BGT Corporate Proposal-Draft-1

download BGT Corporate Proposal-Draft-1

of 28

Transcript of BGT Corporate Proposal-Draft-1

  • 8/7/2019 BGT Corporate Proposal-Draft-1

    1/28

    BGT COMPANY PROPOSAL

    [Type the document subtitle] | OCHAI

    BGT BGTCORP.PRPOPOSAL

  • 8/7/2019 BGT Corporate Proposal-Draft-1

    2/28

    2

    Purpose ................................ ................................ ................................ ................................ ............. 3

    Unders

    anding ofB

    require ents................................ ................................ ................................ 5

    Due Diligence Documentation for B

    ................................ ................................ ........................... 10

    Tec nical Due Diligence ................................ ................................ ................................ ................... 17

    1. Tec nical................................ ................................ ................................ ................................ .. 18

    1.1. Network Documentation ................................ ................................ ................................ ...... 18

    1.2. Hardware ................................ ................................ ................................ ..................... 18

    1.3. Software................................ ................................ ................................ ....................... 18

    1.4. Links ................................ ................................ ................................ ............................. 18

    1.5. Coverage ................................ ................................ ................................ ...................... 18

    1.6. Co-location ................................ ................................ ................................ ................... 18

    2. Services................................ ................................ ................................ ............................ 19

    3. Customers ................................ ................................ ................................ ........................ 19

    4. Interconnects ................................ ................................ ................................ ................... 19

    5. Capacity ................................ ................................ ................................ ........................... 19

    6. In progress ................................ ................................ ................................ ....................... 19

    7. Outsourcing ................................ ................................ ................................ ............................. 19

    8. Outbound ................................ ................................ ................................ ......................... 19

    9. Inbound................................ ................................ ................................ ............................ 19

    10. Employees ................................ ................................ ................................ ........................... 19

    10.1. Areas of Expertise ................................ ................................ ................................ ..... 19

    10.2. Key Employees................................ ................................ ................................ .......... 19

    10.3. Structure ................................ ................................ ................................ .................. 19

    11. Intelectual Properties................................ ................................ ................................ ........... 20

    12. Projects................................ ................................ ................................ ................................ 20

    13. Present ................................ ................................ ................................ ......................... 20

    14. Past ................................ ................................ ................................ .............................. 20

    15. Future ................................ ................................ ................................ .......................... 20

    16. Licenses ................................ ................................ ................................ ............................... 20

    17. Market/Commercial ................................ ................................ ................................ ............. 20

    18. Risks................................ ................................ ................................ ................................ ..... 20

  • 8/7/2019 BGT Corporate Proposal-Draft-1

    3/28

    3

    19. Missing topics ................................ ................................ ................................ ...................... 20

    Delivery Structure (Work Pl n Overview) ................................ ................................ ......................... 21

    Implement

    tion Pln ................................ ................................ ................................ ....................... 23

    Personal Profile / Personal Attributes ................................ ............ Error! Bookmark not defined.

    Experience / Specialisms ................................ ............................. Error! Bookmark not defined.

    Achievements ................................ ................................ ............... Error! Bookmark not defined.

    Career History: ................................ ................................ ............. Error! Bookmark not defined.

  • 8/7/2019 BGT Corporate Proposal-Draft-1

    4/28

    4

    Docu

    nt Pu

    pos

    This document provides the description ofser vices to be rendered byB T, proceduresand

    comprehensiveanalysis of this proposed networks infrastructure. The purpose of this

    document is to lay the necessary groundwork to establish for B T network based on

    accurate information provision, to build an accurate picture ofB

    T enterprise. Thisshould

    include thecapture of the proposed network architecture, complete picture ofall the

    required assets, market penetration and service portfolio, financial dataand forecast. B T

    will provide information on specifics, such as network entities, capital equipment

    requirements to meet interim and long term objectives , network and facilities installation,

    post support, and program design based on our extensiveexpertise in this field in Nigeria.

