Product inforMation
2
All commodities and product names in this document are tradenames or registered trade marks of the respective holder of rights© proventis GmbH 2001-2012. For the sake of the environment, we use recycled paper for printing.
Simple for everybody, everything, everywhere. The Blue Ant Principle: Establishing Multi-Project Management
» With the advent of a simple skills-request facility, a mem-
ber of the IT department can now be gained as a project
member, who has skills and know-how to offer that befor-
ehand wouldn‘t have been known about. It‘s a great help
to our knowledge management experts.«
» With the introduction of Blue Ant we‘ve achieved
the necessary structure, and even with an increasing
number of employees we can deal transparently and
efficiently with projects.«
Thomas Jahn, Ressourcenmanager, Oberfinanzdirektion Niedersachsen (OFD)
Heiko Ahrens, Project & Sales Manager, Axel Springer Digital TV Guide GmbH
3
editorial
Swift process co-ordination, adherence to schedules, clear
decision-making criteria and minimal organisational expen-
diture- all legitimate desires when managing multiple projects.
Without effective support from unified methods and tools,
however, this is difficult to realise.
Project managers need information to be able to reach decisi-
ons. In a project-oriented work environment, attempts to get
this information can run up against unforeseen and time-con-
suming delays. Wait too long for your information and it‘s no
longer up to date, so decisions end up being made off the top
of your head.
The solution consists of a sensible combination of tools and
methodology for supporting a process-oriented, integrated
project management. The goal is to free up the project mem-
ber from research and co-ordination tasks. Only in such an
environment can you find the consistency and acceptability in
handling data collection and retrieval that is the hallmark of
good project management.
With Blue Ant and the range of services offered by our part-
ners, a solution is available to you. We support you with the
evaluation of necessary modifications, through the provision
of a standardised multi-project management system incorpo-
rating training and user care.
Make the most of our experience in providing multi-project
management software.
In the pages that follow, you‘ll find out which Blue Ant func-
tion can give your project management detailed support.
We look forward to working with you!
Norman Frischmuth
Managing Director
Managing Projects Simply
44
» Blue Ant proved itself superbly compatible with our
system layout, our time and activity recording and our
extensive accounting system.«
» Sparkassen Rating and Risikosysteme GmbH now
have a modern planning and reporting tool for
no-fuss daily use, with the option of close involve-
ment with partners.«
introducing SucceSSful Project ManageMent
Ing. Josef Bayrhammer, Bereichsleiter, Porsche Informatik GmbH, Österreich
Michael Tobias, Leiter IT, Sparkassen Rating und Risikosysteme GmbH
5
It goes without saying that software can only support an already
functioning project management arrangement. The introduction
of a multi-project management software requires a structured
approach. Before this initiation can be carried out, it is important
to examine the internal project management procedures. Our
experience shows that the following basic steps aid a successful
initiation.
Step 1
develop an introductory concept
In collaboration with the decision-makers in your company, all
procedures that are relevant to project management should be
examined and anything that may have consequences for the
introduction of Blue Ant checked out. The future multi-project
management model is then developed on this basis. In addition,
necessary steps towards integration (e.g. interface configura-
tion) are agreed on and implemented.
Step 2
training and rollout und rollout
All relevant user groups are trained on the basis of introduc-
tory guidelines. Rollout of the Blue Ant system (prepared
according to your instructions) happens in parallel with the
training.
Introducing Successful Multi-Project Management
Step 3
coaching Phase
During the introductory phase of Blue Ant, experienced
multi-project management coaches are available to give
individual assistance. This coaching speeds up the introduc-
tion process, especially in complex organisational structures.
Step 4
further "Step by Step" integrations
Sobald die Kernprozesse reibungslos laufen, erfolgt die tiefere
Integration in vorhandene Systeme. Hierbei werden die zahl-
reichen Web Services von Blue Ant genutzt, um Daten in Fremd-
systeme zu übergeben oder Blue Ant mit Daten aus anderen
Systemen zu beliefern.
6
To make the entry and evaluation of data easy for project
members to manage, Blue Ant makes a number of access
possibilities available.
These features save time when it comes to data retrieval, and
ensure that current data is available anytime and anywhere.
This enhances performance for data suppliers and
management.
Integrated and Mobile Multi-Project Management
Integrated and MobileMulti-Project Management
SMARTPHONE-COMPATIBLE
100% WEB BASED
INTERFACES ADD-ONS
integrated and Mobile
7
-40
January March May
PM-Cost without Blue Ant PM-Cost with Blue Ant Return on Investment
40
80
0
Co
sts
in E
UR
ROI from Blue Ant (purchase version) after 9 months
July
Month
September November
return on inveStMent
An Investment that‘s well worth it
The reduced process costs yields the following
‚Return on Investment‘ for a concern with 100
employees.
conventionally with blue ant
work-tiMe recording
Various lists, manual collation and checking,
multiple recording of data in different systems.
Integrated employee/work-time account, in-
corporating work-time recording, Controls (for
overtime/holidays), and release mechanisms for
project heads and line managers.
80% *
co ordinating leave
Telephone requests and responses; requests on
sheets of paper; checks by line managers, re-
lease/publication by the personnel department.
Complete electronic request and release pro-
cess in one system.
75% *
Project SettleMent
Gathering all work-times, co-ordination with
the project-head, converting every role and em-
ployee into cost; establishing a proofing system
for work-times
The release of work-times is automatically
carried out in the settlement; specific invoice
records are taken into account.
25% *
Project Planning
No automatic resource co-ordination; having to
request absence personally; activity planning in
Excel or MS Project; having to submit planning
to Accounts
Project and activity planning with conflict
reports based on information such as absences;
automatic resource co-ordination using Resour-
ce Manager; searches for available skills/capabi-
lities in the knowledge/skills database.
25% *
taSk ManageMent
Co-ordination and follow-up by Outlook, E-mail
or off the cuff
Integrated ticket and task
management,including SLA and chain-of-com-
mand mechanisms.
50% *
Project rePortS
Gathering data and reconstructing it with
Powerpoint
Central Database, current information, multiple
reports at the touch of a button.
25% *
In many project management processes, Blue Ant can help
you to make savings of up to 80%. We reckon that, in total,
process costs can be reduced by an average of 6%.
