BIOTECH SUPPLYBIOTECH SUPPLYBIOTECH SUPPLYBIOTECH SUPPLYOctober 8-9, 2012
Crowne Plaza, Foster City, CA
There is more project at the end of the money!
Matt Blume, GMCatalent Pharma Solutions
• Global Phase III Clinical Trial– 36 Countries– 3000 Patients– 200 Sites– 30 Languages – Regional Booklets– Multiple Arms– Limited Drug Availability– Possible Compassionate Extension– Dose Adjustments– Country list may change– Internal Pressure for accelerated FPI Date
04/21/23 2
STRESS!
–Main focus on supply and clinic start date–Total returned goods budget through 2016?
04/21/23 3
Objectives
Presentation Goals:– Increase awareness of changing trial contract
environment– Examples where early communication would have
changed outcomes– Take-away list of items to consider– Save everyone at least one headache on a future trial
04/21/23 4
Contract Environment
Traditional Model:
04/21/23 5
Sponsor Company
Estimated Contract
Packaging and Distribution
Vendor
Contract Environment
New Model:
04/21/23 6
Sponsor Company
All –InclusiveContract
Clinical Research
Organization
Packaging and Distribution
Vendor
Exact PO
Real Example
Clinical Trial Shipping To Global Depots•Total contract courier estimate of ~$500k for life of 3 year contract•Multiple shipments to Ukraine•Duties and Taxes were approximately $50k per shipment•Duties and Taxes not included in original budget, drove total courier cost for study over $1M•Headache for sponsor, CRO, and Distributor
04/21/23 7
Real Example
Mid-Sized phase 2 trial with 40 sites and 400pts•24 month trial duration – Storage and Distribution Only•Original estimate averaged 5 pallets/month of storage for study•Kit size much larger than assumption, received 45 pallets several months into study•Number of shipments was also higher than estimated•Drove increased storage, distribution (Controlled Ambient), freight and returns costs•Total budget increased from ~$76k to ~$450k
04/21/23 8
Items to Consider
What is the purpose of the budget internally?•Rough estimate based on current assumptions•Precise forward calculation of total spend for the trial
Let the above answer drive the amount of rigor put into the original contract•Multiple versions are good!•Good idea to have team meetings to build, and three-way meetings if there are multiple contract holders
04/21/23 9
Take-Away List of Specifics
Storage and Receipt:•Ensure the number of items / size of those items are accurate
– How many items will fit on a pallet?
– If cold-chain, what is the exact size of the location the items will be stored in and how many will fit?
•Will there be one large shipment of supplies to vendor, or could it possibly be split into multiple shipments
•If finished, shippable kits are sent, are they be split up by treatment group or blended together
•Do a “reality-check” shortly after initial receipt.
04/21/23 10
Take-Away List of Specifics
Packaging and Labeling:•Usually the most visible and defined portion of contracts. Variations to scope are easily identified
•Booklet Labels– Small Changes in design or ordering approach can greatly alter cost
– Best approach is an actual quote from booklet vendor for best-guess design rather than a placeholder estimate
•Unit Dose Cards– Best to receive actual quote rather than placeholder
04/21/23 11
Take-Away List of Specifics
Distribution:•What is the planned shipping strategy? Ensure that the plan matches IxR system.
– Number of items sent per shipment
– Size of the shipper and estimated freight
– Number of planned shipments per site
– Initial order size vs resupply size
– Especially important with controlled temperature studies
•Example:– Small CRT study with large kits. One kit fit in a large (~50lb) shipper.
Shipping plan was 2-3 kits per shipment, but IVR was set for 14 kit seed orders.
– Changed to specialty courier to unload / take away boxes – Increased cost by ~$20k for study.
04/21/23 12
Take-Away List of Specifics
Distribution (Cont):•International Studies
– Bulk Shipments to Depot – Same size, or varying quantities?
– Pallets vs. Large shippers
– Freight estimates
– Estimated taxes and duties
– Specialty courier quotes better than estimates – current fuel surcharges and assumptions
– Approximate duration of shipment – appropriate shippers (48hr vs 72hr)
04/21/23 13
Questions
Q & A