BIM VACCINE FOR COVID CONSTRUCTION
Transcript of BIM VACCINE FOR COVID CONSTRUCTION
![Page 1: BIM VACCINE FOR COVID CONSTRUCTION](https://reader031.fdocuments.net/reader031/viewer/2022011809/61d450e65c2c6f1d7677a874/html5/thumbnails/1.jpg)
BIM VACCINE
FOR COVID
CONSTRUCTION
![Page 2: BIM VACCINE FOR COVID CONSTRUCTION](https://reader031.fdocuments.net/reader031/viewer/2022011809/61d450e65c2c6f1d7677a874/html5/thumbnails/2.jpg)
EXISTING TECHNOLOGIES
Tablets
Web Meetings
Building Information Modeling
Virtual Reality Tools
![Page 3: BIM VACCINE FOR COVID CONSTRUCTION](https://reader031.fdocuments.net/reader031/viewer/2022011809/61d450e65c2c6f1d7677a874/html5/thumbnails/3.jpg)
EXISTING TECHNOLOGY
BIM is an existing technology that has been producing amazing
results in the construction industry AND NOW, due to NEW challenges, it has become even
more relevant.
![Page 4: BIM VACCINE FOR COVID CONSTRUCTION](https://reader031.fdocuments.net/reader031/viewer/2022011809/61d450e65c2c6f1d7677a874/html5/thumbnails/4.jpg)
"Progress is impossible without change, and those who cannot change their minds cannot change anything."
George Bernard Shaw
![Page 5: BIM VACCINE FOR COVID CONSTRUCTION](https://reader031.fdocuments.net/reader031/viewer/2022011809/61d450e65c2c6f1d7677a874/html5/thumbnails/5.jpg)
"Progress is impossible without change, and those who cannot change their minds cannot change anything."
George Bernard Shaw
![Page 6: BIM VACCINE FOR COVID CONSTRUCTION](https://reader031.fdocuments.net/reader031/viewer/2022011809/61d450e65c2c6f1d7677a874/html5/thumbnails/6.jpg)
NOW BIM TECHNOLOGY HAS BECOME ONE OF THE MAIN PILLARS FOR SUCCESSFUL CONSTRUCTION PROJECTS
![Page 7: BIM VACCINE FOR COVID CONSTRUCTION](https://reader031.fdocuments.net/reader031/viewer/2022011809/61d450e65c2c6f1d7677a874/html5/thumbnails/7.jpg)
COVID CONSTRUCTION
PROBLEMS
Social Distancing?
Crew Size Limits?
Limited Materials?
Delivery Disruptions?
![Page 8: BIM VACCINE FOR COVID CONSTRUCTION](https://reader031.fdocuments.net/reader031/viewer/2022011809/61d450e65c2c6f1d7677a874/html5/thumbnails/8.jpg)
CO
NST
RU
CT
ION
IN
DU
STR
Y C
HA
LLE
NG
ES
2
02
0
![Page 9: BIM VACCINE FOR COVID CONSTRUCTION](https://reader031.fdocuments.net/reader031/viewer/2022011809/61d450e65c2c6f1d7677a874/html5/thumbnails/9.jpg)
ME
P T
RA
DE
M
AN
PO
WE
R
BIM Planning &
Prefabrication
Smoother
Finish
![Page 10: BIM VACCINE FOR COVID CONSTRUCTION](https://reader031.fdocuments.net/reader031/viewer/2022011809/61d450e65c2c6f1d7677a874/html5/thumbnails/10.jpg)
BIM & LEGO
Keep it Simple
Reference Often
Leverage on Jobsite
![Page 11: BIM VACCINE FOR COVID CONSTRUCTION](https://reader031.fdocuments.net/reader031/viewer/2022011809/61d450e65c2c6f1d7677a874/html5/thumbnails/11.jpg)
CASE STUDY 1HOTEL EDDYSTONE
Work closely with the CM team
Challenges
Contractors involvement
The details blow up design plans
No thoughts on the bathrooms
Laser Scanned the whole building
Finding the Common Starting Point
Pre-fabricate with confidence
![Page 12: BIM VACCINE FOR COVID CONSTRUCTION](https://reader031.fdocuments.net/reader031/viewer/2022011809/61d450e65c2c6f1d7677a874/html5/thumbnails/12.jpg)
RECAPHOTEL EDDYSTONE
❑ Navigated uncertainty of COVID-19 Jobsite
Conditions