*Savings with Blue Ant
8
ParticiPantS
PROJECT MANAGEMENT AND CONTROLLINGFor managers, time is a precious commodity and up-to-date
information is the basis on which important decisions are
made. Only when obstacles are identified early, developments
that affect projects become clear and decision-making
processes happen quickly can projects be implemented on
time, on budget and up to scratch. It is not only necessary to
plan and control a project, but to ensure that the perfor-
mance of it is satisfactory to the client. Daily information
updates, which are available in the project area, provide a
basis for this.
PROJECT HEAD/ RESOURCE MANAGERProject leaders are managers of time, so they need manage-
ment tools which give them wide-ranging support from the
beginning of the project to its completion. The daily balan-
cing of planning and reality forms the cornerstone of their
activity.
PROJECT EMPLOYEESProject employees have to take on important tasks within a
project, and time is of the essence. It is vital to have a
platform which facilitates communication with the project
head and the line manager, and also reduces administrative
duties to a minimum. The solution exists, and it is called Blue
Ant.
ADMINISTRATORSoftware must fit seamlessly into your existing infrastructure.
The master data must be quickly adaptable and enable an
extensive rights management system. Here, standards like
LDAP or XML play a significant role. Blue Ant is a new
generation web-based software solution. Using web services,
Blue Ant can be connected to any application.
Project employees
Project managerand controlling
Administrator
Project head
9
You‘ll learn more about Blue Ant‘s various functions in the pages that follow
Planning 10 - 11
Resources 12 - 13
Checklists 17
Knowledge 19
Documents 18
Time Recording 14
Tickets and Tasks 15
Travel costs 16
Project Settlement 20
Project portfolio 21
Controlling 22
Interfaces 25
Add-ons24
functionS
Administration 23
10
4
4
4
4
4
4
4
4
�
--Quicklinks--
�
User: McRoot, Andy (271080/I)
ActionNew
Level 3
WBS Gantt Network plan Dependencies
Release 9.0.0.109
View Imp./Exp. Reports Quicklinks Help
PROJECTS PLANNING PROJECT PLAN
11 confl icts have arisen.Time recording
Percent complete
Vouchers
Absences
Projects
Tickets
Service assignments
Knowledge
General Reporting
Releases
Management
Administration
Support
Main informationProject profi le
ChecklistsDashboard
Team calender
Documents
ResourcesProject plan
Parameters
BaselineRisksProject controlReportingExtras
Planning
1 - Relaunch www.yourdomain.com36 37 38
Sept 2011 Oct 2011 Nov 2011
39 40 41 42 43 44 45 46
1.1 MS - Go1.2 MS - Kickoff meeting1.3 Project Management1.4 MS - Wirframes/Key Screens1.5 Further specifi cation1.6 MS - Acceptance Specifi cation1.7 - Developement
1.7.1 Technical project management1.7.2 Developement1.7.3 Technical documentation1.7.4 Coordination1.7.5 Bugfi xing1.8 Documentation / handbooks1.9 Quality Assurance1.10 MS - System installation1.11 Adding Content1.12 Acceptance Test 1.13 MS - Acceptance task passed
1.14 MS - Going live
Project head plans
budget and time
Fig. Gantt Chart of a Project
Employee records
work-times and
progress
Employee records
work-times and
progress
Comparison of target/
actual work costs in
the budget
management
Settlement of
approved work
4
4
4
4
4
4
Individual project management is the cornerstone of multi-project management. Blue Ant
supports the project head in project planning and project control, allowing the project head
to decide which project members should have which rights entitlements within the project.
The project head can also grant the client access to the project material. All of this combines
to give the project team a unifi ed project platform for communication and interaction when
involved in the day-to-day activity of the project
Planning
functionS
Project planningQuick and easy project creation using wizards and
template management
Options to use classical or agile planning methods
Simple processes for creating and editing project plans
using MS Excel
Import function of all project data from templates,
projects and MS Excel
Defi nition of standard, project or individual role cost-
rates up to activity level
Options to invoice for each activity
Planning interfaces compatible with MS Project
Each activity and planned cost can be invoiced
Settlement methods (proactive and retroactive), in-
cluding critical paths and confi gurable confl ict reports
Options to create any number of baselines using
current planning and/ or other baselines
Options to create any number of links between
activities throughout the multi-project structure
Displays showing main and sub-project structures -
including all activities – accessible in either WBS or
Gantt form
Options to link documents and activities
Defi nition of employee, project or individual cost-rates down
to the level of activities
11
�
--Quicklinks--
�
User: McRoot, Andy (271080/I)
Time
Costs
Profi tability
Importieren
ViewAction
Release 9.0.0.109
Report Quicklink Help
PROJECTS DASHBOARD
All calculations have the current date as a basisIntern
Quicklinks
Time recording
Percent completeStatus
Activities
Quotes
Milestones
Vouchers
Ressources
Invoice
Documents
Development Work-times
Vouchers
Absences
Projects
Tickets
Knowledge
Controlling
Releases
Management
Administration
Support
Main informationProject profi le
ChecklistsDashboard
Team Calendar
Documents
Project controlReporting
Parameters
Extras
Planning
100.00% Actual work
0 Requested11 Completed
Target invoiceAllocatedOpen 41.273,00170,0034,868,46 041.273,006.404,531741.273,00
No milestones exist. No documents exist.
73,63 PT MD Released 0,00 PT MD Settled
98.36% Actual percent complete
11 Reserved1 In progress
SettledNot allocatedConfi rmed
View costs...Create quotation...
To trend analysis...
Current completion...
View project participants... to the documents...
0,00 PT Open96.72% Percent complete plan
0 Contacts0 Open
OpenTotalTotal
0,00 PT Declined % c
ompl
ete
Time0
50
100
4
4
4
4
4
4
4
4
4
4
4
4
4
4
functionS
Project controllingChanging project status, with workflows and entitlements
Freely configurable status reports
Generating key figures (profitability, turnover, margins)
Dashboard to enable control over all information and links
Prognoses of work volumes required, and milestone trend
analysis
Performance overview using comparisons (preallocations,
plans, baselines, actual, estimated)
Tabular or graphic overview of development work or
remaining development work
Costs and budget controls
Adjusting planned values to work-values swiftly and simply
Drawing up project settlements for clients
Directory of changes made throughout the project
Archiving of projects
Own report generator
Providing project information and key data via Smartphone
Blackberry Curve 8310 and Blackberry Pearl 8100
All key project data at a
glance – in real time and
without manual data
preparation. This source of
information can be expanded
by means of individual status
reports, and it can also be
rendered as a pdf document
or a slide presentation. The
project planning and control
processes are mutually
dependent. For this reason,
Blue Ant makes information
relevant to controlling
available within the project
plan.