  • 8/7/2019 BGT Corporate Proposal-Draft-1

    5/28

    5

    Understanding of BGT requirements

    B T understands that in order to enter the ICT bundlecompetitive market it must endeavour to

    review each of thefollowing areas:

    y Comprehensive review of proposed infrastructure (operational, and non operational

    assets

    y Review of non infrastructural assets

    y Architectural and design review

    y Examination of proposed services

    y Type ofBilling services required

    y Financial and revenue generation prospects, data review, and analysis

    y Market analysisand survey

    y Human Resources

  • 8/7/2019 BGT Corporate Proposal-Draft-1

    6/28

    6

    Executive Summary

    y This proposal describes ICT bundle infrastructure requirements for B T to enter this

    competitive market.B T will evaluateall infrastructure / network elements, assets,facilities, licensing / agreements, and strategic resources to ensureaseamlessentryin thecompetitive ICT bundle market. This process will ascertain details ofB T

    capabilities using S OT analysis. Then, with theclarity that this proposal provides

    and the data generated from thisexercise, B T will haveat its disposal essential

    tools that are required to dynamicallystrategize the most proactive market

    approach. And deliver the best services

  • 8/7/2019 BGT Corporate Proposal-Draft-1

    7/28

    7

    Requirements and data gathering sections:

    This proposal will bea document centric process ofB T prospects. Reflective of this fact

    B T has provided the following tables. (See table 1 pp10 ) below for financial and technical

    formats respectively; CAC and NCC licences will besort and acquired byB T. Our dedicated team will beactively

    seeking all relevant data to support the ICT bundle deliverablesasenvisioned byB T. This

    team is poised to assist in all levels through thiscritical phase.

    During this data gathering process in the requirements, B T will analyze its facilities by

    performing various best practice verification and validation exercises, including the

    following:

    BGTd

    t

    gath

    ing:

    i Co p ! h! nsiv ! layoutofp opos! dinf ast uctu ! (bothop! ational, andnon

    op! ational ass! ts)

    a. Proposed asset enumeration

    i. Top down list ofall ICT equipment

    1. Procurement of required network elements

    2. Warrantyand or manufacturers guarantees

    3. Softwareand related licensing status on operating infrastructure

    a. Reconciliation ofsoftware / licensing as will be implementedagainst existing purchase orders

    4. Fibre infrastructure

    a. Proposed Fibre Optic Network Elements (leased and / or

    B " T instituted) gigabit passive optical network (GPON)

    b. Proposed Network Topology

    c. Proposed Network Capacity (as built)

    d. Fibre Optic Cable Routes (as proposed within Abuja

    Metropolis)

    e. Proposed Route planning

    f. Proposed Assesscapacityand inventory to be deployed

    ii. Non-ICT related equipment and assets

    1. Power, electrical

    2. Test Equipments ( Fibre / Electrical / RF )

    b. Enumeration of variances (undeclared proposed assets list and missing from asset

    list reports)

  • 8/7/2019 BGT Corporate Proposal-Draft-1

    8/28

    8

    ii # Noninf$ ast$ uctu $ al ass% ts:

    a. Licensing

    i. Commercial Licensing

    1. Incorporation, shareholder structureetc

    ii. NCC Licenses

    1. State, regional, and national

    iii. FCDA right of way (whereapplicable)

    iv. Sub contractual or partnership agreements (seeking 3rd

    partyservice

    providers)

    b. Competitive / commercial agreements / partnerships

    c. Other strategicarrangements / collocations or collaborative relationships

    iii& P ' opos( d Archit ( ctural / N ( twork distributiond ( sign

    iv &

    a. Proposed network capacity

    b. Core Network Architecture (As planned to be Deployed)

    i. Corporate LAN, enterprise MAN, National network, and services:

    1. i.e. Firewall, IP traffic routesand flow, physical network topology,

    media, and protocol required.

