BIOMASS HEATING for · manufacturered ETA and Herz Biomass Boilers so you can be sure of excellent...

16
100% RHI Application Success BIOMASS HEATING for Farms & Country Estates www . lphillips .co.uk

Transcript of BIOMASS HEATING for · manufacturered ETA and Herz Biomass Boilers so you can be sure of excellent...

Page 1: BIOMASS HEATING for · manufacturered ETA and Herz Biomass Boilers so you can be sure of excellent quality. Operating efficiencies of over 90% With heating and hot water representing

100%RHI

Application Success

BIOMASS HEATING for

Farms & Country Estates

www . l p h i l l i p s .co.uk

Page 2: BIOMASS HEATING for · manufacturered ETA and Herz Biomass Boilers so you can be sure of excellent quality. Operating efficiencies of over 90% With heating and hot water representing

2

TAkE cONTrOl Of yOur HEATING cOSTS

Generate an income

via Renewable Heat Incentive

Efficient, low carbon

heating

70%less expensive

than otherenergy

Budgeting control of your

costs

Move away from

conventional, expensive and

damaging fossil fuels

How could it work for you?Estate owners and farmers are moving towards biomass heating in order to benefit from hugely reduced fuel costs for their properties. In addition, they can gain extra income from the Government’s RHI

and also contribute to overall carbon savings.

Modern biomass systems work in a comparable way to traditional

oil or gas-fuelled systems but instead use pellet or wood chip

sourced from sustainable forestry plantations.

At J L Phillips Renewable Energy Ltd, we only use Austrian-manufacturered ETA and Herz Biomass Boilers so you can be sure of

excellent quality.

Operating efficiencies of over 90%

With heating and hot water representing by far the biggest

energy demand on any property, it makes sense to

ensure you take advantage of biomass heating.

You take control of your heating costs with the added

benefit of reducing your carbon footprint.

Biomass benefits include:

Page 3: BIOMASS HEATING for · manufacturered ETA and Herz Biomass Boilers so you can be sure of excellent quality. Operating efficiencies of over 90% With heating and hot water representing

3

rHI TArrIffS

TArIff NAME ElIGIBlE TEcHNOlOGy BOIlEr SIZE TIEr TArIffS

Small commercial biomass

Solid biomass including solid biomass contained in waste

less than 200kW TIEr 1 4.40 pence

TIEr 2 1.17 pence

Medium commercial biomass

200kW to 999kW TIEr 1 5.1 pence

TIEr 2 2.2 pence

large commercial biomass

1,000kW and above N/A 2 pence

SuBjEcT TO quArTErly rEvIEW

NET cOST Of HEAT (pEr kWH)

2.1 pence 3.2 pence 3.5 pence 6 pence 8 pence 12 pence

Home produced wood chip

Bought in wood chip

Natural Gas Oil LPG Electricity

@ £60 per tonne to produce

@ £90 per tonne @ 70 pence per litre

@ 60 pence per litre

rENEWABlE HEAT INcENTIvE (rHI) BENEfITS

The Renewable Heat Incentive (RHI) was introduced in 2012 to encourage the use of renewable energy sources such as biomass. The incentive offers payments based on the kWhs of heat

provided by your biomass system and so represents an excellent return on your investment.

BIOMASS v. fOSSIl fuElSAlong with reducing your carbon footprint, the savings on heating costs when

transferring to renewable energy such as biomass can be huge.

GET pAIDto heat with

biomass

Page 4: BIOMASS HEATING for · manufacturered ETA and Herz Biomass Boilers so you can be sure of excellent quality. Operating efficiencies of over 90% With heating and hot water representing

4

BIOMASS fo r cOuNTry ESTATES & fArMS

Farms & Country Estates are typically of a large scale and poorly insulated, making them very costly to heat. Many also have the option of providing their own fuel meaning they

are the ideal candidate for a biomass heating solution.

Most customers need a solution which is going to replace an aging and expensive oil or gas system. A biomass installation will provide you with a central heating hub which can heat, monitor and control the distribution of heat to numerous buildings, with the potential to

turn a previously large expense into a reliable income stream.

