Cn3D Construction, LLC | 355 E 2100 S, Salt Lake City, UT 84115 | Office: 385-528-2984 | www.cn3dconstruction.com BIM & CONSTRUCTION TECHNOLOGY CN3D CONSTRUCTION SERVICES & TRAINING Fragmented and inaccurate project information leads to opportunities for a design and construction team. Centralizing project information allows for more collaborative and integrated project management. Securing information flow and accuracy results in higher quality, improved safety, less waste and projects delivered on time; thus making construction and buildings more sustainable. When was the last time you had a project go the way you wanted? Cn3D offers ways to enhance your business and efficiency efforts.

Transcript of BIM & CONSTRUCTION TECHNOLOGY

Page 1: BIM & CONSTRUCTION TECHNOLOGY

Cn3D Construction, LLC | 355 E 2100 S, Salt Lake City, UT 84115 | Office: 385-528-2984 | www.cn3dconstruction.com

BIM & CONSTRUCTION TECHNOLOGY

CN3D CONSTRUCTION SERVICES & TRAINING

Fragmented and inaccurate project information leads to opportunities for a

design and construction team. Centralizing project information allows for

more collaborative and integrated project management. Securing

information flow and accuracy results in higher quality, improved safety, less

waste and projects delivered on time; thus making construction and buildings

more sustainable. When was the last time you had a project go the way you

wanted? Cn3D offers ways to enhance your business and efficiency efforts.

Page 2: BIM & CONSTRUCTION TECHNOLOGY

BIM & CONSTRUCTION TECHNOLOGY

Page 1

Cn3D Construction, LLC | 355 E 2100 S, Salt Lake City, UT 84115 | Office: 385-528-2984 | www.cn3dconstruction.com

BIM & CONSTRUCTION TECHNOLOGY C N 3 D C O N S T R U C T I O N S E R V I C E S & T R A I N I N G

TABLE OF CONTENTS BUILDING INFORMATION MODELING

ABOUT CN3D CONSTRUCTION………………………………………………………………………..2

EXPERIENCE………...…………………………………………………………………………………...3

3D MODELING…………………………………………………………………………....……………4

CONSTRUCTABILITY REVIEW………….……………...………………………………...………………5

3D LASER SCANNING……………………………………...……………………………………..……6

4D SCHEDULING……………………………………...……………………………………..…….……7

5D ESTIMATING……………………………………...…………………………………………….…...8

3D SPATIAL COORDINATION………………………………...………………………………………10

VIRUTAL MOCK-UPS……………………………………...……………………………….….………12

DIGITAL LIFT DRAWINGS……………………………………...…………………………...…………14

RECORD MODEL CLOSEOUT.………………………...…………………………………..……...……16

CONSTRUCTION TECHNOLOGY

2D/3D SITE PLANNING…………………………...…...………………………………….……..……17

2D SURVEY LAYOUT……………………………………...………………………………..…………18

CLOUD CONSULTING…...………………………………...……………………………….…………19

BLUEBEAM TRAINING………………………………...……………………………………….………20

PROJECT SCHEDULING……………………………………...……………………………….….……21

LEAN CONSTRUCTION PLANNING.………………………...……………………………….…..……22

PROJECT MANAGEMENT………....………………………...……………………………….…..……23

Page 3: BIM & CONSTRUCTION TECHNOLOGY

BIM & CONSTRUCTION TECHNOLOGY

Page 2

Cn3D Construction, LLC | 355 E 2100 S, Salt Lake City, UT 84115 | Office: 385-528-2984 | www.cn3dconstruction.com

ABOUT CN3D DESIGN TEAM GENERAL CONTRACTORS TRADE CONTRACTORS OWNERS

Scott Adams said it best (creator of Dilbert); there are a limited amount of people inventing new tools but not many

showing us how to use them. We are left to follow suit, with limited instructions. At Cn3D Construction, we have noticed the gap between technology that helps us build better and the implementation of those tools. We are here to fill that gap. We are an exceptional team that enjoys teaching

and sharing information.

