BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange...

86
Imagine the result Ohio Department of Transportation District 11 BEL-7-18.07 PID 99087 Interchange Operations Study July 2, 2015

Transcript of BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange...

Page 1: BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange Operations Study BEL-7-18.07 5.5 Build Intersection Figure 5 SR 7 & IR 470 Westbound

Imagine the result

Ohio Department of Transportation

District 11

BEL-7-18.07

PID 99087

Interchange Operations Study

July 2, 2015

Page 2: BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange Operations Study BEL-7-18.07 5.5 Build Intersection Figure 5 SR 7 & IR 470 Westbound

Document Title BEL-7-18.07 Prepared for:

Ohio Department of Transportation District 11

Prepared by:

ARCADIS U.S., Inc. 222 South Main Street Suite 300 Akron Ohio 44308 Tel 330 434 1995 Fax 330 374 1095

Our Ref.:

TOHODT04.PE08

Date:

6/3/15

Kevin Kehres, PE Project Manager

Daniel Jozity, PE, PTOE Transportation Project Engineer

This document is intended only for the use

of the individual or entity for which it was

prepared and may contain information that

is privileged, confidential and exempt from

disclosure under applicable law. Any

dissemination, distribution or copying of

this document is strictly prohibited.

Page 3: BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange Operations Study BEL-7-18.07 5.5 Build Intersection Figure 5 SR 7 & IR 470 Westbound

bel-7-1807 ios.docx i

Table of Contents

1. Project Summary 1

2. Study Area 1

2.1 HCS Analysis Points 2

2.1.1 Freeway Analysis 2

2.1.2 Ramp Analysis 3

2.1.3 Intersection Analysis 3

3. Existing Conditions 3

4. Problem Description 3

5. Traffic Analysis 4

5.1 Freeway Analysis 5

5.2 Ramp Analysis 6

5.3 Intersection Analysis 7

5.4 No Build Intersection 8

5.5 Build Intersection 9

6. Conclusion 10

Tables

Table 1 Freeway Analysis 5

Table 2 Ramp Analysis 6

Table 3 Intersection Analysis 7

Figures

Figure 1 SR 7 & IR 470 Intersection Looking West 1

Figure 2 Study Map with Analysis Points 2

Figure 3 SR 7 Northbound at IR 470 Queue 4

Figure 4 SR 7 & IR 470 Westbound Exit Ramp No Build Condition 8

Figure 5 SR 7 & IR 470 Westbound Exit Ramp Build Condition 9

Page 4: BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange Operations Study BEL-7-18.07 5.5 Build Intersection Figure 5 SR 7 & IR 470 Westbound

bel-7-1807 ios.docx ii

Table of Contents

Appendices

A Certified Traffic

B Freeway Analysis – No Build

C Freeway Analysis – Build

D Ramp Analysis – No Build

E Ramp Analysis – Build

F Intersection Analysis – No Build

G Intersection Analysis - Build

H Turn Lane Calculations

Page 5: BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange Operations Study BEL-7-18.07 5.5 Build Intersection Figure 5 SR 7 & IR 470 Westbound

bel-7-1807 ios.docx 1

Interchange Operations Study BEL-7-18.07

1. Project Summary

2. Study Area

The project area is located in Belmont County, at the interchange of IR 470 and SR 7. IR 470 is an east-west freeway, while SR 7 runs north and south.

Figure 1 SR 7 & IR 470 Intersection Looking West

Location SR 7 and IR 470 Intersection, Pultney Township, Belmont County

PID 99087

Study Sponsor ODOT, District 11

Proposed Work Widening the CD roads, ramps and installing a traffic signal at the interseciton of the SR 7 CD and IR 470 intersection.

Page 6: BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange Operations Study BEL-7-18.07 5.5 Build Intersection Figure 5 SR 7 & IR 470 Westbound

bel-7-1807 ios.docx 2

Interchange Operations Study BEL-7-18.07

Figure 2 Study Map with Analysis Points

2.1 HCS Analysis Points

2.1.1 Freeway Analysis

Eastbound IR 470 upstream of SR 7 Diverge Eastbound IR 470 downstream of SR 7 Merge Eastbound IR 470 between SR 7 Diverge and Merge Westbound IR 470 downstream of SR 7 Merge Westbound IR 470 between SR 7 Diverge and Merge Northbound SR 7 upstream of IR 470 Diverge Southbound SR 7 upstream of IR 470 Diverge

Freeway Analysis Points Ramp Analysis Points

Page 7: BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange Operations Study BEL-7-18.07 5.5 Build Intersection Figure 5 SR 7 & IR 470 Westbound

bel-7-1807 ios.docx 3

Interchange Operations Study BEL-7-18.07

2.1.2 Ramp Analysis

Northbound SR 7 Diverge to IR 470 Southbound SR 7 Diverge to IR 470 Eastbound IR 470 Diverge to SR 7 Westbound IR 470 Diverge to SR 7 Eastbound IR 470 Merge from SR 7 Westbound IR 470 Merge from SR 7

2.1.3 Intersection Analysis

IR 470 Ramps at SR 7

3. Existing Conditions

The interchange is a trumpet interchange, with a loop ramp in the northwest quadrant. SR 7 runs north and south while IR 470 runs east and west. The ramps create a three leg, stop controlled intersection.

To the west of the interchange, IR 470 is a divided highway with two lanes in the eastbound direction and three in the westbound direction. Immediately to the east of the interchange, IR 470 is a divided highway with two lanes in each direction. The IR 470 exit ramp is two lanes, while the entrance ramp is one lane. The westbound entrance ramp connects to IR 470 as an add lane. IR 470 and the ramps are constructed of asphalt over a concrete base.

Within the project area, SR 7 is a four-lane divided asphalt concrete roadway. The northbound and southbound entrance and exit ramps for SR 7 are single lane. SR 7 northbound and southbound exit ramps are asphalt over concrete base.

4. Problem Description

This study follows the “BEL-07-18.19 Safety Study” which evaluated the existing safety performance and identified potential improvements to the interchange in order to reduce congestion and crashes at the interchange of IR 470 and SR 7. There were a total of 29 crashes within the study area over a three year period between 2011 and 2013. Of these 29 crashes, 22 were rear end crashes.

Page 8: BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange Operations Study BEL-7-18.07 5.5 Build Intersection Figure 5 SR 7 & IR 470 Westbound

bel-7-1807 ios.docx 4

Interchange Operations Study BEL-7-18.07

The most significant congestion problems at the interchange occur at the northbound and eastbound approaches at the intersection. During peak hours the SR 7 northbound exit ramp queue extends back to the mainline of SR 7, and the IR 470 eastbound exit queue extends back to the merge point of the eastbound and westbound ramps. These extended queues contribute to the high number of rear end crashes. Congestion issues exist due to the insufficient storage and capacity of these approaches and the intersection being stopped controlled. The increased traffic volumes for the design year will further increase the congestion and potential for crashes.

The purpose of this study is to identify modifications to the interchange which will improve the traffic flow and reduce congestion without impacting operations on IR 470 or SR 7.

Figure 3 SR 7 Northbound at IR 470 Queue

5. Traffic Analysis

Mainline, IR 470 – 65 mph Crossroad, SR 7 – 55 mph

Page 9: BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange Operations Study BEL-7-18.07 5.5 Build Intersection Figure 5 SR 7 & IR 470 Westbound

bel-7-1807 ios.docx 5

Interchange Operations Study BEL-7-18.07

5.1 Freeway Analysis

The freeway analysis was performed at the locations identified in Section 2.1.1 and shown in Figure 1. See Appendix A for certified traffic data, Appendices B and C for the Freeway Analyses of the no-build and build condition, respectively.

Mainline Analysis

2035 AM No-Build

2035 AM Build

2035 PM No-Build

2035 PM Build

LOS Density

(pc/mi/ln) LOS Density

(pc/mi/ln) LOS Density

(pc/mi/ln) LOS Density

(pc/mi/ln)Eastbound I-470 West of SR 7 A 10.4 A 10.4 B 12.9 B 12.9

Eastbound I-470 East of SR 7 B 13.6 B 13.6 B 16.5 B 16.5

Eastbound I-470 between SR 7 Diverge/Merge

A 6.8 A 6.8 A 9.5 A 9.5

Westbound I-470 West of SR 7 A 6.2 A 6.2 A 9.8 A 9.8

Westbound I-470 between SR 7 Diverge/Merge

A 7.0 A 7.0 B 11.6 B 11.6

Northbound SR 7 South of I-470 A 8.5 A 8.5 A 9.4 A 9.4

Southbound SR 7 North of I-470 A 6.1 A 6.1 A 8.8 A 8.8

Table 1 Freeway Analysis

Page 10: BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange Operations Study BEL-7-18.07 5.5 Build Intersection Figure 5 SR 7 & IR 470 Westbound

bel-7-1807 ios.docx 6

Interchange Operations Study BEL-7-18.07

5.2 Ramp Analysis

The ramp analysis was performed at the locations identified in Section 2.1.2 and shown in Figure 1. See Appendix A for certified traffic data, Appendices D and E for the Ramp Analyses of the no-build and build condition, respectively.

Ramp Analysis

2035 AM No-Build

2035 AM Build

2035 PM No-Build

2035 PM Build

LOS Density

(pc/mi/ln) LOS

Density (pc/mi/ln)

LOS Density

(pc/mi/ln) LOS

Density (pc/mi/ln)

Westbound I-470 Diverge at SR 7 B 11.2 B 11.2 C 20.8 C 20.8

Westbound I-470 Merge from SR 7 A 8.9 A 8.9 B 14.3 B 14.3

Eastbound I-470 Diverge at SR 7 B 11.0 B 11.0 B 13.8 B 13.8

Eastbound I-470 Merge from SR 7 B 13.0 B 13.0 B 15.9 B 15.9

Southbound SR 7 Diverge at I-470 A 1.6 A 1.6 A 4.1 A 4.1

Northbound SR 7 Diverge at I-470 A 3.8 A 3.8 A 4.7 A 4.7

Table 2 Ramp Analysis

Page 11: BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange Operations Study BEL-7-18.07 5.5 Build Intersection Figure 5 SR 7 & IR 470 Westbound

bel-7-1807 ios.docx 7

Interchange Operations Study BEL-7-18.07

5.3 Intersection Analysis

The intersection analysis was performed at the location identified in Section 2.1.3 and shown in Figure 1. See Appendix A for certified traffic data, Appendices F and G for the Intersection Analyses of the no-build and build condition, respectively.