    2. Proposed help Desk, Email, Security, Anti-Virusand Intrusion

    detection

    3. Company Intranet and Internet presence

    CISCO 2950

  • 8/7/2019 BGT Corporate Proposal-Draft-1

    9/28

    9

    4. Proposed remote toolsand remote monitoring capabilities

    5. Proposed automated error correction and reporting /monitoring

    tools

    ii. Proposed keyclient inspection / sampling / performanceevaluation

    iii. Proposed Network Security Evaluation

    1. Access Control

    2. Client securityand access

    3. CRM / database management

    4. Firewall / intrusion prevention / control

    5. Intranet / Internet / Web

    c. Fibre Optic Network (Leased or Planned Deployment)

    d. Network Power Distribution Design

    i. Both for Core network and NOC facilities, hub or satellite / remote locations

    v) 0 xaminationofpropos1 ds 1 rvic1 s asplann1 d:

    a. Enumeration and definition ofservices

    i. Proposed Packages / Marketing

    ii. Proposed Client surveys / satisfaction and analysis

    iii. Examination of Churn in existing networks (ICT Bundleservices) in Nigeria

    iv. Proposed Client retention programs / reward programs / incentives

    vi2 Propos3 dBilling s3 rvic3 s

    a. Assessment of type of billing platform to be deployed

    i. Billing Structure

    ii. Billing Criteria

    iii. Service definition and consistency through financial / marketing / technical

    organizationsiv. Uniformity of labelling

    v. Client tracking data (CRM) through the billing / financial / technical systems

    b. Pulling data from switch

    i. Accesscontrol

    vii 4 Propos5 d Financial and revenue generation

    a. Financial analysis

    b. Proposed reconciliation of billing from switch dataagainst audited monthly financial

    results

    i. Proposed capacities from suppliersasagainst real-time dataanalysis of

    networkii. Comparison of declared capacitiessold (whether clear channel, internet, or

    other as from salesand marketing) against real-time dataanalysis ofswitch

    and billing systems.

    viii 6 Market Analysis andsurvey

    a. Review ofcosts ofservices (competitiveness)

    b. Forecasting and projections based on present business model

  • 8/7/2019 BGT Corporate Proposal-Draft-1

    10/28

    10

    c. Forecast review based on strategic / architectural / marketing changes (with

    management input)

    ix7 Human Resources

    a. Proposed Staff retention / remuneration strategy (existing)

    i. Adequacy of planned remuneration

    ii. Risk assessment

    iii. Avoid Redundancy of key positions

    b. Competency review of technical management, evaluation

    c. Integrity / efficacy of Marketing and Sales, evaluation

    d. Adherence to best practices, adhesion to company guidelines

    e. StaffStrength / adequacy

    Table 1

    Due Diligence Documentation for BGT

    DUE DILIGENCE CATEGORY DOCUMENTATION TASK OWNER STATUS

    BusinessPlan, Corporate Structure, Financing

    Businessplan Latest Business Plan 3 year forecast

    Corporate Certificate of Incorporation

    Certificate to CommenceBusiness

    Articles of Association & Memorandum

    Anyamendments to any Corporate documents ie. name

    change, increase in sharecapital

    List of Directors, including contact details

  • 8/7/2019 BGT Corporate Proposal-Draft-1

    11/28

    11

    DUE DILIGENCE CATEGORY DOCUMENTATION TASK OWNER STATUS

    Shareholders Share Register

    Shareholders Agreement

    Stock option plan

    Samples ofcommon and preferred stock certificates,

    debentures, and other outstanding securities

    Warrants, options, and other rights to acquireequitysecurities

    Current shareholders, including number ofshares owned, dates

    that shares wereacquired, considerations received, and contact

    information

    Relevant private placement memorandaand other offering

    circulars

    Lenders Convertible, senior, or other debt financing

    Bank lines ofcredit, loan agreements, or guarantees

    Loan defaults or expected defaults

    Recentcorporate transactions Proposed Description and rationale for each transaction

    Proposed Purchaseand saleagreements

    Regulations Business licenses (Excluding Telecom Licenses)

    Environmental permits (whereapplicable)

    Workers health and safety permits

    Sales & Marketing

    Market analysis Competition by product line (includecontact details, market

    size, market share, and competitiveadvantagesand

    disadvantages)

