Bentleys & ANZ Perth: Critical financial reporting update & business mentoring
Bentleys Construction Solution Overview -...
-
Upload
vuongthuan -
Category
Documents
-
view
245 -
download
3
Transcript of Bentleys Construction Solution Overview -...
1 | WWW.BENTLEY.COM | © 2013 Bentley Systems, Incorporated
Bentleys Construction Solution Overview
Steven Rice Construction Technology Manager - Construction Solutions
2 | WWW.BENTLEY.COM | © 2013 Bentley Systems, Incorporated
2 | WWW.BENTLEY.COM | © 2013 Bentley Systems, Incorporated
God Morgon Mitt namn är Steve Rice
Identifying the Problem
4 | WWW.BENTLEY.COM | © 2013 Bentley Systems, Incorporated
Project Breakdown
01.1
Design
SP3D
PDS
PDMS
PlantSpace
AutoPlant
Tekla
Project Schedule
Primavera
MS Project
Project Control and
Material Management
SPM
Legacy Systems
Fabrication
Spoolgen
PDMS Spooler
5 | WWW.BENTLEY.COM | © 2013 Bentley Systems, Incorporated
Current Major Issues
01.1
Installation
Testing
Systems Turnover
Engineering
Delivery + Fabrication
7 1, 2
3, 4, 5
6, 8
7 1, 2
3, 4, 5
6, 8
1, 2
3, 4, 5
6, 8 9
1, 2
3, 4, 5
6, 8 9
1.Poor communications between disciplines and functions
2.Concurrent engineering
3.Fast-track projects
4.Limited resources
5.Ageing skilled workforce
6.Schedule / install by area – test and turnover by systems
7.Short time between AFC/IFC and construction
8.Many revisions
9.Operate in “scramble” mode and work with whatever is available
a) Engineering deliverables
b) Materials availability
c) Allocation of materials
d) Fabrication deliverables
6 | WWW.BENTLEY.COM | © 2013 Bentley Systems, Incorporated
Common Questions
01.1
What is the exact progress to date?
Is the planned schedule
achievable?
How will the schedule be kept
given the changing circumstances?
What will be the project impact be if materials are delayed?
Is everybody up to speed with the plan?
Addressing the Problem
8 | WWW.BENTLEY.COM | © 2013 Bentley Systems, Incorporated
WorkFace Planning Automation Bring your data together in one location
01.1
T/O Systems
Construction
Solution
CAD Model
Pipe isometrics
Line Lists
Cable Schedule
Equipment Lists
Fabricator Status
Project Controls
Primavera
Hydro Test Plan
Instrument Index
MMS In/out
EH&S Assessment
What is Bentleys Construction Solution
10 | WWW.BENTLEY.COM | © 2013 Bentley Systems, Incorporated
01.1
Not a design tool but a Project/Construction Management tool that :-
• Is a graphically enabled integration system that brings data
together in from different sources, CAD models, planning systems,
material management systems etc. into a single interactive system.
• An extremely flexible status visualisation tool that can create a
breakdown of the model by any required permutation allowing
schedule simulation, reporting on construction, completion,
commissioning etc.
• A system that could deliver 1-5% project cost savings.
• A graphically driven work pack planning tool that allows optimum
works scheduling, planning and reporting that can be use on major
projects or brownfield modifications
What is Bentleys Construction Solution
11 | WWW.BENTLEY.COM | © 2013 Bentley Systems, Incorporated
01.1
Gorgon Gas Project
Karan Gas Project
Arzew LNG plant
In Salah Gas
Who and Where?
Prelude FLNG and ‘Deep Dive’
12 | WWW.BENTLEY.COM | © 2013 Bentley Systems, Incorporated
01.1
• Off Shore Platform • On Shore Refinery
Offshore, Onshore and everything in between
13 | WWW.BENTLEY.COM | © 2013 Bentley Systems, Incorporated
01.1
And Finally the Why?
•To help the project team visualize how the plan is being impacted
by constraints of materials, labor and resources.
• To work across multiple phases of the project
• To breakdown the model by any required permutation for
example Construction Work Areas (CWAs)
• To create Construction Work Packages (CWPs) for civil, structural,
mechanical equipment, piping, steel, instrumentation etc
• To understand material allocation based on availability/priority.
• To carry out Look Ahead Planning, Schedule Validation and What
if Case Studies.
Bentleys Construction Solution Demonstration
ProjectWise Construction Work Package Server
16 | WWW.BENTLEY.COM | © 2013 Bentley Systems, Incorporated
• Comprehensive Construction Information Management – Data Relationships (e.g. relate engineering, material,
inspection and construction data, documents, tasks)
– Instantly Access Project Delivery Data
• Automated Work Packaging – Change Manage, Assemble, Publish For Distribution
– Construct More Consistently and More Safely
• Holistic Reporting and Insight – Continuous feedback
– Operate More Confidently Through Actionable Awareness
ProjectWise Construction Work Package Server
Decrease TCI 10%
Increase Safety
Bentleys Construction Solution Benefits
18 | WWW.BENTLEY.COM | © 2013 Bentley Systems, Incorporated
Benefits
01.1
• Provides an insight to project progress - greater control and visibility of project
• Potential to shorten schedule - know where you are and what needs to be completed
• Speed time to start-up by systems tracking
• Improves field productivity by 7 - 25%
19 | WWW.BENTLEY.COM | © 2013 Bentley Systems, Incorporated
Construction Solution Case Studies
20 | WWW.BENTLEY.COM | © 2013 Bentley Systems, Incorporated
Diesel Refinery: $2M Savings in Mechanical Sub Change Orders
01.1
– New Refinery Unit - TIC $320M
– Lump Sum Contract with Mechanical
Sub
– ConstructSim Pipe purchased by
Owner and utilized by Construction
Management firm
– Excessive change order submitted by
Mechanical Sub
– Actual progress not in alignment with
progress reported
– ConstructSim used to analyze change
order and update progress reporting
system
Background
ConstructSim Use Case
– New Refinery Unit - TIC $320M
– Lump Sum Contract with Mechanical
Sub
– ConstructSim Pipe purchased by
Owner and utilized by Construction
Management firm
– Excessive change order submitted by
Mechanical Sub
– Actual progress not in alignment with
progress reported
– ConstructSim used to analyze change
order and update progress reporting
system
Background
ConstructSim Use Case “ ConstructSim enabled
us to recover project
schedule losses, and
complete on time -
without paying for
unwarranted change
orders.”
Claim: $2.5M
Settled: $0.5M
21 | WWW.BENTLEY.COM | © 2013 Bentley Systems, Incorporated
Offshore Platform: Saved $17M, Reduced Schedule 3 Months
01.1
– Deepwater Offshore Platform - $150M
– Time and materials contract with Fab
Yard
– ConstructSim Pipe purchased by
Owner and utilized by module Fab Yard
contractor
– ConstructSim used to re-baseline
project schedule
– Development of crew-level work face
plans with ConstructSim
– Project completes on time, under
budget, and sails away with only 7
punch list items (compared to 1000’s
for other projects)
Background
ConstructSim Use Case
“ The labour efficiency
we obtained using
ConstructSim enabled
us to save 3 months
and U.S.$17M, as well
as reduce the punch list
items by over 99%.”
22 | WWW.BENTLEY.COM | © 2013 Bentley Systems, Incorporated
22 | WWW.BENTLEY.COM | © 2013 Bentley Systems, Incorporated
Tack
23 | WWW.BENTLEY.COM | © 2013 Bentley Systems, Incorporated
Additional information