SR 7 Intersections

2035 AM No-Build

2035 AM Build

2035 PM No-Build

2035 PM Build

LOS Delay

(sec/veh) LOS Delay

(sec/veh) LOS Delay

(sec/veh) LOS Delay

(sec/veh)

IR 470 No-Build – Stop Controlled

Build – Signalized (60 sec. Cycle) No-Build – Stop Controlled

Build – Signalized (60 sec. Cycle)

EB Approach F 64.7 B 15.1 F 71.3 B 18.7

NB Approach F 66.5 C 20.0 F 67.3 C 24.1

SB Approach E 38.5 B 19.9 F 63.2 C 23.1

Overall Intersection A 6.6

B 15.5

Table 3 Intersection Analysis

Page 12: BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange Operations Study BEL-7-18.07 5.5 Build Intersection Figure 5 SR 7 & IR 470 Westbound

bel-7-1807 ios.docx 8

Interchange Operations Study BEL-7-18.07

5.4 No Build Intersection

Figure 4 SR 7 & IR 470 Westbound Exit Ramp No Build Condition

The existing SR 7 exit ramps, both northbound and southbound have one sixteen foot lane with a four foot outside shoulder and a three foot inside shoulder. The pavement is asphalt over concrete base and all the ramps at the intersection are stop controlled.

The westbound IR 470 exit ramp is two lanes at the intersection. The lanes are approximately twelve feet in width with adequate shoulders. The IR 470 eastbound entrance ramp has one lane approximately sixteen feet wide, with adequate shoulders. The pavement of both ramps is asphalt over concrete base. The entrance and exit ramps are separated by a concrete barrier.

Page 13: BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange Operations Study BEL-7-18.07 5.5 Build Intersection Figure 5 SR 7 & IR 470 Westbound

bel-7-1807 ios.docx 9

Interchange Operations Study BEL-7-18.07

5.5 Build Intersection

Figure 5 SR 7 & IR 470 Westbound Exit Ramp Build Condition

The proposed build condition constructs a new 425 foot left turn lane for the northbound SR 7 ramp. Each lane is twelve feet in width with a six foot outside shoulder and a three foot inside shoulder. The outside lane is protected with guardrail due to the steeper slopes required to provide wider ditches to meet best management practices. The southbound SR 7 ramp pavement is widened to install a concrete traffic island to restrict thru movements.

IR 470 entrance ramp is widened to two lanes, providing a dedicated lane to each westbound and eastbound ramps. The center concrete median will be removed as needed to allow the dual left turns from the northbound SR 7 ramp.

A traffic signal will be installed with stop line and dilemma zone detection to replace the existing stop controlled operation.

Page 14: BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange Operations Study BEL-7-18.07 5.5 Build Intersection Figure 5 SR 7 & IR 470 Westbound

bel-7-1807 ios.docx 10

Interchange Operations Study BEL-7-18.07

6. Conclusion

The proposed design of the intersection will improve the issues of safety and congestion. The addition of a second northbound turn lane, the restriction southbound and northbound thru traffic, and the installation of a traffic signal will increase the capacity and storage for the intersection. The improvements will reduce the queues lengths on the northbound and eastbound approaches and provide better operational characteristics of the intersection. With the intersection functioning more efficiently, the crashes caused by congestion could potentially be mitigated. Neither IR 470 nor SR 7 will be adversely affected by the proposed improvements.

Page 15: BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange Operations Study BEL-7-18.07 5.5 Build Intersection Figure 5 SR 7 & IR 470 Westbound

Appendix A

Certified Traffic

Page 16: BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange Operations Study BEL-7-18.07 5.5 Build Intersection Figure 5 SR 7 & IR 470 Westbound

INTER-OFFICE COMMUNICATION

TO: Chris Varcolla, District 11 FROM: Bryan Raderstorf, Office of Statewide Planning and Research SUBJECT: BEL-7-18.07, PID 99087 DATE: April 7, 2015 In reply to a request received January 8, 2015, plates are attached showing 2015/2035 ADT, A.M. DHV and P.M. DHV volumes, and truck factors. K&D factors can be calculated from the plates as needed.

If you have any questions, please contact me at (614) 752-5736.

Page 17: BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange Operations Study BEL-7-18.07 5.5 Build Intersection Figure 5 SR 7 & IR 470 Westbound
Page 18: BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange Operations Study BEL-7-18.07 5.5 Build Intersection Figure 5 SR 7 & IR 470 Westbound
Page 19: BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange Operations Study BEL-7-18.07 5.5 Build Intersection Figure 5 SR 7 & IR 470 Westbound
Page 20: BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange Operations Study BEL-7-18.07 5.5 Build Intersection Figure 5 SR 7 & IR 470 Westbound
Page 21: BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange Operations Study BEL-7-18.07 5.5 Build Intersection Figure 5 SR 7 & IR 470 Westbound

Appendix B

Freeway Analysis – No Build

Page 22: BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange Operations Study BEL-7-18.07 5.5 Build Intersection Figure 5 SR 7 & IR 470 Westbound

HCS 2010: Basic Freeway Segments Release 6.50 Phone: Fax: E-mail: _________________________Operational Analysis__________________________________ Analyst: ARCADIS Agency or Company: ODOT Date Performed: 5/29/2015 Analysis Time Period: AM DHV Freeway/Direction: IR 470 Eastbound From/To: SR 7 to Bellaire-High Ridge Rd Jurisdiction: ODOT Analysis Year: 2035 Description: BEL-7-18.07 _________________________Flow Inputs and Adjustments___________________________ Volume, V 1200 veh/h Peak-hour factor, PHF 0.94 Peak 15-min volume, v15 319 v Trucks and buses 12 % Recreational vehicles 0 % Terrain type: Level Grade - % Segment length - mi Trucks and buses PCE, ET 1.5 Recreational vehicle PCE, ER 1.2 Heavy vehicle adjustment, fHV 0.943 Driver population factor, fp 1.00 Flow rate, vp 677 pc/h/ln _________________________Speed Inputs and Adjustments__________________________ Lane width - ft Right-side lateral clearance - ft Total ramp density, TRD - ramps/mi Number of lanes, N 2 Free-flow speed: Measured FFS or BFFS 65.0 mi/h Lane width adjustment, fLW - mi/h Lateral clearance adjustment, fLC - mi/h TRD adjustment - mi/h Free-flow speed, FFS 65.0 mi/h _________________________LOS and Performance Measures__________________________ Flow rate, vp 677 pc/h/ln Free-flow speed, FFS 65.0 mi/h Average passenger-car speed, S 65.0 mi/h Number of lanes, N 2 Density, D 10.4 pc/mi/ln Level of service, LOS A

Page 23: BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange Operations Study BEL-7-18.07 5.5 Build Intersection Figure 5 SR 7 & IR 470 Westbound

HCS 2010: Basic Freeway Segments Release 6.50 Phone: Fax: E-mail: _________________________Operational Analysis__________________________________ Analyst: ARCADIS Agency or Company: ODOT Date Performed: Analysis Time Period: PM DHV Freeway/Direction: IR 470 Eastbound From/To: SR 7 to Bellaire-High Ridge Rd Jurisdiction: ODOT Analysis Year: 2035 Description: BEL-7-18.07 _________________________Flow Inputs and Adjustments___________________________ Volume, V 1490 veh/h Peak-hour factor, PHF 0.94 Peak 15-min volume, v15 396 v Trucks and buses 12 % Recreational vehicles 0 % Terrain type: Level Grade - % Segment length - mi Trucks and buses PCE, ET 1.5 Recreational vehicle PCE, ER 1.2 Heavy vehicle adjustment, fHV 0.943 Driver population factor, fp 1.00 Flow rate, vp 840 pc/h/ln _________________________Speed Inputs and Adjustments__________________________ Lane width - ft Right-side lateral clearance - ft Total ramp density, TRD - ramps/mi Number of lanes, N 2 Free-flow speed: Measured FFS or BFFS 65.0 mi/h Lane width adjustment, fLW - mi/h Lateral clearance adjustment, fLC - mi/h TRD adjustment - mi/h Free-flow speed, FFS 65.0 mi/h _________________________LOS and Performance Measures__________________________ Flow rate, vp 840 pc/h/ln Free-flow speed, FFS 65.0 mi/h Average passenger-car speed, S 65.0 mi/h Number of lanes, N 2 Density, D 12.9 pc/mi/ln Level of service, LOS B

Page 24: BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange Operations Study BEL-7-18.07 5.5 Build Intersection Figure 5 SR 7 & IR 470 Westbound

HCS 2010: Basic Freeway Segments Release 6.50 Phone: Fax: E-mail: _________________________Operational Analysis__________________________________ Analyst: ARCADIS Agency or Company: ODOT Date Performed: 5/29/2015 Analysis Time Period: AM DHV Freeway/Direction: IR 470 Eastbound From/To: SR 7 to SR 2 Jurisdiction: ODOT Analysis Year: 2035 Description: _________________________Flow Inputs and Adjustments___________________________ Volume, V 1600 veh/h Peak-hour factor, PHF 0.94 Peak 15-min volume, v15 426 v Trucks and buses 8 % Recreational vehicles 0 % Terrain type: Level Grade - % Segment length - mi Trucks and buses PCE, ET 1.5 Recreational vehicle PCE, ER 1.2 Heavy vehicle adjustment, fHV 0.962 Driver population factor, fp 1.00 Flow rate, vp 885 pc/h/ln _________________________Speed Inputs and Adjustments__________________________ Lane width - ft Right-side lateral clearance - ft Total ramp density, TRD - ramps/mi Number of lanes, N 2 Free-flow speed: Measured FFS or BFFS 65.0 mi/h Lane width adjustment, fLW - mi/h Lateral clearance adjustment, fLC - mi/h TRD adjustment - mi/h Free-flow speed, FFS 65.0 mi/h _________________________LOS and Performance Measures__________________________ Flow rate, vp 885 pc/h/ln Free-flow speed, FFS 65.0 mi/h Average passenger-car speed, S 65.0 mi/h Number of lanes, N 2 Density, D 13.6 pc/mi/ln Level of service, LOS B

Page 25: BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange Operations Study BEL-7-18.07 5.5 Build Intersection Figure 5 SR 7 & IR 470 Westbound

HCS 2010: Basic Freeway Segments Release 6.50 Phone: Fax: E-mail: _________________________Operational Analysis__________________________________ Analyst: ARCADIS Agency or Company: ODOT Date Performed: 5/29/2015 Analysis Time Period: PM DHV Freeway/Direction: IR 470 Eastbound From/To: SR 7 to SR 2 Jurisdiction: ODOT Analysis Year: 2035 Description: _________________________Flow Inputs and Adjustments___________________________ Volume, V 1940 veh/h Peak-hour factor, PHF 0.94 Peak 15-min volume, v15 516 v Trucks and buses 8 % Recreational vehicles 0 % Terrain type: Level Grade - % Segment length - mi Trucks and buses PCE, ET 1.5 Recreational vehicle PCE, ER 1.2 Heavy vehicle adjustment, fHV 0.962 Driver population factor, fp 1.00 Flow rate, vp 1073 pc/h/ln _________________________Speed Inputs and Adjustments__________________________ Lane width - ft Right-side lateral clearance - ft Total ramp density, TRD - ramps/mi Number of lanes, N 2 Free-flow speed: Measured FFS or BFFS 65.0 mi/h Lane width adjustment, fLW - mi/h Lateral clearance adjustment, fLC - mi/h TRD adjustment - mi/h Free-flow speed, FFS 65.0 mi/h _________________________LOS and Performance Measures__________________________ Flow rate, vp 1073 pc/h/ln Free-flow speed, FFS 65.0 mi/h Average passenger-car speed, S 65.0 mi/h Number of lanes, N 2 Density, D 16.5 pc/mi/ln Level of service, LOS B

