What today is about
Introduction to bidding
Principles of bidding to win
A winning bid approach
![Page 3: Bid to Win workshop for Seedbed - October 2015](https://reader031.fdocuments.net/reader031/viewer/2022022200/58a625c01a28ab416c8b5249/html5/thumbnails/3.jpg)
What today is not about
Bid writing
Bidding by numbers
Secret shortcuts
![Page 4: Bid to Win workshop for Seedbed - October 2015](https://reader031.fdocuments.net/reader031/viewer/2022022200/58a625c01a28ab416c8b5249/html5/thumbnails/4.jpg)
My bidding story
![Page 5: Bid to Win workshop for Seedbed - October 2015](https://reader031.fdocuments.net/reader031/viewer/2022022200/58a625c01a28ab416c8b5249/html5/thumbnails/5.jpg)
An introduction to bidding
![Page 6: Bid to Win workshop for Seedbed - October 2015](https://reader031.fdocuments.net/reader031/viewer/2022022200/58a625c01a28ab416c8b5249/html5/thumbnails/6.jpg)
Why is bidding important?Key B2B market mechanism
Public sector via OJEC rules
Inevitable part of growth & winning bigger opportunities
We need challengers to enter key markets and change the status quo!
![Page 7: Bid to Win workshop for Seedbed - October 2015](https://reader031.fdocuments.net/reader031/viewer/2022022200/58a625c01a28ab416c8b5249/html5/thumbnails/7.jpg)
What is bidding all about?
solving the buyer’s problem
designing and communicating your solution - vision
convincing the buyer you can deliver within their parameters
making the buyer want to work with you
![Page 8: Bid to Win workshop for Seedbed - October 2015](https://reader031.fdocuments.net/reader031/viewer/2022022200/58a625c01a28ab416c8b5249/html5/thumbnails/8.jpg)
What might you bid for?supply of services
supply of products
partnering/collaboration
funding e.g. grants, loans etc
competitions
![Page 9: Bid to Win workshop for Seedbed - October 2015](https://reader031.fdocuments.net/reader031/viewer/2022022200/58a625c01a28ab416c8b5249/html5/thumbnails/9.jpg)
Typical bid processEOI or PQQ/RFI
Stage 1 ISOS/RFP/ITT
Stage 2 ITSFS/RFP/ITT/BAFO
Clarifications
Presentation
Preferred bidder
Contract close
Mobilise
Q&
A or dialogue
Buyer Bidder
Selecting bidders (4-6)
Shortlisting bidders (2-3) Producing information
Selecting winning bid Detailed evaluation
Preparing clarifications
Updating evaluation
Updating evaluation
Contract negotiation
Governance and support
Preparing response
Outline solution & pricing
Detailed solution & final pricing
Responding to clarifications
Preparing presentation
Contract negotiation
Mobilise!
Celebrate (& sleep)
![Page 10: Bid to Win workshop for Seedbed - October 2015](https://reader031.fdocuments.net/reader031/viewer/2022022200/58a625c01a28ab416c8b5249/html5/thumbnails/10.jpg)
Competitive dialogue• there is no single way to for buyers to approach dialogue
• time commitment could range from one day per month to two days per week
• the aim is for the buyer to engage fully with the bidder and their solution, and help guide it towards something they would buy
• provides an opportunity for the buyer to align bidders
• onus shifts from buyer to bidder as dialogue progresses (can be very early!)
• often limited numbers in the room (bench system) - bidder usually outnumbered
• buyer will usually set topic for discussion, with certain sessions left to discretion of bidder
• after dialogue you will be expected to submit a final proposal, which should be based on what you have pitched and agreed in dialogue - no surprises!
![Page 11: Bid to Win workshop for Seedbed - October 2015](https://reader031.fdocuments.net/reader031/viewer/2022022200/58a625c01a28ab416c8b5249/html5/thumbnails/11.jpg)
Sector differences
Public sector
• rigorous
• process-driven
• much improved but slower
• restricted in evaluation
• social value act
Private sector
• flexible
• fast
• variable quality
• unrestricted in evaluation
• no social value obligation
![Page 12: Bid to Win workshop for Seedbed - October 2015](https://reader031.fdocuments.net/reader031/viewer/2022022200/58a625c01a28ab416c8b5249/html5/thumbnails/12.jpg)
Some good bid behaviours• one team approach - ‘what’s best for the customer?” not ‘what’s
best for me/my company?”
