BERLinPro P. Kuske. P. Kuske, ESLS08 2 BERLinPro: The German ERL Test Facility BERLinPro* (Berlin...

5
BERLinPro P. Kuske

Transcript of BERLinPro P. Kuske. P. Kuske, ESLS08 2 BERLinPro: The German ERL Test Facility BERLinPro* (Berlin...

Page 1: BERLinPro P. Kuske. P. Kuske, ESLS08 2 BERLinPro: The German ERL Test Facility BERLinPro* (Berlin Energy Recovery Linac Prototype) Proposal for the construction.

BERLinProP. Kuske

Page 2: BERLinPro P. Kuske. P. Kuske, ESLS08 2 BERLinPro: The German ERL Test Facility BERLinPro* (Berlin Energy Recovery Linac Prototype) Proposal for the construction.

2P. Kuske, ESLS‘08

BERLinPro: The German ERL Test Facility

BERLinPro*

(Berlin Energy Recovery Linac Prototype)

Proposal for the construction of a 100-MeV superconducting RF CW LINAC with energy recovery at Berlin-Adlershof. Building on the existing SRF program

at HZB-ME/BESSY, this new facility is designed to develop and demonstrate the CW LINAC technology and expertise required to drive next-generation light sources

that are based on the Energy Recovery LINAC (ERL) principle.

*DESY HZB/BESSY FZK Cornell

Co-Production

E. Jaeschke, J. Knobloch

Page 3: BERLinPro P. Kuske. P. Kuske, ESLS08 2 BERLinPro: The German ERL Test Facility BERLinPro* (Berlin Energy Recovery Linac Prototype) Proposal for the construction.

3P. Kuske, ESLS‘08

BERLinPro

E. Jaeschke, J. Knobloch

Page 4: BERLinPro P. Kuske. P. Kuske, ESLS08 2 BERLinPro: The German ERL Test Facility BERLinPro* (Berlin Energy Recovery Linac Prototype) Proposal for the construction.

4P. Kuske, ESLS‘08

„Schwerlasthalle“

E. Jaeschke, J. Knobloch

BERLinPro – Building Site

Page 5: BERLinPro P. Kuske. P. Kuske, ESLS08 2 BERLinPro: The German ERL Test Facility BERLinPro* (Berlin Energy Recovery Linac Prototype) Proposal for the construction.

5P. Kuske, ESLS‘08

BERLinPro: HoBiCaT – Gun Test Stand

E. Jaeschke, J. Knobloch, W. Anders