BGT COMPANY PROPOSAL
[Type the document subtitle] | OCHAI
BGT BGTCORP.PRPOPOSAL
-
8/7/2019 BGT Corporate Proposal-Draft-1
2/28
2
Purpose ................................ ................................ ................................ ................................ ............. 3
Unders
anding ofB
require ents................................ ................................ ................................ 5
Due Diligence Documentation for B
................................ ................................ ........................... 10
Tec nical Due Diligence ................................ ................................ ................................ ................... 17
1. Tec nical................................ ................................ ................................ ................................ .. 18
1.1. Network Documentation ................................ ................................ ................................ ...... 18
1.2. Hardware ................................ ................................ ................................ ..................... 18
1.3. Software................................ ................................ ................................ ....................... 18
1.4. Links ................................ ................................ ................................ ............................. 18
1.5. Coverage ................................ ................................ ................................ ...................... 18
1.6. Co-location ................................ ................................ ................................ ................... 18
2. Services................................ ................................ ................................ ............................ 19
3. Customers ................................ ................................ ................................ ........................ 19
4. Interconnects ................................ ................................ ................................ ................... 19
5. Capacity ................................ ................................ ................................ ........................... 19
6. In progress ................................ ................................ ................................ ....................... 19
7. Outsourcing ................................ ................................ ................................ ............................. 19
8. Outbound ................................ ................................ ................................ ......................... 19
9. Inbound................................ ................................ ................................ ............................ 19
10. Employees ................................ ................................ ................................ ........................... 19
10.1. Areas of Expertise ................................ ................................ ................................ ..... 19
10.2. Key Employees................................ ................................ ................................ .......... 19
10.3. Structure ................................ ................................ ................................ .................. 19
11. Intelectual Properties................................ ................................ ................................ ........... 20
12. Projects................................ ................................ ................................ ................................ 20
13. Present ................................ ................................ ................................ ......................... 20
14. Past ................................ ................................ ................................ .............................. 20
15. Future ................................ ................................ ................................ .......................... 20
16. Licenses ................................ ................................ ................................ ............................... 20
17. Market/Commercial ................................ ................................ ................................ ............. 20
18. Risks................................ ................................ ................................ ................................ ..... 20
-
8/7/2019 BGT Corporate Proposal-Draft-1
3/28
3
19. Missing topics ................................ ................................ ................................ ...................... 20
Delivery Structure (Work Pl n Overview) ................................ ................................ ......................... 21
Implement
tion Pln ................................ ................................ ................................ ....................... 23
Personal Profile / Personal Attributes ................................ ............ Error! Bookmark not defined.
Experience / Specialisms ................................ ............................. Error! Bookmark not defined.
Achievements ................................ ................................ ............... Error! Bookmark not defined.
Career History: ................................ ................................ ............. Error! Bookmark not defined.
-
8/7/2019 BGT Corporate Proposal-Draft-1
4/28
4
Docu
nt Pu
pos
This document provides the description ofser vices to be rendered byB T, proceduresand
comprehensiveanalysis of this proposed networks infrastructure. The purpose of this
document is to lay the necessary groundwork to establish for B T network based on
accurate information provision, to build an accurate picture ofB
T enterprise. Thisshould
include thecapture of the proposed network architecture, complete picture ofall the
required assets, market penetration and service portfolio, financial dataand forecast. B T
will provide information on specifics, such as network entities, capital equipment
requirements to meet interim and long term objectives , network and facilities installation,
post support, and program design based on our extensiveexpertise in this field in Nigeria.
-
8/7/2019 BGT Corporate Proposal-Draft-1
5/28
5
Understanding of BGT requirements
B T understands that in order to enter the ICT bundlecompetitive market it must endeavour to
review each of thefollowing areas:
y Comprehensive review of proposed infrastructure (operational, and non operational
assets
y Review of non infrastructural assets
y Architectural and design review
y Examination of proposed services
y Type ofBilling services required
y Financial and revenue generation prospects, data review, and analysis
y Market analysisand survey
y Human Resources
-
8/7/2019 BGT Corporate Proposal-Draft-1
6/28
6
Executive Summary
y This proposal describes ICT bundle infrastructure requirements for B T to enter this
competitive market.B T will evaluateall infrastructure / network elements, assets,facilities, licensing / agreements, and strategic resources to ensureaseamlessentryin thecompetitive ICT bundle market. This process will ascertain details ofB T
capabilities using S OT analysis. Then, with theclarity that this proposal provides
and the data generated from thisexercise, B T will haveat its disposal essential
tools that are required to dynamicallystrategize the most proactive market
approach. And deliver the best services
-
8/7/2019 BGT Corporate Proposal-Draft-1
7/28
7
Requirements and data gathering sections:
This proposal will bea document centric process ofB T prospects. Reflective of this fact
B T has provided the following tables. (See table 1 pp10 ) below for financial and technical
formats respectively; CAC and NCC licences will besort and acquired byB T. Our dedicated team will beactively
seeking all relevant data to support the ICT bundle deliverablesasenvisioned byB T. This
team is poised to assist in all levels through thiscritical phase.