Page 26: BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange Operations Study BEL-7-18.07 5.5 Build Intersection Figure 5 SR 7 & IR 470 Westbound

HCS 2010: Basic Freeway Segments Release 6.50 Phone: Fax: E-mail: _________________________Operational Analysis__________________________________ Analyst: ARCADIS Agency or Company: ODOT Date Performed: 5/29/2015 Analysis Time Period: AM DHV Freeway/Direction: IR 470 Eastbound From/To: SR 7 Diverge to SR 7 Merge Jurisdiction: ODOT Analysis Year: 2035 Description: BEL-7-18.07 _________________________Flow Inputs and Adjustments___________________________ Volume, V 780 veh/h Peak-hour factor, PHF 0.94 Peak 15-min volume, v15 207 v Trucks and buses 12 % Recreational vehicles 0 % Terrain type: Level Grade - % Segment length - mi Trucks and buses PCE, ET 1.5 Recreational vehicle PCE, ER 1.2 Heavy vehicle adjustment, fHV 0.943 Driver population factor, fp 1.00 Flow rate, vp 440 pc/h/ln _________________________Speed Inputs and Adjustments__________________________ Lane width - ft Right-side lateral clearance - ft Total ramp density, TRD - ramps/mi Number of lanes, N 2 Free-flow speed: Measured FFS or BFFS 65.0 mi/h Lane width adjustment, fLW - mi/h Lateral clearance adjustment, fLC - mi/h TRD adjustment - mi/h Free-flow speed, FFS 65.0 mi/h _________________________LOS and Performance Measures__________________________ Flow rate, vp 440 pc/h/ln Free-flow speed, FFS 65.0 mi/h Average passenger-car speed, S 65.0 mi/h Number of lanes, N 2 Density, D 6.8 pc/mi/ln Level of service, LOS A

Page 27: BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange Operations Study BEL-7-18.07 5.5 Build Intersection Figure 5 SR 7 & IR 470 Westbound

HCS 2010: Basic Freeway Segments Release 6.50 Phone: Fax: E-mail: _________________________Operational Analysis__________________________________ Analyst: ARCADIS Agency or Company: ODOT Date Performed: 5/29/2015 Analysis Time Period: PM DHV Freeway/Direction: IR 470 Eastbound From/To: SR 7 Diverge to SR 7 Merge Jurisdiction: ODOT Analysis Year: 2035 Description: BEL-7-18.07 _________________________Flow Inputs and Adjustments___________________________ Volume, V 1100 veh/h Peak-hour factor, PHF 0.94 Peak 15-min volume, v15 293 v Trucks and buses 12 % Recreational vehicles 0 % Terrain type: Level Grade - % Segment length - mi Trucks and buses PCE, ET 1.5 Recreational vehicle PCE, ER 1.2 Heavy vehicle adjustment, fHV 0.943 Driver population factor, fp 1.00 Flow rate, vp 620 pc/h/ln _________________________Speed Inputs and Adjustments__________________________ Lane width - ft Right-side lateral clearance - ft Total ramp density, TRD - ramps/mi Number of lanes, N 2 Free-flow speed: Measured FFS or BFFS 65.0 mi/h Lane width adjustment, fLW - mi/h Lateral clearance adjustment, fLC - mi/h TRD adjustment - mi/h Free-flow speed, FFS 65.0 mi/h _________________________LOS and Performance Measures__________________________ Flow rate, vp 620 pc/h/ln Free-flow speed, FFS 65.0 mi/h Average passenger-car speed, S 65.0 mi/h Number of lanes, N 2 Density, D 9.5 pc/mi/ln Level of service, LOS A

Page 28: BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange Operations Study BEL-7-18.07 5.5 Build Intersection Figure 5 SR 7 & IR 470 Westbound

HCS 2010: Basic Freeway Segments Release 6.50 Phone: Fax: E-mail: _________________________Operational Analysis__________________________________ Analyst: ARCADIS Agency or Company: ODOT Date Performed: Analysis Time Period: AM DHV Freeway/Direction: IR 470 Westbound From/To: Bellaire-High Ridge Rd to SR 7 Jurisdiction: ODOT Analysis Year: 2035 Description: BEL-7-18.07 _________________________Flow Inputs and Adjustments___________________________ Volume, V 1070 veh/h Peak-hour factor, PHF 0.94 Peak 15-min volume, v15 285 v Trucks and buses 12 % Recreational vehicles 0 % Terrain type: Level Grade - % Segment length - mi Trucks and buses PCE, ET 1.5 Recreational vehicle PCE, ER 1.2 Heavy vehicle adjustment, fHV 0.943 Driver population factor, fp 1.00 Flow rate, vp 402 pc/h/ln _________________________Speed Inputs and Adjustments__________________________ Lane width - ft Right-side lateral clearance - ft Total ramp density, TRD - ramps/mi Number of lanes, N 3 Free-flow speed: Measured FFS or BFFS 65.0 mi/h Lane width adjustment, fLW - mi/h Lateral clearance adjustment, fLC - mi/h TRD adjustment - mi/h Free-flow speed, FFS 65.0 mi/h _________________________LOS and Performance Measures__________________________ Flow rate, vp 402 pc/h/ln Free-flow speed, FFS 65.0 mi/h Average passenger-car speed, S 65.0 mi/h Number of lanes, N 3 Density, D 6.2 pc/mi/ln Level of service, LOS A

Page 29: BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange Operations Study BEL-7-18.07 5.5 Build Intersection Figure 5 SR 7 & IR 470 Westbound

HCS 2010: Basic Freeway Segments Release 6.50 Phone: Fax: E-mail: _________________________Operational Analysis__________________________________ Analyst: ARCADIS Agency or Company: ODOT Date Performed: 5/29/2015 Analysis Time Period: PM DHV Freeway/Direction: IR 470 Westbound From/To: Bellaire-High Ridge Rd to SR 7 Jurisdiction: ODOT Analysis Year: 2035 Description: _________________________Flow Inputs and Adjustments___________________________ Volume, V 1690 veh/h Peak-hour factor, PHF 0.94 Peak 15-min volume, v15 449 v Trucks and buses 12 % Recreational vehicles 0 % Terrain type: Level Grade - % Segment length - mi Trucks and buses PCE, ET 1.5 Recreational vehicle PCE, ER 1.2 Heavy vehicle adjustment, fHV 0.943 Driver population factor, fp 1.00 Flow rate, vp 635 pc/h/ln _________________________Speed Inputs and Adjustments__________________________ Lane width - ft Right-side lateral clearance - ft Total ramp density, TRD - ramps/mi Number of lanes, N 3 Free-flow speed: Measured FFS or BFFS 65.0 mi/h Lane width adjustment, fLW - mi/h Lateral clearance adjustment, fLC - mi/h TRD adjustment - mi/h Free-flow speed, FFS 65.0 mi/h _________________________LOS and Performance Measures__________________________ Flow rate, vp 635 pc/h/ln Free-flow speed, FFS 65.0 mi/h Average passenger-car speed, S 65.0 mi/h Number of lanes, N 3 Density, D 9.8 pc/mi/ln Level of service, LOS A

Page 30: BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange Operations Study BEL-7-18.07 5.5 Build Intersection Figure 5 SR 7 & IR 470 Westbound

HCS 2010: Basic Freeway Segments Release 6.50 Phone: Fax: E-mail: _________________________Operational Analysis__________________________________ Analyst: ARCADIS Agency or Company: ODOT Date Performed: 5/29/2015 Analysis Time Period: AM DHV Freeway/Direction: IR 470 Westbound From/To: SR 7 Diverge to SR 7 Merge Jurisdiction: ODOT Analysis Year: 2035 Description: BEL-7-18.07 _________________________Flow Inputs and Adjustments___________________________ Volume, V 820 veh/h Peak-hour factor, PHF 0.94 Peak 15-min volume, v15 218 v Trucks and buses 8 % Recreational vehicles 0 % Terrain type: Level Grade - % Segment length - mi Trucks and buses PCE, ET 1.5 Recreational vehicle PCE, ER 1.2 Heavy vehicle adjustment, fHV 0.962 Driver population factor, fp 1.00 Flow rate, vp 454 pc/h/ln _________________________Speed Inputs and Adjustments__________________________ Lane width - ft Right-side lateral clearance - ft Total ramp density, TRD - ramps/mi Number of lanes, N 2 Free-flow speed: Measured FFS or BFFS 65.0 mi/h Lane width adjustment, fLW - mi/h Lateral clearance adjustment, fLC - mi/h TRD adjustment - mi/h Free-flow speed, FFS 65.0 mi/h _________________________LOS and Performance Measures__________________________ Flow rate, vp 454 pc/h/ln Free-flow speed, FFS 65.0 mi/h Average passenger-car speed, S 65.0 mi/h Number of lanes, N 2 Density, D 7.0 pc/mi/ln Level of service, LOS A

Page 31: BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange Operations Study BEL-7-18.07 5.5 Build Intersection Figure 5 SR 7 & IR 470 Westbound

HCS 2010: Basic Freeway Segments Release 6.50 Phone: Fax: E-mail: _________________________Operational Analysis__________________________________ Analyst: ARCADIS Agency or Company: ODOT Date Performed: 5/29/2015 Analysis Time Period: PM DHV Freeway/Direction: IR 470 Westbound From/To: SR 7 Diverge to SR 7 Merge Jurisdiction: ODOT Analysis Year: 2035 Description: BEL-7-18.07 _________________________Flow Inputs and Adjustments___________________________ Volume, V 1360 veh/h Peak-hour factor, PHF 0.94 Peak 15-min volume, v15 362 v Trucks and buses 8 % Recreational vehicles 0 % Terrain type: Level Grade - % Segment length - mi Trucks and buses PCE, ET 1.5 Recreational vehicle PCE, ER 1.2 Heavy vehicle adjustment, fHV 0.962 Driver population factor, fp 1.00 Flow rate, vp 752 pc/h/ln _________________________Speed Inputs and Adjustments__________________________ Lane width - ft Right-side lateral clearance - ft Total ramp density, TRD - ramps/mi Number of lanes, N 2 Free-flow speed: Measured FFS or BFFS 65.0 mi/h Lane width adjustment, fLW - mi/h Lateral clearance adjustment, fLC - mi/h TRD adjustment - mi/h Free-flow speed, FFS 65.0 mi/h _________________________LOS and Performance Measures__________________________ Flow rate, vp 752 pc/h/ln Free-flow speed, FFS 65.0 mi/h Average passenger-car speed, S 65.0 mi/h Number of lanes, N 2 Density, D 11.6 pc/mi/ln Level of service, LOS B

