BIOGENIC ENERGY PARK PRESENTATION -...
Transcript of BIOGENIC ENERGY PARK PRESENTATION -...
“Agromin’s Commitment to Delivering Unequaled Value”
BIOGENIC ENERGY PARK PRESENTATION
Transform
Develop
Benefits
Introduction…Biogenic Energy Project
9.6-Acre Green Material Compost Facility
“State-of-the-Art”40-Acre Organics Renewable Energy Conversion Facility
• Help meet Renewable Energy Standards 33% by 2020• Help meet SB 375 by adding green energy project• Increase Landfill
Diversion from 80K to 150K to achieve 80% by 2020• Reduce GHG
Emissions by 29% thru food waste recycling• Produce Carbon Credit
energy• Help meet Commercial
Recycling mandate
• Produce Low-Carbon Fuels
AB 939 - 50% Diversion
AB 32 - GHG Reduction
AB 341 – 75%
Recycling
What’s Driving the Challenge?
• Diversion goals of AB 939 have been achieved
– 50% diversion rate by year 2000
• AB 32 established plans and programs to reduce GHGs to
– 1990 levels by 2020
– 80% reduction in 2050
• Mandated Commercial Recycling including food waste from Landfills (5 million metric tons of GHGs)
• Anaerobic Digestion (2 million metric tons of GHGs)
• Low Carbon Fuel Standard (16 million metric tons of GHGs)
• Compost Use (2 million metric tons of GHGs)
• AB 341 – 75% Recycling by 2020
• Renewable Portfolio Standards – 33% Alternative Energy by 2020
SUSTAINABLE ORGAINIC SOLUTION
Waste Diversion – Collection and processing of organic waste into sustainably manufactured materials for energy conversion and fertility products as an alternative to landfilling
Renewable Energy – Use natural biological processes and other technologies to convert organic waste streams into electrical power, heat and low carbon fuel for private customers or public utilities
• Sustainable Agriculture – Use natural biological processes to convert organic waste streams into non chemical fertility products which support sustainable agriculture
“Unlocks Common Threads between Wasted Organics, Green Energy and Agriculture”
BIOGENIC ENERGY PROJECT TECHNOLOGIES
BIOGENIC ENERGY PROJECT TECHNOLOGIES
BIOGENIC ENERGY PROJECT TECHNOLOGIES
SMARTFERM DIGESTER DEMO
CASE STUDY
• Anaerobic Digestion of 200-300,000 lbs. of onion waste per day provides on-site power
• $400,000 savings/year in operational costs (disposal,equipment,labor,etc.)
• $700,000/year in energy savings (600 kW capacity)
• Reduce GHGs by 30,000 tons/yr.
ANAEROBIC DIGESTION PROJECT
BIOGENIC ENERGY LOCATION
Limoneira Facility
Biogenic Energy Facility
CURRENT COMPOST FACILITY
BIOGENIC ENEGRY PARK EXPANSION
BIOGENIC ENERGY PARK CONCEPTUAL DESIGN
Gasification
Material Processing
Anaerobic Digestion
Compost Feedstock
Covered Aerated Static Piles
Finished Compost
Product Sales
Covered Aerated Static Piles
Finished Compost
Bio-Filters
The information included in this document is strictly confidential and is provided with the understanding that it will not be disclosed to third parties without the expressed written consent of Bill Camarillo, Chief Executive Officer of Agromin Corporation.
CONFIDENTIALITY & CONTACT INFORMATION
Bill Camarillo, CEO201 Kinetic Drive
Oxnard, CA 93030805-207-5650