Project Capability Sheet Boddington Gold The Project The project required manufacture, supply, delivery and installation of 16 complete switchrooms. At its peak, the project engaged 135 staff, consumed 140,000 man hours and 3700 CAD drawings. Road freight comprised 1200 tonnes of completed switchrooms (32 trips/6,400kms).
Scope of Supply Schneider Australia (Benalla) Transformers - 28
Schneider Italy 33kV GM6 - 29 panels
Schneider Spain 33kv CBGS0 - 36 Panels
Schneider Indonesia MC Set - 53 Panels
Schneider Motorpact USA/ Indonesia - 29 Panels (MCSet/Motorpact)
Schneider Indonesia 80 tiers Okken MSB’s
Schneider France 175 Tiers Okken MCC’s
TeSys T Motor Protection Relays - 850+
Masterpact LV Circuit Breakers (inc) - 100+
Schneider China Altivar VSD’s - 95
Switchroom manufacture was undertaken by organisations under instruction by Schneider Electric on a National basis. State enterprises included Queensland, Northern Territory, Western Australia and South Australia. It should be noted that HVLV have built the Minara switchrooms under instruction from Schneider Electric.
Capital Budget: $2.7 billion Location: 200km South East of Perth. Processing Rate: Approx. 35 Mt/a Annual Production: Gold - First 5 years average of approximately 1 million ounces/year. Copper - LOM average of approximately 30,000 tonnes/year.
Schneider Electric (AUST) Role: - 16 complete substations & transformers - MV&LV MCC’s, MV&LV SWBRDs, MV &
LV VFD’s - Project Value: $61M (AUD)