Page 32: BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange Operations Study BEL-7-18.07 5.5 Build Intersection Figure 5 SR 7 & IR 470 Westbound

HCS 2010: Basic Freeway Segments Release 6.50 Phone: Fax: E-mail: _________________________Operational Analysis__________________________________ Analyst: ARCADIS Agency or Company: ODOT Date Performed: 5/29/2015 Analysis Time Period: AM DHV Freeway/Direction: SR 7 Northbound From/To: 48th Street to I-470 Jurisdiction: ODOT Analysis Year: 2035 Description: _________________________Flow Inputs and Adjustments___________________________ Volume, V 850 veh/h Peak-hour factor, PHF 0.94 Peak 15-min volume, v15 226 v Trucks and buses 7 % Recreational vehicles 0 % Terrain type: Level Grade - % Segment length - mi Trucks and buses PCE, ET 1.5 Recreational vehicle PCE, ER 1.2 Heavy vehicle adjustment, fHV 0.966 Driver population factor, fp 1.00 Flow rate, vp 468 pc/h/ln _________________________Speed Inputs and Adjustments__________________________ Lane width - ft Right-side lateral clearance - ft Total ramp density, TRD - ramps/mi Number of lanes, N 2 Free-flow speed: Measured FFS or BFFS 55.0 mi/h Lane width adjustment, fLW - mi/h Lateral clearance adjustment, fLC - mi/h TRD adjustment - mi/h Free-flow speed, FFS 55.0 mi/h _________________________LOS and Performance Measures__________________________ Flow rate, vp 468 pc/h/ln Free-flow speed, FFS 55.0 mi/h Average passenger-car speed, S 55.0 mi/h Number of lanes, N 2 Density, D 8.5 pc/mi/ln Level of service, LOS A

Page 33: BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange Operations Study BEL-7-18.07 5.5 Build Intersection Figure 5 SR 7 & IR 470 Westbound

HCS 2010: Basic Freeway Segments Release 6.50 Phone: Fax: E-mail: _________________________Operational Analysis__________________________________ Analyst: ARCADIS Agency or Company: ODOT Date Performed: 5/29/2015 Analysis Time Period: PM DHV Freeway/Direction: SR 7 Northbound From/To: 48th Street to I-470 Jurisdiction: ODOT Analysis Year: 2035 Description: _________________________Flow Inputs and Adjustments___________________________ Volume, V 940 veh/h Peak-hour factor, PHF 0.94 Peak 15-min volume, v15 250 v Trucks and buses 7 % Recreational vehicles 0 % Terrain type: Level Grade - % Segment length - mi Trucks and buses PCE, ET 1.5 Recreational vehicle PCE, ER 1.2 Heavy vehicle adjustment, fHV 0.966 Driver population factor, fp 1.00 Flow rate, vp 517 pc/h/ln _________________________Speed Inputs and Adjustments__________________________ Lane width - ft Right-side lateral clearance - ft Total ramp density, TRD - ramps/mi Number of lanes, N 2 Free-flow speed: Measured FFS or BFFS 55.0 mi/h Lane width adjustment, fLW - mi/h Lateral clearance adjustment, fLC - mi/h TRD adjustment - mi/h Free-flow speed, FFS 55.0 mi/h _________________________LOS and Performance Measures__________________________ Flow rate, vp 517 pc/h/ln Free-flow speed, FFS 55.0 mi/h Average passenger-car speed, S 55.0 mi/h Number of lanes, N 2 Density, D 9.4 pc/mi/ln Level of service, LOS A

Page 34: BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange Operations Study BEL-7-18.07 5.5 Build Intersection Figure 5 SR 7 & IR 470 Westbound

HCS 2010: Basic Freeway Segments Release 6.50 Phone: Fax: E-mail: _________________________Operational Analysis__________________________________ Analyst: ARCADIS Agency or Company: ODOT Date Performed: 5/29/2015 Analysis Time Period: AM DHV Freeway/Direction: SR 7 Southbound From/To: Whitely Street to I-470 Jurisdiction: ODOT Analysis Year: 2035 Description: BEL-7-18.07 _________________________Flow Inputs and Adjustments___________________________ Volume, V 620 veh/h Peak-hour factor, PHF 0.94 Peak 15-min volume, v15 165 v Trucks and buses 4 % Recreational vehicles 0 % Terrain type: Level Grade - % Segment length - mi Trucks and buses PCE, ET 1.5 Recreational vehicle PCE, ER 1.2 Heavy vehicle adjustment, fHV 0.980 Driver population factor, fp 1.00 Flow rate, vp 336 pc/h/ln _________________________Speed Inputs and Adjustments__________________________ Lane width - ft Right-side lateral clearance - ft Total ramp density, TRD - ramps/mi Number of lanes, N 2 Free-flow speed: Measured FFS or BFFS 55.0 mi/h Lane width adjustment, fLW - mi/h Lateral clearance adjustment, fLC - mi/h TRD adjustment - mi/h Free-flow speed, FFS 55.0 mi/h _________________________LOS and Performance Measures__________________________ Flow rate, vp 336 pc/h/ln Free-flow speed, FFS 55.0 mi/h Average passenger-car speed, S 55.0 mi/h Number of lanes, N 2 Density, D 6.1 pc/mi/ln Level of service, LOS A

Page 35: BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange Operations Study BEL-7-18.07 5.5 Build Intersection Figure 5 SR 7 & IR 470 Westbound

HCS 2010: Basic Freeway Segments Release 6.50 Phone: Fax: E-mail: _________________________Operational Analysis__________________________________ Analyst: ARCADIS Agency or Company: ODOT Date Performed: 5/29/2015 Analysis Time Period: PM DHV Freeway/Direction: SR 7 Southbound From/To: Whitely Street to I-470 Jurisdiction: ODOT Analysis Year: 2035 Description: _________________________Flow Inputs and Adjustments___________________________ Volume, V 890 veh/h Peak-hour factor, PHF 0.94 Peak 15-min volume, v15 237 v Trucks and buses 4 % Recreational vehicles 0 % Terrain type: Level Grade - % Segment length - mi Trucks and buses PCE, ET 1.5 Recreational vehicle PCE, ER 1.2 Heavy vehicle adjustment, fHV 0.980 Driver population factor, fp 1.00 Flow rate, vp 483 pc/h/ln _________________________Speed Inputs and Adjustments__________________________ Lane width - ft Right-side lateral clearance - ft Total ramp density, TRD - ramps/mi Number of lanes, N 2 Free-flow speed: Measured FFS or BFFS 55.0 mi/h Lane width adjustment, fLW - mi/h Lateral clearance adjustment, fLC - mi/h TRD adjustment - mi/h Free-flow speed, FFS 55.0 mi/h _________________________LOS and Performance Measures__________________________ Flow rate, vp 483 pc/h/ln Free-flow speed, FFS 55.0 mi/h Average passenger-car speed, S 55.0 mi/h Number of lanes, N 2 Density, D 8.8 pc/mi/ln Level of service, LOS A

Page 36: BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange Operations Study BEL-7-18.07 5.5 Build Intersection Figure 5 SR 7 & IR 470 Westbound

Appendix C

Freeway Analysis – Build

Page 37: BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange Operations Study BEL-7-18.07 5.5 Build Intersection Figure 5 SR 7 & IR 470 Westbound

HCS 2010: Basic Freeway Segments Release 6.50 Phone: Fax: E-mail: _________________________Operational Analysis__________________________________ Analyst: ARCADIS Agency or Company: ODOT Date Performed: 5/29/2015 Analysis Time Period: AM DHV Freeway/Direction: IR 470 Eastbound From/To: SR 7 to Bellaire-High Ridge Rd Jurisdiction: ODOT Analysis Year: 2035 Description: BEL-7-18.07 _________________________Flow Inputs and Adjustments___________________________ Volume, V 1200 veh/h Peak-hour factor, PHF 0.94 Peak 15-min volume, v15 319 v Trucks and buses 12 % Recreational vehicles 0 % Terrain type: Level Grade - % Segment length - mi Trucks and buses PCE, ET 1.5 Recreational vehicle PCE, ER 1.2 Heavy vehicle adjustment, fHV 0.943 Driver population factor, fp 1.00 Flow rate, vp 677 pc/h/ln _________________________Speed Inputs and Adjustments__________________________ Lane width - ft Right-side lateral clearance - ft Total ramp density, TRD - ramps/mi Number of lanes, N 2 Free-flow speed: Measured FFS or BFFS 65.0 mi/h Lane width adjustment, fLW - mi/h Lateral clearance adjustment, fLC - mi/h TRD adjustment - mi/h Free-flow speed, FFS 65.0 mi/h _________________________LOS and Performance Measures__________________________ Flow rate, vp 677 pc/h/ln Free-flow speed, FFS 65.0 mi/h Average passenger-car speed, S 65.0 mi/h Number of lanes, N 2 Density, D 10.4 pc/mi/ln Level of service, LOS A

Page 38: BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange Operations Study BEL-7-18.07 5.5 Build Intersection Figure 5 SR 7 & IR 470 Westbound

HCS 2010: Basic Freeway Segments Release 6.50 Phone: Fax: E-mail: _________________________Operational Analysis__________________________________ Analyst: ARCADIS Agency or Company: ODOT Date Performed: Analysis Time Period: PM DHV Freeway/Direction: IR 470 Eastbound From/To: SR 7 to Bellaire-High Ridge Rd Jurisdiction: ODOT Analysis Year: 2035 Description: BEL-7-18.07 _________________________Flow Inputs and Adjustments___________________________ Volume, V 1490 veh/h Peak-hour factor, PHF 0.94 Peak 15-min volume, v15 396 v Trucks and buses 12 % Recreational vehicles 0 % Terrain type: Level Grade - % Segment length - mi Trucks and buses PCE, ET 1.5 Recreational vehicle PCE, ER 1.2 Heavy vehicle adjustment, fHV 0.943 Driver population factor, fp 1.00 Flow rate, vp 840 pc/h/ln _________________________Speed Inputs and Adjustments__________________________ Lane width - ft Right-side lateral clearance - ft Total ramp density, TRD - ramps/mi Number of lanes, N 2 Free-flow speed: Measured FFS or BFFS 65.0 mi/h Lane width adjustment, fLW - mi/h Lateral clearance adjustment, fLC - mi/h TRD adjustment - mi/h Free-flow speed, FFS 65.0 mi/h _________________________LOS and Performance Measures__________________________ Flow rate, vp 840 pc/h/ln Free-flow speed, FFS 65.0 mi/h Average passenger-car speed, S 65.0 mi/h Number of lanes, N 2 Density, D 12.9 pc/mi/ln Level of service, LOS B

