BHEL Presentation IIFL 030210

download BHEL Presentation IIFL 030210

of 25

Transcript of BHEL Presentation IIFL 030210

  • 7/31/2019 BHEL Presentation IIFL 030210

    1/25

    At

    3rdFebruary 2010Mumbai

  • 7/31/2019 BHEL Presentation IIFL 030210

    2/25

    Cautionary Statement

  • 7/31/2019 BHEL Presentation IIFL 030210

    3/25

  • 7/31/2019 BHEL Presentation IIFL 030210

    4/25

    Power Transmission

    Industry Transportation

    Oil & Gas NCES

    Single Source

    for Multiple

    Solutions of

    Infrastructure &

    Industrial

    Sectors of the

    Economy

  • 7/31/2019 BHEL Presentation IIFL 030210

    5/25

  • 7/31/2019 BHEL Presentation IIFL 030210

    6/25

  • 7/31/2019 BHEL Presentation IIFL 030210

    7/25

    (Rs. crore)

  • 7/31/2019 BHEL Presentation IIFL 030210

    8/25

    Rs. crore

  • 7/31/2019 BHEL Presentation IIFL 030210

    9/25

    Rs. crore

    Total Order Book as on 31.12.09: Rs. 1,34,000 crore

  • 7/31/2019 BHEL Presentation IIFL 030210

    10/25

    Parameter Q3 FY0910 Q3 FY0809 YoY %

    Turnover 7381 6445 + 15%

    EBIDTA 1755 1327 + 32%

    EBIDTA Margin 24% 21% +319 bps

    Profit Before Tax (PBT) 1644 1223 + 34%

    Profit After Tax (PAT) 1073 791 + 36%

    EPS (Rs) 21.91 16.13 + 36%

    (Rs. Crore)

    Growth Story Continues

  • 7/31/2019 BHEL Presentation IIFL 030210

    11/25

    (Rs Cr)

  • 7/31/2019 BHEL Presentation IIFL 030210

    12/25

    Transmission,

    7.6%

    Transportation,3.6%

    Other Indl.

    Products, 12.8%

    Transformers

    Switchgear Indl. Control Gear / Control Panels

    Capacitors

    Insulators

    HVDC/ Transmission Projects

    Traction machines Traction Control gears

    DESL

    AC Locos / DG Sets / Other

    Industrial Machines

    Indl. TG / Boiler Sets Compressors

    Oil Field Equipment

    Valves

    Others

    Industry Segment contribution to

    total Turnover: 25-27%

  • 7/31/2019 BHEL Presentation IIFL 030210

    13/25

  • 7/31/2019 BHEL Presentation IIFL 030210

    14/25

    BHEL is fully geared up

    to meet demand for

    Power Plant Equipments

    in the Country.

  • 7/31/2019 BHEL Presentation IIFL 030210

    15/25

    Ordered on

    Others

    36097

    45%

    Thermal

    33298

    41%

    Hydro

    6142

    8%

    Nuclear

    500

    1%

    Gas

    3973

    5%

    BHEL

    43913

    54%

  • 7/31/2019 BHEL Presentation IIFL 030210

    16/25

  • 7/31/2019 BHEL Presentation IIFL 030210

    17/25

  • 7/31/2019 BHEL Presentation IIFL 030210

    18/25

  • 7/31/2019 BHEL Presentation IIFL 030210

    19/25

  • 7/31/2019 BHEL Presentation IIFL 030210

    20/25

  • 7/31/2019 BHEL Presentation IIFL 030210

    21/25

  • 7/31/2019 BHEL Presentation IIFL 030210

    22/25

  • 7/31/2019 BHEL Presentation IIFL 030210

    23/25

  • 7/31/2019 BHEL Presentation IIFL 030210

    24/25

  • 7/31/2019 BHEL Presentation IIFL 030210

    25/25

    AA:P

    LD:56::02.0

    2.1

    0