W H Y H I R E C N 3 D C O N S T R U C T I O N

BECAUSE ITS NOW OR NEVER. Project delivery methods are changing, lean construction is more than a class in school and the cloud is dominating computing. Add BIM to the big picture and there is a lot

changing; it's time to adjust your business model. We know just how to help you adopt, implement and integrate.

BECAUSE WE TRAIN YOUR IN-HOUSE STAFF.

Your employees are your greatest asset and we think there is no better way to reward them than promotion

from within. We help create Technology Guru's and BIM Director's.

S E A S O N E D P RO F E S S I O N A L S

Technology and BIM are here to stay and are no longer buzz words or market trends. Making the right changes, strategically and economically is what Cn3D Construction is here to assist you with.

Cn3D Construction is:

ED/WOSB (Economically

Disadvantaged Woman Owned Small

Business)

SDB (Small Disadvantaged

Business)

“Everyone knows what BIM is.

But do you know how it can save you time and money?”

Page 4: BIM & CONSTRUCTION TECHNOLOGY

BIM & CONSTRUCTION TECHNOLOGY

Page 3

Cn3D Construction, LLC | 355 E 2100 S, Salt Lake City, UT 84115 | Office: 385-528-2984 | www.cn3dconstruction.com

EXPERIENCE A few of our favorite projects…

C L I E N T S : Association of General Contractors

Montana Association of Contractors

Utah Department of Transportation (UDOT)

Boise State University

Weber State University

Prosoft

Jacobsen Construction

Bodell Construction

GSBS Architects

Taylor Electric

Barnard Construction

Mitchell Acoustics

Russell Construction

IM Flash (Micron/Intel Venture)

Furst Construction

Steed Construction

Halbert Construction Company

J & S Mechanical

Archer Mechanical

KHI Mechanical

Copper Mountain Electric

A & B Mechanical

3D Sheet Metal

Alternative Mechanical

B&S Drywall

A-C Electric

All-Phase Electric

Child Enterprises Masonry

United Team Mechanical

Copper Mountain Electric

Comfort Systems

CR Lighting & Design

Edward Scott Electric

Gramoll Construction

Halverson Mechanical

KOH Mechanical

Northstar HVAC

KOCH Mechanical

Okland Construction

Big-D Construction

MJ Mechanical

Rydalch Electric

STF Electrical

SV Mechanical

Wadman Corporation

Western States Mechanical

UTAH PERFORMING ARTS CENTER J & S Mechanical, Salt Lake City Utah

VA AMBULATORY RECREATION CENTER Halbert Construction Co., Palo Alto CA

IM FLASH TECHNOLOGIES (Micron/Intel JV) IM Flash Design & Construction, Lehi UT

RIVERTON HOPSITAL EXPANSION & REMODEL 3D Sheet Metal and Taylor Electric, SLC UT

OLD DOMINION FREIGHT LINE (national account) Furst Construction, Salt Lake City Utah

Cottonwood Clinic A & B Mechanical, Salt Lake City UT

Page 5: BIM & CONSTRUCTION TECHNOLOGY

BIM & CONSTRUCTION TECHNOLOGY

Page 4

Cn3D Construction, LLC | 355 E 2100 S, Salt Lake City, UT 84115 | Office: 385-528-2984 | www.cn3dconstruction.com

3D MODELING PROPOSAL PRECONSTRUCTION CONSTRUCTION CLOSE-OUT

D E S C R I P T I O N :

Design Authoring software is used to develop a (3D) Building Information Model based on criteria that is important to the translation of the project’s design.

3 D M O D E L I N G :

Architectural

Structural

Mechanical HVAC

Mechanical Piping

Plumbing

Electrical

Fire Protection

P O T E N T I A L VA L U E :

Improved quality control and consistency (parametric feature of BIM software).

