Best Practices for Optical Fiber Installation Sprint ALU 2.5 Program
1. Connector Inspection • All connectors must be inspected
thoroughly
2. Endface Cleaning • All fiber endfaces must be cleaned to
meet IEC and Sprint standards
3. Insertion dB Loss Testing • Follow Sprint build-specific guidelines
o ALU o Samsung o NSN
Scan Code to Access ODM Tech Support Page
143 Lake St, Laconia NH 03246 603-524-8350
Fax 603-524-8332 Email [email protected]
odm-inc.com
![Page 2: Best Practices for Optical Fiber Installation ALU Best Practices 4-16-14.pdf · Best Practices for Optical Fiber Installation ... some models allow technicians to ... that will run](https://reader036.fdocuments.net/reader036/viewer/2022062600/5a7f997d7f8b9ada388b9599/html5/thumbnails/2.jpg)
ALU Fiber Link Architecture
Radios
Trunk Cable (Riser) (12 fibers, 6 LC pairs to MPO)
Distribution Enclosure
BTS
Sector Jumpers (3 pairs MPO to LC) (Housing 3 spare LC pairs)
Protective Cylinder
Sector Jumpers (3 pairs LC to LC)
MPO Connection
![Page 3: Best Practices for Optical Fiber Installation ALU Best Practices 4-16-14.pdf · Best Practices for Optical Fiber Installation ... some models allow technicians to ... that will run](https://reader036.fdocuments.net/reader036/viewer/2022062600/5a7f997d7f8b9ada388b9599/html5/thumbnails/3.jpg)
Sector Cable – BTS to FDP
Three cables will run from BTS to Fiber Distribution Panel per sector. Each individual cable will route from BTS to corresponding color-coded trunk cable. Sector cables must be labeled at BTS end to aid in dB loss testing procedure.
![Page 4: Best Practices for Optical Fiber Installation ALU Best Practices 4-16-14.pdf · Best Practices for Optical Fiber Installation ... some models allow technicians to ... that will run](https://reader036.fdocuments.net/reader036/viewer/2022062600/5a7f997d7f8b9ada388b9599/html5/thumbnails/4.jpg)
Trunk Cable (Riser)
Riser will contain three cables of 12 fibers (6 pairs) each. Top of riser cable will be a 12 fiber MPO connector. Pairs at the bottom of riser will be installed into appropriate ports in the Fiber Distribution Panel. Each set of six pairs contains: Red/Blue/Green – Primary Orange/Yellow/Purple – Spare
![Page 5: Best Practices for Optical Fiber Installation ALU Best Practices 4-16-14.pdf · Best Practices for Optical Fiber Installation ... some models allow technicians to ... that will run](https://reader036.fdocuments.net/reader036/viewer/2022062600/5a7f997d7f8b9ada388b9599/html5/thumbnails/5.jpg)
Sector Cable – Riser to RRU
Each sector jumper contains 12 fibers (6 pairs) Top of sector cable will be 6 LC pairs. Each set of six pairs contains: Red/Blue/Green – Primary Orange/Yellow/Purple – Spare Bottom of sector jumper will be a 12 fiber MPO connector to interface with riser.
