BIM CHALLENGES AND POTENTIAL
![Page 2: Bim challenges and potential](https://reader031.fdocuments.net/reader031/viewer/2022022203/587070681a28ab48378b7751/html5/thumbnails/2.jpg)
01
Adoption of technology in construction has been slow but the industry is becoming increasingly aware of BIM’s potential
![Page 3: Bim challenges and potential](https://reader031.fdocuments.net/reader031/viewer/2022022203/587070681a28ab48378b7751/html5/thumbnails/3.jpg)
02
Are you Awareof BIM
![Page 4: Bim challenges and potential](https://reader031.fdocuments.net/reader031/viewer/2022022203/587070681a28ab48378b7751/html5/thumbnails/4.jpg)
Building Information Modelling (BIM)
A process involving the structured sharing and coordination of digital information about a building thoughout the lifecycle (Eastman, 2011)
Eliminates most of the communication-related delivery challenges of the industry
The single well-coordinated process that could catalyze the improvement of the construction industry
03
BIM: A Recap
![Page 5: Bim challenges and potential](https://reader031.fdocuments.net/reader031/viewer/2022022203/587070681a28ab48378b7751/html5/thumbnails/5.jpg)
04
BIM Projections
Up to 20% cost
reduction
Improved carbon performance
Efficient delivery
![Page 6: Bim challenges and potential](https://reader031.fdocuments.net/reader031/viewer/2022022203/587070681a28ab48378b7751/html5/thumbnails/6.jpg)
05
BIM Benefits
Faster and more effective processes
Better design
Better customer service
Controlled whole-life costs and environmental data
Lifecycle data
Automated assembly
Better production quality
![Page 7: Bim challenges and potential](https://reader031.fdocuments.net/reader031/viewer/2022022203/587070681a28ab48378b7751/html5/thumbnails/7.jpg)
Up to 40% elimination of unbudgeted change
Cost estimation accuracy within 3% as compared to traditional estimates
Up to 80% reduction in time taken to generate a cost estimate
A savings of up to 10% of the contract value through clash detections
Up to 7% reduction in project time
06
BIM Case Studies Data
![Page 8: Bim challenges and potential](https://reader031.fdocuments.net/reader031/viewer/2022022203/587070681a28ab48378b7751/html5/thumbnails/8.jpg)
07Specific Benefits to BIM
ParticipantsClients:
Better requirement due to enhanced communication with design team
Contractors: Increased clarity in design intent, easy testing of design options, and easy distribution of
design documentation across the teams
Designers: Access to better quality information for estimation and bidding, early involvement to
contribute to constructability and effective scheduling, and clash-free construction due to ability to simulate before actual construction
Facilities Management: enhanced quality of as-built and handing-over information, and easier integration into
computer-aided facilities management systems for maintenance and post occupancy assessments
![Page 9: Bim challenges and potential](https://reader031.fdocuments.net/reader031/viewer/2022022203/587070681a28ab48378b7751/html5/thumbnails/9.jpg)
08
![Page 10: Bim challenges and potential](https://reader031.fdocuments.net/reader031/viewer/2022022203/587070681a28ab48378b7751/html5/thumbnails/10.jpg)
75% of contractors globally reported a positive ROI
09
BIM ROI Study
![Page 11: Bim challenges and potential](https://reader031.fdocuments.net/reader031/viewer/2022022203/587070681a28ab48378b7751/html5/thumbnails/11.jpg)
BIM ROI for 10 projects varied from 140% to 39,900% with a calculated average of 1,633% for all projects and 634% for projects without a planning or value analysis phase
10
BIM ROI
![Page 12: Bim challenges and potential](https://reader031.fdocuments.net/reader031/viewer/2022022203/587070681a28ab48378b7751/html5/thumbnails/12.jpg)
11
BIM Challenges
![Page 13: Bim challenges and potential](https://reader031.fdocuments.net/reader031/viewer/2022022203/587070681a28ab48378b7751/html5/thumbnails/13.jpg)
12
![Page 14: Bim challenges and potential](https://reader031.fdocuments.net/reader031/viewer/2022022203/587070681a28ab48378b7751/html5/thumbnails/14.jpg)
13Success for BIM Relies
on
![Page 15: Bim challenges and potential](https://reader031.fdocuments.net/reader031/viewer/2022022203/587070681a28ab48378b7751/html5/thumbnails/15.jpg)
THANK YOU
Thomas Goubau CEO
www.aproplan.com www.facebook.com/AproPLAN
www.twitter.com/AproPLAN
www.linkedin.com/in/thomasgoubau/