Page 39: BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange Operations Study BEL-7-18.07 5.5 Build Intersection Figure 5 SR 7 & IR 470 Westbound

HCS 2010: Basic Freeway Segments Release 6.50 Phone: Fax: E-mail: _________________________Operational Analysis__________________________________ Analyst: ARCADIS Agency or Company: ODOT Date Performed: 5/29/2015 Analysis Time Period: AM DHV Freeway/Direction: IR 470 Eastbound From/To: SR 7 to SR 2 Jurisdiction: ODOT Analysis Year: 2035 Description: _________________________Flow Inputs and Adjustments___________________________ Volume, V 1600 veh/h Peak-hour factor, PHF 0.94 Peak 15-min volume, v15 426 v Trucks and buses 8 % Recreational vehicles 0 % Terrain type: Level Grade - % Segment length - mi Trucks and buses PCE, ET 1.5 Recreational vehicle PCE, ER 1.2 Heavy vehicle adjustment, fHV 0.962 Driver population factor, fp 1.00 Flow rate, vp 885 pc/h/ln _________________________Speed Inputs and Adjustments__________________________ Lane width - ft Right-side lateral clearance - ft Total ramp density, TRD - ramps/mi Number of lanes, N 2 Free-flow speed: Measured FFS or BFFS 65.0 mi/h Lane width adjustment, fLW - mi/h Lateral clearance adjustment, fLC - mi/h TRD adjustment - mi/h Free-flow speed, FFS 65.0 mi/h _________________________LOS and Performance Measures__________________________ Flow rate, vp 885 pc/h/ln Free-flow speed, FFS 65.0 mi/h Average passenger-car speed, S 65.0 mi/h Number of lanes, N 2 Density, D 13.6 pc/mi/ln Level of service, LOS B

Page 40: BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange Operations Study BEL-7-18.07 5.5 Build Intersection Figure 5 SR 7 & IR 470 Westbound

HCS 2010: Basic Freeway Segments Release 6.50 Phone: Fax: E-mail: _________________________Operational Analysis__________________________________ Analyst: ARCADIS Agency or Company: ODOT Date Performed: 5/29/2015 Analysis Time Period: PM DHV Freeway/Direction: IR 470 Eastbound From/To: SR 7 to SR 2 Jurisdiction: ODOT Analysis Year: 2035 Description: _________________________Flow Inputs and Adjustments___________________________ Volume, V 1940 veh/h Peak-hour factor, PHF 0.94 Peak 15-min volume, v15 516 v Trucks and buses 8 % Recreational vehicles 0 % Terrain type: Level Grade - % Segment length - mi Trucks and buses PCE, ET 1.5 Recreational vehicle PCE, ER 1.2 Heavy vehicle adjustment, fHV 0.962 Driver population factor, fp 1.00 Flow rate, vp 1073 pc/h/ln _________________________Speed Inputs and Adjustments__________________________ Lane width - ft Right-side lateral clearance - ft Total ramp density, TRD - ramps/mi Number of lanes, N 2 Free-flow speed: Measured FFS or BFFS 65.0 mi/h Lane width adjustment, fLW - mi/h Lateral clearance adjustment, fLC - mi/h TRD adjustment - mi/h Free-flow speed, FFS 65.0 mi/h _________________________LOS and Performance Measures__________________________ Flow rate, vp 1073 pc/h/ln Free-flow speed, FFS 65.0 mi/h Average passenger-car speed, S 65.0 mi/h Number of lanes, N 2 Density, D 16.5 pc/mi/ln Level of service, LOS B

Page 41: BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange Operations Study BEL-7-18.07 5.5 Build Intersection Figure 5 SR 7 & IR 470 Westbound

HCS 2010: Basic Freeway Segments Release 6.50 Phone: Fax: E-mail: _________________________Operational Analysis__________________________________ Analyst: ARCADIS Agency or Company: ODOT Date Performed: 5/29/2015 Analysis Time Period: AM DHV Freeway/Direction: IR 470 Eastbound From/To: SR 7 Diverge to SR 7 Merge Jurisdiction: ODOT Analysis Year: 2035 Description: BEL-7-18.07 _________________________Flow Inputs and Adjustments___________________________ Volume, V 780 veh/h Peak-hour factor, PHF 0.94 Peak 15-min volume, v15 207 v Trucks and buses 12 % Recreational vehicles 0 % Terrain type: Level Grade - % Segment length - mi Trucks and buses PCE, ET 1.5 Recreational vehicle PCE, ER 1.2 Heavy vehicle adjustment, fHV 0.943 Driver population factor, fp 1.00 Flow rate, vp 440 pc/h/ln _________________________Speed Inputs and Adjustments__________________________ Lane width - ft Right-side lateral clearance - ft Total ramp density, TRD - ramps/mi Number of lanes, N 2 Free-flow speed: Measured FFS or BFFS 65.0 mi/h Lane width adjustment, fLW - mi/h Lateral clearance adjustment, fLC - mi/h TRD adjustment - mi/h Free-flow speed, FFS 65.0 mi/h _________________________LOS and Performance Measures__________________________ Flow rate, vp 440 pc/h/ln Free-flow speed, FFS 65.0 mi/h Average passenger-car speed, S 65.0 mi/h Number of lanes, N 2 Density, D 6.8 pc/mi/ln Level of service, LOS A

Page 42: BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange Operations Study BEL-7-18.07 5.5 Build Intersection Figure 5 SR 7 & IR 470 Westbound

HCS 2010: Basic Freeway Segments Release 6.50 Phone: Fax: E-mail: _________________________Operational Analysis__________________________________ Analyst: ARCADIS Agency or Company: ODOT Date Performed: 5/29/2015 Analysis Time Period: PM DHV Freeway/Direction: IR 470 Eastbound From/To: SR 7 Diverge to SR 7 Merge Jurisdiction: ODOT Analysis Year: 2035 Description: BEL-7-18.07 _________________________Flow Inputs and Adjustments___________________________ Volume, V 1100 veh/h Peak-hour factor, PHF 0.94 Peak 15-min volume, v15 293 v Trucks and buses 12 % Recreational vehicles 0 % Terrain type: Level Grade - % Segment length - mi Trucks and buses PCE, ET 1.5 Recreational vehicle PCE, ER 1.2 Heavy vehicle adjustment, fHV 0.943 Driver population factor, fp 1.00 Flow rate, vp 620 pc/h/ln _________________________Speed Inputs and Adjustments__________________________ Lane width - ft Right-side lateral clearance - ft Total ramp density, TRD - ramps/mi Number of lanes, N 2 Free-flow speed: Measured FFS or BFFS 65.0 mi/h Lane width adjustment, fLW - mi/h Lateral clearance adjustment, fLC - mi/h TRD adjustment - mi/h Free-flow speed, FFS 65.0 mi/h _________________________LOS and Performance Measures__________________________ Flow rate, vp 620 pc/h/ln Free-flow speed, FFS 65.0 mi/h Average passenger-car speed, S 65.0 mi/h Number of lanes, N 2 Density, D 9.5 pc/mi/ln Level of service, LOS A

Page 43: BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange Operations Study BEL-7-18.07 5.5 Build Intersection Figure 5 SR 7 & IR 470 Westbound

HCS 2010: Basic Freeway Segments Release 6.50 Phone: Fax: E-mail: _________________________Operational Analysis__________________________________ Analyst: ARCADIS Agency or Company: ODOT Date Performed: Analysis Time Period: AM DHV Freeway/Direction: IR 470 Westbound From/To: Bellaire-High Ridge Rd to SR 7 Jurisdiction: ODOT Analysis Year: 2035 Description: BEL-7-18.07 _________________________Flow Inputs and Adjustments___________________________ Volume, V 1070 veh/h Peak-hour factor, PHF 0.94 Peak 15-min volume, v15 285 v Trucks and buses 12 % Recreational vehicles 0 % Terrain type: Level Grade - % Segment length - mi Trucks and buses PCE, ET 1.5 Recreational vehicle PCE, ER 1.2 Heavy vehicle adjustment, fHV 0.943 Driver population factor, fp 1.00 Flow rate, vp 402 pc/h/ln _________________________Speed Inputs and Adjustments__________________________ Lane width - ft Right-side lateral clearance - ft Total ramp density, TRD - ramps/mi Number of lanes, N 3 Free-flow speed: Measured FFS or BFFS 65.0 mi/h Lane width adjustment, fLW - mi/h Lateral clearance adjustment, fLC - mi/h TRD adjustment - mi/h Free-flow speed, FFS 65.0 mi/h _________________________LOS and Performance Measures__________________________ Flow rate, vp 402 pc/h/ln Free-flow speed, FFS 65.0 mi/h Average passenger-car speed, S 65.0 mi/h Number of lanes, N 3 Density, D 6.2 pc/mi/ln Level of service, LOS A

Page 44: BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange Operations Study BEL-7-18.07 5.5 Build Intersection Figure 5 SR 7 & IR 470 Westbound

HCS 2010: Basic Freeway Segments Release 6.50 Phone: Fax: E-mail: _________________________Operational Analysis__________________________________ Analyst: ARCADIS Agency or Company: ODOT Date Performed: 5/29/2015 Analysis Time Period: PM DHV Freeway/Direction: IR 470 Westbound From/To: Bellaire-High Ridge Rd to SR 7 Jurisdiction: ODOT Analysis Year: 2035 Description: _________________________Flow Inputs and Adjustments___________________________ Volume, V 1690 veh/h Peak-hour factor, PHF 0.94 Peak 15-min volume, v15 449 v Trucks and buses 12 % Recreational vehicles 0 % Terrain type: Level Grade - % Segment length - mi Trucks and buses PCE, ET 1.5 Recreational vehicle PCE, ER 1.2 Heavy vehicle adjustment, fHV 0.943 Driver population factor, fp 1.00 Flow rate, vp 635 pc/h/ln _________________________Speed Inputs and Adjustments__________________________ Lane width - ft Right-side lateral clearance - ft Total ramp density, TRD - ramps/mi Number of lanes, N 3 Free-flow speed: Measured FFS or BFFS 65.0 mi/h Lane width adjustment, fLW - mi/h Lateral clearance adjustment, fLC - mi/h TRD adjustment - mi/h Free-flow speed, FFS 65.0 mi/h _________________________LOS and Performance Measures__________________________ Flow rate, vp 635 pc/h/ln Free-flow speed, FFS 65.0 mi/h Average passenger-car speed, S 65.0 mi/h Number of lanes, N 3 Density, D 9.8 pc/mi/ln Level of service, LOS A