❑ Introduced a Construction Manager to BIM
❑ Showed the value of BIM
❑ Helped Contractors identify Prefabrication
Opportunities
![Page 13: BIM VACCINE FOR COVID CONSTRUCTION](https://reader031.fdocuments.net/reader031/viewer/2022011809/61d450e65c2c6f1d7677a874/html5/thumbnails/13.jpg)
"With the application of BIM, we were able to 'begin' construction on the project in the middle of uncertain Covid issues"
Conor DareProject Manager
![Page 14: BIM VACCINE FOR COVID CONSTRUCTION](https://reader031.fdocuments.net/reader031/viewer/2022011809/61d450e65c2c6f1d7677a874/html5/thumbnails/14.jpg)
CASE STUDY 2CHICAGO O'HARE AIRPORT TSA
CHECKPOINT
Construction in the middle of Covid-19 with
world travelers in close proximity
Incorporated Laser Scanning to limit companies'
trips to the jobsite
Able to coordinate while companies were sorting
out Covid issues
![Page 15: BIM VACCINE FOR COVID CONSTRUCTION](https://reader031.fdocuments.net/reader031/viewer/2022011809/61d450e65c2c6f1d7677a874/html5/thumbnails/15.jpg)
RECAPCHICAGO O'HARE AIRPORT TSA
CHECKPOINT
❑ Avoided exposing people to Covid
❑ Used Laser Scanning to minimize traveling to
jobsite
❑ Minimized business disruption during
construction.
![Page 16: BIM VACCINE FOR COVID CONSTRUCTION](https://reader031.fdocuments.net/reader031/viewer/2022011809/61d450e65c2c6f1d7677a874/html5/thumbnails/16.jpg)
"BIM brought so many
benefits to our team, it
allowed us to work from
home while having real
field data to trust without
having to leave the safety
of our homes."
DJ VizzaProject Manager
![Page 17: BIM VACCINE FOR COVID CONSTRUCTION](https://reader031.fdocuments.net/reader031/viewer/2022011809/61d450e65c2c6f1d7677a874/html5/thumbnails/17.jpg)
CASE STUDY 3100 GRAND AVENUE
If you already have a great BIM practice, then you were ready to handle anything
When Covid-19, our electrical customer was able to prefabricate at their shop while other
trades were at a stand still.
When they were allowed back on site, they were 4 months ahead of the other trades.
![Page 18: BIM VACCINE FOR COVID CONSTRUCTION](https://reader031.fdocuments.net/reader031/viewer/2022011809/61d450e65c2c6f1d7677a874/html5/thumbnails/18.jpg)
RECAP100 GRAND AVENUE
❑ Electrical contractor was 7 weeks ahead of schedule
❑ Prefabricated most of the electrical components
❑ Huge labor saving onsite.
❑ Reduced potential rework onsite.
![Page 19: BIM VACCINE FOR COVID CONSTRUCTION](https://reader031.fdocuments.net/reader031/viewer/2022011809/61d450e65c2c6f1d7677a874/html5/thumbnails/19.jpg)
"We went from facing manditory overtime to being 7 weeks ahead of schedule because of the BIM process."
Josh StormProject Superintendent
![Page 20: BIM VACCINE FOR COVID CONSTRUCTION](https://reader031.fdocuments.net/reader031/viewer/2022011809/61d450e65c2c6f1d7677a874/html5/thumbnails/20.jpg)
3D Design
4D Scheduling & Planning
5D Estimating & Cost Control
6D Operations
7D Controls
ADDITIONAL APPLICATIONS
![Page 21: BIM VACCINE FOR COVID CONSTRUCTION](https://reader031.fdocuments.net/reader031/viewer/2022011809/61d450e65c2c6f1d7677a874/html5/thumbnails/21.jpg)
THANK YOU!BIM RISK ANALYSIS$5,000 value FREE for attending
Every Project is Different
Use BIM to access project risk
Schedule, Budget or Quality?