    Product rollout scheduleand product lifecycle

    Features, benefits & pricing of product offerings

    Copies of patentsand trademarks filed or obtained

    Pricing strategy of product or service

  • 8/7/2019 BGT Corporate Proposal-Draft-1

    12/28

    12

    DUE DILIGENCE CATEGORY DOCUMENTATION TASK OWNER STATUS

    Descriptions ofexisting partnersand joint ventures

    Distribution channels

    Promotion tactics

    Prospective Top-10 customers by product line

    Salesand marketing presentations

    Product cataloguesand brochures

    Press releases or articles written about the organization

    Professional affiliations

    Customer servicestrategy

    Contracts Major contracts by product line

    Support/maintenancecontracts

    Warrantiesand guarantees

    Other customer-related contracts

    Customer Contracts

    Supplier Contracts

    Technology Technologystrategy

    Overall technical capabilities

    Technical competitiveadvantagesand weaknesses

    Technical personnel

    Copies of user documentation by product (current and historical

    ifany)

    Copies of technical requirements, codestrategy by product

    (current and historical)

    Development process

  • 8/7/2019 BGT Corporate Proposal-Draft-1

    13/28

    13

    DUE DILIGENCE CATEGORY DOCUMENTATION TASK OWNER STATUS

    Financial and Operations

    Financial statements Proposed Threeyears plane:

    - Incomestatement (P&L)

    - Balancesheet

    - Statement ofcash flows

    - Statement ofshareholdersequity

    Management Accounts to date

    Most recent Management/DirectorsBudgets/Forecast

    Monthlysales projectionsand sales pipeline over next 18

    months, including assumptions

    Key financial ratios Liquidity

    Leverage

    Operating efficiency

    Profitability

    Return to investors

    Taxes Statement from Auditorsconfirming that all taxesare up to

    date

    If tax returnsare not up to date provide liabilitystatement

    Copy of Annual Tax returns (National & Local Government)

    Summary results ofall tax examinationsand audits

    Receivables (Hypothesis) Accounts receivable turnover

    Accounts receivableaging schedule

    Accounts receivablecontrol and credit policy

    Accounts receivableseasonality

  • 8/7/2019 BGT Corporate Proposal-Draft-1

    14/28

    14

    DUE DILIGENCE CATEGORY DOCUMENTATION TASK OWNER STATUS

    Creditors Creditors Ledger

    Age Analysis

    Arrangements with Creditors

    Capital expenditures Next fiveyears

    Nest Five-year gross projection

    Proposed Copex Ordered, but not delivered

    Detailed priority list

    Assets Detailed Asset List - Movable & Immoveable (Excluding Leased

    Transmission Network)

    Depreciation method

    Age

    Liquidation value

    Replacement value

    A list ofequipment suppliers (3 years back)

    Leases Lenders

    Terms

    Interest rate

    Payment schedule

    Litigation Current litigation and potential damages

    Potential litigation and potential damages

    Insurance Property

    Liability

    Workerscompensation

  • 8/7/2019 BGT Corporate Proposal-Draft-1

    15/28

    15

    DUE DILIGENCE CATEGORY DOCUMENTATION TASK OWNER STATUS

    Other

    Informationsystems Description of infrastructure

    Security layers

    Backup strategy

    List all software used in the daily operations i.e. accounting, HR,

    customer serviceetc.

    Confirm ifall software licensesare up to dateand ifany illegal

    softwareexists

    Property Leases List all leases & providecopies ofagreements, include thestart

    dateand termination date of property leases, plus liability

    associated with each property.

    Consultants Agreements of Consultants

    Management Organizational chart (including number ofemployees by

    department)

    Contracts of key managers

    Management stock incentives

    Compensation and benefits Proposed cash compensation per employee (including salary,

    bonuses, commissions)

    Proposed summary ofstandard employee benefits (such as

    medical insurance, disability insurance

    Proposed qualified pension and profit-sharing plans

    Other Ownership interest

    Employment contracts

    Performanceevaluation criteria

    Material transactions with insiders or associates of insiders

  • 8/7/2019 BGT Corporate Proposal-Draft-1

    16/28

    16

    DUE DILIGENCE CATEGORY DOCUMENTATION TASK OWNER STATUS

    References

    Investors: List all individualsand institutional investors

    Customers: List of top 10

    Strategic partners

    Consultants, freelance workers (current)