Page 45: BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange Operations Study BEL-7-18.07 5.5 Build Intersection Figure 5 SR 7 & IR 470 Westbound

HCS 2010: Basic Freeway Segments Release 6.50 Phone: Fax: E-mail: _________________________Operational Analysis__________________________________ Analyst: ARCADIS Agency or Company: ODOT Date Performed: 5/29/2015 Analysis Time Period: AM DHV Freeway/Direction: IR 470 Westbound From/To: SR 7 Diverge to SR 7 Merge Jurisdiction: ODOT Analysis Year: 2035 Description: BEL-7-18.07 _________________________Flow Inputs and Adjustments___________________________ Volume, V 820 veh/h Peak-hour factor, PHF 0.94 Peak 15-min volume, v15 218 v Trucks and buses 8 % Recreational vehicles 0 % Terrain type: Level Grade - % Segment length - mi Trucks and buses PCE, ET 1.5 Recreational vehicle PCE, ER 1.2 Heavy vehicle adjustment, fHV 0.962 Driver population factor, fp 1.00 Flow rate, vp 454 pc/h/ln _________________________Speed Inputs and Adjustments__________________________ Lane width - ft Right-side lateral clearance - ft Total ramp density, TRD - ramps/mi Number of lanes, N 2 Free-flow speed: Measured FFS or BFFS 65.0 mi/h Lane width adjustment, fLW - mi/h Lateral clearance adjustment, fLC - mi/h TRD adjustment - mi/h Free-flow speed, FFS 65.0 mi/h _________________________LOS and Performance Measures__________________________ Flow rate, vp 454 pc/h/ln Free-flow speed, FFS 65.0 mi/h Average passenger-car speed, S 65.0 mi/h Number of lanes, N 2 Density, D 7.0 pc/mi/ln Level of service, LOS A

Page 46: BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange Operations Study BEL-7-18.07 5.5 Build Intersection Figure 5 SR 7 & IR 470 Westbound

HCS 2010: Basic Freeway Segments Release 6.50 Phone: Fax: E-mail: _________________________Operational Analysis__________________________________ Analyst: ARCADIS Agency or Company: ODOT Date Performed: 5/29/2015 Analysis Time Period: PM DHV Freeway/Direction: IR 470 Westbound From/To: SR 7 Diverge to SR 7 Merge Jurisdiction: ODOT Analysis Year: 2035 Description: BEL-7-18.07 _________________________Flow Inputs and Adjustments___________________________ Volume, V 1360 veh/h Peak-hour factor, PHF 0.94 Peak 15-min volume, v15 362 v Trucks and buses 8 % Recreational vehicles 0 % Terrain type: Level Grade - % Segment length - mi Trucks and buses PCE, ET 1.5 Recreational vehicle PCE, ER 1.2 Heavy vehicle adjustment, fHV 0.962 Driver population factor, fp 1.00 Flow rate, vp 752 pc/h/ln _________________________Speed Inputs and Adjustments__________________________ Lane width - ft Right-side lateral clearance - ft Total ramp density, TRD - ramps/mi Number of lanes, N 2 Free-flow speed: Measured FFS or BFFS 65.0 mi/h Lane width adjustment, fLW - mi/h Lateral clearance adjustment, fLC - mi/h TRD adjustment - mi/h Free-flow speed, FFS 65.0 mi/h _________________________LOS and Performance Measures__________________________ Flow rate, vp 752 pc/h/ln Free-flow speed, FFS 65.0 mi/h Average passenger-car speed, S 65.0 mi/h Number of lanes, N 2 Density, D 11.6 pc/mi/ln Level of service, LOS B

Page 47: BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange Operations Study BEL-7-18.07 5.5 Build Intersection Figure 5 SR 7 & IR 470 Westbound

HCS 2010: Basic Freeway Segments Release 6.50 Phone: Fax: E-mail: _________________________Operational Analysis__________________________________ Analyst: ARCADIS Agency or Company: ODOT Date Performed: 5/29/2015 Analysis Time Period: AM DHV Freeway/Direction: SR 7 Northbound From/To: 48th Street to I-470 Jurisdiction: ODOT Analysis Year: 2035 Description: _________________________Flow Inputs and Adjustments___________________________ Volume, V 850 veh/h Peak-hour factor, PHF 0.94 Peak 15-min volume, v15 226 v Trucks and buses 7 % Recreational vehicles 0 % Terrain type: Level Grade - % Segment length - mi Trucks and buses PCE, ET 1.5 Recreational vehicle PCE, ER 1.2 Heavy vehicle adjustment, fHV 0.966 Driver population factor, fp 1.00 Flow rate, vp 468 pc/h/ln _________________________Speed Inputs and Adjustments__________________________ Lane width - ft Right-side lateral clearance - ft Total ramp density, TRD - ramps/mi Number of lanes, N 2 Free-flow speed: Measured FFS or BFFS 55.0 mi/h Lane width adjustment, fLW - mi/h Lateral clearance adjustment, fLC - mi/h TRD adjustment - mi/h Free-flow speed, FFS 55.0 mi/h _________________________LOS and Performance Measures__________________________ Flow rate, vp 468 pc/h/ln Free-flow speed, FFS 55.0 mi/h Average passenger-car speed, S 55.0 mi/h Number of lanes, N 2 Density, D 8.5 pc/mi/ln Level of service, LOS A

Page 48: BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange Operations Study BEL-7-18.07 5.5 Build Intersection Figure 5 SR 7 & IR 470 Westbound

HCS 2010: Basic Freeway Segments Release 6.50 Phone: Fax: E-mail: _________________________Operational Analysis__________________________________ Analyst: ARCADIS Agency or Company: ODOT Date Performed: 5/29/2015 Analysis Time Period: PM DHV Freeway/Direction: SR 7 Northbound From/To: 48th Street to I-470 Jurisdiction: ODOT Analysis Year: 2035 Description: _________________________Flow Inputs and Adjustments___________________________ Volume, V 940 veh/h Peak-hour factor, PHF 0.94 Peak 15-min volume, v15 250 v Trucks and buses 7 % Recreational vehicles 0 % Terrain type: Level Grade - % Segment length - mi Trucks and buses PCE, ET 1.5 Recreational vehicle PCE, ER 1.2 Heavy vehicle adjustment, fHV 0.966 Driver population factor, fp 1.00 Flow rate, vp 517 pc/h/ln _________________________Speed Inputs and Adjustments__________________________ Lane width - ft Right-side lateral clearance - ft Total ramp density, TRD - ramps/mi Number of lanes, N 2 Free-flow speed: Measured FFS or BFFS 55.0 mi/h Lane width adjustment, fLW - mi/h Lateral clearance adjustment, fLC - mi/h TRD adjustment - mi/h Free-flow speed, FFS 55.0 mi/h _________________________LOS and Performance Measures__________________________ Flow rate, vp 517 pc/h/ln Free-flow speed, FFS 55.0 mi/h Average passenger-car speed, S 55.0 mi/h Number of lanes, N 2 Density, D 9.4 pc/mi/ln Level of service, LOS A

Page 49: BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange Operations Study BEL-7-18.07 5.5 Build Intersection Figure 5 SR 7 & IR 470 Westbound

HCS 2010: Basic Freeway Segments Release 6.50 Phone: Fax: E-mail: _________________________Operational Analysis__________________________________ Analyst: ARCADIS Agency or Company: ODOT Date Performed: 5/29/2015 Analysis Time Period: AM DHV Freeway/Direction: SR 7 Southbound From/To: Whitely Street to I-470 Jurisdiction: ODOT Analysis Year: 2035 Description: BEL-7-18.07 _________________________Flow Inputs and Adjustments___________________________ Volume, V 620 veh/h Peak-hour factor, PHF 0.94 Peak 15-min volume, v15 165 v Trucks and buses 4 % Recreational vehicles 0 % Terrain type: Level Grade - % Segment length - mi Trucks and buses PCE, ET 1.5 Recreational vehicle PCE, ER 1.2 Heavy vehicle adjustment, fHV 0.980 Driver population factor, fp 1.00 Flow rate, vp 336 pc/h/ln _________________________Speed Inputs and Adjustments__________________________ Lane width - ft Right-side lateral clearance - ft Total ramp density, TRD - ramps/mi Number of lanes, N 2 Free-flow speed: Measured FFS or BFFS 55.0 mi/h Lane width adjustment, fLW - mi/h Lateral clearance adjustment, fLC - mi/h TRD adjustment - mi/h Free-flow speed, FFS 55.0 mi/h _________________________LOS and Performance Measures__________________________ Flow rate, vp 336 pc/h/ln Free-flow speed, FFS 55.0 mi/h Average passenger-car speed, S 55.0 mi/h Number of lanes, N 2 Density, D 6.1 pc/mi/ln Level of service, LOS A

Page 50: BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange Operations Study BEL-7-18.07 5.5 Build Intersection Figure 5 SR 7 & IR 470 Westbound

HCS 2010: Basic Freeway Segments Release 6.50 Phone: Fax: E-mail: _________________________Operational Analysis__________________________________ Analyst: ARCADIS Agency or Company: ODOT Date Performed: 5/29/2015 Analysis Time Period: PM DHV Freeway/Direction: SR 7 Southbound From/To: Whitely Street to I-470 Jurisdiction: ODOT Analysis Year: 2035 Description: _________________________Flow Inputs and Adjustments___________________________ Volume, V 890 veh/h Peak-hour factor, PHF 0.94 Peak 15-min volume, v15 237 v Trucks and buses 4 % Recreational vehicles 0 % Terrain type: Level Grade - % Segment length - mi Trucks and buses PCE, ET 1.5 Recreational vehicle PCE, ER 1.2 Heavy vehicle adjustment, fHV 0.980 Driver population factor, fp 1.00 Flow rate, vp 483 pc/h/ln _________________________Speed Inputs and Adjustments__________________________ Lane width - ft Right-side lateral clearance - ft Total ramp density, TRD - ramps/mi Number of lanes, N 2 Free-flow speed: Measured FFS or BFFS 55.0 mi/h Lane width adjustment, fLW - mi/h Lateral clearance adjustment, fLC - mi/h TRD adjustment - mi/h Free-flow speed, FFS 55.0 mi/h _________________________LOS and Performance Measures__________________________ Flow rate, vp 483 pc/h/ln Free-flow speed, FFS 55.0 mi/h Average passenger-car speed, S 55.0 mi/h Number of lanes, N 2 Density, D 8.8 pc/mi/ln Level of service, LOS A

Page 51: BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange Operations Study BEL-7-18.07 5.5 Build Intersection Figure 5 SR 7 & IR 470 Westbound

Appendix D

Ramp Analysis – No Build

Page 52: BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange Operations Study BEL-7-18.07 5.5 Build Intersection Figure 5 SR 7 & IR 470 Westbound