Alternatives can be suggested and visualized almost instantly.

“3D Modeling exposes

errors and omissions.”

Page 6: BIM & CONSTRUCTION TECHNOLOGY

BIM & CONSTRUCTION TECHNOLOGY

Page 5

CONSTRUCTABILITY REVIEW PROPOSAL PRECONSTRUCTION CONSTRUCTION CLOSE-OUT

D E S C R I P T I O N :

A process in which Building Information Models are used to showcase the design intent and program to

the stakeholders and set criteria such as layout, sightlines, lighting, security, ergonomics, acoustics,

textures and colors, etc. The process is also used to fine-tune the means and methods.

P O T E N T I A L VA L U E :

Get instant feedback on meeting program requirements, owner’s needs and building or space aesthetics.

Different design options and various scenarios and alternatives are easy to model and change real-time during design review.

Create shorter and more efficient design review meetings.

Resolve the conflicts that would arise in the field and model the potential fixes in real-time along with tolerances revised and RFI’s answered. Aid in the permitting process (e.g. continuous change vs. specified code.)

Page 7: BIM & CONSTRUCTION TECHNOLOGY

BIM & CONSTRUCTION TECHNOLOGY

Page 6

3D LASER SCANNING PROPOSAL PRECONSTRUCTION CONSTRUCTION CLOSE-OUT

D E S C R I P T I O N :

Light Detection and Ranging (LIDAR) Technology is a very fast and accurate way to collect exact existing

conditions data. Using measurement technology similar to a total station, the collected points are recorded

as X,Y,Z values and combined with color and GPS data.

P O T E N T I A L VA L U E :

Accurately documents existing buildings and surroundings.

Aids in future modeling and 3D design coordination.

Helps Contractor study site for: Utilities, Site Access, Safety Evaluation, Excavation, Shoring, Dewatering, Cranes and Hoisting and Laydown Areas.

“In today’s business

you need a tactical

and technical

advantage.”

Page 8: BIM & CONSTRUCTION TECHNOLOGY

BIM & CONSTRUCTION TECHNOLOGY

Page 7

4D SCHEDULING PROPOSAL PRECONSTRUCTION CONSTRUCTION CLOSE-OUT

D E S C R I P T I O N :

A process in which 3D models and the construction schedule are combined to create a 4D animation. This

animation shows the project being built; effectively showing the plan for construction per day. Provides for

maximization of subcontractor schedules and production.

P O T E N T I A L VA L U E :

Visually see the critical path and demonstrate to the project team.

Identify flaws in the schedule logic before field impacts.

Visually show schedule impact due to changes.

Review multiple options and solutions to construction.

Workspace and trade stacking conflicts identified.

Marketing purposes and publicity.

Page 9: BIM & CONSTRUCTION TECHNOLOGY

BIM & CONSTRUCTION TECHNOLOGY

Page 8

5D ESTIMATING (Quantity Extraction)

PROPOSAL PRECONSTRUCTION CONSTRUCTION CLOSE-OUT

D E S C R I P T I O N :

A process in which a 3D model is queried for total quantities and checked against the traditional estimated

take-off. Best practices is to perform QTO during preconstruction with each model iteration and continue

throughout the design process. This allows designers to see the cost effects of their changes in a timely manner

and avoid budget overruns.

P O T E N T I A L VA L U E :

1. Precisely estimate material quantities and generate quick revisions if needed. 2. Visual reality check for construction elements that need to be estimated. 3. Estimators can focus on more value adding activities such as identifying construction assemblies,

generating pricing and factoring risks, which are essential for high quality estimates. 4. Be able to compare visual design options and costs simultaneously.

Page 10: BIM & CONSTRUCTION TECHNOLOGY

BIM & CONSTRUCTION TECHNOLOGY

Page 9

Often, at the completion of a project it is difficult to tell how much has changed from the original design

and new coordinated design. We provide you before and after quantities that detail original scope versus

new.