    Accountants (current)

    Bankersand creditors (current)

    Associations: All industryassociations in which companyand

    management areaffiliated or active

    Licenses & Frequencies Copy of licenses issued as issued by the Regulator

    Copy ofall frequencies issued as issued by the Regulator

    Copy ofany right of wayagreementsand dues paid

    Copy ofanyamendments to licenses & frequencies

    Latest statement reflecting fees due to the Regulator

    Regulator Check Request confirmation of validity of licenses & frequencies

    Request confirmation ofany outstanding fees due

    Request confirmation that thereare no liens or hypothecs over

    the licenses & frequencies

    Request confirmation of rules & regulations in place to

    successfully transfer a license & frequency, including the

    required procedureand timescales

    Any other matter which may be material to the transaction

  • 8/7/2019 BGT Corporate Proposal-Draft-1

    17/28

  • 8/7/2019 BGT Corporate Proposal-Draft-1

    18/28

    18

    y The purpose of this document is to propose requirement information.

    y Theanswers to thequestions provided shall not be limited to thecurrent statusand

    performance of thecompany, but shall also providesignificant events in the past and point out

    expectations for the future.

    1.Technical

    Providea general overview of theareas in which thecompanycurrently providesservices,

    expertiseand has properties.

    1.1.NetworkDocumentation

    1.1.1. Theaim of this task is to providecomplete network documentation.

    1.1.2. Providea general network description.

    1.1.3. Providea network diagram for each network.

    1.1.4. The diagram must include information for all subtopics.

    1.1.5. The diagram must be in MS Visio format.

    1.1.6. For each diagram item, fill in the Assets Table "network_assets.xlsx"

    1.2.Hardware

    1.2.1.Describeall hardwaresuch as: routers, switches, air conditioners, UPS, antennas.

    1.2.2.Provide information ofequipment loading.

    1.3.Software

    1.3.1.Describeall software, such as databases, monitoring software, mail servers, DNSserversand so

    on.

    1.4.Links

    1.4.1.Describeall network links, such as VSAT links, fibre links, wireless links , right of way, and so on.

    1.4.2.Is VSAT link shared or dedicated, loading?

    1.4.3.Include diagram of links loading.

    1.5.Coverage

    1.5.1.Separatecoverage maps must be provided. Describe the reach of the network. For example the

    location and the reach ofeach basestation, fibre node, or the places where fibre links reach.1.5.2.The diagram must include information that can link an asset to thecoverage map. Theasset id

    must be taken from "network_assets.xlsx"

    1.6.Co-location

    1.6.1.Describe theco-location centres

    1.6.2.Location

    1.6.3.What iscontained in theco-location centre

  • 8/7/2019 BGT Corporate Proposal-Draft-1

    19/28

    19

    1.6.4.How much additional space isavailable?

    1.6.5.State if theco-location place isattractive in terms of deploying linksand why.

    .

    2.Services

    2.1. Describe theservices that the network provides. If thereareany packages that you offer, describe

    them. For example: "Fibre Internet Gold 1mbit/sec bidirectional, no oversubscription, dedicated".

    3.Customers

    3.1. Describe where, how manyand at what capacities, customersconnect to the network.

    3.2. It must beclear which asset is theedge that connects to thecustomer.

    4.Interconnects

    4.1. Describeany interconnects with 3rd partiessuch as: ISPs, SP and so on. State thecontract names for

    the Interconnects.

    5.Capacity

    5.1. Provide thecapacity of theasset. For examplean IP link can have: 10Mbit/sec uplink, 5 Mbit/sec

    downlink, or ATM fibre routes may have 155mb/setc...

    6.In progress

    6.1. If theasset is not currentlyavailable to use or not yet completed this must be visible on the diagram.

    7.Outsourcing

    7.1. Provide information about tasksexported or imported from other companies.

    8.Outbound

    8.1. Do you rely on external companies to assist you with the technical mattersand to what extent? For

    example: When building aBS, you hireacompany to build the mast. Please provide only major

    activities that you outsource.

