1
10575 2 BEDROOM 6640 1 BEDROOM 2 BEDROOM 2 BEDROOM 10575 10575 21075 1500 2475 2475 2475 2475 2475 3150 4315 675 675 675 675 675 675 25185 First Floor 38.825 Second Floor 42.650 Third Floor 45.800 Fouth Floor 48.950 Fifth Floor 52.100 Sixth Floor 55.250 Roof 58.400 Ground Floor 34.500 BLOCK C - VIEW 4B BLOCK C - VIEW 4A ANGLE CHANGE Roof Access 61.550 Parapet 59.900 2-BED 2-BED 7995 7995 BLOCK C - VIEW 3 1500 2475 2475 2475 2475 2475 3150 675 675 675 675 675 675 3825 3150 3150 3150 3150 3150 First Floor 38.825 Second Floor 42.650 Third Floor 45.800 Fouth Floor 48.950 Fifth Floor 52.100 Sixth Floor 55.250 Roof 58.400 Roof Access 61.550 21075 Parapet 59.900 C D B A E 4A 4B 3 2A 2B 1 C BLOCK C - SOUTH ELEVATION 3 BLOCK C - EAST ELEVATION 4 KEY PLANS 1 : 200 Proposed Elevations - Block C - 3, 4, 5 P19-007D P19-007D_3.2_205 Planning Planning Ballymore RCP Development Services Limited PJC December 2019 DO NOT SCALE FROM THIS DRAWING. USE FIGURED DIMENSIONS IN ALL CASES. VERIFY DIMENSIONS ON SITE AND REPORT ANY DISCREPANCIES TO THE ARCHITECTS IMMEDIATELY. THIS DRAWING TO BE READ IN CONJUNCTION WITH THE ARCHITECTS SPECIFICATION. © THIS DRAWING IS COPYRIGHT AND MAY ONLY BE REPRODUCED WITH THE ARCHITECTS PERMISSION. Notes: Drawing Notes: E: [email protected] W: www.reddyarchitecture.com Reddy Architecture + Urbanism T: +353 (0)1 4987000 Dartry Mills, Dartry Road Dublin 6, D06 Y0E3. Drawing Title: Job No Date Scale@A1 Status Drawing Number Revision Purpose Project Details: Client Details: Drawn By: Checked By: A1 Landscape AL Rev Date DRN Description P1 Rev Date DRN Description NOTE: ELEVATIONS HAVE BEEN PROJECTED WITH ANGLED FACES FLAT SEE KEY PLAN NOTE: SELECTED INFILL METAL RAINSCREEN PANELS TO PUBLIC FACES OF BLOCK - SELECTED INFILL RENDER/CEMENT BOARD PANELS TO COURTYARD SPACES. 1 4 3 5 1 4 5 DEC 2019 PJC P1 PLANNING ISSUE 1. EXPRESSED SELECTED BRICK PANEL WITH INSET PPC METAL RAINSCREEN PANEL 2. EXPRESSED SELECTED BRICK PANEL WITH INSET RENDER/FIBER CEMENT BOARD PANEL 3. EXPRESSED SELECTED BRICK PANEL WITH INSET PPC VERTICAL METAL SCREEN/RAILING SYSTEM 4. CANTILEVERED BALCONY PPC VERTICAL RAILING CONTRASTING METAL PPC SOFIT 5. SELECTED PPC ALUMINIUM WINDOW AND DOOR SYSTEM 6. DEEP FRAME/REVEAL PPC ALUMINIMUM WINDOW SYSTEM WITH PROTRUDING FIN MOTIF 7. CANTILEVERED ENTRANCE CANOPY PPC METAL & GLASS 8. GREEN WALL 9. WINTER GARDEN BALCONY AGREED RED BRICK AGREED BLUE BRICK AGREED BLONDE BRICK BRICK LEGEND: BLOCK C - EAST ELEVATION - TYPICAL MATERIAL TREATMENT 5 Royal Canal Park Phase IV The Former Ormond Printworks, Ratoath Rd., Dublin 11 D11 HY83

Transcript of BLOCK C- 3 4...3 2A2B 1 C BLOCK C - SOUTH ELEVATION 3 BLOCK C - EAST ELEVATION 4 KEY PLANS 1 : 200...