Orange/Yellow/Purple LC pairs will be stored in protective cylinder after dB loss test has been performed
![Page 6: Best Practices for Optical Fiber Installation ALU Best Practices 4-16-14.pdf · Best Practices for Optical Fiber Installation ... some models allow technicians to ... that will run](https://reader036.fdocuments.net/reader036/viewer/2022062600/5a7f997d7f8b9ada388b9599/html5/thumbnails/6.jpg)
Remote Radio Unit (RRU)
Each RRU represents one sector (Alpha, Beta, Gamma) Three LC duplex ports on each RRU accept LC riser pairs: Red/Blue/Green
![Page 7: Best Practices for Optical Fiber Installation ALU Best Practices 4-16-14.pdf · Best Practices for Optical Fiber Installation ... some models allow technicians to ... that will run](https://reader036.fdocuments.net/reader036/viewer/2022062600/5a7f997d7f8b9ada388b9599/html5/thumbnails/7.jpg)
Acceptable Testing Practices to Follow
DO:
• Inspect all fiber optic connectors to acceptable standard
• Use Video Inspection Scope – VIS 300 or VIS 400 recommended
• Always clean connectors before mating – Note: One-click MPO connector cleaners available
• Use industry-accepted connector end caps to protect endfaces
DON’T:
• Touch the endface of a fiber connector
• Install a connector into the Sprint system without first inspecting and cleaning the connector surface
Fingerprint: NOT GOOD
Dust/Debris: NOT GOOD
Cleaned with wet/dry method: ACCEPTABLE
Auto PASS/FAIL Results (VIS 400) Scoped image of MPO connector
![Page 8: Best Practices for Optical Fiber Installation ALU Best Practices 4-16-14.pdf · Best Practices for Optical Fiber Installation ... some models allow technicians to ... that will run](https://reader036.fdocuments.net/reader036/viewer/2022062600/5a7f997d7f8b9ada388b9599/html5/thumbnails/8.jpg)
Video Inspection Scopes (USB)
• Provide microscopic view of fiber endfaces – some models allow technicians to save images to be reported
• Inspecting is the ONLY way to know for sure that fiber endfaces are clean • Always inspect fibers before making any connection
Section 2.1 Video Inspection Microscopes
![Page 9: Best Practices for Optical Fiber Installation ALU Best Practices 4-16-14.pdf · Best Practices for Optical Fiber Installation ... some models allow technicians to ... that will run](https://reader036.fdocuments.net/reader036/viewer/2022062600/5a7f997d7f8b9ada388b9599/html5/thumbnails/9.jpg)
Direct View Scopes Avoid Eye Damage on Live Fibers
![Page 10: Best Practices for Optical Fiber Installation ALU Best Practices 4-16-14.pdf · Best Practices for Optical Fiber Installation ... some models allow technicians to ... that will run](https://reader036.fdocuments.net/reader036/viewer/2022062600/5a7f997d7f8b9ada388b9599/html5/thumbnails/10.jpg)
• When viewing an endface close-up, any dirt, debris, or defect will stand out
• If this debris blocks light coming from core/cladding area, fiber will not function efficiently
• If debris is trapped between mated ferrules, they can be permanently damaged and need to be replaced
Section 2.1 Video Inspection Microscopes
Debris
Core
Single Fiber MPO Connector
![Page 11: Best Practices for Optical Fiber Installation ALU Best Practices 4-16-14.pdf · Best Practices for Optical Fiber Installation ... some models allow technicians to ... that will run](https://reader036.fdocuments.net/reader036/viewer/2022062600/5a7f997d7f8b9ada388b9599/html5/thumbnails/11.jpg)
Criteria Table
There are four “zones” on the fiber endface as outlined in the IEC document. Each zone has been assigned a limit to the amount of debris and/or scratches it may contain. Whether the fiber is single Mode or Multi Mode, PC, UPC, or APC will affect zone size and criteria.