• clear roles and accountability - knowing exactly who is responsible for what
• stick to deadlines - internal timescales should be driven by buyer’s programme
• presentation is important - everything you produce & present matters, invest in support if needed
• plan early for mobilisation - may identify issues, shows buyer we are serious
• it’s always about the customer, never about you!
![Page 13: Bid to Win workshop for Seedbed - October 2015](https://reader031.fdocuments.net/reader031/viewer/2022022200/58a625c01a28ab416c8b5249/html5/thumbnails/13.jpg)
Bid submissionswritten response
• free form
• question response
• online form
pricing files
contract or commentary
presentation
![Page 14: Bid to Win workshop for Seedbed - October 2015](https://reader031.fdocuments.net/reader031/viewer/2022022200/58a625c01a28ab416c8b5249/html5/thumbnails/14.jpg)
How bids are evaluatedRead the guidance carefully!
Quality v price
Quality
• Different sections, different markers
• graded
Price
• absolute
• £ per quality price
• relative to lowest
Auction?
![Page 15: Bid to Win workshop for Seedbed - October 2015](https://reader031.fdocuments.net/reader031/viewer/2022022200/58a625c01a28ab416c8b5249/html5/thumbnails/15.jpg)
Why bidding is great
Breadth of disciplines
Design the future
Scale & impact
Profile
Challenge
Learning
Competitive
![Page 16: Bid to Win workshop for Seedbed - October 2015](https://reader031.fdocuments.net/reader031/viewer/2022022200/58a625c01a28ab416c8b5249/html5/thumbnails/16.jpg)
Why bidding sucks
Time
Money
Risk
Binary outcome
![Page 17: Bid to Win workshop for Seedbed - October 2015](https://reader031.fdocuments.net/reader031/viewer/2022022200/58a625c01a28ab416c8b5249/html5/thumbnails/17.jpg)
Principles of bidding to win
![Page 18: Bid to Win workshop for Seedbed - October 2015](https://reader031.fdocuments.net/reader031/viewer/2022022200/58a625c01a28ab416c8b5249/html5/thumbnails/18.jpg)
#1 Be selective
![Page 19: Bid to Win workshop for Seedbed - October 2015](https://reader031.fdocuments.net/reader031/viewer/2022022200/58a625c01a28ab416c8b5249/html5/thumbnails/19.jpg)
#2 Assemble the right team
![Page 20: Bid to Win workshop for Seedbed - October 2015](https://reader031.fdocuments.net/reader031/viewer/2022022200/58a625c01a28ab416c8b5249/html5/thumbnails/20.jpg)
#3 Devote time
![Page 21: Bid to Win workshop for Seedbed - October 2015](https://reader031.fdocuments.net/reader031/viewer/2022022200/58a625c01a28ab416c8b5249/html5/thumbnails/21.jpg)
#4 Do your homework
![Page 22: Bid to Win workshop for Seedbed - October 2015](https://reader031.fdocuments.net/reader031/viewer/2022022200/58a625c01a28ab416c8b5249/html5/thumbnails/22.jpg)
#5 Think holistic
![Page 23: Bid to Win workshop for Seedbed - October 2015](https://reader031.fdocuments.net/reader031/viewer/2022022200/58a625c01a28ab416c8b5249/html5/thumbnails/23.jpg)
#6 Start from scratch
![Page 24: Bid to Win workshop for Seedbed - October 2015](https://reader031.fdocuments.net/reader031/viewer/2022022200/58a625c01a28ab416c8b5249/html5/thumbnails/24.jpg)
#7 Don’t be precious