During this data gathering process in the requirements, B T will analyze its facilities by
performing various best practice verification and validation exercises, including the
following:
BGTd
t
gath
ing:
i Co p ! h! nsiv ! layoutofp opos! dinf ast uctu ! (bothop! ational, andnon
op! ational ass! ts)
a. Proposed asset enumeration
i. Top down list ofall ICT equipment
1. Procurement of required network elements
2. Warrantyand or manufacturers guarantees
3. Softwareand related licensing status on operating infrastructure
a. Reconciliation ofsoftware / licensing as will be implementedagainst existing purchase orders
4. Fibre infrastructure
a. Proposed Fibre Optic Network Elements (leased and / or
B " T instituted) gigabit passive optical network (GPON)
b. Proposed Network Topology
c. Proposed Network Capacity (as built)
d. Fibre Optic Cable Routes (as proposed within Abuja
Metropolis)
e. Proposed Route planning
f. Proposed Assesscapacityand inventory to be deployed
ii. Non-ICT related equipment and assets
1. Power, electrical
2. Test Equipments ( Fibre / Electrical / RF )
b. Enumeration of variances (undeclared proposed assets list and missing from asset
list reports)
-
8/7/2019 BGT Corporate Proposal-Draft-1
8/28
8
ii # Noninf$ ast$ uctu $ al ass% ts:
a. Licensing
i. Commercial Licensing
1. Incorporation, shareholder structureetc
ii. NCC Licenses
1. State, regional, and national
iii. FCDA right of way (whereapplicable)
iv. Sub contractual or partnership agreements (seeking 3rd
partyservice
providers)
b. Competitive / commercial agreements / partnerships
c. Other strategicarrangements / collocations or collaborative relationships
iii& P ' opos( d Archit ( ctural / N ( twork distributiond ( sign
iv &
a. Proposed network capacity
b. Core Network Architecture (As planned to be Deployed)
i. Corporate LAN, enterprise MAN, National network, and services:
1. i.e. Firewall, IP traffic routesand flow, physical network topology,
media, and protocol required.
2. Proposed help Desk, Email, Security, Anti-Virusand Intrusion
detection
3. Company Intranet and Internet presence
CISCO 2950
-
8/7/2019 BGT Corporate Proposal-Draft-1
9/28
9
4. Proposed remote toolsand remote monitoring capabilities
5. Proposed automated error correction and reporting /monitoring
tools
ii. Proposed keyclient inspection / sampling / performanceevaluation
iii. Proposed Network Security Evaluation
1. Access Control
2. Client securityand access
3. CRM / database management
4. Firewall / intrusion prevention / control
5. Intranet / Internet / Web
c. Fibre Optic Network (Leased or Planned Deployment)
d. Network Power Distribution Design
i. Both for Core network and NOC facilities, hub or satellite / remote locations
v) 0 xaminationofpropos1 ds 1 rvic1 s asplann1 d:
a. Enumeration and definition ofservices
i. Proposed Packages / Marketing
ii. Proposed Client surveys / satisfaction and analysis
iii. Examination of Churn in existing networks (ICT Bundleservices) in Nigeria
iv. Proposed Client retention programs / reward programs / incentives
vi2 Propos3 dBilling s3 rvic3 s
a. Assessment of type of billing platform to be deployed
i. Billing Structure
ii. Billing Criteria
iii. Service definition and consistency through financial / marketing / technical
organizationsiv. Uniformity of labelling
v. Client tracking data (CRM) through the billing / financial / technical systems
b. Pulling data from switch
i. Accesscontrol
vii 4 Propos5 d Financial and revenue generation
a. Financial analysis
b. Proposed reconciliation of billing from switch dataagainst audited monthly financial
results
i. Proposed capacities from suppliersasagainst real-time dataanalysis of
networkii. Comparison of declared capacitiessold (whether clear channel, internet, or
other as from salesand marketing) against real-time dataanalysis ofswitch
and billing systems.