Page 1: BLOCK C- 3 4...3 2A2B 1 C BLOCK C - SOUTH ELEVATION 3 BLOCK C - EAST ELEVATION 4 KEY PLANS 1 : 200 Proposed Elevations - Block C - 3, 4, 5 P19-007D P19-007D_3.2_205 Planning Planning

10575

2 BEDROOM

6640

1 BEDROOM 2 BEDROOM 2 BEDROOM

10575 10575

21075

1500

2475

2475

2475

2475

2475

3150

4315

675

675

675

675

675

675

25185

First Floor

38.825

Second Floor

42.650

Third Floor

45.800

Fouth Floor

48.950

Fifth Floor

52.100

Sixth Floor

55.250

Roof

58.400

Ground Floor

34.500

BLOCK C - VIEW 4B BLOCK C - VIEW 4A

AN

GL

E C

HA

NG

E

Roof Access

61.550

Parapet

59.900

2-BED 2-BED

7995 7995

BLOCK C - VIEW 3

1500

2475

2475

2475

2475

2475

3150

675

675

675

675

675

675

3825

3150

3150

3150

3150

3150

First Floor

38.825

Second Floor

42.650

Third Floor

45.800

Fouth Floor

48.950

Fifth Floor

52.100

Sixth Floor

55.250

Roof

58.400

Roof Access

61.550

21075

Parapet

59.900

C

D

B

A

E

4A

4B

3

2A

2B

1

C

BLOCK C - SOUTH ELEVATION3 BLOCK C - EAST ELEVATION4

KEY PLANS

1 : 200

Proposed Elevations - Block C - 3, 4, 5

P19-007D

P19-007D_3.2_205

Planning

Planning

Ballymore RCP Development Services Limited

PJC

December 2019

DO NOT SCALE FROM THIS DRAWING. USE FIGURED DIMENSIONS IN ALL CASES.VERIFY DIMENSIONS ON SITE AND REPORT ANY DISCREPANCIES TO THE

ARCHITECTS IMMEDIATELY. THIS DRAWING TO BE READ IN CONJUNCTION WITHTHE ARCHITECTS SPECIFICATION. © THIS DRAWING IS COPYRIGHT AND MAY

ONLY BE REPRODUCED WITH THE ARCHITECTS PERMISSION.

Notes:

Drawing Notes:

E: [email protected]: www.reddyarchitecture.com

Reddy Architecture + Urbanism

T: +353 (0)1 4987000

Dartry Mills,Dartry RoadDublin 6, D06 Y0E3.

Drawing Title:

Job No Date Scale@A1

Status

Drawing Number Revision

Purpose

Project Details:

Client Details:

Drawn By:

Checked By:

A1 Landscape

AL

Rev Date DRN Description

P1

Rev Date DRN Description

NOTE: ELEVATIONS HAVE BEEN PROJECTED WITH ANGLEDFACES FLAT SEE KEY PLAN

NOTE: SELECTED INFILL METAL RAINSCREEN PANELS TO PUBLICFACES OF BLOCK - SELECTED INFILL RENDER/CEMENT BOARDPANELS TO COURTYARD SPACES.

1

4

3

5

1

4

5

DEC 2019 PJCP1PLANNING ISSUE

1. EXPRESSED SELECTED BRICK PANEL WITH INSET PPC METAL RAINSCREEN PANEL

2. EXPRESSED SELECTED BRICK PANEL WITH INSET RENDER/FIBER CEMENT BOARD PANEL

3. EXPRESSED SELECTED BRICK PANEL WITH INSET PPC VERTICAL METAL SCREEN/RAILING SYSTEM

4. CANTILEVERED BALCONY PPC VERTICAL RAILING CONTRASTING METAL PPC SOFIT

5. SELECTED PPC ALUMINIUM WINDOW AND DOOR SYSTEM6. DEEP FRAME/REVEAL PPC ALUMINIMUM WINDOW SYSTEM WITH PROTRUDING FIN MOTIF7. CANTILEVERED ENTRANCE CANOPY PPC METAL & GLASS8. GREEN WALL9. WINTER GARDEN BALCONY

AGREED RED BRICK

AGREED BLUE BRICK

AGREED BLONDE BRICK

BRICK LEGEND:

BLOCK C - EAST ELEVATION - TYPICAL MATERIAL TREATMENT5

Royal Canal Park Phase IVThe Former Ormond Printworks,Ratoath Rd.,Dublin 11 D11 HY83