RAMPS AND RAMP JUNCTIONS WORKSHEETGeneral Information Site Information Analyst ARCADIS Freeway/Dir of Travel NorthboundAgency or Company ODOT Junction SR 7 exit ramp to I-470Date Performed 5/29/2015 Jurisdiction ODOTAnalysis Time Period AM DHV Analysis Year 2035Project Description BEL-7-18.07 Inputs

Upstream Adj Ramp

Yes On

No Off

Lup = 3950 ft

Vu = 140 veh/h

Freeway Number of Lanes, N 2 Ramp Number of Lanes, N 1 Acceleration Lane Length, LADeceleration Lane Length LD 420 Freeway Volume, VF 850 Ramp Volume, VR 620 Freeway Free-Flow Speed, SFF 55.0 Ramp Free-Flow Speed, SFR 40.0

Downstream Adj Ramp

Yes On

No Off

Ldown = ft

VD = veh/h

Conversion to pc/h Under Base Conditions (pc/h) V

(Veh/hr) PHF Terrain %Truck %Rv fHV fp v = V/PHF x fHV x fpFreeway 850 0.94 Level 7 0 0.966 1.00 936Ramp 620 0.94 Level 6 0 0.971 1.00 679UpStream 140 0.94 Level 3 0 0.985 1.00 151DownStream

Merge Areas Diverge AreasEstimation of v12 Estimation of v12

V12 = VF ( PFM )LEQ = (Equation 13-6 or 13-7)PFM = using Equation (Exhibit 13-6) V12 = pc/h V3 or Vav34 pc/h (Equation 13-14 or 13-17)Is V3 or Vav34 > 2,700 pc/h? Yes NoIs V3 or Vav34 > 1.5 * V12/2 Yes No

If Yes,V12a = pc/h (Equation 13-16, 13-18, or 13-19)

V12 = VR + (VF - VR)PFDLEQ = (Equation 13-12 or 13-13) PFD = 1.000 using Equation (Exhibit 13-7) V12 = 936 pc/h V3 or Vav34 0 pc/h (Equation 13-14 or 13-17)Is V3 or Vav34 > 2,700 pc/h? Yes No

Is V3 or Vav34 > 1.5 * V12/2 Yes No

If Yes,V12a = pc/h (Equation 13-16, 13-18, or 13-19)

Capacity Checks Capacity ChecksActual Capacity LOS F? Actual Capacity LOS F?

VFO Exhibit 13-8

VF 936 Exhibit 13-8 4500 NoVFO = VF - VR 257 Exhibit 13-8 4500 No

VR 679 Exhibit 13-10 2100 No

Flow Entering Merge Influence Area Flow Entering Diverge Influence AreaActual Max Desirable Violation? Actual Max Desirable Violation?

VR12 Exhibit 13-8 V12 936 Exhibit 13-8 4400:All NoLevel of Service Determination (if not F) Level of Service Determination (if not F)

DR = 5.475 + 0.00734 v R + 0.0078 V12 - 0.00627 LADR = (pc/mi/ln)LOS = (Exhibit 13-2)

DR = 4.252 + 0.0086 V12 - 0.009 LDDR = 8.5 (pc/mi/ln)LOS = A (Exhibit 13-2)

Speed Determination Speed DeterminationMS = (Exibit 13-11) SR= mph (Exhibit 13-11) S0= mph (Exhibit 13-11) S = mph (Exhibit 13-13)

Ds = 0.424 (Exhibit 13-12) SR= 49.5 mph (Exhibit 13-12) S0= N/A mph (Exhibit 13-12) S = 49.5 mph (Exhibit 13-13)

Copyright © 2013 University of Florida, All Rights Reserved HCS2010TM Version 6.50 Generated: 7/2/2015 9:34 AM

Page 53: BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange Operations Study BEL-7-18.07 5.5 Build Intersection Figure 5 SR 7 & IR 470 Westbound

RAMPS AND RAMP JUNCTIONS WORKSHEETGeneral Information Site Information Analyst ARCADIS Freeway/Dir of Travel NorthboundAgency or Company ODOT Junction SR 7 exit ramp to I-470Date Performed 5/29/2015 Jurisdiction ODOTAnalysis Time Period PM DHV Analysis Year 2035Project Description BEL-7-18.07 Inputs

Upstream Adj Ramp

Yes On

No Off

Lup = 3950 ft

Vu = 210 veh/h

Freeway Number of Lanes, N 2 Ramp Number of Lanes, N 1 Acceleration Lane Length, LADeceleration Lane Length LD 420 Freeway Volume, VF 940 Ramp Volume, VR 590 Freeway Free-Flow Speed, SFF 55.0 Ramp Free-Flow Speed, SFR 40.0

Downstream Adj Ramp

Yes On

No Off

Ldown = ft

VD = veh/h

Conversion to pc/h Under Base Conditions (pc/h) V

(Veh/hr) PHF Terrain %Truck %Rv fHV fp v = V/PHF x fHV x fpFreeway 940 0.94 Level 7 0 0.966 1.00 1035Ramp 590 0.94 Level 6 0 0.971 1.00 646UpStream 210 0.94 Level 3 0 0.985 1.00 227DownStream

Merge Areas Diverge AreasEstimation of v12 Estimation of v12

V12 = VF ( PFM )LEQ = (Equation 13-6 or 13-7)PFM = using Equation (Exhibit 13-6) V12 = pc/h V3 or Vav34 pc/h (Equation 13-14 or 13-17)Is V3 or Vav34 > 2,700 pc/h? Yes NoIs V3 or Vav34 > 1.5 * V12/2 Yes No

If Yes,V12a = pc/h (Equation 13-16, 13-18, or 13-19)

V12 = VR + (VF - VR)PFDLEQ = (Equation 13-12 or 13-13) PFD = 1.000 using Equation (Exhibit 13-7) V12 = 1035 pc/h V3 or Vav34 0 pc/h (Equation 13-14 or 13-17)Is V3 or Vav34 > 2,700 pc/h? Yes No

Is V3 or Vav34 > 1.5 * V12/2 Yes No

If Yes,V12a = pc/h (Equation 13-16, 13-18, or 13-19)

Capacity Checks Capacity ChecksActual Capacity LOS F? Actual Capacity LOS F?

VFO Exhibit 13-8

VF 1035 Exhibit 13-8 4500 NoVFO = VF - VR 389 Exhibit 13-8 4500 No

VR 646 Exhibit 13-10 2100 No

Flow Entering Merge Influence Area Flow Entering Diverge Influence AreaActual Max Desirable Violation? Actual Max Desirable Violation?

VR12 Exhibit 13-8 V12 1035 Exhibit 13-8 4400:All NoLevel of Service Determination (if not F) Level of Service Determination (if not F)

DR = 5.475 + 0.00734 v R + 0.0078 V12 - 0.00627 LADR = (pc/mi/ln)LOS = (Exhibit 13-2)

DR = 4.252 + 0.0086 V12 - 0.009 LDDR = 9.4 (pc/mi/ln)LOS = A (Exhibit 13-2)

Speed Determination Speed DeterminationMS = (Exibit 13-11) SR= mph (Exhibit 13-11) S0= mph (Exhibit 13-11) S = mph (Exhibit 13-13)

Ds = 0.421 (Exhibit 13-12) SR= 49.5 mph (Exhibit 13-12) S0= N/A mph (Exhibit 13-12) S = 49.5 mph (Exhibit 13-13)

Copyright © 2013 University of Florida, All Rights Reserved HCS2010TM Version 6.50 Generated: 7/2/2015 9:34 AM

Page 54: BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange Operations Study BEL-7-18.07 5.5 Build Intersection Figure 5 SR 7 & IR 470 Westbound

RAMPS AND RAMP JUNCTIONS WORKSHEETGeneral Information Site Information Analyst ARCADIS Freeway/Dir of Travel SouthboundAgency or Company ODOT Junction SR 7 exit ramp to I-470Date Performed 5/29/2015 Jurisdiction ODOTAnalysis Time Period AM DHV Analysis Year 2035Project Description BEL-7-18.07 Inputs

Upstream Adj Ramp

Yes On

No Off

Lup = 5200 ft

Vu = 150 veh/h

Freeway Number of Lanes, N 2 Ramp Number of Lanes, N 1 Acceleration Lane Length, LADeceleration Lane Length LD 400 Freeway Volume, VF 620 Ramp Volume, VR 450 Freeway Free-Flow Speed, SFF 55.0 Ramp Free-Flow Speed, SFR 40.0

Downstream Adj Ramp

Yes On

No Off

Ldown = ft

VD = veh/h

Conversion to pc/h Under Base Conditions (pc/h) V

(Veh/hr) PHF Terrain %Truck %Rv fHV fp v = V/PHF x fHV x fpFreeway 620 0.94 Level 4 0 0.980 1.00 673Ramp 450 0.94 Level 7 0 0.966 1.00 495UpStream 150 0.94 Level 4 0 0.980 1.00 163DownStream

Merge Areas Diverge AreasEstimation of v12 Estimation of v12

V12 = VF ( PFM )LEQ = (Equation 13-6 or 13-7)PFM = using Equation (Exhibit 13-6) V12 = pc/h V3 or Vav34 pc/h (Equation 13-14 or 13-17)Is V3 or Vav34 > 2,700 pc/h? Yes NoIs V3 or Vav34 > 1.5 * V12/2 Yes No

If Yes,V12a = pc/h (Equation 13-16, 13-18, or 13-19)

V12 = VR + (VF - VR)PFDLEQ = (Equation 13-12 or 13-13) PFD = 1.000 using Equation (Exhibit 13-7) V12 = 673 pc/h V3 or Vav34 0 pc/h (Equation 13-14 or 13-17)Is V3 or Vav34 > 2,700 pc/h? Yes No

Is V3 or Vav34 > 1.5 * V12/2 Yes No

If Yes,V12a = pc/h (Equation 13-16, 13-18, or 13-19)

Capacity Checks Capacity ChecksActual Capacity LOS F? Actual Capacity LOS F?

VFO Exhibit 13-8

VF 673 Exhibit 13-8 4500 NoVFO = VF - VR 178 Exhibit 13-8 4500 No

VR 495 Exhibit 13-10 2100 No

Flow Entering Merge Influence Area Flow Entering Diverge Influence AreaActual Max Desirable Violation? Actual Max Desirable Violation?