viii 6 Market Analysis andsurvey
a. Review ofcosts ofservices (competitiveness)
b. Forecasting and projections based on present business model
-
8/7/2019 BGT Corporate Proposal-Draft-1
10/28
10
c. Forecast review based on strategic / architectural / marketing changes (with
management input)
ix7 Human Resources
a. Proposed Staff retention / remuneration strategy (existing)
i. Adequacy of planned remuneration
ii. Risk assessment
iii. Avoid Redundancy of key positions
b. Competency review of technical management, evaluation
c. Integrity / efficacy of Marketing and Sales, evaluation
d. Adherence to best practices, adhesion to company guidelines
e. StaffStrength / adequacy
Table 1
Due Diligence Documentation for BGT
DUE DILIGENCE CATEGORY DOCUMENTATION TASK OWNER STATUS
BusinessPlan, Corporate Structure, Financing
Businessplan Latest Business Plan 3 year forecast
Corporate Certificate of Incorporation
Certificate to CommenceBusiness
Articles of Association & Memorandum
Anyamendments to any Corporate documents ie. name
change, increase in sharecapital
List of Directors, including contact details
-
8/7/2019 BGT Corporate Proposal-Draft-1
11/28
11
DUE DILIGENCE CATEGORY DOCUMENTATION TASK OWNER STATUS
Shareholders Share Register
Shareholders Agreement
Stock option plan
Samples ofcommon and preferred stock certificates,
debentures, and other outstanding securities
Warrants, options, and other rights to acquireequitysecurities
Current shareholders, including number ofshares owned, dates
that shares wereacquired, considerations received, and contact
information
Relevant private placement memorandaand other offering
circulars
Lenders Convertible, senior, or other debt financing
Bank lines ofcredit, loan agreements, or guarantees
Loan defaults or expected defaults
Recentcorporate transactions Proposed Description and rationale for each transaction
Proposed Purchaseand saleagreements
Regulations Business licenses (Excluding Telecom Licenses)
Environmental permits (whereapplicable)
Workers health and safety permits
Sales & Marketing
Market analysis Competition by product line (includecontact details, market
size, market share, and competitiveadvantagesand
disadvantages)
Product rollout scheduleand product lifecycle
Features, benefits & pricing of product offerings
Copies of patentsand trademarks filed or obtained
Pricing strategy of product or service
-
8/7/2019 BGT Corporate Proposal-Draft-1
12/28
12
DUE DILIGENCE CATEGORY DOCUMENTATION TASK OWNER STATUS
Descriptions ofexisting partnersand joint ventures
Distribution channels
Promotion tactics
Prospective Top-10 customers by product line
Salesand marketing presentations
Product cataloguesand brochures
Press releases or articles written about the organization
Professional affiliations
Customer servicestrategy
Contracts Major contracts by product line
Support/maintenancecontracts
Warrantiesand guarantees
Other customer-related contracts
Customer Contracts
Supplier Contracts
Technology Technologystrategy
Overall technical capabilities
Technical competitiveadvantagesand weaknesses
Technical personnel
Copies of user documentation by product (current and historical
ifany)
Copies of technical requirements, codestrategy by product
(current and historical)
Development process
-
8/7/2019 BGT Corporate Proposal-Draft-1
13/28
13
DUE DILIGENCE CATEGORY DOCUMENTATION TASK OWNER STATUS
Financial and Operations
Financial statements Proposed Threeyears plane:
- Incomestatement (P&L)
- Balancesheet
- Statement ofcash flows
- Statement ofshareholdersequity
Management Accounts to date
Most recent Management/DirectorsBudgets/Forecast
Monthlysales projectionsand sales pipeline over next 18
months, including assumptions
Key financial ratios Liquidity
Leverage
Operating efficiency
Profitability
Return to investors
Taxes Statement from Auditorsconfirming that all taxesare up to
date
If tax returnsare not up to date provide liabilitystatement
Copy of Annual Tax returns (National & Local Government)
Summary results ofall tax examinationsand audits
Receivables (Hypothesis) Accounts receivable turnover
Accounts receivableaging schedule
Accounts receivablecontrol and credit policy
Accounts receivableseasonality
-
8/7/2019 BGT Corporate Proposal-Draft-1
14/28
14
DUE DILIGENCE CATEGORY DOCUMENTATION TASK OWNER STATUS
Creditors Creditors Ledger
Age Analysis
Arrangements with Creditors
Capital expenditures Next fiveyears
Nest Five-year gross projection
Proposed Copex Ordered, but not delivered
Detailed priority list
Assets Detailed Asset List - Movable & Immoveable (Excluding Leased
Transmission Network)
Depreciation method
Age
Liquidation value
Replacement value
A list ofequipment suppliers (3 years back)
Leases Lenders
Terms
Interest rate
Payment schedule
Litigation Current litigation and potential damages
Potential litigation and potential damages
Insurance Property
Liability
Workerscompensation
-
8/7/2019 BGT Corporate Proposal-Draft-1
15/28
15
DUE DILIGENCE CATEGORY DOCUMENTATION TASK OWNER STATUS
Other
Informationsystems Description of infrastructure
Security layers
Backup strategy
List all software used in the daily operations i.e. accounting, HR,
customer serviceetc.