TypIcAl SAvINGS & ANNuAl INcOME frOM A BIOMASS INSTAllATION

large country Estate

Boiler Size:

130kW

previous Oil usage:

18,634L

Wood fuel consumption:

53 tonnes

Biomass Installation cost:

£88,000.00

Annual rHI income: £11,615.00

fuel Savings: £5,635.00

payback Time: 5 years

farm

Boiler Size:

199kW

previous Oil usage:

30,500L

Wood chip fuel consumption:

79 tonnes

Biomass Installation cost:

£102,000.00

Annual rHI income: £17,916.00

fuel Savings: £9,200.00

payback Time: 4 years

poultry farm

Boiler Size:

199kW

previous lpG usage:

34,615L

Wood pellet fuel consumption:

66 tonnes

Biomass Installation cost:

£90,000.00

Annual rHI income: £18,474.30

fuel Savings: £7,158.00

payback Time: Less than 4 years

ANNuAl INcOME£17,250

ANNuAl INcOME£27,116

ANNuAl INcOME£25,632

Page 5: BIOMASS HEATING for · manufacturered ETA and Herz Biomass Boilers so you can be sure of excellent quality. Operating efficiencies of over 90% With heating and hot water representing

5

prEvIOuS INSTAllATIONS

ABOuTj l pHIllIpS

Douglas

CardiffSwansea

Perth

Lerwick

Dundee

Kirkwall

Wick

Fort William

Aberdeen

Inverness

Edinburgh

Glasgow

Dumfries

Ayr

Greenock

DoverSouthampton

Bournemouth

Portsmouth

Bristol Bath

Norwich

Reading

OxfordLuton

Ipswich

Cambridge

SunderlandCarlisle

Newcastle

Middlesbrough

Scarborough

Kingston-upon-Hull

Liverpool

Chester

Stoke

Sheffield

Manchester

Leeds

York

BradfordBlackpool

Birmingham

Nottingham

Coventry

Peterborough

Leicester

Southend

BrightonExeter

Penzance

Plymouth

St. Helier

St. Peter Port

THE INSTAllATION prOcESS

Initial contact

Stage 1. project assessment to produce outline design and quotation

Stage 2. project development approval,

technical survey and design sign off

Stage 3. client sign off, procure material,

on site work commences

Stage 4. commissioning and handover

to the customer

Stage 5. rHI application confirmation, handover to servicing team

J L Phillips Renewable Energy are biomass design, installation and commissioning specialists offering a complete solution to your renewable energy needs.

We have successfully designed and installed over 250 projects across Nottinghamshire, Lincolnshire,

Leicestershire & Yorkshire. We also specialise in Renewable Heat Incentive (RHI) support and are able to advise on finance solutions. We provide a

complete service which includes designing, building and installing biomass heating systems as well as

service and maintenance packages. As an advanced partner for Herz and ETA, we also provide pre-

commissioning and commissioning services for systems installed by other companies.

We have designed, installed & commissioned projects from small district heating schemes to castles, hotels & schools. Our extensive experience & innovative

designs ensure high quality installations which successfully and reliably meet the required energy

demand.

Over250

installations

Page 6: BIOMASS HEATING for · manufacturered ETA and Herz Biomass Boilers so you can be sure of excellent quality. Operating efficiencies of over 90% With heating and hot water representing

6

j l pHIllIpS rENEWABlE ENErGy cASE STuDIES

We have completed over 250 successful installations providing farms & country estates with large annual fuel savings and an impressive RHI income.

WHETSTONE pASTurES fArM & ScHOOl (Large Farm, House,Workshop & School)

prEvIOuS fuEl SOurcE: Oil Fired Boiler

BOIlEr: Herz Firematic 199kW

fuEl TypE: Wood Pellet

cO2 SAvINGS pEr yEAr: 60.8 tonne

fuEl SAvING pEr ANNuM: £10,804.02

prOjEcTED rHI pAyMENT pEr ANNuM: £21,964.00

prOjEcTED pAyBAck TIME: 6 years

BElMOuNT HOuSE (Large Farm House,

Office Block & 2 Other Properties)

prEvIOuS fuEl SOurcE: Oil Fired Boiler

BOIlEr: ETA 90 PEK

fuEl TypE: Wood Pellet

cO2 SAvINGS pEr yEAr: 29.5 tonnes

fuEl SAvING pEr ANNuM: £3,540.00

prOjEcTED rHI pAyMENT pEr ANNuM: £10,783.00

prOjEcTED pAyBAck TIME: 6 years

ANNuAl INcOME£32,768

ANNuAl INcOME£14,323

Page 7: BIOMASS HEATING for · manufacturered ETA and Herz Biomass Boilers so you can be sure of excellent quality. Operating efficiencies of over 90% With heating and hot water representing

