ZFP_IND CALCULATION FORMAT file:///tt/file_convert/544b36f0b1af9f76478b4954/document.xls
3.4 BLAST LOAD
Reference: SAES-M-009 - Design Criteria for Blast Resistant Buildings Design of Blast Resistant Buildings in Petrochemical Facilities, ASCE
As per Final Building Risk Assesment Study Report - reference letter LP/TSU-036-2006 dated August 30, 2006.
Peak side-on overpressur = 1.40 psi & 67.7 ms = ### sec
m
PR
OP
OS
ED
SU
BS
TA
TIO
N
7.2
00
NO
RTH
m6
.65
H =
L = ### m
FGL TOC
SECTION A - A m PROPOSED SUBSTATION
10
.72
A A
B =
PLAN
BLAST FORCE
Reference :ASCE Report 97; Design of Blast Resistant Buildings in Petrochemical Plants
Building size : = 70.00 m = 229.60 ftWidth B = 10.72 m = 35.16 ftHeightH = 7.20 m = 23.62 ft
CALCULATION SHEETDESCRIPTION: SUBSTATION - UGOSP 7 AND UGOSP 8 BI No.
REPLACE ELECTRICAL EQUIPMENT AT 5 SOUTHERN GOSPsBI-10-00241
Saudi Arabia
PSO duration, td =
Length L
ZFP_IND CALCULATION FORMAT file:///tt/file_convert/544b36f0b1af9f76478b4954/document.xls
DESIGNED: CHECKED: APPROVED: SHEET NO.: DATE:
ZUHAIR FAYEZ PARTNERSHIP CONSULTANTS NTP JAMA AZJ 1 of 1 APRIL 2007NTP
BLAST LOAD
Reference: SAES-M-009 - Design Criteria for Blast Resistant Buildings Design of Blast Resistant Buildings in Petrochemical Facilities, ASCE
As per Final Building Risk Assesment Study Report - reference letter LP/TSU-036-2006 dated August 30, 2006.
Peak side-on overpressur = 1.40 psi & 67.7 ms = ### sec
m
PR
OP
OS
ED
SU
BS
TA
TIO
N
NO
RTH
7.2
00
m6
.65
H =
L = ### m
m
FGL TOC
10
.72
B = PROPOSED SUBSTATION
SECTION A - AA
A
PLAN
BLAST FORCE
Reference :ASCE Report 97; Design of Blast Resistant Buildings in Petrochemical Plants
Building size : = 70.00 m = 229.60 ftWidth B = 10.72 m = 35.16 ftHeightH = 7.20 m = 23.62 ft
CALCULATION SHEETDESCRIPTION: SUBSTATION - UGOSP 7 AND UGOSP 8 BI No.
PSO duration, td =
Length L
ZFP_IND CALCULATION FORMAT file:///tt/file_convert/544b36f0b1af9f76478b4954/document.xls
REPLACE ELECTRICAL EQUIPMENT AT 5 SOUTHERN GOSPsBI-10-00241
Saudi Arabia
DESIGNED: CHECKED: APPROVED: SHEET NO.: DATE:
ZUHAIR FAYEZ PARTNERSHIP CONSULTANTSNTP JAMA AZJ 1 of 3 APRIL 2007
NTP
Blast Loading:
Pso = 1.40 psi and = 0.068 sec
shock front velocity, U = 1130 ( 1 + 0.058 Pso )^0.5 ft/sec ………………….eq. 3.5= 1174.983 ft/sec= U * td = 79.5 ft ………………….eq. 3.6
peak dynamic wind pressure, = = 0.0431 psi ………………….eq. 3.4
a) Front wall loading :
The front wall is assumed to span vertically from foundation to roof. The design will be for a typical
wall segment of one foot width.
reflected overpressure, Pr = ………………………eq 3.2 & 3.3= 2.8980 psi = 19.982 kn/sqm
= = 17.58 ft. ………………Section 3.5.1
reflected overpressure clering time, = 3 (S / U) < ………………….eq. 3.8= 0.045 < ###
drag coefficient, Cd = 1.00 ………………Section 3.3.3stagnation pressure, Ps = = 0.043 psi ………………….eq. 3.7front wall impulse, Iw = + ………………….eq. 3.9
= 0.066 psi-sec
effective duration, = 2 Iw / Pr = 0.045 sec ………………….eq. 3.10
b) Side wall loading :
The side wall is the same as the front wall, spanning vertically from foundation to roof.