4
4
4
Budget and quote managementTop down budget allocations for main and sub-projects, in
fiscal terms or as man-days
Creating any number of quotes with status freely
defined as fixed-price or cost-indexed
Quote values on the basis of project plans or freely
defined positions
Invoice proposals with payment deadlines for settlement
according to quotes or on the basis of actual data
Quick definition of budgets through the transfer of ‘plan’
and ‘actual’ files
Budget calculation through provision of turnover rate
Free definition of costs and investment types and their
structure
4
4
4
4
Fig. Project cockpit
12
functionS
Unlimited work-time models, a variety of public holiday
calendar options, and individual skill profi les enable resources
to be deployed simply, quickly and effi ciently. The reservation
process is given sterling support courtesy of integrated leave
management, and this means that any potential staff
shortages can be quickly identifi ed.
Functions of resource planning Any number of work-time calendars/ work-time models can
be defi ned for employees
The option to document the skills available in the company
Planning resource deployment
Skill defi nition for all employees (knowledge management)
Resource searches based on required capabilities
Automatic inclusion of reservation periods in the calculation
Swift, cyclical reservation of employees using the reservation
plan
Simulation of employees
Employee, project and company forecasts
Support for resource planning thanks to the resource mana-
ger, by means of required skill defi nitions
Formation of project team calendar
Managing contacts, including organisation and cost-centre
structures
Defi nition and settlement of service times
Defi nition of cost-rates of employee including historicising
Quick allocation of cost-rates through employees of a given
position
Resources
Employee plans
leave
Employee requests
leave
Line manager/
supervisor
approves/declines
Entry in the leave
calendar
Request taken into
account in budget
management
Email to line
manager/
supervisor
Email to line
manager/
supervisor
Feedback via
SmartphoneFig. Release process - leave
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
�
--Quicklinks--
�
� �
�
�
Time recording
Percent complete
Vouchers
Absences
Projects
Tickets
Service assign-ments
Record absence
Leave statistics 2011
Absence1-- - -- - -
- -
864
4
753
3
151311
11
141210
10
222018
18
211917
17
24
24
29-
-
18
1522
29
18
1522
29
18
15
22
29
1
8
1522
29
18
15
22
29
18
15
22
29
1
81522
29
18
15
22
29
18
1522
29
1
8
1522
29
18
15
22
27-
- -
-
613
2027
6
13
20
27
6
132027
6
132027
6
13
20
27
613
2027
25
25
-
- -
411
1825
4
11
18
25
411
1825
411
1825
4
11
1825
411
18
25
28-
-
--
-- -
-- -
7
1421
-- - --28
7
14
21
28
7
1421
28
7
14
21
28
7
142128
7
14
21
28
7
142128
26-
-
- -- -
-
- --- --
-
-
-
-
-
- -
-
- - -
-
-
-
512
1926
5
12
19
26
6
132027
4
Mo
Mo
Mo
Mo
Mo Mo
Tu We
January
April
July
October
Planned Requested Approved Declined Non-working Day
February
May
August
November
March
June
September
December
Th Fr Sa Su
111825
7
142128
5
121926
6
132027
7
142128
5
121926
613
20
27
512
19
26
6
13
20
27
7
14
21
28
5
12
19
26
512
1926
5
12
19
26
512
1926
31
-
310
1724
3
10
17
24
3
10
1724
310
1724
310
1724
4
111825
5
121926
3
101724
6
13
20
27
7
14
21
28
4
11
18
25
5
12
19
26
3
10
17
24
3
10
1724
2
2
9
9
16
16
23
23
30
30
30
30
31
31
31
310
17
24
3131
-
2 2
2
9 9
9
16 16
16
23
30
2
9
16
23
30
2
9
1623
30
29
16
23
30
2
91623
30
2
9
1623
30
29
16
23
411
18
25
310
17
24
30
29
16
23
23
23
LeaveWhole dayWhen17.10.2011Date from
21.10.2011to dateTime: StartTime: Finish
Project Leave
Short descriptionComment
Contractual leave Current leave correction∑ Current year‘s leave
26,00,0
26,0
0,00,0 0,0
0,0
26,09,0 0,0 21,5
-4,5
Remaining leave from previous yearRemaining leave approvedRemaining leave expiredRemaining leave still open
Total leavePlannedRequestedApprovedRemainder
Comment only visible to editor
Show
Request Plan
Knowledge
General reporting
Releases
Management
Administration
User: McRoot, Andy (271080/I)
Quicklinks Help
ABSCENCES ANNUAL CALENDARRelease 9.0.0.109
Year 2011
Support
Overview
Weekly calenderAnnual calender
Request
Mo Tu We Th Fr Sa Su Mo Tu We Th Fr Sa Su
Tu We Th Fr Sa SuTu We Th Fr Sa SuTu We Th Fr Sa Su
Tu We Th Fr Sa Su Mo Tu We Th Fr Sa Su Mo Tu We Th Fr Sa Su
Tu We Th Fr Sa Su Mo Tu We Th Fr Sa Su Mo Tu We Th Fr Sa Su
13
Functions of reaource planningLeave and absence management including approval
processes
Availability of absence overviews via Smartphone, Blackberry
Curve 8310 and Blackberry Pearl 8100
Comparison of leave and absences with MS Exchange
conventionally with blue ant
Processing time: 37 minutes, avg. 8 mins avg.
Having to tie up valuable resources unnecessarily, (Line managers,
project heads)
Valuable resources only briefly
involved
Different means of communication One means of communication
Process cost per request ca. 50 EUR Process cost per request ca
11 EUR
Working more efficiently with Blue Ant
ProceSSing tiMeS con-ventional
with blue ant
Planning leave
Complete request
Sending to LM/PH
1 min.
2 min.
1 min.
-
Approval/Refusal by LM
LM checks release
Agreement of LM
Follow-up phone call
Informing EE
5 min.
10 min.
10 min.
2 min.
5 min.
-
2 min.
-
Publication
Backoffice informieren
Entry in leave file
1 min.
1 min.
