Beulah Keane

19
Plan A Doing Plan A - Doing the right thing the right thing Beulah Keane Beulah Keane Sustainable Construction Project Manager Marks and Spencer

Transcript of Beulah Keane

Page 1: Beulah Keane

Plan A DoingPlan A - Doing the right thingthe right thing

Beulah KeaneBeulah KeaneSustainable Construction Project Manager

Marks and Spencer

Page 2: Beulah Keane

What have we already achieved?

Through Plan A we have:

Made a real difference to the issues we tackleEngaged customers Motivated our peopleSti l t d i tiStimulated innovationOpened up new marketsMitigated riskMitigated riskDelivered financial return

Page 3: Beulah Keane

A future store that:

Is zero embodied carbon in constructionIs made from 100% recycledIs made from 100% recycled material Is 100% recyclable when yrefurbished or no longer neededH t itiHas a net positive biodiversity impactIs resilient to climate changeIs resilient to climate change by being net water positiveBrings new benefits to the communities we serve

Page 4: Beulah Keane

Scope & Boundary

Page 5: Beulah Keane

Embodied Carbon

Page 6: Beulah Keane

Operational Carbon

Page 7: Beulah Keane

Total Carbon

Page 8: Beulah Keane

“Right now, the urgent issue is water, not global warming, and we cannot afford to ignore it any longer”longer

Peter Brabeck-Letmathe – Chairman of Nestléete abec et at e C a a o est é

Page 9: Beulah Keane

• Each Briton uses about 150 litres per day, h h b dd d ihowever the embedded water consumption per person is over 3400 litres every day

• 1.2 billion litres of water are flushed needlessly away every day in the UKaway every day in the UK.

• London is drier than Istanbul, South East England , ghas less water than the Sudan or Syria.

Page 10: Beulah Keane

Scope & Boundary

Page 11: Beulah Keane

Embodied water in Raw MaterialsEmbodied water in Raw Materials for a notional shell specification.p

Page 12: Beulah Keane

Life Cycle Water Consumption

Page 13: Beulah Keane

Total LifeCycle Water

Page 14: Beulah Keane

Carbon & ater embodied inCarbon & water embodied in materials and in building unitsmaterials and in building units

Page 15: Beulah Keane

Available Water- London specific

Page 16: Beulah Keane

What we still need to do…• Continue the search for an industry accepted

methodologymethodology• Engage our supply chain, and address possible

mitigation routesg• Further investigate the connection between water

and carbon• Create a Water Strategy for our construction

processS l i• Scale up water measurement in stores

• Extend the scope to include fit out materials

Page 17: Beulah Keane

Further information

• www.marksandspencer.com/constructionIncludes:

Our Plan A commitments 2010 2015– Our Plan A commitments 2010-2015– Sustainable Construction Paper– Sustainable Construction Manual– 2009 How We Do Business Report

Page 18: Beulah Keane

We can't solve problems by usingthe same kind of thinking we usedwhen we created themwhen we created them.

Albert Einstein

Page 19: Beulah Keane

Thank youThank you