Confirm ifall software licensesare up to dateand ifany illegal
softwareexists
Property Leases List all leases & providecopies ofagreements, include thestart
dateand termination date of property leases, plus liability
associated with each property.
Consultants Agreements of Consultants
Management Organizational chart (including number ofemployees by
department)
Contracts of key managers
Management stock incentives
Compensation and benefits Proposed cash compensation per employee (including salary,
bonuses, commissions)
Proposed summary ofstandard employee benefits (such as
medical insurance, disability insurance
Proposed qualified pension and profit-sharing plans
Other Ownership interest
Employment contracts
Performanceevaluation criteria
Material transactions with insiders or associates of insiders
-
8/7/2019 BGT Corporate Proposal-Draft-1
16/28
16
DUE DILIGENCE CATEGORY DOCUMENTATION TASK OWNER STATUS
References
Investors: List all individualsand institutional investors
Customers: List of top 10
Strategic partners
Consultants, freelance workers (current)
Accountants (current)
Bankersand creditors (current)
Associations: All industryassociations in which companyand
management areaffiliated or active
Licenses & Frequencies Copy of licenses issued as issued by the Regulator
Copy ofall frequencies issued as issued by the Regulator
Copy ofany right of wayagreementsand dues paid
Copy ofanyamendments to licenses & frequencies
Latest statement reflecting fees due to the Regulator
Regulator Check Request confirmation of validity of licenses & frequencies
Request confirmation ofany outstanding fees due
Request confirmation that thereare no liens or hypothecs over
the licenses & frequencies
Request confirmation of rules & regulations in place to
successfully transfer a license & frequency, including the
required procedureand timescales
Any other matter which may be material to the transaction
-
8/7/2019 BGT Corporate Proposal-Draft-1
17/28
-
8/7/2019 BGT Corporate Proposal-Draft-1
18/28
18
y The purpose of this document is to propose requirement information.
y Theanswers to thequestions provided shall not be limited to thecurrent statusand
performance of thecompany, but shall also providesignificant events in the past and point out
expectations for the future.
1.Technical
Providea general overview of theareas in which thecompanycurrently providesservices,
expertiseand has properties.
1.1.NetworkDocumentation
1.1.1. Theaim of this task is to providecomplete network documentation.
1.1.2. Providea general network description.
1.1.3. Providea network diagram for each network.
1.1.4. The diagram must include information for all subtopics.
1.1.5. The diagram must be in MS Visio format.
1.1.6. For each diagram item, fill in the Assets Table "network_assets.xlsx"
1.2.Hardware
1.2.1.Describeall hardwaresuch as: routers, switches, air conditioners, UPS, antennas.
1.2.2.Provide information ofequipment loading.
1.3.Software
1.3.1.Describeall software, such as databases, monitoring software, mail servers, DNSserversand so
on.
1.4.Links
1.4.1.Describeall network links, such as VSAT links, fibre links, wireless links , right of way, and so on.
1.4.2.Is VSAT link shared or dedicated, loading?
1.4.3.Include diagram of links loading.
1.5.Coverage
1.5.1.Separatecoverage maps must be provided. Describe the reach of the network. For example the
location and the reach ofeach basestation, fibre node, or the places where fibre links reach.1.5.2.The diagram must include information that can link an asset to thecoverage map. Theasset id
must be taken from "network_assets.xlsx"
1.6.Co-location
1.6.1.Describe theco-location centres
1.6.2.Location
1.6.3.What iscontained in theco-location centre
-
8/7/2019 BGT Corporate Proposal-Draft-1
19/28
19
1.6.4.How much additional space isavailable?
