Beyond Zero Carbon Housing - Ben Hopkins Rachael Hibbert Chris Dalton

60
Beyond Zero Carbon Housing Carbon Housing exploring solutions to sustainability issues beyond the zero carbon agenda 24 th October 2012 at The University of Nottingham 24 th October 2012 at The University of Nottingham Department of Architecture and Built Environment

description

A one day symposium on zero/low carbon sustainable homes took place at The University of Nottingham on the 24th October, 2012. The event offered professionals within the construction industry a unique opportunity to gain added and significant insight into the innovations, policies and legislation which are driving the construction of zero/low carbon energy efficient homes both here in the UK and elsewhere in Europe. It explored solutions to sustainability issues “beyond” the zero carbon agenda. BZCH followed on from the successful ‘Towards Zero Carbon Housing’ symposium the University hosted in 2007. This event is part of the Europe Wide Ten Act10n project which is supported by the European Commission Intelligent Energy Europe.

Transcript of Beyond Zero Carbon Housing - Ben Hopkins Rachael Hibbert Chris Dalton

Page 1: Beyond Zero Carbon Housing - Ben Hopkins Rachael Hibbert Chris Dalton

Beyond Zero

Carbon HousingCarbon Housinge x p l o r i n g s o l u t i o n s t o s u s t a i n a b i l i t y i s s u e s

b e y o n d t h e z e r o c a r b o n a g e n d a

2 4 t h O c t o b e r 2 0 1 2 a t T h e U n i v e r s i t y o f N o t t i n g h a m2 4 t h O c t o b e r 2 0 1 2 a t T h e U n i v e r s i t y o f N o t t i n g h a m

D e p a r t m e n t o f A r c h i t e c t u r e a n d B u i l t E n v i r o n m e n t

Page 2: Beyond Zero Carbon Housing - Ben Hopkins Rachael Hibbert Chris Dalton

©

Copyright NoticeCopyright NoticeAl l the mater ia l in these s l ides

may not be used or reproduced wi thout the

express permiss ion of the authors

Page 3: Beyond Zero Carbon Housing - Ben Hopkins Rachael Hibbert Chris Dalton

The Saint Gobain Nottingham H.O.U.S.EThe Saint Gobain Nottingham H.O.U.S.E

Ben Hopkins (Bennetts Associates)

Chris Dalton (Sheppard Robson)

Rachael Hibbert (Evo Energy)

Page 4: Beyond Zero Carbon Housing - Ben Hopkins Rachael Hibbert Chris Dalton

THE COMPETITIONSOLAR DECATHLON EUROPE 2010

The Rules:

• Plot of 25m x 20m

• 5.5m high• 5.5m high

• Site area of 74m2

Page 5: Beyond Zero Carbon Housing - Ben Hopkins Rachael Hibbert Chris Dalton

THE BEGINNING

•Began as a 5th Year diploma studio project

•Led by the winning group the design was developed by a

student team of all year groups and courses.

Page 6: Beyond Zero Carbon Housing - Ben Hopkins Rachael Hibbert Chris Dalton

•To perform environmentally in both Madrid and UK

climates

•To show that the house can work within a community

housing scheme for a range of tenures

•To comply to competition rules and regulations

DESIGN CONSIDERATIONS

•To comply to competition rules and regulations

Page 7: Beyond Zero Carbon Housing - Ben Hopkins Rachael Hibbert Chris Dalton

Family Home

• A truly sustainable house is one which provides adequate density to form a

sustainable part of an urban fabric.

• An appropriate response to the Madrid 2010 brief was to show how a small

family house could be produced within the brief.

THE DESIGN

family house could be produced within the brief.

Environmental Issues

• At all times we have considered the implications of providing what is

effectively a self sufficient house.

•Meets Code Level 6 and PassivHaus standards.

4 Day build4 Day build

• Perfect opportunity to demonstrate the benefits of off-site construction.

• The house is designed in “chunks”. These pieces were carefully designed to

allow efficient logistics.