-
-
Entry in budget management
Balanching systems
5 min. -
37 min. 8 min.
functionS
4
4
4
4
4
4
4
4
4
4
4
4
14
4
4
4
4
4
4
4
4
4
4
4
4
4
4
functionS
Work-time recording is one of the things that form the basis of an economically-sound
evaluation of all projects. Blue Ant supports all participants of a project with a variety of
recording options. All recorded work-times are forwarded to the relevant responsible party
for approval and settlement. Automatic validations are a valuable aid when recording and
editing work-times.
Time Recording
Work-time recording and work-time management Work-time recording with calendar function and weekly
overview
Quick and precise recording thanks to the stopwatch
functionality
Recording of work-times for other employees
Option to report completion of working weeks
Recording of estimated excess and remaining work
Overtime account, including carry-over option
Recording time using either from/to (times of day) or
durations
Configurable overbooking for each activity
Indirect cost centres for the precise calculation and
settlement of work-times
Freely selectable release processes for work-times
Collective work-times
Deadline rules for work-times
Checking completion of work-times according to the work-
time model
Locking the calendar week once completion has been repor-
ted
Fig. Time Recording
�
--Quicklinks--
Time recording
Percent complete
Vouchers
Absences
Projects
Tickets
Service assignment
Hochladen
Knowledge
General Reporting
Releases
Management
Administration
Support
User: McRoot, Andy (271080/I)
Action Report Quicklink Help
Time recordingRelease 9.0.0.109
Date
12.12.2011 Consult Project (agile) Roll Out
13.12.2011 Consult Project (agile) Roll Out
14.12.2011 Serice Request SAP FI/CO
15.12.2011 Consult Project (agile) Roll Out
15.12.2011 Consult Project (agile) Roll Out
16.12.2011 Relaunch Customer Website Technical project managemen
16.12.2011 Consult Project (agile) Roll Out
Start
08:00 16:00 16:00 00003
08:00 13:00 13:00 00003
08:00 09:19 09:19 00002
08:00 12:00 12:00 00003
08:00 09:00
00:00 25:49
09:00 00003
09:19 11:19 11:19 00003
12:00 16:30 16:30 00007
Finish Break Duration Ticket Project Prj-no. AktivityDay
Mo
Tu
We
We
Th
Fr
Th
DateDuration
Ticket
ProjectActivity
State
TaskComment
Billable
Single Day Week
December 201114.12.2011
3,5
- - - 1 2 3
10865
1312 15 17
24222019
2726 29 31
4
1197
14 16 18
252321
28 30
Fr Sa SuThWeTuMoRelaunch Customer Website
implemented activity
Compulsory fi eld: Input requiredSave
1.7.1 Technical project managementPlan/actual work in hrs 48:00 / 20:30 99
% - complete48,00
Estimate in hrs
The integrated time-recor-
ding permits feedback about
the work done on both
projects and tickets.
15
4
4
4
4
4
4
4
4
4
4
4
Tickets & Tasks
Thanks to the ticket system integrated into Blue Ant, it is
possible to collate, edit and survey all tasks, whether they
arise in the course of projects or not. The fully-integrated
ticket system links those aspects of everyday work that resist
easy planning to the overall project plan.
Fig. Ticket recording
functionS
Functions of ticket and task managementFree workflow configurations showing responsibilities
and news
Supporting support teams
Order of work and tasks for participants displayed
Supporting reminder functionalities
Quick and easy recording thanks to ticket templates
Drafting of Service Level Agreements, incorporating
support time, reaction and warning times, and
settlement types.
Configuring escalation and warning mechanisms
Copying tickets in new or existing activities
Creating and editing tickets via email, through any email
account, including Domain White Lists
Full integration in work-time recording, project planning,
evaluation and controlling
Escalation via Smartphone Blackberry Curve 8310 and Black-
berry Pearl 8100
�
--Quicklinks--
��
��
��
�
Time recording
Quicklinks
Percent complete
Vouchers
Absence
Projects
Tickets
Service assignments
Save
Knowledge
General reporting
Releases
Management
Administration
Support
User: McRoot, Andy (271080/I)
Back New Action Send Report Help
TICKETS DETAILSRelease 9.0.0.109
General
Edit tickets
Client
Project
Topic & Team
Service Level Argreement (SLA)
Participiants
Documents Work-times History
Designation
Status
Client
Project
Subject
SLA
Team
Priority
Contact
Responsible
Type
Desired completion date
Warning time
Activity
Plan (hrs)
Please check on furniture ABCD346 in Hall 1
New
Sample Enterprise
AZ-Mobile-01
Blue Ant
Request
09/27/2011 13:00 PMTarget completion date
06/30/2011 17:00 AM
--- Division---
Ressource
Comment Internal Creator
McRoot, Andy (271080/I)
Double click to add new participants
Double click for new commentary
Plan (hrs) Actual(h)
00:00
Fertigstellung Plan
09/27/2011 13:00 AM
Follow upWorkfl ow
Reaction time
Participiants
Ticket
B
McRoot, Andy (271080
SE Blue Ant
Request
09/27/2011 13:00 PM
07/11/2011 11:00 AM
Doe, Jon (0000/I)
NumberCreator
Plan (h)Actual (h)
Target deadlineDesired completion date
2151McRoot, Andy (271080/I) on 06.01.11 17:18
05:0000:00 (00:00)
27.09.11 13:0027.09.11 13:00
Individual ticket templates
can be used to draw up a
variety of ad hoc permuta-
tions of project business.
16
4
4
4
4
4
4
4
functionS
Travel costs represent not only costs involved in a project,
they also generate additional organisational work. Vouchers
have to be checked, expenses refunded and travel cost
settlements entered. Blue Ant’s travel cost module gives you
invaluable assistance for all of this.
Travel costs
Functions of travel cost recordingOption to define any number of collective vouchers and
voucher types
Individual workflows for collective voucher types
Free configuration of controlling elements
Country-specific expenses, kilometre flat-rates, VAT rates
and archiving.
Simple updating of expenses and kilometre flatrates by
means of importing
Quick and simple recording or voucher and travel costs
in project settlement.
Export of voucher entries
Fig. Travel cost recording
The integrated travel cost
recording allows you to enter
vouchers, and directs you to
places where you can
administer checks and
approval procedures – the
project head or the back
office, for example. The
export of data ensures that
the accounts department can
receive the relevant entries
automatically.