Adhesive Zone
Section 2.2 IEC 61300-3-35 Criteria
![Page 12: Best Practices for Optical Fiber Installation ALU Best Practices 4-16-14.pdf · Best Practices for Optical Fiber Installation ... some models allow technicians to ... that will run](https://reader036.fdocuments.net/reader036/viewer/2022062600/5a7f997d7f8b9ada388b9599/html5/thumbnails/12.jpg)
Connector Cleaning Methods
• Dry Clean Method: MPO One-Click • 400-500 Cleanings
• Dry Clean Method: LC One-Click • 400-500 Cleanings
• Dry Clean Method: Cletop • 400-500 Cleanings
• Wet/Dry Clean Method: SQR Pad and Pen • 100 Cleanings
![Page 13: Best Practices for Optical Fiber Installation ALU Best Practices 4-16-14.pdf · Best Practices for Optical Fiber Installation ... some models allow technicians to ... that will run](https://reader036.fdocuments.net/reader036/viewer/2022062600/5a7f997d7f8b9ada388b9599/html5/thumbnails/13.jpg)
Section 2.3 Connector Cleaning Methods
• IEC Recommends:
• 3 dry clean
• 2 wet/dry clean
![Page 14: Best Practices for Optical Fiber Installation ALU Best Practices 4-16-14.pdf · Best Practices for Optical Fiber Installation ... some models allow technicians to ... that will run](https://reader036.fdocuments.net/reader036/viewer/2022062600/5a7f997d7f8b9ada388b9599/html5/thumbnails/14.jpg)
Acceptable Connector Images
Single Fiber MPO Connector
![Page 15: Best Practices for Optical Fiber Installation ALU Best Practices 4-16-14.pdf · Best Practices for Optical Fiber Installation ... some models allow technicians to ... that will run](https://reader036.fdocuments.net/reader036/viewer/2022062600/5a7f997d7f8b9ada388b9599/html5/thumbnails/15.jpg)
Section 2.4 Inspection Procedures
Automated Analysis: Smartphone or Tablet
Wi-Fi Access Device
![Page 16: Best Practices for Optical Fiber Installation ALU Best Practices 4-16-14.pdf · Best Practices for Optical Fiber Installation ... some models allow technicians to ... that will run](https://reader036.fdocuments.net/reader036/viewer/2022062600/5a7f997d7f8b9ada388b9599/html5/thumbnails/16.jpg)
Sprint ALU 2.5 Inspection Procedures
• All connectors must be inspected and cleaned to meet acceptable standards.
• All inspected fiber endface images must be saved to provide proof of connector cleanliness.
• Images will be included in closeout reports where required.
![Page 17: Best Practices for Optical Fiber Installation ALU Best Practices 4-16-14.pdf · Best Practices for Optical Fiber Installation ... some models allow technicians to ... that will run](https://reader036.fdocuments.net/reader036/viewer/2022062600/5a7f997d7f8b9ada388b9599/html5/thumbnails/17.jpg)
Fiber Inspection
1.25mm ferrules (LC connectors)
MPO/MTP Connectors
![Page 18: Best Practices for Optical Fiber Installation ALU Best Practices 4-16-14.pdf · Best Practices for Optical Fiber Installation ... some models allow technicians to ... that will run](https://reader036.fdocuments.net/reader036/viewer/2022062600/5a7f997d7f8b9ada388b9599/html5/thumbnails/18.jpg)
Pre-Test Inspection (LC Connectors)
• Inspect (and clean if necessary) both ends of all sector cables that will run between the BTS cabinet and junction panel at the tower bottom.
• Inspect (and clean if necessary) all connectors at base-end of riser (trunk) cable.
• Inspect (and clean if necessary) all connectors at RRU-end of sector cable that will run between riser and RRU including spare fibers prior to installation into protective cylinder.
• Save and archive all endface images after performing inspection and cleaning procedures to meet IEC 61300-3-35.
![Page 19: Best Practices for Optical Fiber Installation ALU Best Practices 4-16-14.pdf · Best Practices for Optical Fiber Installation ... some models allow technicians to ... that will run](https://reader036.fdocuments.net/reader036/viewer/2022062600/5a7f997d7f8b9ada388b9599/html5/thumbnails/19.jpg)
Pre-Test Inspection (LC Connectors) Cont.
![Page 20: Best Practices for Optical Fiber Installation ALU Best Practices 4-16-14.pdf · Best Practices for Optical Fiber Installation ... some models allow technicians to ... that will run](https://reader036.fdocuments.net/reader036/viewer/2022062600/5a7f997d7f8b9ada388b9599/html5/thumbnails/20.jpg)
Pre-Test Inspection (MPO Connectors)
• Inspect (and clean if necessary) MPO connector at top-end of riser cable.
• Inspect (and clean if necessary) MPO connector at riser-end of sector cable that will run from riser to RRU.
• MPO connectors contain 12 fiber endfaces in a row. Technicians will save 12 images per riser/sector cable using the manual grading method in the inSpec software.
![Page 21: Best Practices for Optical Fiber Installation ALU Best Practices 4-16-14.pdf · Best Practices for Optical Fiber Installation ... some models allow technicians to ... that will run](https://reader036.fdocuments.net/reader036/viewer/2022062600/5a7f997d7f8b9ada388b9599/html5/thumbnails/21.jpg)
Pre-Test Inspection (MPO Connectors) Cont.