This calculation will be for a wall segment ( L1), 1 foot wide.
Drag coefficient, Cd = -0.4 ……...…………. section 3.3.3
Equivalent load coefficient,Lw / L1 = 35.16 ∕ 1.00 = 35.16Reduction factor, Ce = 0.95 ………………………. Fig. 3.9 for above Lw / S value
= 1.00
= ………….…eq 3.11= 1.383 psi = 9.534 kn/sqm
= L1/U = 0.001 sec (negligble) …………………………figure 3.8
= 0.068 sec
td
length of pressure wave,Lw
qo 0.022 ( Pso)2
[ 2+0.05(PSO)] PSO
clearing distance, S minimum of H or B/2
tc td
Pso + Cd (qo)0.5 ( Pr - Ps ) tc 0.5Ps*td
te
however, use Ce
Equivalent Peak Overpressure, Pa Ce PSO + Cd qo
rise time, tr
time of duration, td
ZFP_IND CALCULATION FORMAT file:///tt/file_convert/544b36f0b1af9f76478b4954/document.xls
CALCULATION SHEETDESCRIPTION: SUBSTATION - UGOSP 7 AND UGOSP 8 BI No.
REPLACE ELECTRICAL EQUIPMENT AT 5 SOUTHERN GOSPsBI-10-00241
Saudi Arabia
DESIGNED: CHECKED: APPROVED: SHEET NO.: DATE:
ZUHAIR FAYEZ PARTNERSHIP CONSULTANTS NTP JAMA AZJ 2 of 3 APRIL 2007asimksen
c) Roof loading :The roof is a slab spanning between roof beams. For the design of the roof, a section 1 foot
wide by span of the slab will be used.
= 35.16 ft
= -0.4 …...…………. section 3.3.3
Equivalent load coefficientLw / S = 35.16 ∕ 1.00 = 35.162 ………………. Figure 3.9
Reduction factor, Ce = 0.95 ………………………. Fig. 3.9 for above Lw / S value= 1.00
= ……………………… eq 3.11= 1.383 psi = 9.534 kn/sqm
= L1/U = 0.030 sec …………………………figure 3.8
= 0.068 sec
= = 0.098 sec
b) Rear wall loading :
The rear wall also spanning vertically from foundation to roof. The analysis will be for a wall
segment of 1 foot wide.
Drag coefficient, Cd = -0.4 ……………………………section 3.3.3
Equivalent load coefficientLw / S = 21.81 ∕ 1.00 = 21.812Reduction factor, Ce = 0.95 ………………………. Fig. 3.9 for above Lw / S value
= 1.00
= ………………………eq 3.11= 1.383 psi = 9.534 kn/sqm
time of arrival = L / U = 0.195 sec …………………………figure 3.8
rise time, ( TM 5-1300 criteria ) tr = S / U = ### sec …………………………page 3-22
= 0.068 sec
= = 0.083 sec
span of the slab, L1
drag coefficient, Cd
however, use Ce
Equivalent Peak Overpressure, Pa Ce PSO + Cd qo
rise time, tr
time of duration, td
total positive phase duration, to tr + td
however, use Ce
Equivalent Peak Overpressure, Pb Ce PSO + Cd qo
ta
time of duration, td
total positive phase duration, to tr + td
ZFP_IND CALCULATION FORMAT file:///tt/file_convert/544b36f0b1af9f76478b4954/document.xls
CALCULATION SHEETDESCRIPTION: SUBSTATION - UGOSP 7 AND UGOSP 8 BI No.
REPLACE ELECTRICAL EQUIPMENT AT 5 SOUTHERN GOSPsBI-10-00241
Saudi Arabia
DESIGNED: CHECKED: APPROVED: SHEET NO.: DATE:
ZUHAIR FAYEZ PARTNERSHIP CONSULTANTSNTP JAMA AZJ 3 of 3 APRIL 2007