![Page 25: Bid to Win workshop for Seedbed - October 2015](https://reader031.fdocuments.net/reader031/viewer/2022022200/58a625c01a28ab416c8b5249/html5/thumbnails/25.jpg)
#8 Focus on what is critical
![Page 26: Bid to Win workshop for Seedbed - October 2015](https://reader031.fdocuments.net/reader031/viewer/2022022200/58a625c01a28ab416c8b5249/html5/thumbnails/26.jpg)
#9 Go big or go home
![Page 27: Bid to Win workshop for Seedbed - October 2015](https://reader031.fdocuments.net/reader031/viewer/2022022200/58a625c01a28ab416c8b5249/html5/thumbnails/27.jpg)
#10 Say what you'll do, do what you say
![Page 28: Bid to Win workshop for Seedbed - October 2015](https://reader031.fdocuments.net/reader031/viewer/2022022200/58a625c01a28ab416c8b5249/html5/thumbnails/28.jpg)
#11 Default to open
![Page 29: Bid to Win workshop for Seedbed - October 2015](https://reader031.fdocuments.net/reader031/viewer/2022022200/58a625c01a28ab416c8b5249/html5/thumbnails/29.jpg)
#12 Choose your partners carefully
![Page 30: Bid to Win workshop for Seedbed - October 2015](https://reader031.fdocuments.net/reader031/viewer/2022022200/58a625c01a28ab416c8b5249/html5/thumbnails/30.jpg)
A winning bid approach
![Page 31: Bid to Win workshop for Seedbed - October 2015](https://reader031.fdocuments.net/reader031/viewer/2022022200/58a625c01a28ab416c8b5249/html5/thumbnails/31.jpg)
The process1. what is the context of the opportunity?
2. who is buying?
3. why should we win this opportunity?
4. what does a winning solution look like?
5. how will we deliver?
6. how does our solution work financially?
7. what risks must we manage?
![Page 32: Bid to Win workshop for Seedbed - October 2015](https://reader031.fdocuments.net/reader031/viewer/2022022200/58a625c01a28ab416c8b5249/html5/thumbnails/32.jpg)
Your turn
think of a customer or partner you’d like to
work with to use as a case study
![Page 33: Bid to Win workshop for Seedbed - October 2015](https://reader031.fdocuments.net/reader031/viewer/2022022200/58a625c01a28ab416c8b5249/html5/thumbnails/33.jpg)
The bid canvas
• inspired by the lean canvas
• a one-page overview of your winning bid proposition
• tool to ensure your offer is coherent
• design - test - learn
• with internal & external stakeholders
![Page 34: Bid to Win workshop for Seedbed - October 2015](https://reader031.fdocuments.net/reader031/viewer/2022022200/58a625c01a28ab416c8b5249/html5/thumbnails/34.jpg)
The bid canvas
1 - Buyer problem
5 - Key processes
4 - Solution design
principles
3 - Win themes
2 - Customer segments
Competition/alternatives
6 - Key metrics
9 - Key risks Key influencers
7 - Cost structure 8 - Revenue streams
![Page 35: Bid to Win workshop for Seedbed - October 2015](https://reader031.fdocuments.net/reader031/viewer/2022022200/58a625c01a28ab416c8b5249/html5/thumbnails/35.jpg)
1 - what is the context of the opportunity?
For you?
strategic fit?
deliverable?
winnable?
can we stand out?
do we have resources?
do we want it?
For the buyer?
why does this opportunity exist?
what’s their problem/need?
what’s going on in their world?
who is driving the opportunity?