1.6.5.State if theco-location place isattractive in terms of deploying linksand why.
.
2.Services
2.1. Describe theservices that the network provides. If thereareany packages that you offer, describe
them. For example: "Fibre Internet Gold 1mbit/sec bidirectional, no oversubscription, dedicated".
3.Customers
3.1. Describe where, how manyand at what capacities, customersconnect to the network.
3.2. It must beclear which asset is theedge that connects to thecustomer.
4.Interconnects
4.1. Describeany interconnects with 3rd partiessuch as: ISPs, SP and so on. State thecontract names for
the Interconnects.
5.Capacity
5.1. Provide thecapacity of theasset. For examplean IP link can have: 10Mbit/sec uplink, 5 Mbit/sec
downlink, or ATM fibre routes may have 155mb/setc...
6.In progress
6.1. If theasset is not currentlyavailable to use or not yet completed this must be visible on the diagram.
7.Outsourcing
7.1. Provide information about tasksexported or imported from other companies.
8.Outbound
8.1. Do you rely on external companies to assist you with the technical mattersand to what extent? For
example: When building aBS, you hireacompany to build the mast. Please provide only major
activities that you outsource.
9.Inbound
9.1. What are the technical services that you provide for other companies? For example:server
installations, router installations, building cabling, web hosting and so on.
10.Employees
Provide information about thestaffqualified in thearea of networking.
10.1. Areas ofExpertise
10.1.1. Provide theareas ofexpertise for each technical employee. It is ofcritical importance to
point out skills, which can help to build a wireless network, such as:antenna mounting skills,basestation installation skills, core network planning skills, OLT engineering, IP routing skills,
MPLS fibreand so on. Please fill in theattached document to complete this task:
10.2. KeyEmployees
10.2.1. Provide the names only of the keyemployees, and their keyabilities.
10.3. Structure
10.3.1. Describe thecompanystructure with regard to the technical staff.
-
8/7/2019 BGT Corporate Proposal-Draft-1
20/28
20
10.3.2. Point out the technicians, theengineers, theexpert staffand the managers.
10.3.3. Point out the people, which support thecompanyservices outside business hours.
10.3.4. Provide job description ofany technical position.
11.Intelectual Properties
11.1.Please provide information about all significant intellectual propertiesand R&D products, such as:Web sites, Software Platformsand so on.
12.Projects
12.1.Provide information about all past, present and future projects.
13.Present
13.1.Please provide the project plans for the projects that arecurrently being developed.
14.Past
14.1.Please provide information about completed projects.
15.Future15.1.Please provide information about projects that haven't started yet.
16.Licenses
Provide information about all technical licenses that thecompany has.
16.1.For Network Licenses provide: Name, Description, Coverage, Period, Title of the document that
grants the license.
16.2.Provide information about thesoftware licenses.
16.3.Provide information about licenses that lack. For example: "30 computers use unlicensed versions of
Windows XP" or "We havea fibre optic under the ground but we don't havea license from the
government to place fibre under the ground".
17.Market/Commercial
17.1.Please provide overview information about the market share/competitors.
18.Risks
18.1.Provide information about significant risks for the normal operation of the network. For example
state ifyou think that anyequipment is going to fail soon, if thereare dangers ofstealing, sabotage,
overloading, expiration of license, fire, flooding, pollution or anything else.
19.Missing topics
Please provideadditional documentation that you consider important
-
8/7/2019 BGT Corporate Proposal-Draft-1
21/28
21
Delivery Structure (Work Plan Overview)
To complete the project weenvisagecarrying out the following activities.
y Logistics (Transport, document requestfees (NCC, CAC etc 8 8 8 )y Site Survey
y Engineering review (On Site data collection and analysisfor all relevanttopics andoperation
andinfrastructural verification and review)
y Financial andcorporate review
y Post administrative documentcollation anddissemination
y Analysisinterpretation and reviewstructure
y Stage 1 deliverables (Financial, Marketing, Technical Specifics)
y Document Review by BGTtop managementteam
y Submissionto boardofall deliverables
y Conclusions
y Future engagement / planning / forecasting / recapitalization
The following structure will be used to deliver the above stated activities:
ProjectManagement
Managesclient relationships, and coordinates project activities.