Hospital Project QTO Clinic Project QTO

Original Coord. Change Original Coord. Change

Duct Fittings 4,592 4,786 4.2% Duct Fittings 249 286 14.9%

Total Duct Length - feet 20,957 20,208 -3.6% Total Duct Length - feet 977 936 -4.2%

Duct Segments 3,883 4,106 5.7% Duct Segments 215 248 15.3%

Duct Area - square feet 142,186 140,469 -1.2% Duct Area - square feet 4,038 4,141 2.5%

Duct Volume - cubic feet 90,805 88,417 -2.6% Duct Volume - cubic feet 1,307 1,431 9.5%

Fitting Volume - cubic feet 48,829 67,460 38.2% Fitting Volume - cubic feet 739 1,209 63.6%

System Volume - cubic feet 139,634 155,877 11.6% System Volume - cubic feet 2,046 2,640 29.1%

Page 11: BIM & CONSTRUCTION TECHNOLOGY

BIM & CONSTRUCTION TECHNOLOGY

Page 10

3D SPATIAL COORDINATION (MEPF) PROPOSAL PRECONSTRUCTION CONSTRUCTION CLOSE-OUT

D E S C R I P T I O N :

A process in which multiple models (design and construction) are joined together and clash detection

software detects conflicts between the building systems.

P O T E N T I A L VA L U E :

Reduce and eliminate field conflicts prior to installation.

Reduces field RFI's and Change Orders significantly.

Visualize construction means and methods before placed in the field.

Increased productivity and less rework.

Prefabricate off-site leading to a safer and cleaner work environment.

More accurate as-built drawings for close-out.

Overall decrease construction cost and time.

Page 12: BIM & CONSTRUCTION TECHNOLOGY

BIM & CONSTRUCTION TECHNOLOGY

Page 11

PA R T I C I PA N T S :

• DESIGN

– Architectural

– Structural

– Mechanical

– Electrical

• SUBCONTRACTORS

– Structural

– Mechanical

– Electrical

– Plumbing

– Fire Protection

– Data and Telecom

– Framing/King Studs/Wall Bracing

– Unistrut

– Metal Panel System

– Seismic Bracing

– Gas Lines

– Specialty Equipment

“We are in the business of being proactive so you don’t have to be reactive.”

Page 13: BIM & CONSTRUCTION TECHNOLOGY

BIM & CONSTRUCTION TECHNOLOGY

Page 23

VIRTUAL MOCK-UPS PROPOSAL PRECONSTRUCTION CONSTRUCTION CLOSE-OUT

D E S C R I P T I O N :

A virtual mock-up is a 3D representation of a portion of the design created to study the space layout, construction details, test for performance and clarify the appearance of the final structure. By creating 3D virtual mock-ups of complex parts of the project, you can quickly analyze design alternatives, save time and reduce risk.

P O T E N T I A L VA L U E :

Build onsite mock-ups correctly the first time and reduce time needed to construct them.

Solve design and constructability issues in advance of construction.

Allows user to review space and give proper input into the final outcome (rooms, labs, etc.)

Test multiple design alternatives and variations virtually.

Page 14: BIM & CONSTRUCTION TECHNOLOGY

BIM & CONSTRUCTION TECHNOLOGY

Page 23

Page 15: BIM & CONSTRUCTION TECHNOLOGY

BIM & CONSTRUCTION TECHNOLOGY

Page 23

DIGITAL LIFT DRAWINGS PROPOSAL PRECONSTRUCTION CONSTRUCTION CLOSE-OUT

D E S C R I P T I O N :

A process that utilizes a 3D model to layout the structural assemblies and produce lift drawings. Lift

drawings are the concrete assembly drawings used by foremen during on-site construction. The model houses all

the intelligence for the creation of 1) Digital Lift Drawings, 2) Formwork Drawings, 3) Rebar Fabrication Drawings,

4) Robotic Field Layout, 5) Accurate Quantity Take-offs and 6) As-Built Information.