7

prEvIOuS fuEl SOurcE: Oil Fired Boiler

BOIlEr: Herz Firematic 199kW (Hall)

Herz 130kW Firematic

(Stable block)

fuEl TypE: Willow

cO2 SAvINGS pEr yEAr: 100 tonnes

fuEl SAvING pEr ANNuM: £17,000.00 (estimated)

prOjEcTED rHI pAyMENT pEr ANNuM: £32,955.00

prOjEcTED pAyBAck TIME: 6 years

rENISHAW HAll (Large Country Estate & Office Block)

ANNuAl INcOME£49,955

Page 8: BIOMASS HEATING for · manufacturered ETA and Herz Biomass Boilers so you can be sure of excellent quality. Operating efficiencies of over 90% With heating and hot water representing

8

prEvIOuS fuEl SOurcE: Fuel oil

BOIlEr: 2 x ETA 35kW PEK

fuEl TypE: Wood Pellet

cO2 SAvINGS pEr yEAr: 34.5 tonnes

fuEl SAvING pEr ANNuM: £3,732.00

prOjEcTED rHI pAyMENT pEr ANNuM: £16,256.00

prOjEcTED pAyBAck TIME: 4 years

prEvIOuS fuEl SOurcE: Electric

BOIlEr: ETA 90PEK

fuEl TypE: Wood Pellet

cO2 SAvINGS pEr yEAr: 29 tonnes

fuEl SAvING pEr ANNuM: £3,536.00

prOjEcTED rHI pAyMENT pEr ANNuM: £10,735.00

prOjEcTED pAyBAck TIME: 5 years

lANGfOrDHAll

(Large Country Estate)

pArk fArM(Farm House and Nursery)

ANNuAl INcOME£19,988

ANNuAl INcOME£14,271

Page 9: BIOMASS HEATING for · manufacturered ETA and Herz Biomass Boilers so you can be sure of excellent quality. Operating efficiencies of over 90% With heating and hot water representing

9

prEvIOuS fuEl SOurcE: LPG

BOIlEr: Herz 199kW Firematic

fuEl TypE: Pellet Silo

cO2 SAvINGS pEr yEAr: 54 tonnes

fuEl SAvING pEr ANNuM: £11,508.04

prOjEcTED rHI pAyMENT pEr ANNuM: £18,474.30

prOjEcTED pAyBAck TIME: 4 years

MIll fArM pOulTry SITE (6 Poultry Sheds)

ANNuAl INcOME£29,982

Page 10: BIOMASS HEATING for · manufacturered ETA and Herz Biomass Boilers so you can be sure of excellent quality. Operating efficiencies of over 90% With heating and hot water representing

10

prEvIOuS fuEl SOurcE: Fuel oil and logs

BOIlEr: ETA 199Hack

fuEl TypE: Locally sourced woodchip

cO2 SAvINGS pEr yEAr: 79 tonnes

fuEl SAvING pEr ANNuM: £3,800.00

prOjEcTED rHI pAyMENT pEr ANNuM: £24,320.00

prOjEcTED pAyBAck TIME: 5 years

NOrTON plAcE (Hall, Office Block & 2 Other Properties)

ANNuAl INcOME£28,120

Page 11: BIOMASS HEATING for · manufacturered ETA and Herz Biomass Boilers so you can be sure of excellent quality. Operating efficiencies of over 90% With heating and hot water representing

11

j l pHIllIpSrENEWABlE ENErGy HEAT cABINS

Don’t have a suitable fuel store? Don’t worry!

We can provide you with fully equipped and ready to install heat cabins designed

specifically for your requirements.

These heat cabins are the ideal and convenient way of installing a biomass

heating system and can be used on most projects.

Page 12: BIOMASS HEATING for · manufacturered ETA and Herz Biomass Boilers so you can be sure of excellent quality. Operating efficiencies of over 90% With heating and hot water representing

12

DISTrIcT HEATING A district heating scheme allows farms and estates to link their biomass heating system across several properties or buildings. Underground insulated pipework provides these links and the biomass system can

be configured to allow individual properties to be metered and billed separately.