Page 8: Beyond Zero Carbon Housing - Ben Hopkins Rachael Hibbert Chris Dalton

Ground Floor First Floor

Page 9: Beyond Zero Carbon Housing - Ben Hopkins Rachael Hibbert Chris Dalton
Page 10: Beyond Zero Carbon Housing - Ben Hopkins Rachael Hibbert Chris Dalton
Page 11: Beyond Zero Carbon Housing - Ben Hopkins Rachael Hibbert Chris Dalton

THE CONSTRUCTION PROCESS

1. Panels arrive and filled with insulation 2. Modules formed from panels and fully

finished in factory conditions

3. Modules craned into position on site

4. On site finishing 5. Treatment of courtyard 6. House mirrored within masterplan

Page 12: Beyond Zero Carbon Housing - Ben Hopkins Rachael Hibbert Chris Dalton
Page 13: Beyond Zero Carbon Housing - Ben Hopkins Rachael Hibbert Chris Dalton

1. Studio 7, Kings Meadow Campus...

• The panels are manufactured by Pasquill and delivered to site

Page 14: Beyond Zero Carbon Housing - Ben Hopkins Rachael Hibbert Chris Dalton
Page 15: Beyond Zero Carbon Housing - Ben Hopkins Rachael Hibbert Chris Dalton

2. Constructing the modules

• The finished panels come together to form the

individual modules

• The modules are fully finished both internally and

externally before being transported

• All services are combined with two modules with plug

and play connections to the rest of the houseand play connections to the rest of the house

Page 16: Beyond Zero Carbon Housing - Ben Hopkins Rachael Hibbert Chris Dalton
Page 17: Beyond Zero Carbon Housing - Ben Hopkins Rachael Hibbert Chris Dalton

Trial Run...

•We were asked to showcase the Nottingham H.O.U.S.E as a

primary exhibition at EcoBuild (2010), Earls Court, London

• The process of transporting the modules, assembling and

disassembling them in a shorter time period than for the

competition was a much needed exercise

Page 18: Beyond Zero Carbon Housing - Ben Hopkins Rachael Hibbert Chris Dalton

3. On Site in Madrid

Page 19: Beyond Zero Carbon Housing - Ben Hopkins Rachael Hibbert Chris Dalton

• Before the modules could be craned into position the temporary

competition site had to be prepared

• The site was levelled, with timber sections marking out the

footprint of the house

Page 20: Beyond Zero Carbon Housing - Ben Hopkins Rachael Hibbert Chris Dalton
Page 21: Beyond Zero Carbon Housing - Ben Hopkins Rachael Hibbert Chris Dalton

Craning the modules into position

• The modules were craned in one by one and directed very

precisely by highly skilled crane drivers

• Steel supports were placed on the modules to prevent twisting

during transit and lifting

Page 22: Beyond Zero Carbon Housing - Ben Hopkins Rachael Hibbert Chris Dalton
Page 23: Beyond Zero Carbon Housing - Ben Hopkins Rachael Hibbert Chris Dalton
Page 24: Beyond Zero Carbon Housing - Ben Hopkins Rachael Hibbert Chris Dalton
Page 25: Beyond Zero Carbon Housing - Ben Hopkins Rachael Hibbert Chris Dalton
Page 26: Beyond Zero Carbon Housing - Ben Hopkins Rachael Hibbert Chris Dalton
Page 27: Beyond Zero Carbon Housing - Ben Hopkins Rachael Hibbert Chris Dalton
Page 28: Beyond Zero Carbon Housing - Ben Hopkins Rachael Hibbert Chris Dalton
Page 29: Beyond Zero Carbon Housing - Ben Hopkins Rachael Hibbert Chris Dalton
Page 30: Beyond Zero Carbon Housing - Ben Hopkins Rachael Hibbert Chris Dalton
Page 31: Beyond Zero Carbon Housing - Ben Hopkins Rachael Hibbert Chris Dalton

