    BORANG BEN/UP/001B

    UNIVERSITI TUN HUSSIEN ONN MALAYSIA

    BORANG PERMOHONAN KELULUSAN SPESIFIKASI ALAT

    LAMPIRAN SPESIFIKASI: BAIKPULIH, MENYELENGGARA, MENAIKTARAF DAN

    MENGUJILARI SERTA MENGESAHKAN PERALATAN OVERHEAD LINE MODEL

    UNTUK MAKMAL SISTEM KUASA, FAKULTI KEJURUTERAAN ELEKTRIK KUASA,

    JABATAN KEJURUTERAAN ELEKTRIK KUASA, FAKULTI ELEKTRIK DAN

    ELEKTRONIK, UTHMBIL. SPESIFIKASI AM / TEKNIKAL

    1.0

    1.1

    1.2

    1.3

    1.4

    1.5

    1.6

    1.7

    1.8

    1.9

    1.10

    1.11

    2.0

    2.1

    2.22.3

    2.42.5

    INSTALLATION, TESTING AND COMMISSIONING

    All items of equipment shall be installed on site by the supplier at no extra cost to Facultyof Electrical and Electronic, UTHM.The site of installation is at Power System Laboratory, Department of ElectricalPower Engineering, Faculty of Electrical and Electronics, UTHM. The power supplyshall be obtained from nearby point. Supplier must visit the site of installation in order tofamiliarize himself with local electricity and water supply environment, and accordinglyshall be responsible for the supply and installation of any additional electrical devices inaccordance to relevant local standard will result in the supplier being liable to any

    subsequent delay.The supplier shall undertake to install, test and commission the equipment on site by aqualified engineer. This include for example, advice on the best site for the equipment,electrical connection, levelling, interfacing with other peripherals, testing according toaccepted standards and test run. All costs regarding the above work shall be borne by thesupplier.If the work is not satisfactory, UTHM has the right not to accept the handing over. UTHMhas the right to call other professional parties to complete the job satisfactorily. The costwill be borne by the supplier.The supplier is requested to justify their competency for executing the job successfully. Forthis purpose the supplier is required to submit the companys past experience in handlingsimilar kind of job.Work permit of professional worker wherever applicable will also be under the

    responsibility of the supplier.The specification stipulated in this document serves as the minimum requirement to befulfilled by the supplier. Additional or more comprehensive specification by the supplier ismost welcomed.(*) Insurance cover costs during the course of executing this project will be borne by thesupplier.If the work carried in item (*) is not satisfactory, UTHM has the right not to accept thehanding over. UTHM has the right to call other professional parties to complete the jobsatisfactorily. The cost will be borne by thesupplier.All government regulations and procedures must be followed closely during theinstallation, testing and commissioning work. Approval from any government authoritieswherever applicable will be the responsibility of the supplier.Test certificate for the basic system of the specified equipment and its attachments shallbe provided. If the equipment is found to deviate from the certified results, the equipmentshall be replaced or corrected by the supplier at suppliers own expense.

    WARRANTY PERIOD

    The supplier shall state the warranty period for all equipment and component supplied andshall quote the cost of maintenance contract for all equipment after expiry of warrantyperiod.The supplier shall also clearly state the terms of warranty covering theequipment.Any equipment/material defects and faulty operation due to manufacturer or installationshall be the responsibility of the supplier, who shall immediately make good and/ or

    replace such defect or faulty components or equivalent.All labour and parts needed during the warranty period shall be supplied free of charge.Any exclusion shall be clearly specified in the specification.

    T.tangan pemohonNama & Cop

    : .. T.tangan Ketua JabatanNama & Cop

    : ..

  • 8/2/2019 Benup001b Spesifikasi Alat_overhead Line Models

    2/3

    BORANG BEN/UP/001B

    UNIVERSITI TUN HUSSIEN ONN MALAYSIA

    BORANG PERMOHONAN KELULUSAN SPESIFIKASI ALAT

    LAMPIRAN SPESIFIKASI: BAIKPULIH, MENYELENGGARA, MENAIKTARAF DAN

    MENGUJILARI SERTA MENGESAHKAN PERALATAN OVERHEAD LINE MODEL

    UNTUK MAKMAL SISTEM KUASA, FAKULTI KEJURUTERAAN ELEKTRIK KUASA,

    JABATAN KEJURUTERAAN ELEKTRIK KUASA, FAKULTI ELEKTRIK DAN

    ELEKTRONIK, UTHMBIL. SPESIFIKASI AM / TEKNIKAL

    3.0

    3.1

    3.2

    4.0

    4.1

    MAINTENANCE

    Full maintenance support for all items of equipment must be available locally. Theengineering support shall be provided by competent personnel. The supplier will have toindicate how he intends to meet this requirement, including naming the facilities availableand their location. Details of maintenance scheme shall be outline by the supplier.The equipment should be provided with at least three months free maintenance.

    SPARE PARTS

    The supplier shall state the period for which he undertakes to support the supply of allspare parts for all the equipment supplied.

    TECHNICAL SPECIFICATION:

    Description:

    Equipments name : Overhead Line Model

    Model : DL7901TTBrand: De Lorenzo

    T.tangan pemohonNama & Cop

    : .. T.tangan Ketua JabatanNama & Cop

    : ..

  • 8/2/2019 Benup001b Spesifikasi Alat_overhead Line Models

    3/3

    BORANG BEN/UP/001B

    UNIVERSITI TUN HUSSIEN ONN MALAYSIA

    BORANG PERMOHONAN KELULUSAN SPESIFIKASI ALAT

    LAMPIRAN SPESIFIKASI: BAIKPULIH, MENYELENGGARA, MENAIKTARAF DAN

    MENGUJILARI SERTA MENGESAHKAN PERALATAN OVERHEAD LINE MODEL

    UNTUK MAKMAL SISTEM KUASA, FAKULTI KEJURUTERAAN ELEKTRIK KUASA,

    JABATAN KEJURUTERAAN ELEKTRIK KUASA, FAKULTI ELEKTRIK DAN

    ELEKTRONIK, UTHMBIL. SPESIFIKASI AM / TEKNIKAL

    Repair/ replace part including:

    - 7 unit fuse at sending and receiving end(Install/modify new protection fuse)- 1 unit resistor 12 ohm, 25W- 1 unit resistor 15 ohm, 25W- 5 unit resistor 150 ohm, 4W- 5 unit resistor 100 ohm, 7W- 12 unit capacitor 1uH 450VAC- 4 unit Transformer/Inductor 91.1V, 290mH (Rewinding)

    T.tangan pemohonNama & Cop