--Quicklinks--
Time recording
Percent complete
Vouchers
Absences
Projects
Tickets
Service assignments
Upload
Deductions for free sustenance
Date Duration Overnight funds Deductions Amount
07.11.11 14:29 12,00 12,000,00
0,00
0,00
0,00
0,00
0,00
24:00 24,00 24,00
24:00 24,00 24,00
24:00 24,00 24,00
15:00 12,00 12,00
96,00 96,00
08.11.11
09.11.11
10.11.11
11.11.11
Upload
Save
Add
Knowledge
General Reporting
Releases
Management
Administration
Support
User: McRoot, Andy (271080/I)
Cancel Help
VOUCHERS COLLECTIVE VOUCHERSRelease 9.0.0.109
Collective Vouchers type Collective Voucher no
Project
Comment
Travel cost
Sample MZ EZ Vouchers for McRoot, Andy
Attachment
Voucher type Description expenses
Deductions 0,00
From Activity 1.5 Customer desire
Gross 96,00
To Overnight funds 96,00
Less VAT
Net 96,00
Invoice 96,00Refunded
Current attachment: business_ex
Country Destination Germany
EURCurrency
VAT in %
Billabale vExpenses
Attachment • business_expenses.pdf 0,2MB
Ust in %
Expenses
07.11.2011, 09:30
11.11.2011, 16:00
Collective Vouchers
Record individual vouchers
17
4
4
4
4
4
Checklists
Small tasks and reminders do not belong in the project plan, as they would only expand it
unnecessarily. These small but nonetheless important tasks are found in the checklists
developed specifically for them. Checklists indicate important standards in the projects, and
help to ensure that these are kept to. There is no real limit to how many checklists can be
created for projects, imported or individually amended.
Aufgaben einer Checkliste
Description of checklist functionsOptions to define as many checklists and tasks as required
in the project
Free allocation of tasks and reminder functions
Tasks can be completed simply
Completed tasks are automatically forwarded
Templates can be defined
Work directives issued during
project meetings can be
swiftly recorded within the
project, and allocated to the
relevant responsible party. If
there are project templates in
which typical reminders or
task settings have already
been defined, these are then
made available to the project
as checklists.
functionS�
--Quicklinks--
�
User: McRoot, Andy (271080/I)
Project number:Project name:Project status:
From:By:
Project type:Currency:working hours in:
02078In House TrainingC-Realization
1 Briefi ng on new product functionalitiesUpdate of admin manual & user manualUpdate marketing material
Update Administrations manualUpdate Installation manual
Create short update information for customers
update training papers
Verifi cation of the Update Info
Updating the positions in marketing material
Update Website
Updating of customer contractsUpload the new Version in-cluding Dokumente
Customer Mailing
Partner Mailing
Update LinkedIN/XING/Twitter/Facebook/Youtube
4 weeks before release Open 10.10.2011
10.10.2011
10.10.2011
10.10.2011
10.10.2011
10.10.2011
10.10.2011
10.10.2011
10.10.2011
10.10.2011
10.10.2011
10.10.2011
10.10.2011
10.10.2011
10.10.2011
McRoot, Andy(2710180/I)
McRoot, Andy(2710180/I)
McRoot, Andy(2710180/I)
McRoot, Andy(2710180/I)
McRoot, Andy(2710180/I)
McRoot, Andy(2710180/I)
McRoot, Andy(2710180/I)
McRoot, Andy(2710180/I)
McRoot, Andy(2710180/I)
McRoot, Andy(2710180/I)
McRoot, Andy(2710180/I)
McRoot, Andy(2710180/I)
McRoot, Andy(2710180/I)
McRoot, Andy(2710180/I)
McRoot, Andy(2710180/I)
1 Open
1 Does the User manual include all new features
Open
1 Does the administration manuel include all new features
Open
1 Does the administration manual include all new features
Open
1 Open
1 McRoot, Andy(2710180/I)
McRoot, Andy(2710180/I)
McRoot, Andy(2710180/I)
McRoot, Andy(2710180/I)
McRoot, Andy(2710180/I)
McRoot, Andy(2710180/I)
McRoot, Andy(2710180/I)
Open
1 McRoot, Andy(2710180/I)
Should be checked by marketing depart-ment and partner department
Open
1 Doe, John (12/I) Open
1 Doe, John (12/I) Open
1 Doe, John (12/I) New features include Open
1 Doe, John (12/I) upload the new version in the download area
Open
1 Smith, Jane (2/I) Open
1 Smith, Jane (2/I) Open
1 Smith, Jane (2/I) Open
Show only my to-dosOnly show open tasks
SearchHide Save Delete Reduce
Show shortened description
05.01.201103.09.2012
Reference projectEURh
ActionNew Imp./Exp. Reports Quicklinks Help
PROJECTS CHECKLISTS
Time recording
Percent complete
Vouchers
Product A [0/15]
Order. To-Do For Description Status von
Last changed:
Project- initialisation[0/2]
Absences
Projects
Service assignments
Tickets
Knowledge
General Reporting
Releases
Management
Administration
Support
Dashboard
DocumentsMain informationBlogProject profi leTeam calendar
ParametersPlanningProject controlReportingExtras
Checklists
Release 9.0.0.109
18
4
4
4
4
4
4
4
4
functionS
Documents
Blue Ant’s document management system enables the
management of project-specific documents which have been
created, changed or deleted by project members. The
documents are provided with header data in a menu tree, so
that they can be easily retrieved using a search mechanism.
Functions of document managementFreely configurable file structure for projects and templates
Integration into projects at the touch of a button
Storage for multiple documents
Option to link documents and activities
Unlimited key word search for fast retrieval of documents
Free allocation of editing rights
Versioning of all documents
Storage of documents in tickets
The document filing system
within Blue Ant makes it
possible to administer
project-related material in a
central location. By allocating
individual documents to
activities, you give the project
participants partial access to
important information.
Successive versions keep track
of the changes and maintain
an archive of the individual
document groups.