This form of network would work perfectly for offices,

poultry sheds, swimming pools or any other building which

requires a heat source.

Page 13: BIOMASS HEATING for · manufacturered ETA and Herz Biomass Boilers so you can be sure of excellent quality. Operating efficiencies of over 90% With heating and hot water representing

13

EScOs &fINANcING

EScOs – fully fuNDED OpTIONS

If you are interested in biomass but don’t feel able to raise the capital investment necessary then we can help with a fully financed ESCo (Energy Services Company) solution. If you opt for an ESCo model then we

provide a fully managed service through our Service Plan. You receive the cost savings and environmental benefits against other fuels and pay an agreed amount for heat per kWh, billed on a quarterly basis. The

biomass boiler and associated equipment remains the property of J L Phillips who retain the RHI payments.

We have a reputationfor improving systems

which are not performingto capacity.

If you are interested in biomass but don’t feel able to raise the capital

investment necessary then we can help with a fully

financed ESCo.

lOANS & cApITAl fINANcING

Lombard are an asset specialist finance provider who will give support for capital investment on biomass heat projects. J L Phillips Renewable

Energy Ltd are an approved supplier of Lombard’s and will direct you through the process which is most appropriate for you.

BENEfITS Of AN EScO

Fuel saving cost on existing heating systemNo installation cost

Full service and maintenance plan at no costIncrease efficiency on CO2 levels

If yOu HAvE A BIOMASS BOIlEr AlrEADy INSTAllED

We are frequently asked to take over biomass boilers which are already installed and we have a reputation for improving systems which are not performing to capacity. Our service plan is also available on these boilers

subject to a comprehensive initial survey.

To discuss an ESCo or Service Plan Project in more detail please contact us on 01636 642790

www . l p h i l l i p s .co.uk

Page 14: BIOMASS HEATING for · manufacturered ETA and Herz Biomass Boilers so you can be sure of excellent quality. Operating efficiencies of over 90% With heating and hot water representing

14

Following installation of your Biomass Heating System, we recommendyou choose one of our service and maintenance packages. Regular service and maintenance is essential to

ensure your boiler is running as efficiently as possible and providing you with the best possible return.

WE WIll SErvIcE AND MAINTAIN ANy SIZE BIOMASS HEATING SySTEMS frOM 20kW+

fIxED ANNuAl SErvIcE fEE

full SErvIcE AND MAINTENANcE plAN ON AN OpTIONAl DIrEcT DEBIT BASIS

Our ExpErIENcED ENGINEErS SpEcIAlISE IN fAulT fINDING GIvING yOu

THE pEAcE Of MIND, THAT SHOulD ANy prOBlEMS ArISE WE WIll BE

ABlE TO rEcTIfy THEM quIckly AND EffIcIENTly

SErvIcE & MAINTENANcE

plANS AvAIlABlE

EMAIlin fo@ lphi l l ips.co.uk

WEBSITEwww. lphi l l ips.co.uk

SErvIcE & MAINTENANcE

Page 15: BIOMASS HEATING for · manufacturered ETA and Herz Biomass Boilers so you can be sure of excellent quality. Operating efficiencies of over 90% With heating and hot water representing

15

“The installation went as planned and the workmanship within the property and

the boiler room was to a high standard. The difference between the old storage heaters and the new radiator system is incredible. I would

recommend J L Phillips and the ETA boiler, I have placed an order for a larger system to be installed

at the Hall” – Mr Duguid 90kW and 199kW ETA Hack

“The installation and commitment to on-going support convinced me to use J L Phillips for my

biomass installation which is working well and heating the building efficiently” – Mr J Harrison

40kW Herz Log and 150 kW Herz Firematic

“We heard about JL Phillips by word of mouth and used them to install 2 small commercial

boilers, we were very satisfied with the results and continued to use them on the larger projects.” –

Mr P W Davies 2 x 30kW ETA Hack, 1 x ETA 90kW ETA Hack, 1 x 150kW Herz Firematic

“I would recommend J L Phillips and the ETA boiler to anybody who has a high oil usage,

the installation of the two boilers working together was difficult to achieve, but works well.

