BOMBS C.C.shahab/Courses/e1/... · Group Members • B. rett Gleasman – Group Leader •...

14
BOMBS C.C. BOMBS C.C.

Transcript of BOMBS C.C.shahab/Courses/e1/... · Group Members • B. rett Gleasman – Group Leader •...

Page 1: BOMBS C.C.shahab/Courses/e1/... · Group Members • B. rett Gleasman – Group Leader • Introduction • Problem • Conclusion • O. wen Clark – Design/Drawings •Design •

BOMBS C.C.BOMBS C.C.

Page 2: BOMBS C.C.shahab/Courses/e1/... · Group Members • B. rett Gleasman – Group Leader • Introduction • Problem • Conclusion • O. wen Clark – Design/Drawings •Design •

Group Members

•• BBrett Gleasman– Group Leader

• Introduction• Problem• Conclusion

•• OOwen Clark– Design/Drawings

• Design• Adjustment

•• MMatt Holsopple– Design/Drawings

• Base• Accuracy

•• BBrett Morris– Materials/Final Sketch

• Radial Arm/Trigger• Final Product

•• SSteven Kovach– CADD Drawing/Assembly

• Assembly• CADD Drawing

Page 3: BOMBS C.C.shahab/Courses/e1/... · Group Members • B. rett Gleasman – Group Leader • Introduction • Problem • Conclusion • O. wen Clark – Design/Drawings •Design •

Problem

The Problem was to design a Catapult that would fire a 50 gram object 3 meters and hit a target that is 20 inches off the ground. The Catapult had to fit in a box that was 1.5 feet3. We had to be able to design the Catapult to be able to change on the needs of trajectory and distance to hit the target in the bull’s-eye.

Page 4: BOMBS C.C.shahab/Courses/e1/... · Group Members • B. rett Gleasman – Group Leader • Introduction • Problem • Conclusion • O. wen Clark – Design/Drawings •Design •

Design

Page 5: BOMBS C.C.shahab/Courses/e1/... · Group Members • B. rett Gleasman – Group Leader • Introduction • Problem • Conclusion • O. wen Clark – Design/Drawings •Design •

Assembly

• Materials– 2x2 8ft $2.50– 1x3 8ft $2.00– 2’x2’ plywood Base $4.00– 5ft 2in PVC Pipe $5.00– 8ft Molding $1.00– Screws/Medical

Tubing/Labor/Hinge/ Carpet liner $Free

• November 5th

• Steven Grandfather’s Garage• Tools Used

– Table Saw– Drill/Screw Driver– Chop Saw– Sander– Staple Gun

• 4 Hours of Building Time

Page 6: BOMBS C.C.shahab/Courses/e1/... · Group Members • B. rett Gleasman – Group Leader • Introduction • Problem • Conclusion • O. wen Clark – Design/Drawings •Design •

Base

• Materials– Rubber matting– 1.5ft2 Plywood Base– 10lb Plate

• Reasons– Stability– Safety

Page 7: BOMBS C.C.shahab/Courses/e1/... · Group Members • B. rett Gleasman – Group Leader • Introduction • Problem • Conclusion • O. wen Clark – Design/Drawings •Design •

Adjustment

• Materials– PVC Pipe– 2x2 Wood– 1x3 Wood– Padding

• Reasons– Angle– Distance– Safety

• Changes

Page 8: BOMBS C.C.shahab/Courses/e1/... · Group Members • B. rett Gleasman – Group Leader • Introduction • Problem • Conclusion • O. wen Clark – Design/Drawings •Design •

Radial Arm/Trigger• Materials

– Chinstrap– Hinge– 1x3 Wood– Eye Screws– Nail– String– Medical Tubing

• Reasons– Stability– Safety– Reliability

• Changes

Page 9: BOMBS C.C.shahab/Courses/e1/... · Group Members • B. rett Gleasman – Group Leader • Introduction • Problem • Conclusion • O. wen Clark – Design/Drawings •Design •

CADD Drawing

TopFront Side

Page 10: BOMBS C.C.shahab/Courses/e1/... · Group Members • B. rett Gleasman – Group Leader • Introduction • Problem • Conclusion • O. wen Clark – Design/Drawings •Design •

Accuracy

60

65

70

75

80

85

90

95

100

Prototype Test 1 Test 2 Test 3

First ShotSecond ShotThird Shot

Page 11: BOMBS C.C.shahab/Courses/e1/... · Group Members • B. rett Gleasman – Group Leader • Introduction • Problem • Conclusion • O. wen Clark – Design/Drawings •Design •

Final Product

Page 12: BOMBS C.C.shahab/Courses/e1/... · Group Members • B. rett Gleasman – Group Leader • Introduction • Problem • Conclusion • O. wen Clark – Design/Drawings •Design •
Page 13: BOMBS C.C.shahab/Courses/e1/... · Group Members • B. rett Gleasman – Group Leader • Introduction • Problem • Conclusion • O. wen Clark – Design/Drawings •Design •

Conclusion

For this problem of hitting the target consistently with accuracy we made the final product by going through the process that was stated.

Page 14: BOMBS C.C.shahab/Courses/e1/... · Group Members • B. rett Gleasman – Group Leader • Introduction • Problem • Conclusion • O. wen Clark – Design/Drawings •Design •

Questions

BB OO MM BB SS