P O T E N T I A L VA L U E :

Produce accurate lift drawings using cuts and sections from 3D model.

Reduces human error, catches field conflicts before field work has started.

Better understanding of the project from drawing review and model creation.

Increase productivity of field workers by visually showing them the process and end result.

Avoid costly mistakes (i.e., missing embeds, incorrect sequencing, no chipping-out mistakes etc.)

“Less time is spent hand-

sketching the lift drawings,

allowing superintendents to

spend more time in the field

overseeing quality.”

Page 16: BIM & CONSTRUCTION TECHNOLOGY

BIM & CONSTRUCTION TECHNOLOGY

Page 23

Page 17: BIM & CONSTRUCTION TECHNOLOGY

BIM & CONSTRUCTION TECHNOLOGY

Page 23

RECORD MODEL CLOSE-OUT PROPOSAL PRECONSTRUCTION CONSTRUCTION CLOSE-OUT

D E S C R I P T I O N :

A process in which a 3D As-Built model is embedded with links to information such as serial codes,

warranties, O&M Manual information, specifications and maintenance schedules/history of all the

components in the building.

P O T E N T I A L VA L U E :

Excellent tool for Facilities and Maintenance to access valuable project information with a few clicks versus digging through binders and paper documents.

Able to train staff on different equipment using model prior to project close-out.

Aid in future modeling and 3D design coordination for renovation.

Provide owner with accurate model of building, equipment, and spaces within a building to create possible synergies with other BIM Uses.

Page 18: BIM & CONSTRUCTION TECHNOLOGY

BIM & CONSTRUCTION TECHNOLOGY

Page 23

2D/3D SITE PLANNING PROPOSAL PRECONSTRUCTION CONSTRUCTION CLOSE-OUT

D E S C R I P T I O N :

A process in which a 3D model is used to graphically represent both permanent and temporary facilities

on site. Can also be used in conjunction with the construction activity schedule to convey space and

sequencing requirements.

P O T E N T I A L VA L U E :

Provides a good visual to the stakeholders to understand the site layout.

Identify early potential and critical space and time conflicts.

Easily update site organization and space usage as construction progresses.

Accurately evaluate site layout for safety concerns.

Page 19: BIM & CONSTRUCTION TECHNOLOGY

BIM & CONSTRUCTION TECHNOLOGY

Page 23

2D SURVEY LAYOUT PROPOSAL PRECONSTRUCTION CONSTRUCTION CLOSE-OUT

D E S C R I P T I O N :

Reviewing 2D CAD plans for missing or incorrect elements and providing information such as dimensions, arcs, radii, layout from grids.

P O T E N T I A L VA L U E :

Taking technology from the office into the field.

Getting the field important, necessary measurements to ensure swift and accurate survey work.

Reduce field personnel and length of time laying out the project.

“Remember, you’re not just contractors, you are risk

managers. And there is no better risk mitigation

tool than technology.”

Page 20: BIM & CONSTRUCTION TECHNOLOGY

BIM & CONSTRUCTION TECHNOLOGY

Page 23

CLOUD CONSULTING PROPOSAL PRECONSTRUCTION CONSTRUCTION CLOSE-OUT

D E S C R I P T I O N :

Two words to describe the cloud are ‘organized’ and ‘instant’. Information is more valuable than gold in this business; the cloud gets you what you need, when you need it. Companies that grow in today's economy consistently base their processes on best practices. The quickest way for a company to be consistent is with project management software, because every process has a set course of actions. If you ask most people everyone has their own way of doing things and they use at least 4 different programs to do it. Project Management solves this; the only confusion is picking one. There are so many, Cn3D helps you choose what fits you best.

P O T E N T I A L VA L U E :

Unlimited storage.

Instant access to all file types.

Inexpensive and secure.

Easy to use and share with others.