Financial Team
Financial team will evaluateall necessary requirements within BGT start-up and deployment plans
LogisticsTeam
Movement ofequipment and engineers to site, conduct detail field surveys, manages disbursements
forac
tivities
a
nd fees
.
FieldEngineers
Installation and setup, ofall test equipment used to validate network maps, planned or operational
traffic routesand capacities, across the various media planned to be implemented byBGT.
Documentation ofall ICT and operational equipment, dataand trafficanalysis, billing reconciliation
and validation (from switch), all network nodes, power etc...
-
8/7/2019 BGT Corporate Proposal-Draft-1
22/28
22
BGT Organogram for this exercise andfunctionsisdescribed below
-
8/7/2019 BGT Corporate Proposal-Draft-1
23/28
23
Implementation Plan
Our proven approach to ICT systemsanalysisand review utilizes industry best practice
methodologies that reduces project risks, improves project deliverablesand ensures predictability in
project outcomes. Weareable to further reduce project costs whileadding significant valueasa
result of our knowledge of the local environment. Byengaging our financial consultancyand
engineering project team to review all aspect BGT comprehensively, we harmonize thisentire
process by leveraging multiplestreams of information coming from within our organization (from
different disciplines with different perspectives) simultaneously, thuslyenhancing our results due to
improved network design, organizational strategy, marketing targets, cross-checking, and
reconciliation.
BGT will have 2 teams (technical and financial) managed bya project / program manager to carry out
thisengagement.
The financial team will be responsible for theadministration and implementation ofall corporate
and financial undertaking.
The technical team will be responsible for the network augmentation for elements, deployment and
testing plan, the implementation ofall test equipment for proposed network linksand
infrastructure/hardware, architectural review, administration of ICT based bundleservicesand
surveys.
A principal ICT engineer with executive working experience in the operation and review of
telecommunications organizations internationally will be the principal in charge of the overall
planning, design and implementation of thisexercise.
We will approach this project using the following proven methodologies, such as thosesuggested by
the DMAIC process whereapplicable, and following BGTs orientation and alignment with ASP:
SWAT teams will be used in some form at all sites
InvolvesSix Sigma, Cost Reduction and Maintenance Productivity teams
Team Targets Lines based on Labor Performance, Material Performance, and Standard Units
deployed
Line Improvement Projectsareselected based on Cost vs. Return just like RCE projects
Team evaluates network based content performance, processesand procedures
Team trackseffectivenessand strives to make permanent fixes
Utilizing SixSigma to reducecosts, improvecycle times, eliminatecustomer
perceived negatives.
-
8/7/2019 BGT Corporate Proposal-Draft-1
24/28
24
The SixSigmaD 9 A @ Cpro A ess (define, me B sure, B n B lyze, improve,
control).
-
8/7/2019 BGT Corporate Proposal-Draft-1
25/28
Project Roles and Responsibilities
ProjectTeam Lead: The Project Team Leads primary role is to scope, schedule, budget, monitorproject trends, variances, change requests, team relationsand establish corrective plansasare
required. He or she has the overall responsibility to lead and manageall project activities including
procurement, managing expectationsand providing status updates. He or she will review and accept
or re-evaluateall document submissions from the financial and technical teams, and will engageand
lead directlyas required.
Network Team: This team has the primary responsibility of reviewing the IT equipments, the
network configuration and setup of the network infrastructure, architectural drawing review and
mapping analysis, in the NOC and all terminal points where there isswitch/equipment respectively.
The team isalso responsible for all deliverables to the Team lead, and to assist in theadministration
and interpretation ofsurveyand results.
Financial Team: This team will be led byasenior chartered accountant of our accounting firm.They
will also be responsible for theadministration ofall surveys to thecorporate bodyand board,
financial and accounting departments, and regulatory bodiesasappropriate. They will provide
maximum assistance to interpret financial dataand perform spot audits. They will also provide the
key data to the Project Team Lead for project analysisand interpretation. Principally responsible for
making sense ofand providing analysis for the mountains of financial data that must besifted
through to provideaccurate results.
Project activitiesand Timeline
Weeks / Tasks 1 2 3 4 5 6 7 8 9 10 11 12
Project
Management
Administration
OfSurvey
Technical team
Onsite data
Financial Team
Survey review
-
8/7/2019 BGT Corporate Proposal-Draft-1
26/28
26
Technical team
Survey Review
Report
generation
Initial
Submissions
Final
Submissions
-
8/7/2019 BGT Corporate Proposal-Draft-1
27/28
ProjectTeam CVs
-