4. On Site finishing

• Once in position the modules needed to be sealed at the

junctions to create a controlled environment inside

• Flashing was added over the joints, solar panels installed on the

roof and systems plugged together to create a fully functioning

house

Page 32: Beyond Zero Carbon Housing - Ben Hopkins Rachael Hibbert Chris Dalton

5. Courtyard and Landscaping

• An ETFE screen bounds the courtyard, replicating the

environmental characteristics of the neighbouring house in the

terrace

• Planter boxes lined the courtyard providing growing space and

also defined paths and routes on the public tour

Page 33: Beyond Zero Carbon Housing - Ben Hopkins Rachael Hibbert Chris Dalton

6. The Finished H.O.U.S.E

Page 34: Beyond Zero Carbon Housing - Ben Hopkins Rachael Hibbert Chris Dalton
Page 35: Beyond Zero Carbon Housing - Ben Hopkins Rachael Hibbert Chris Dalton
Page 36: Beyond Zero Carbon Housing - Ben Hopkins Rachael Hibbert Chris Dalton
Page 37: Beyond Zero Carbon Housing - Ben Hopkins Rachael Hibbert Chris Dalton
Page 38: Beyond Zero Carbon Housing - Ben Hopkins Rachael Hibbert Chris Dalton
Page 39: Beyond Zero Carbon Housing - Ben Hopkins Rachael Hibbert Chris Dalton
Page 40: Beyond Zero Carbon Housing - Ben Hopkins Rachael Hibbert Chris Dalton
Page 41: Beyond Zero Carbon Housing - Ben Hopkins Rachael Hibbert Chris Dalton
Page 42: Beyond Zero Carbon Housing - Ben Hopkins Rachael Hibbert Chris Dalton
Page 43: Beyond Zero Carbon Housing - Ben Hopkins Rachael Hibbert Chris Dalton
Page 44: Beyond Zero Carbon Housing - Ben Hopkins Rachael Hibbert Chris Dalton
Page 45: Beyond Zero Carbon Housing - Ben Hopkins Rachael Hibbert Chris Dalton
Page 46: Beyond Zero Carbon Housing - Ben Hopkins Rachael Hibbert Chris Dalton
Page 47: Beyond Zero Carbon Housing - Ben Hopkins Rachael Hibbert Chris Dalton

The Competition Process

3. Performance Tests1. Public Tours 2. Jury Panels

Page 48: Beyond Zero Carbon Housing - Ben Hopkins Rachael Hibbert Chris Dalton

Public Tours

Page 49: Beyond Zero Carbon Housing - Ben Hopkins Rachael Hibbert Chris Dalton

• Thousands of people shown around the house in

English and Spanish.

• Great public response to the innovative but very

realistic approach to housing.

Page 50: Beyond Zero Carbon Housing - Ben Hopkins Rachael Hibbert Chris Dalton

Jury Panels

• Expert panels evaluated the HOUSE through tours given by the

student team.

• Panels evaluated Architecture, Innovation, Communications, Market

Viability, Sustainability and Solar Systems.

•The HOUSE was awarded second place in the Sustainability Contest.

Page 51: Beyond Zero Carbon Housing - Ben Hopkins Rachael Hibbert Chris Dalton
Page 52: Beyond Zero Carbon Housing - Ben Hopkins Rachael Hibbert Chris Dalton

Performance Tests

• Tests conducted to show the HOUSE performance. From cooking

contests to the efficiency of the freezer.

• The energy balance for the HOUSE was also measured as well as

the Hygrothermal comfort.

Page 53: Beyond Zero Carbon Housing - Ben Hopkins Rachael Hibbert Chris Dalton
Page 54: Beyond Zero Carbon Housing - Ben Hopkins Rachael Hibbert Chris Dalton
Page 55: Beyond Zero Carbon Housing - Ben Hopkins Rachael Hibbert Chris Dalton
Page 56: Beyond Zero Carbon Housing - Ben Hopkins Rachael Hibbert Chris Dalton

Winter Daytime

Winter Night

Page 57: Beyond Zero Carbon Housing - Ben Hopkins Rachael Hibbert Chris Dalton

Dismantling

•Modules were separated and then removed in much better

conditions than the assembly, allowing team Nottingham to be

one of the quickest teams of the competition.

Page 58: Beyond Zero Carbon Housing - Ben Hopkins Rachael Hibbert Chris Dalton

What’s happened since..

• The HOUSE is now re-assembled permanently on the University

campus as part of the Creative Energy Homes project.

Page 59: Beyond Zero Carbon Housing - Ben Hopkins Rachael Hibbert Chris Dalton
Page 60: Beyond Zero Carbon Housing - Ben Hopkins Rachael Hibbert Chris Dalton