Page 21: BIM & CONSTRUCTION TECHNOLOGY

BIM & CONSTRUCTION TECHNOLOGY

Page 23

BLUEBEAM TRAINING PROPOSAL PRECONSTRUCTION CONSTRUCTION CLOSE-OUT

D E S C R I P T I O N :

The cornerstone software program in design and construction is Bluebeam Revu. It was built around this industry offering valuable functions such as PDF creation, editing, markup and collaboration technology. One of the most powerful functions of Bluebeam is using the built-in cloud program, Studio. As soon as you get the construction documents on a project they are outdated. Questions have been asked and answered. Keeping your plans updated digitally allows the entire team, regardless of platform to have access to the latest information anywhere/anytime. With studio you can make digital changes to the plans and share everything with the project team in real time. Live Drawings is one of the best ways to harness the power of the cloud.

P O T E N T I A L VA L U E :

Affordable and user-friendly.

Plug-ins for numerous programs; Microsoft Office, Autodesk, etc.

Built-in cloud program.

Page 22: BIM & CONSTRUCTION TECHNOLOGY

BIM & CONSTRUCTION TECHNOLOGY

Page 23

PROJECT SCHEDULING PROPOSAL PRECONSTRUCTION CONSTRUCTION CLOSE-OUT

D E S C R I P T I O N :

Project Scheduling has gone from wallpaper status to one of the most important documents on a jobsite. Scheduling matches equipment, materials and labor with work tasks over time.

No matter what size your project is, whether your schedule is resource or time based, Cn3D creates and updates the schedule for all phases.

P O T E N T I A L VA L U E :

Communicate entire project scope and expectations.

Critical path and trade sorting.

Percentage complete reports.

Review for logic and missing predecessor/successor tasks.

VA and government work.

PERT schedules, Gantt chart and swim lane options.

Cost loaded schedules available.

Page 23: BIM & CONSTRUCTION TECHNOLOGY

BIM & CONSTRUCTION TECHNOLOGY

Page 23

LEAN CONSTRUCTION PLANNING PROPOSAL PRECONSTRUCTION CONSTRUCTION CLOSE-OUT

D E S C R I P T I O N :

Lean Construction is a blend of operational study and practical development in design and construction. It gained its foundations from lean manufacturing principles. However, unlike manufacturing, construction presents a unique circumstance that all projects are one-of-a-kind. Even the same store (adapt-build) will be built by different people, in a different location and environment. Lean Construction focuses on workflows and consistency. With the new advents in technology it is critical for all firms to examine their business model and take full advantage technology. This often requires drafting new workflows and putting new systems in place.

P O T E N T I A L VA L U E :

Make procedures leaner saving time, resources and sanity.

Work more efficiently as a team.

Create consistent, tested procedures.

2

Page 24: BIM & CONSTRUCTION TECHNOLOGY

BIM & CONSTRUCTION TECHNOLOGY

Page 23

PROJECT MANAGEMENT PROPOSAL PRECONSTRUCTION CONSTRUCTION CLOSE-OUT

D E S C R I P T I O N :

Design and Construction starts out in the planning stage and then evolves into execution. A consistent process or workflow for every to do item is how a project is set up to succeed. If you went to all your employees today, and asked how they tracked changes or gathered submittals, are the methods consistent? A single platform management system with consistent methods increases productivity and quality.

Cn3D Construction supports Procore, a cloud-based construction management software. Procore offers a secure management platform for all types of construction projects including industrial plants, office buildings, apartment buildings,

university facilities, retail centers and more. Built for general contractors, owners, architects, construction management firms, specialty contractors, engineering firms and subcontractors, Procore improves project communication and collaboration.

P O T E N T I A L VA L U E :

Intuitive and easy to use interface.

Unlimited users, data storage, training, and support.

Accessible from any web browser, tablet, or smartphone.

Secure, automatic real-time backups of project data.

Enhance project team collaboration with a single platform.

All product updates are included at no additional cost.