![Page 22: Best Practices for Optical Fiber Installation ALU Best Practices 4-16-14.pdf · Best Practices for Optical Fiber Installation ... some models allow technicians to ... that will run](https://reader036.fdocuments.net/reader036/viewer/2022062600/5a7f997d7f8b9ada388b9599/html5/thumbnails/22.jpg)
System Insertion dB Loss Testing
• General Testing Guidelines 6.0 dB @ 850nm loss budget for complete system loopback fiber testing
DLS 350 LED for Multi Mode RP460 @ 850nm for MM
Appropriate connectors for wireless build must be used – Contact ODM for assistance
MPO Connector LC Connector
![Page 23: Best Practices for Optical Fiber Installation ALU Best Practices 4-16-14.pdf · Best Practices for Optical Fiber Installation ... some models allow technicians to ... that will run](https://reader036.fdocuments.net/reader036/viewer/2022062600/5a7f997d7f8b9ada388b9599/html5/thumbnails/23.jpg)
Testing Procedure:
Light Source & Power Meter remain at tower bottom
Loopback
Used for duplex fiber runs (paired)
![Page 24: Best Practices for Optical Fiber Installation ALU Best Practices 4-16-14.pdf · Best Practices for Optical Fiber Installation ... some models allow technicians to ... that will run](https://reader036.fdocuments.net/reader036/viewer/2022062600/5a7f997d7f8b9ada388b9599/html5/thumbnails/24.jpg)
Loopback (Paired Fiber Runs)
1 Connect the RP 460 power meter, DLS 350 LED light source, clipped orange multimode cable, and multimode loopback module as shown above. Power on both the Power Meter and Light Source. Set both units to 850nm. Set the RP 460 Power Meter to dBm mode.
2 Make sure the Power Meter is reading within the appropriate power level for the light source. The DLS 350 outputs between -22 and -26 dBm when connected in the loopback configuration. If the reading is not within this range, inspect and clean all optical fiber connector endfaces.
3 Hold the dB/dBm button on the power meter to set the reference on the device. Your power meter should read 0.00dB.
![Page 25: Best Practices for Optical Fiber Installation ALU Best Practices 4-16-14.pdf · Best Practices for Optical Fiber Installation ... some models allow technicians to ... that will run](https://reader036.fdocuments.net/reader036/viewer/2022062600/5a7f997d7f8b9ada388b9599/html5/thumbnails/25.jpg)
Pre-Test dB Loss
• Pre-Test is performed in warehouse upon receipt of cables
• Loopback method
• The following cables must be tested for loss as a pre-test – BTS to FDP jumpers – 3dB budget
– Riser pairs – 3dB budget
– Sector cable pairs – 3dB budget
• Pre-Test results do not need to be saved or reported. Any cable that exceeds loss budget must be reported.
![Page 26: Best Practices for Optical Fiber Installation ALU Best Practices 4-16-14.pdf · Best Practices for Optical Fiber Installation ... some models allow technicians to ... that will run](https://reader036.fdocuments.net/reader036/viewer/2022062600/5a7f997d7f8b9ada388b9599/html5/thumbnails/26.jpg)
System dB Loss Test
• Performed on-site after installation of all fibers
• Loopback method
• FIRST: Test 3 pairs of spare trunk and sector cables (per sector) These run from bottom of trunk to storage cylinder at tower top – 1. Orange – 2. Yellow – 3. Purple
• THEN: Test 3 pairs of primary trunk and sector cables (per sector) These
run from BTS to RRU – 1. Red – 2. Blue – 3. Green
![Page 27: Best Practices for Optical Fiber Installation ALU Best Practices 4-16-14.pdf · Best Practices for Optical Fiber Installation ... some models allow technicians to ... that will run](https://reader036.fdocuments.net/reader036/viewer/2022062600/5a7f997d7f8b9ada388b9599/html5/thumbnails/27.jpg)
Half of sector cables at tower top will not run to RRU. They will be installed into a small protective cylinder for later use. Insert the loopback module here.
