocation
22
Facilities ImprovementsLBCC
Building Needs Assessment Project Parking Structure/Traffic Study Master Landscape Project District Wide Energy Efficiency Improvements Electronic Signage Wayfaring and Building Signage Facilities Website Facilities Work Order System Buildings M & N Replacement at LAC Building G at PCC Modernization of Building P at LAC (IPP) Replacement of Building M (Construction Trades) at PCC
(IPP)
Important Ongoing Initiatives
23
QUESTIONS & ANSWERS