    9.Inbound

    9.1. What are the technical services that you provide for other companies? For example:server

    installations, router installations, building cabling, web hosting and so on.

    10.Employees

    Provide information about thestaffqualified in thearea of networking.

    10.1. Areas ofExpertise

    10.1.1. Provide theareas ofexpertise for each technical employee. It is ofcritical importance to

    point out skills, which can help to build a wireless network, such as:antenna mounting skills,basestation installation skills, core network planning skills, OLT engineering, IP routing skills,

    MPLS fibreand so on. Please fill in theattached document to complete this task:

    10.2. KeyEmployees

    10.2.1. Provide the names only of the keyemployees, and their keyabilities.

    10.3. Structure

    10.3.1. Describe thecompanystructure with regard to the technical staff.

  • 8/7/2019 BGT Corporate Proposal-Draft-1

    20/28

    20

    10.3.2. Point out the technicians, theengineers, theexpert staffand the managers.

    10.3.3. Point out the people, which support thecompanyservices outside business hours.

    10.3.4. Provide job description ofany technical position.

    11.Intelectual Properties

    11.1.Please provide information about all significant intellectual propertiesand R&D products, such as:Web sites, Software Platformsand so on.

    12.Projects

    12.1.Provide information about all past, present and future projects.

    13.Present

    13.1.Please provide the project plans for the projects that arecurrently being developed.

    14.Past

    14.1.Please provide information about completed projects.

    15.Future15.1.Please provide information about projects that haven't started yet.

    16.Licenses

    Provide information about all technical licenses that thecompany has.

    16.1.For Network Licenses provide: Name, Description, Coverage, Period, Title of the document that

    grants the license.

    16.2.Provide information about thesoftware licenses.

    16.3.Provide information about licenses that lack. For example: "30 computers use unlicensed versions of

    Windows XP" or "We havea fibre optic under the ground but we don't havea license from the

    government to place fibre under the ground".

    17.Market/Commercial

    17.1.Please provide overview information about the market share/competitors.

    18.Risks

    18.1.Provide information about significant risks for the normal operation of the network. For example

    state ifyou think that anyequipment is going to fail soon, if thereare dangers ofstealing, sabotage,

    overloading, expiration of license, fire, flooding, pollution or anything else.

    19.Missing topics

    Please provideadditional documentation that you consider important

  • 8/7/2019 BGT Corporate Proposal-Draft-1

    21/28

    21

    Delivery Structure (Work Plan Overview)

    To complete the project weenvisagecarrying out the following activities.

    y Logistics (Transport, document requestfees (NCC, CAC etc 8 8 8 )y Site Survey

    y Engineering review (On Site data collection and analysisfor all relevanttopics andoperation

    andinfrastructural verification and review)

    y Financial andcorporate review

    y Post administrative documentcollation anddissemination

    y Analysisinterpretation and reviewstructure

    y Stage 1 deliverables (Financial, Marketing, Technical Specifics)

    y Document Review by BGTtop managementteam

    y Submissionto boardofall deliverables

    y Conclusions

    y Future engagement / planning / forecasting / recapitalization

    The following structure will be used to deliver the above stated activities:

    ProjectManagement

    Managesclient relationships, and coordinates project activities.

    Financial Team

    Financial team will evaluateall necessary requirements within BGT start-up and deployment plans

    LogisticsTeam

    Movement ofequipment and engineers to site, conduct detail field surveys, manages disbursements

    forac

    tivities

    a

    nd fees

    .

    FieldEngineers

    Installation and setup, ofall test equipment used to validate network maps, planned or operational

    traffic routesand capacities, across the various media planned to be implemented byBGT.

    Documentation ofall ICT and operational equipment, dataand trafficanalysis, billing reconciliation

    and validation (from switch), all network nodes, power etc...