We are now receiving our domestic RHI. Thanks Jason and the team” – R M Manby 2 x 35kW

ETA PEK

“The Project was installed over an eight- week period to enable the chicken shed to be cleared of stock and the new heating fan units to be installed. J L Phillips coordinated the project to a successful conclusion. We are very pleased with the results and are looking forward to our first RHI payment.” – Mr Santos 300kW Herz Firematic

“J L Phillips were recommended to us by the boiler manufacturer, we have now had 36 199kW Herz boilers installed by their teams. Very happy with the team and the installations.” – Rob Dawson, Poultry Farmer

“We chose J L Phillips through recommendation, despite tight deadlines the installation of the boilers and the new office heating system was completed on time. From design to fuel consideration and boiler set up JL Phillips proved to be an excellent installer.” – S McDougall, Assistant Estate Manager Renishaw Hall 1 x 130kW Herz Firematic 1 x 199kW Herz Firematic

“We have a very large heat demand and after considering a number of biomass installers, chose J L Phillips to carry out our installation. The deciding factor was the integration of the biomass system with the old heating system. The use of heat exchangers, pumps and controls was explained very well and the installation performance matched the predictions.” – B Orme Three Acres 199 Herz Firematic

www . l p h i l l i p s .co.uk

SOME fEEDBAck frOM Our cuSTOMErS

Page 16: BIOMASS HEATING for · manufacturered ETA and Herz Biomass Boilers so you can be sure of excellent quality. Operating efficiencies of over 90% With heating and hot water representing

j l phillips renewable Energy ltd are a friendly team of experienced engineers, installers, project

managers, sales & office staff. We have a 100% RHI Application Success Rate and have installed hundreds of

successful individually tailored biomass systems throughout the UK.

AccrEDITATIONS

We are accredited by all relevant bodies for the design, installation and service of biomass heating systems.

> MCS Accredited Installer Biomass Systems (NIC 3554)

> HETAS trained flue design & installation specialists

> NICEIC Governing Body – Biomass

> RECC – Renewable Energy Consumer Code

> Approved HERZ – ETA Installation & Commissioning specialists

pArTNErS j l phillips are preferred installers for the Herz and ETA biomass boiler. Our engineers are qualified

to install, commission and service these boiler types.

Founded in 1896, Herz has been continuously active in the market for more than 110 years. With six sites within Austria, another three in Europe and more than 1,500 employees at home and abroad, HERZ is the only Austrian manufacturer that produces equipment for the entire heating and installation industry and is one of the most important internationally. HERZ Feuerungstechnik in Sebersdorf/Styria was founded in 1983. Today more than 100 people work in production and sales. Over the years HERZ Feuerungstechnik has established itself as a specialist for biomass heating. The main focus for this is placed upon modern, cost efficient and environmentally friendly heating systems with highest levels of comfort and convenience as well as being user-friendly. A heart for the environment, all HERZ boiler exceed the strictest emission regulations. This is proven by various environmental seals of approval. HERZ quality Herz design engineers are in regular contact with acknowledged research institutions in order to further improve the very high standards.

The beginning of the ETA Company can be traced back to the year 1998 and is marked and developed by individuals. Individuals, for whom benefits are not the most important thing, but who also emphasise conviction. The conviction: that the production of boilers which use renewable energies are an important contribution to the protection of the environment and the containment of the greenhouse effect. ETA Heiztechnik was founded in December 1998 and since then, has dedicated itself to the production of heating boilers for renewable energies. ETA has specialized in heating boilers for wood. Fifteen employees (from a total of 165 employees) are dedicated to develop the technology for wood, including the electronics and control components. Emphasis is on safety and user comfort. As in the automobile manufacturing process, selected suppliers produce all our components according to our construction plans. As a result, ETA can deploy the most adequate material for every part of the boiler. The assembly of the boiler is done in-house, therefore all parts can be checked before being assembled. All ETA heating boilers have Lambda controlling. The result is high quality in the upper section of today’s technology.

AWArDS“Geberit Best Commercial Installer 2014” award for our quality and standard of work.

Follow us on J L Phillips Renewable Energy Ltd and @jlprenewenergy

6 Evans Business centre, jessop close, Newark, Notts, NG24 2TTT 01636 642790 E info@ lphill ips.co.uk W www. lphill ips.co.uk