Fig. Allocating documents to activities
�
--Quicklinks--
�
User: McRoot, Andy (271080/I)
Project Folder
-- Templates-- Import
Edit Folder1. Specifi cations2. Change request
Sample change request
ProtocollTransport
QuicklinksNew
Release 9.0.0.109
Help
PROJECTS DOCUMENTS
Quicklinks
Time recording
Percent complete
Vouchers
Absence
Projects
Tickets
Service assignments
Knowledge
General reporting
Releases
Management
Administration
Support
Save
Project profi le
ChecklistsDashboard
Steckbrief
Documents
Team calendar
Main information
Project controlReporting
Parameters
Extras
Planning
Project number:Project name:Project status:
Start:End:
Art Project:Currency:working hours in:
02078In House Training 2011C-Realisierung
05.01.201103.09.2011
Document name
Description
URL
2. Change Request
www.proventis.net
Activity
Position
Rights All may readProject members may read
project members my write
Project membersmay delete
1 Relaunch www.yourdomain.co.uk 1.1 MS - Go 1.2 MS - Kick off meeting 1.3 Project management 1.4 Further specifi cations 1.5 MS - Acceptance specifi cations2 Developement 2.1 Technical project management
Sample change request
Reference projectEURh
19
4
4
4
4
4
4
functionS
Knowledge
Knowledge maps give you the option to switch between the target profiles and the actual
capabilities of employees. At the same time as you are creating a new project employee in the
system, the skills of these employees are identified in the employee management section. The
employee profile can be updated at regular intervals to reflect the increasing knowledge and
capability of the employee.
Knowledge maps for more transparency in the projectThe knowledge tree can be freely defined
Target profiles can be created for employees
Allocation of skills and defined characteristics about employees
Option to search resources by skills
Knowledge map in the form of bar diagrams, network diagrams
or line diagrams
The option to archive and historicise changes to skills to show
learning curves
Blue Ant allows for the
management of resources on
the basis of their particular
skills. This information is
available both to for resource
management itself and also
to project managers, to help
identify suitable project
resources.
Fig. Comparison of Target and Actual profiles
�
--Quicklinks--
�
Time recording
Percent complete
Vouchers
Absences
Projects
Tickets
Service assignment
Knowledge
General reporting
Releases
Management
Administration
Support
User: McRoot, Andy (271080/I)
Back Update Report Help
GENERAL REPORTING EMPLOYEE KNOWLEDGE RESULT Release 9.0.0.109
Table view Spiderweb view Line chart view
DB 2
English
Mac OSX
Max DB
MySQL
Oracle
PerlPostgres
Is_Profi le Target_Profi le
Pythos
Windows
Unic
SQL
Ruby
Evaluation form:Profi l:Employee:
Employee type:Division:
Location:Position:
Abgleich Soll/Ist-Profi lSoftware developerAll
AllAll
AllAll
AbsencesActivities
TurnoverUtilisation
Work-time evaluationWeek completedCostsKnowledgeProjects
Employee
20
4
4
4
4
4
4
4
functionS
If you need a conformation process for work performed and costs incurred within the project,
the settlement options within Blue Ant are on hand to help. The project settlement automa-
tes the collocation of data, as well as the settlement of all necessary cost items (work,
material and travel costs). You can avail of a project-wide overview of all the performed work
which must be settled, as well as that which is still ongoing.
Project settlement
Project settlement options in Blue AntOption to select all costs relevant to settlement
Option to adjust and edit settlement data at field-level
Capacity to modify recorded work-times for projects
and tickets at agreed intervals
Fixed-rate or automatic project settlements
Partial settlement of tickets
Partial or complete cancellation of settlements
Availability of project settlement in PDF format
The project settlement facility
in Blue Ant enables a swift
and glitch-free calculation for
all relevant items, whether
work-times, travel costs or
tickets. Statuses enable the
quick retrieval of information
relating to work approved by
clients, as well as the possibi-
lity to settle them.
Fig. Performance settlement in overview
�
--Quicklinks--
�
Time recording
Percent complete
Vouchers
Absences
Projects
Tickets
Service assignments
Knowledge
General Reporting
Releases
Management
Administration
Support
User: McRoot, Andy (271080/I)
Back New Action View HelpQuicklinkReport
MANAGEMENT PROJECT SETTLEMENT PROJECTRelease 9.0.0.109
2011_1201
2011_1203 2011_1203 Quote 100.000,00 11.04.2011 100.000,00
2011_1202 2011_1202 Quote 3.000,00 14.04.2011 3.000,00
2011_1201 2011_1201 Quote 47.000,00 15.04.2011 47.000,00
150.000,00 150.000,00
12031202
1201
Euro0
Actual
Target 150.000,00
Settled 150.000,00
P & L 150.000,00
Open
100.000 200.000 300.000Quote AB 1
Project number:Project name:Project status:FromVolume confi rmed
Project type:Currency:work in:
Target Invoice
Start:End:
CreatorFix
45610Blue AntA - Projektidea13.04.20113.000,00
01.04.201131.12.2011
McRoot, Andy (271080/I)Ja
Internal ProjectEURPT
150.000,00
Quote GH 4
Quote XY20
100.000,00
3.000,00
47.000,00
150.000,00
19.04.2011
31.05.2011
McRoot, Andy (271080/I)
McRoot, Andy (271080/I)
McRoot, Andy (271080/I)
Invoice-Nno
IP-no.: Designation
Angebot Gültig bis
Type Proposal Deadline Settled
Status Date
no. Designation Quote Valid until Creator
Settled Invoice type Start
Settlement
Invoices
Invoice Proposals
QuoteOverview
From Number Amount Type
Transferred 14.04.2011
12.04.2011
47.000,00 47.000,00 QuoteActual cost
Actual cost
Actual cost
2011_1201
2011_1202
2011_1203
Transferred
Transferred
14.04.2011 3.000,00 3.000,00 Quote
100.000,00 100.000,00 Quote
2011_1202
2011_1203
150.000,00 150.000,00
Project settlementProject archive
TeamsPersons
Organisational structure
Clients/ contactsNews ticker
Vouchers
21
4
4
4
4
4
Project portfolio management is a part of multi-project management. Essentially, the goal of
project portfolio management is finding and selecting the right projects, which go to make
up the project portfolio.
Project portfolio management is geared towards a greater effectiveness of projects from an
economic point of view. Above all, though, it is about the successful implementation of
projects.
Fig. Portfolio analysis
Project portfolio functionsCreation of ad hoc scenarios
Wide-reaching filter for creating portfolios
Option to create unlimited number of portfolios
Availability of portfolio in tabular or graphic form
Possibility of exporting data to HTML, PDF or CSV
Complex project landscapes
can, with the help of portfolio
visualisation, be appraised
and assessed graphically. In
this way, a variety of questi-
ons relating to multi-project
management can be answe-
red by simply turning to the
portfolio.