![Page 36: Bid to Win workshop for Seedbed - October 2015](https://reader031.fdocuments.net/reader031/viewer/2022022200/58a625c01a28ab416c8b5249/html5/thumbnails/36.jpg)
Customer research toolswebsite
annual reports
press releases
publications
industry news sources
your network i.e. contacts
![Page 37: Bid to Win workshop for Seedbed - October 2015](https://reader031.fdocuments.net/reader031/viewer/2022022200/58a625c01a28ab416c8b5249/html5/thumbnails/37.jpg)
Useful tool - business model environment
![Page 38: Bid to Win workshop for Seedbed - October 2015](https://reader031.fdocuments.net/reader031/viewer/2022022200/58a625c01a28ab416c8b5249/html5/thumbnails/38.jpg)
The bid canvas
1 - Buyer problem
5 - Key processes
4 - Solution design
principles
3 - Win themes
2 - Customer segments
Competition6 - Key metrics
9 - Key risks Key influencers
7 - Cost structure 8 - Revenue streams
![Page 39: Bid to Win workshop for Seedbed - October 2015](https://reader031.fdocuments.net/reader031/viewer/2022022200/58a625c01a28ab416c8b5249/html5/thumbnails/39.jpg)
2 - who is buying?• what do we know about the buyer?
• who are the customers?
• balance of power?
• key stakeholders?
• key decision makers?
• what relationships do we have/need?
• Supporters? Opponents?
![Page 40: Bid to Win workshop for Seedbed - October 2015](https://reader031.fdocuments.net/reader031/viewer/2022022200/58a625c01a28ab416c8b5249/html5/thumbnails/40.jpg)
Useful tool - stakeholder map
Name Role OrganisationSupport (Low
- Neutral - High)
What do we want from
stakeholder?
What’s important to stakeholder?
How could they block?
How can we enhance their
support?
![Page 41: Bid to Win workshop for Seedbed - October 2015](https://reader031.fdocuments.net/reader031/viewer/2022022200/58a625c01a28ab416c8b5249/html5/thumbnails/41.jpg)
The bid canvas
1 - Buyer problem
5 - Key processes
4 - Solution design
principles
3 - Win themes
2 - Customer segments
Competition6 - Key metrics
9 - Key risks Key influencers
7 - Cost structure 8 - Revenue streams
![Page 42: Bid to Win workshop for Seedbed - October 2015](https://reader031.fdocuments.net/reader031/viewer/2022022200/58a625c01a28ab416c8b5249/html5/thumbnails/42.jpg)
3 - why should we win?
• Win theme development answers the “why us” question
• a win theme is a high level feature or benefit of your solution that transcends the entire proposal i.e. a common or golden thread
• aim for 2-4 win themes
![Page 43: Bid to Win workshop for Seedbed - October 2015](https://reader031.fdocuments.net/reader031/viewer/2022022200/58a625c01a28ab416c8b5249/html5/thumbnails/43.jpg)
Win themes
Differentiate
Resonate
Substantiate
A win theme should have three features:
• resonate - does the customer care?
• differentiate - are we the only bidder who can say it?
• substantiate - can we prove it?
![Page 44: Bid to Win workshop for Seedbed - October 2015](https://reader031.fdocuments.net/reader031/viewer/2022022200/58a625c01a28ab416c8b5249/html5/thumbnails/44.jpg)
Win theme examplesPut the client first
• Not “we are an agile business“ but “our agile approach means we can react quickly and effectively to changes in your needs“
Express it in terms of benefits to the customer
• Not “our IT systems are market-leading“ but “we will provide real-time performance measurement and impact data through our market-leading IT platform“
Justify it with evidence
• Not “we have ten years of experience in delivering health services in the County” but “over the last ten years we have built strong relationships with key partners and stakeholders across the County”
Always ask “so what?” if you’re not sure!
![Page 45: Bid to Win workshop for Seedbed - October 2015](https://reader031.fdocuments.net/reader031/viewer/2022022200/58a625c01a28ab416c8b5249/html5/thumbnails/45.jpg)
Win theme example - healthcare1. Stakeholder and community engagement - across the whole of the
County, with the full support of GPs and the involvement of residents through co-design, communication and feedback
2. Empowered & motivated workforce - we help our people go the extra mile for patients by building a culture that encourages and rewards staff who do the right thing
3. Whole-system integration and leadership experience - we already operate across all services and health and social care providers for the benefit of service users
4. Innovative solutions - we have a 10-year history of successfully delivering change that brings benefits to service users and commissioners
![Page 46: Bid to Win workshop for Seedbed - October 2015](https://reader031.fdocuments.net/reader031/viewer/2022022200/58a625c01a28ab416c8b5249/html5/thumbnails/46.jpg)
The bid canvas
1 - Buyer problem
5 - Key processes
4 - Solution design
principles
3 - Win themes
2 - Customer segments
Competition6 - Key metrics
9 - Key risks Key influencers
7 - Cost structure 8 - Revenue streams
![Page 47: Bid to Win workshop for Seedbed - October 2015](https://reader031.fdocuments.net/reader031/viewer/2022022200/58a625c01a28ab416c8b5249/html5/thumbnails/47.jpg)
4 - what does a winning solution look like?