The cables that do not run to the RRU will not have corresponding runs to the BTS cabinet. Insert the multimode clipped cable attached to the DLS 350 and RP 460 here.
System dB Loss Test Cont.
BTS
![Page 28: Best Practices for Optical Fiber Installation ALU Best Practices 4-16-14.pdf · Best Practices for Optical Fiber Installation ... some models allow technicians to ... that will run](https://reader036.fdocuments.net/reader036/viewer/2022062600/5a7f997d7f8b9ada388b9599/html5/thumbnails/28.jpg)
Half of sector cables at tower top will run to RRU. Insert the loopback module here.
The sector cables that are installed into the RRU will have corresponding sector cables running from the BTS to the fiber distribution panel. Insert the multimode clipped cable attached to the DLS 350 and RP 460 here.
System dB Loss Test Cont.
![Page 29: Best Practices for Optical Fiber Installation ALU Best Practices 4-16-14.pdf · Best Practices for Optical Fiber Installation ... some models allow technicians to ... that will run](https://reader036.fdocuments.net/reader036/viewer/2022062600/5a7f997d7f8b9ada388b9599/html5/thumbnails/29.jpg)
dB Loss Closeout Reporting
Once all loss readings for cellular build have been saved to power meter, plug the device into computer and open report software
Set color code and loss budget to match your build
Dump data from power meter to upload readings to software. Export the readings to Excel to complete the report
![Page 30: Best Practices for Optical Fiber Installation ALU Best Practices 4-16-14.pdf · Best Practices for Optical Fiber Installation ... some models allow technicians to ... that will run](https://reader036.fdocuments.net/reader036/viewer/2022062600/5a7f997d7f8b9ada388b9599/html5/thumbnails/30.jpg)
Sample Closeout Report
![Page 31: Best Practices for Optical Fiber Installation ALU Best Practices 4-16-14.pdf · Best Practices for Optical Fiber Installation ... some models allow technicians to ... that will run](https://reader036.fdocuments.net/reader036/viewer/2022062600/5a7f997d7f8b9ada388b9599/html5/thumbnails/31.jpg)
![Page 32: Best Practices for Optical Fiber Installation ALU Best Practices 4-16-14.pdf · Best Practices for Optical Fiber Installation ... some models allow technicians to ... that will run](https://reader036.fdocuments.net/reader036/viewer/2022062600/5a7f997d7f8b9ada388b9599/html5/thumbnails/32.jpg)
Sprint ALU Accessory Kit
![Page 33: Best Practices for Optical Fiber Installation ALU Best Practices 4-16-14.pdf · Best Practices for Optical Fiber Installation ... some models allow technicians to ... that will run](https://reader036.fdocuments.net/reader036/viewer/2022062600/5a7f997d7f8b9ada388b9599/html5/thumbnails/33.jpg)
Sprint ALU Accessory Kits
AC 807 For TTK 650
• DLS 350 LED Light Source
• AC 4600 MM Loopback Module
• AC 533 MM Clipped Loopback Jumper
• AC 176 MPO Inspection Tip for VIS 400 Inspection Scope
• MPO One-Click Cleaner
AC 806 For TTK 500
• AC 4600 MM Loopback Module
• AC 533 MM Clipped Loopback Jumper
• AC 176 MPO Inspection Tip for VIS 400 Inspection Scope
• MPO One-Click Cleaner
Note* For additional cleaning and accessory items please call ODM at 603-524-8350 or visit us at http://www.odm-inc.com/Accessories.html.
![Page 34: Best Practices for Optical Fiber Installation ALU Best Practices 4-16-14.pdf · Best Practices for Optical Fiber Installation ... some models allow technicians to ... that will run](https://reader036.fdocuments.net/reader036/viewer/2022062600/5a7f997d7f8b9ada388b9599/html5/thumbnails/34.jpg)
Technical Support
Optical Design Manufacturing, Inc. Phone: 603-524-8350
Email: [email protected] Visit ODM’s YouTube Page
Scan Code to Access ODM Tech Support Page