�
--Quicklinks--
�
User: McRoot, Andy (271080/I)
ViewBack
Search settings:Project name:Status:Incl. archive projects:X-axis:Work:
Proj.Division:Project type:Bilable projects only:Y-axis:Currency:
Client:Priority:Access to live data:Z-axis:Display:
Portfolio
Service
Reference project
IT- Project
Internal Tasks
Proj
ect
type
Internal Project
Consulting Project
Arrangements
Agile Project
0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 5.5 6.0 6.5 7.0
Attention: In this set-up no individual projects are shown, only totals.
Status: 10.10.2011, 02:49 (max. time period 01.01.2009 - 01.01.2016)
7.5 8.0 8.5 9.0 9.5 10.0
NoC - RealisationNono. Ressourcesin PT
Sample GmbHNoNoProjekt typeEUR
NoNoNoProject durationGraphical
Release 9.0.0.109
Update Report Help
CONTROLLING PROJECTS PORTFOLIO SEARCH DETAILS
Quicklinks
Time recording
Percent complete
Vouchers
Absences
Projects
Tickets
Service assignments
Knowledge
Controlling
Releases
Management
Administration
Support
EmployeeProjects
TurnoverUtilisation
Labour cost
Client cost centre
Percent completeCosts/ Budget
Baseline
LandscapeForecastPortfolio
Budget allocation
functionS
Project portfolio
22
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
functionS
At the touch of a button, you can obtain a departmental or
company-wide overview showing the utilisation and planning of
your resources in graphic or tabular form. All projects (main and
sub-projects) can be displayed with the most important
parameter/plan/actual data, and then compared with each
other.
Controlling
Fig. Graph
Fig. Network diagram
All the data recorded in the multi-project management data
is available for detailed appraisal and reporting. The current
state of resource utilisation can be accessed in just a few
clicks.
Thanks to the integrated personal information, requirements
arising from the projects can be aligned to actual utilisation
data.
�
--Quicklinks--
�
�
�
�
�
�
�
�
�
�
���
User: McRoot, Andy (271080/I)
Grouped according to Projects
All
dat
a in
% 450
0
22.2
010
23.2
010
24.2
010
25.2
010
29.2
010
35.2
010
26.2
010
30.2
010
36.2
010
27.2
010
33.2
010
31.2
010
Plan
Stand 24.05.2011 17:34 (max time period 01.01.2010 - 01.01.2011)
37.2
010
39.2
010
28.2
010
34.2
010
32.2
010
38.2
010
40.2
010
900
Suchen
ActionBack View Update
Level 2
TotalOffi ce Move
Management /Board
Management /Board
Software productionproventis GmbH
Management /BoardManagement /Board
Project ResearchAdministration
Reports Help
CONTROLLING UTILISATION SEARCH DETAILS
Quicklinks
Time recording
Percent complete
Vouchers
Absences
Projects
Tickets
Knowledge
Controlling
Releases
Management
Administration
Support
UtilisationTurnoverClient cost centre
EmployeeProjectsReservation plans
Release 9.0.0.109
�
--Quicklinks--
�
�
�
�
�
�
�
�
�
���
�
User: McRoot, Andy (271080/I)
Grouped according to Employee-Division
All
dat
a in
%
0
53.2
010
07.2
011
19.2
011
31.2
011
40.2
011
46.2
011
04.2
011
16.2
011
28.2
011
37.2
011
11.2
011
22.2
011
34.2
011
43.2
011
49.2
011
01.2
011
14.2
011
26.2
011
09.2
011
20.2
011
32.2
011
41.2
011
47.2
011
05.2
011
17.2
011
29.2
011
38.2
011
12.2
011
23.2
011
35.2
011
44.2
011
50.2
011
02.2
011
15.2
011
27.2
011
10.2
011
21.2
011
33.2
011
42.2
011
48.2
011
06.2
011
18.2
011
30.2
011
39.2
011
13.2
011
25.2
011
24.2
011
36.2
011
45.2
011
51.2
011
52.2
011
53.2
011
01.2
012
Availability Plan
Stand 24.05.2011 17:34 max time period 01.01.2010 - 01.01.2011
300
270
240
210
180
150
110
80
50
10
Suchen
ActionBack
Release 9.0.0.109
View Update
Level 3
Total proventis GmbH
Management BoardManagement BoardAdministration
Reports Help
CONTROLLING UTILISATION SEARCH DETAILS
Quicklinks
Time recording
Percent complete
Vouchers
Absences
Projects
Tickets
Knowledge
Controlling
Releases
Management
Administration
Support
UtilisationTurnoverClient cost centre
EmployeeProjectsReservation plans
Functions within controllingReports and queries
Costs and budgets
Budgetary management
Project work-costs
Project landscapes
Employee work-costs
Work volumes
Baseline evaluations
Completion and progress evaluations
Utilisations from live or mirror data
Cost centre evaluations
Client turnover
Employee activities
Extensive, project-wide utilisation overviews
Tabular and graphic project landscape views
Various overviews from a company, project or employee
viewpoint
Projected excess work volumes
Work and remaining work progressions
Availability of various reports on the Smartphones
Blackberry Curve 8310 and Blackberry Pearl 8100
Monthly performance reports for departments, individual
release processes and their controlling
23
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
functionS
Blue Ant can be adjusted to meet your particular requirements
using web interfaces, allowing you to configure approval
workflows, create rights profiles, manage web services for
mobile applications and record master data. This greatly
expedites maintenance and reduces unnecessary administrative
work.
Administration
User interfaces100% web capability
Intuitive operation
Availability via Smartphone Blackberry Curve 8310 and
Blackberry Pearl 8100
Individualised layout of start page and many other settings
Swift data preparation through AJAX technology
Unlimited language and formatting support (Date, Time,
Duration)
Simple and expanded search with predefined search settings
User defined configuration of overviews and tables
Compressed data overview in the form of index cards
Full-picture function for complex displays
Complete adjustment for all texts, fields, etc to the
company’s language
Option to modify the corporate design of your company
Freely configurable menu entries
Rights managementUnlimited allocations for users and user groups
Option to save individual project-related rights
Option to archive/historicise rights allocations
Access rights to employee, project and controlling data
Unlimited alias user names
Increased customisingIndividual fields in the whole system
Reports tailored to individual customers using the report
generator BIRT
Configurable workflows
Master data management and translation
Individual settings per employee
Definition of templates for documents, emails, projects
and checklists
Definition of column configuration
LDAP or ActiveX configuration
SSO configuration
Project settings
Connection of report generators
24
4
4
4
4
4
4
4
4
functionS
On the basis of web services made available by us, a wide
variety of extensions (add-ons) can be devised. These add-ons
optimise and extend the use of individual functions or enable
other media such as mobile phones or MS Excel.