• set the key pillars or parameters of your solution that will ensure that it meets your customer’s needs
• establish your design principles before you sit down to design your solution or offer
• design principles provide a checklist or reference throughout the bid process - they keep you honest!
• aim for 6-10
![Page 48: Bid to Win workshop for Seedbed - October 2015](https://reader031.fdocuments.net/reader031/viewer/2022022200/58a625c01a28ab416c8b5249/html5/thumbnails/48.jpg)
Design principles example - healthcare
1. Our strategy and services will be designed round the needs of patients and their communities
2. Everyone will receive the same, high level of care
3. We will empower patients to receive as much care at home or in the community as possible
4. Our staff will feel valued, and will be empowered to do the right thing
5. Our services will deliver a seamless experience 24/7
6. We will strive to make the complex simple
7. Our organisation will be agile in response to a changing environment
8. We will be a learning organisation and use the information we collect to find opportunities to innovate
9. We will be open, accountable and transparent when engaging with stakeholders
10. We will take a ‘whole-system’ view to maximise value for money and the sustainability of services
![Page 49: Bid to Win workshop for Seedbed - October 2015](https://reader031.fdocuments.net/reader031/viewer/2022022200/58a625c01a28ab416c8b5249/html5/thumbnails/49.jpg)
Design principles example - GDS
![Page 50: Bid to Win workshop for Seedbed - October 2015](https://reader031.fdocuments.net/reader031/viewer/2022022200/58a625c01a28ab416c8b5249/html5/thumbnails/50.jpg)
Design principles example - GDS
![Page 51: Bid to Win workshop for Seedbed - October 2015](https://reader031.fdocuments.net/reader031/viewer/2022022200/58a625c01a28ab416c8b5249/html5/thumbnails/51.jpg)
The bid canvas
1 - Buyer problem
5 - Key processes
4 - Solution design
principles
3 - Win themes
2 - Customer segments
Competition6 - Key metrics
9 - Key risks Key influencers
7 - Cost structure 8 - Revenue streams
![Page 52: Bid to Win workshop for Seedbed - October 2015](https://reader031.fdocuments.net/reader031/viewer/2022022200/58a625c01a28ab416c8b5249/html5/thumbnails/52.jpg)
5 - how will we deliver?
• your solution represented by your
operating model, which defines how you
will deliver
• no single approach to solution design,
driven by sector, scope, terms etc
• but common themes need to be considered
![Page 53: Bid to Win workshop for Seedbed - October 2015](https://reader031.fdocuments.net/reader031/viewer/2022022200/58a625c01a28ab416c8b5249/html5/thumbnails/53.jpg)
Operating model design
Processes
Governance
Metrics
PeopleTechnology
What is the key work? What do we have to
be excellent at?
What are the key outcomes? What must be measured? How do we define success?
What capabilities do we need? What capacity? How should it be organised? What facilities & assets do we need?
What systems do we need? Information security? Hardware? Software?
Data management?
What legal and fiscal structure do we need?
How should governance be managed? Escalation?
Iterative process
![Page 54: Bid to Win workshop for Seedbed - October 2015](https://reader031.fdocuments.net/reader031/viewer/2022022200/58a625c01a28ab416c8b5249/html5/thumbnails/54.jpg)
The bid canvas
1 - Buyer problem
5 - Key processes
4 - Solution design
principles
3 - Win themes
2 - Customer segments
Competition6 - Key metrics
9 - Key risks Key influencers
7 - Cost structure 8 - Revenue streams
![Page 55: Bid to Win workshop for Seedbed - October 2015](https://reader031.fdocuments.net/reader031/viewer/2022022200/58a625c01a28ab416c8b5249/html5/thumbnails/55.jpg)
6 - how does it work financially?• Cost v price
• cost = what it will cost you to deliver
• price = what you will charge the customer
• what’s the difference?