  • 8/7/2019 BGT Corporate Proposal-Draft-1

    22/28

    22

    BGT Organogram for this exercise andfunctionsisdescribed below

  • 8/7/2019 BGT Corporate Proposal-Draft-1

    23/28

    23

    Implementation Plan

    Our proven approach to ICT systemsanalysisand review utilizes industry best practice

    methodologies that reduces project risks, improves project deliverablesand ensures predictability in

    project outcomes. Weareable to further reduce project costs whileadding significant valueasa

    result of our knowledge of the local environment. Byengaging our financial consultancyand

    engineering project team to review all aspect BGT comprehensively, we harmonize thisentire

    process by leveraging multiplestreams of information coming from within our organization (from

    different disciplines with different perspectives) simultaneously, thuslyenhancing our results due to

    improved network design, organizational strategy, marketing targets, cross-checking, and

    reconciliation.

    BGT will have 2 teams (technical and financial) managed bya project / program manager to carry out

    thisengagement.

    The financial team will be responsible for theadministration and implementation ofall corporate

    and financial undertaking.

    The technical team will be responsible for the network augmentation for elements, deployment and

    testing plan, the implementation ofall test equipment for proposed network linksand

    infrastructure/hardware, architectural review, administration of ICT based bundleservicesand

    surveys.

    A principal ICT engineer with executive working experience in the operation and review of

    telecommunications organizations internationally will be the principal in charge of the overall

    planning, design and implementation of thisexercise.

    We will approach this project using the following proven methodologies, such as thosesuggested by

    the DMAIC process whereapplicable, and following BGTs orientation and alignment with ASP:

    SWAT teams will be used in some form at all sites

    InvolvesSix Sigma, Cost Reduction and Maintenance Productivity teams

    Team Targets Lines based on Labor Performance, Material Performance, and Standard Units

    deployed

    Line Improvement Projectsareselected based on Cost vs. Return just like RCE projects

    Team evaluates network based content performance, processesand procedures

    Team trackseffectivenessand strives to make permanent fixes

    Utilizing SixSigma to reducecosts, improvecycle times, eliminatecustomer

    perceived negatives.

  • 8/7/2019 BGT Corporate Proposal-Draft-1

    24/28

    24

    The SixSigmaD 9 A @ Cpro A ess (define, me B sure, B n B lyze, improve,

    control).

  • 8/7/2019 BGT Corporate Proposal-Draft-1

    25/28

    Project Roles and Responsibilities

    ProjectTeam Lead: The Project Team Leads primary role is to scope, schedule, budget, monitorproject trends, variances, change requests, team relationsand establish corrective plansasare

    required. He or she has the overall responsibility to lead and manageall project activities including

    procurement, managing expectationsand providing status updates. He or she will review and accept

    or re-evaluateall document submissions from the financial and technical teams, and will engageand

    lead directlyas required.

    Network Team: This team has the primary responsibility of reviewing the IT equipments, the

    network configuration and setup of the network infrastructure, architectural drawing review and

    mapping analysis, in the NOC and all terminal points where there isswitch/equipment respectively.

    The team isalso responsible for all deliverables to the Team lead, and to assist in theadministration

    and interpretation ofsurveyand results.

    Financial Team: This team will be led byasenior chartered accountant of our accounting firm.They

    will also be responsible for theadministration ofall surveys to thecorporate bodyand board,

    financial and accounting departments, and regulatory bodiesasappropriate. They will provide

    maximum assistance to interpret financial dataand perform spot audits. They will also provide the

    key data to the Project Team Lead for project analysisand interpretation. Principally responsible for

    making sense ofand providing analysis for the mountains of financial data that must besifted

    through to provideaccurate results.

    Project activitiesand Timeline

    Weeks / Tasks 1 2 3 4 5 6 7 8 9 10 11 12

    Project

    Management

    Administration

    OfSurvey

    Technical team

    Onsite data

    Financial Team

    Survey review

  • 8/7/2019 BGT Corporate Proposal-Draft-1

    26/28

    26

    Technical team

    Survey Review

    Report

    generation

    Initial

    Submissions

    Final

    Submissions

  • 8/7/2019 BGT Corporate Proposal-Draft-1

    27/28

    ProjectTeam CVs

  • 8/7/2019 BGT Corporate Proposal-Draft-1

    28/28