Add-Ons
Add-ons also available in Blue Ant:Recording of work-times in MS Excel
Transfer of data for the desired time period to Blue Ant
Work-time recording for other Blue Ant users
Feedback of completion and the remaining work of
one user with the help of a handy or PDA.
Recording of tickets on a portable terminal
Blue Ant iPhone appRecording of work-times
on available projects and
tickets.
Recording of degrees of
completion
Overview of all recorded
work-times of the account
being used
4
4
4
4
4
4
Blue Ant supports the following procedural models and norms
GPM/IPMA
ISO 69901
PMI/PMIBOK
Prince 2
V-Modell
Individual processes
Fig. Blue Ant iPhone App
Work-time recording Record work-times
Date 01.03.2011
Duration 03:20
Ticket
Project Blue Ant iPhone App
Activity Record work-times
Task Development
Comment WebServices ...
Plan: / Actual: 08:00 / 03:20
Completion 0.00
Blue Ant ? KW 8 - 2012 Save
Recorded work-times
Blue Ant on the Web
Feedback
Setting
Work-time recording on projects and tickets
o2 - de 76%08:51
Overview of work-times already recorded
Change to the web version of Blue Ant
Let us know what you think aboutthe Blue Ant iPhone
Change the setting of the "Blue Ant iPhone App"
Work-time recording Record work-times
Date 01.03.2011
Duration 03:20
Ticket
Project Blue Ant iPhone App
Activity Record work-times
Task Development
Comment WebServices ...
Plan: / Actual: 08:00 / 03:20
Completion 0.00
Blue Ant ? KW 8 - 2012 Save
Recorded work-times
Blue Ant on the Web
Feedback
Setting
Work-time recording on projects and tickets
o2 - de 76%08:51
Overview of work-times already recorded
Change to the web version of Blue Ant
Let us know what you think aboutthe Blue Ant iPhone
Change the setting of the "Blue Ant iPhone App"
25
4
4
4
4
4
4
4
4
4
4
4
4
Interfaces
As a general rule, existing systems should be integrated and
not replaced. The users tend to be accustomed to them, and
can use them to negotiate their way through the additional
possibilities offered by a project management software more
quickly. Blue Ant offers interfaces and web services, to
control external systems, or to be controlled by them.
Interface FunctionsSmartphones BlackBerry Curve 8310 and BlackBerry
Pearl 8100
Web services
Data exchange via XML
MS-Project-Interface
Import Activities via MS Excel
Transfer of data to SWOT
functionS
MS Exchange Server 2007 SPI
LDAP/ActiveDirectory link for user authentication
SSO access through open SAML and Windows Domain
Export of all data to PDF, HTML and CSV (MS Excel)
Integration of wiki, forums, web applications
Add-ons for work-time recording, ticket search and recording
and much more
Fig. Web Services
WEB SERVICESDIRECT ENTRY BLUE ANT FOREIGN ENTRY APPLICATIONS
SAP®
Microsoft Access™
Lotus Notes®
Employeedata
Lave
work-time Work-time
Project- and Resource management with Blue Ant
WEB SERVICES
WEB SERVICES
WEB SERVICES
Activity
Leave
Tickets
Microsoft Access ™ is a registered trademark of Microsoft Corporation. Lotus Notes ® is a registered trademark of IBM Corporation. SAP ® is a registered applicationTrademark of SAP Germany AG & Co. KG.
26
Blue Ant is…
...Multiple Language Compatible
...Rights and Role-Based
The Smartphone-optimised
“Mobile Cockpit” enables, among
other things access to the most
important information, whether of
a project, tickets or resources in
Blue Ant. This allows the user to
call up project-control information
on the move. This feature helps the
project leader a great deal in
speeding up the obtaining of
project-relevant information.
Access rights can be
individually controlled for
every field level and
employee.
...100% web-based
...Process-Oriented
At any time, and from any
internet-compatible compu-
ter, you have access to your
project data. This enables the
formation of virtual teams
and means work need not be
location-specific
All processes are
displayed as universal
and extensive automa-
ted workflows. The Smartphone-optimised “Mobile Cockpit” enables,
among other things access to the most important
information, whether of a project, tickets or resources
in Blue Ant. This allows the user to call up project-
control information on the move. This feature helps
the project leader a great deal in speeding up the
obtaining of project-relevant information.
With web services, data and information from external
applications can be read and restored with Blue Ant.
This way, the connection to other software solutions
and the enhancement of Blue Ant is quickly realised.
in brief...
...Mobile
...technologically open
27
the Solution to Suit you...
System Requirements Server
Operation system Windows NT / 2000 / 2003 / 2008 Server / Linux / Unix / AIX / Sun Solaris
Database System Oracle ab Version 9 / MAXDB ab Version 7.6 / MS SQL Server ab Version 2005 / Postgr SQL ab Version 8.2
Web Server Apache / Tomcat 5.5 X
Run-Time Environment Java SE Developement KIT (JDK) Version 6
Hardware (ca. 50 users) 2,6 GHZ Dual CPU or higher
80 GB hard disk or higher
4 GB RAM or higher
client
Web Browser MS Internet Explorer 7.0 onwards / Mozilla Firefox or related / Apple Safari
Monitor solutions 1.280 x 1.024 Pixel (recommended)
Blue Ant Productline
BLUE ANT STANDARD is
suitable for companies who
want completely individual
confi guration in their project
management system.
The expansive BLUE ANT
ENTERPRISE solution is
suitable for businesses and
concerns whose main focus is
on smooth integration into
their company‘s existing
IT-infrastructure.
Blue Ant as an SAAS-Solution
is suitable for companies
who are interested in renting
rather than buying, but who
don‘t want to forgo the all-
inclusive service.
BLUE ANT EXPRESS represents
an entry-level solution for
smaller outfi ts and concerns,
who are looking for an
inexpensive but functionally
wide-ranging approach to
project management.
eXPreSS Standard enterPriSe SaaS
Blue Ant Modules
Master Data Administration
Administration of User Privileges
Confi guration via Web
Multi-language Feature
Interfaces
Customizations / Additional Modules
Solution Pilot Phase
4
4
4
4
4
MS Project Synchronization
Web Services
LDAP
SSO
MS Exchange