• be clear to the buyer
• don’t kid yourself
![Page 56: Bid to Win workshop for Seedbed - October 2015](https://reader031.fdocuments.net/reader031/viewer/2022022200/58a625c01a28ab416c8b5249/html5/thumbnails/56.jpg)
Cost structure• top-down v bottom-up
• expert input
• subject matter expertise
• financial modelling
• sensitivities
• consistency with solution
• categories…people, equipment, consumables, transport, technology, facilities, overheads etc
• time-bound also…pre-contract start, during change, steady state…
![Page 57: Bid to Win workshop for Seedbed - October 2015](https://reader031.fdocuments.net/reader031/viewer/2022022200/58a625c01a28ab416c8b5249/html5/thumbnails/57.jpg)
Pricing model• client perspective - use their templates to understand their
view
• how will it look to the buyer?
• fixed v variable etc price elements
• model sensitivities driven by key risks and scenarios
• understand the impact on your business
• understand impact on P&L, cashflow and balance sheet
• commercial issues
![Page 58: Bid to Win workshop for Seedbed - October 2015](https://reader031.fdocuments.net/reader031/viewer/2022022200/58a625c01a28ab416c8b5249/html5/thumbnails/58.jpg)
Pricing model schematic example - service transformation
![Page 59: Bid to Win workshop for Seedbed - October 2015](https://reader031.fdocuments.net/reader031/viewer/2022022200/58a625c01a28ab416c8b5249/html5/thumbnails/59.jpg)
The bid canvas
1 - Buyer problem
5 - Key processes
4 - Solution design
principles
3 - Win themes
2 - Customer segments
Competition6 - Key metrics
9 - Key risks Key influencers
7 - Cost structure 8 - Revenue streams
![Page 60: Bid to Win workshop for Seedbed - October 2015](https://reader031.fdocuments.net/reader031/viewer/2022022200/58a625c01a28ab416c8b5249/html5/thumbnails/60.jpg)
7 - what risks must we manage?• What are the key risks you need to manage?
• what could go wrong?
• financial
• commercial
• operational
• regulatory/compliance
• reputational
![Page 61: Bid to Win workshop for Seedbed - October 2015](https://reader031.fdocuments.net/reader031/viewer/2022022200/58a625c01a28ab416c8b5249/html5/thumbnails/61.jpg)
Some commercial issues to consider• payment mechanism
• change control
• performance measurement
• termination rights
• governance
• reporting
• cost of change
• investment in assets & cost recovery
• gainshare, rebates etc
• benchmarking
• service levels
• liability caps
• TUPE
• pensions
• year-on-year pricing
• inflation
• changes in law
• changes in ownership
• due diligence
• step-in rights
![Page 62: Bid to Win workshop for Seedbed - October 2015](https://reader031.fdocuments.net/reader031/viewer/2022022200/58a625c01a28ab416c8b5249/html5/thumbnails/62.jpg)
The bid canvas
1 - Buyer problem
5 - Key processes
4 - Solution design
principles
3 - Win themes
2 - Customer segments
Competition6 - Key metrics
9 - Key risks Key influencers
7 - Cost structure 8 - Revenue streams
![Page 63: Bid to Win workshop for Seedbed - October 2015](https://reader031.fdocuments.net/reader031/viewer/2022022200/58a625c01a28ab416c8b5249/html5/thumbnails/63.jpg)
If you lose?
feedback
learning
relationship
![Page 64: Bid to Win workshop for Seedbed - October 2015](https://reader031.fdocuments.net/reader031/viewer/2022022200/58a625c01a28ab416c8b5249/html5/thumbnails/64.jpg)
If you win?
• contract close
• press release
• mobilise
• establish governance etc
• deliver!