VR12 Exhibit 13-8 V12 673 Exhibit 13-8 4400:All NoLevel of Service Determination (if not F) Level of Service Determination (if not F)

DR = 5.475 + 0.00734 v R + 0.0078 V12 - 0.00627 LADR = (pc/mi/ln)LOS = (Exhibit 13-2)

DR = 4.252 + 0.0086 V12 - 0.009 LDDR = 6.4 (pc/mi/ln)LOS = A (Exhibit 13-2)

Speed Determination Speed DeterminationMS = (Exibit 13-11) SR= mph (Exhibit 13-11) S0= mph (Exhibit 13-11) S = mph (Exhibit 13-13)

Ds = 0.408 (Exhibit 13-12) SR= 49.7 mph (Exhibit 13-12) S0= N/A mph (Exhibit 13-12) S = 49.7 mph (Exhibit 13-13)

Copyright © 2013 University of Florida, All Rights Reserved HCS2010TM Version 6.50 Generated: 7/2/2015 9:35 AM

Page 55: BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange Operations Study BEL-7-18.07 5.5 Build Intersection Figure 5 SR 7 & IR 470 Westbound

RAMPS AND RAMP JUNCTIONS WORKSHEETGeneral Information Site Information Analyst ARCADIS Freeway/Dir of Travel SouthboundAgency or Company ODOT Junction SR 7 exit ramp to I-470Date Performed 5/29/2015 Jurisdiction ODOTAnalysis Time Period PM DHV Analysis Year 2035Project Description BEL-7-18.07 Inputs

Upstream Adj Ramp

Yes On

No Off

Lup = 5200 ft

Vu = 390 veh/h

Freeway Number of Lanes, N 2 Ramp Number of Lanes, N 1 Acceleration Lane Length, LADeceleration Lane Length LD 400 Freeway Volume, VF 890 Ramp Volume, VR 580 Freeway Free-Flow Speed, SFF 55.0 Ramp Free-Flow Speed, SFR 40.0

Downstream Adj Ramp

Yes On

No Off

Ldown = ft

VD = veh/h

Conversion to pc/h Under Base Conditions (pc/h) V

(Veh/hr) PHF Terrain %Truck %Rv fHV fp v = V/PHF x fHV x fpFreeway 890 0.94 Level 4 0 0.980 1.00 966Ramp 580 0.94 Level 7 0 0.966 1.00 639UpStream 390 0.94 Level 4 0 0.980 1.00 423DownStream

Merge Areas Diverge AreasEstimation of v12 Estimation of v12

V12 = VF ( PFM )LEQ = (Equation 13-6 or 13-7)PFM = using Equation (Exhibit 13-6) V12 = pc/h V3 or Vav34 pc/h (Equation 13-14 or 13-17)Is V3 or Vav34 > 2,700 pc/h? Yes NoIs V3 or Vav34 > 1.5 * V12/2 Yes No

If Yes,V12a = pc/h (Equation 13-16, 13-18, or 13-19)

V12 = VR + (VF - VR)PFDLEQ = (Equation 13-12 or 13-13) PFD = 1.000 using Equation (Exhibit 13-7) V12 = 966 pc/h V3 or Vav34 0 pc/h (Equation 13-14 or 13-17)Is V3 or Vav34 > 2,700 pc/h? Yes No

Is V3 or Vav34 > 1.5 * V12/2 Yes No

If Yes,V12a = pc/h (Equation 13-16, 13-18, or 13-19)

Capacity Checks Capacity ChecksActual Capacity LOS F? Actual Capacity LOS F?

VFO Exhibit 13-8

VF 966 Exhibit 13-8 4500 NoVFO = VF - VR 327 Exhibit 13-8 4500 No

VR 639 Exhibit 13-10 2100 No

Flow Entering Merge Influence Area Flow Entering Diverge Influence AreaActual Max Desirable Violation? Actual Max Desirable Violation?

VR12 Exhibit 13-8 V12 966 Exhibit 13-8 4400:All NoLevel of Service Determination (if not F) Level of Service Determination (if not F)

DR = 5.475 + 0.00734 v R + 0.0078 V12 - 0.00627 LADR = (pc/mi/ln)LOS = (Exhibit 13-2)

DR = 4.252 + 0.0086 V12 - 0.009 LDDR = 9.0 (pc/mi/ln)LOS = A (Exhibit 13-2)

Speed Determination Speed DeterminationMS = (Exibit 13-11) SR= mph (Exhibit 13-11) S0= mph (Exhibit 13-11) S = mph (Exhibit 13-13)

Ds = 0.421 (Exhibit 13-12) SR= 49.5 mph (Exhibit 13-12) S0= N/A mph (Exhibit 13-12) S = 49.5 mph (Exhibit 13-13)

Copyright © 2013 University of Florida, All Rights Reserved HCS2010TM Version 6.50 Generated: 7/2/2015 9:35 AM

Page 56: BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange Operations Study BEL-7-18.07 5.5 Build Intersection Figure 5 SR 7 & IR 470 Westbound

RAMPS AND RAMP JUNCTIONS WORKSHEETGeneral Information Site Information Analyst ARCADIS Freeway/Dir of Travel EastboundAgency or Company ODOT Junction I-470 exit ramp to SR 7Date Performed 5/29/2015 Jurisdiction ODOTAnalysis Time Period AM DHV Analysis Year 2035Project Description BEL-7-18.07 Inputs

Upstream Adj Ramp

Yes On

No Off

Lup = 9999 ft

Vu = 90 veh/h

Freeway Number of Lanes, N 2 Ramp Number of Lanes, N 1 Acceleration Lane Length, LADeceleration Lane Length LD 540 Freeway Volume, VF 1200 Ramp Volume, VR 420 Freeway Free-Flow Speed, SFF 65.0 Ramp Free-Flow Speed, SFR 50.0

Downstream Adj Ramp

Yes On

No Off

Ldown = ft

VD = veh/h

Conversion to pc/h Under Base Conditions (pc/h) V

(Veh/hr) PHF Terrain %Truck %Rv fHV fp v = V/PHF x fHV x fpFreeway 1200 0.94 Level 12 0 0.943 1.00 1353Ramp 420 0.94 Level 17 0 0.922 1.00 485UpStream 90 0.94 Level 6 0 0.971 1.00 99DownStream

Merge Areas Diverge AreasEstimation of v12 Estimation of v12

V12 = VF ( PFM )LEQ = (Equation 13-6 or 13-7)PFM = using Equation (Exhibit 13-6) V12 = pc/h V3 or Vav34 pc/h (Equation 13-14 or 13-17)Is V3 or Vav34 > 2,700 pc/h? Yes NoIs V3 or Vav34 > 1.5 * V12/2 Yes No

If Yes,V12a = pc/h (Equation 13-16, 13-18, or 13-19)

V12 = VR + (VF - VR)PFDLEQ = (Equation 13-12 or 13-13) PFD = 1.000 using Equation (Exhibit 13-7) V12 = 1353 pc/h V3 or Vav34 0 pc/h (Equation 13-14 or 13-17)Is V3 or Vav34 > 2,700 pc/h? Yes No

Is V3 or Vav34 > 1.5 * V12/2 Yes No

If Yes,V12a = pc/h (Equation 13-16, 13-18, or 13-19)

Capacity Checks Capacity ChecksActual Capacity LOS F? Actual Capacity LOS F?

VFO Exhibit 13-8

VF 1353 Exhibit 13-8 4700 NoVFO = VF - VR 868 Exhibit 13-8 4700 No

VR 485 Exhibit 13-10 2100 No

Flow Entering Merge Influence Area Flow Entering Diverge Influence AreaActual Max Desirable Violation? Actual Max Desirable Violation?

VR12 Exhibit 13-8 V12 1353 Exhibit 13-8 4400:All NoLevel of Service Determination (if not F) Level of Service Determination (if not F)

DR = 5.475 + 0.00734 v R + 0.0078 V12 - 0.00627 LADR = (pc/mi/ln)LOS = (Exhibit 13-2)

DR = 4.252 + 0.0086 V12 - 0.009 LDDR = 11.0 (pc/mi/ln)LOS = B (Exhibit 13-2)

Speed Determination Speed DeterminationMS = (Exibit 13-11) SR= mph (Exhibit 13-11) S0= mph (Exhibit 13-11) S = mph (Exhibit 13-13)

Ds = 0.277 (Exhibit 13-12) SR= 58.6 mph (Exhibit 13-12) S0= N/A mph (Exhibit 13-12) S = 58.6 mph (Exhibit 13-13)

Copyright © 2013 University of Florida, All Rights Reserved HCS2010TM Version 6.50 Generated: 7/2/2015 9:33 AM

Page 57: BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange Operations Study BEL-7-18.07 5.5 Build Intersection Figure 5 SR 7 & IR 470 Westbound

RAMPS AND RAMP JUNCTIONS WORKSHEETGeneral Information Site Information Analyst ARCADIS Freeway/Dir of Travel EastboundAgency or Company ODOT Junction I-470 exit ramp to SR 7Date Performed 5/29/2015 Jurisdiction ODOTAnalysis Time Period PM DHV Analysis Year 2035Project Description BEL-7-18.07 Inputs

Upstream Adj Ramp

Yes On

No Off

Lup = 9999 ft

Vu = 50 veh/h

Freeway Number of Lanes, N 2 Ramp Number of Lanes, N 1 Acceleration Lane Length, LADeceleration Lane Length LD 540 Freeway Volume, VF 1490 Ramp Volume, VR 390 Freeway Free-Flow Speed, SFF 65.0 Ramp Free-Flow Speed, SFR 50.0

Downstream Adj Ramp

Yes On

No Off

Ldown = ft

VD = veh/h

Conversion to pc/h Under Base Conditions (pc/h) V

(Veh/hr) PHF Terrain %Truck %Rv fHV fp v = V/PHF x fHV x fpFreeway 1490 0.94 Level 12 0 0.943 1.00 1680Ramp 390 0.94 Level 17 0 0.922 1.00 450UpStream 50 0.94 Level 6 0 0.971 1.00 55DownStream

Merge Areas Diverge AreasEstimation of v12 Estimation of v12

V12 = VF ( PFM )LEQ = (Equation 13-6 or 13-7)PFM = using Equation (Exhibit 13-6) V12 = pc/h V3 or Vav34 pc/h (Equation 13-14 or 13-17)Is V3 or Vav34 > 2,700 pc/h? Yes NoIs V3 or Vav34 > 1.5 * V12/2 Yes No

If Yes,V12a = pc/h (Equation 13-16, 13-18, or 13-19)

V12 = VR + (VF - VR)PFDLEQ = (Equation 13-12 or 13-13) PFD = 1.000 using Equation (Exhibit 13-7) V12 = 1680 pc/h V3 or Vav34 0 pc/h (Equation 13-14 or 13-17)Is V3 or Vav34 > 2,700 pc/h? Yes No

Is V3 or Vav34 > 1.5 * V12/2 Yes No

If Yes,V12a = pc/h (Equation 13-16, 13-18, or 13-19)

Capacity Checks Capacity ChecksActual Capacity LOS F? Actual Capacity LOS F?

VFO Exhibit 13-8

VF 1680 Exhibit 13-8 4700 NoVFO = VF - VR 1230 Exhibit 13-8 4700 No

VR 450 Exhibit 13-10 2100 No

Flow Entering Merge Influence Area Flow Entering Diverge Influence AreaActual Max Desirable Violation? Actual Max Desirable Violation?

VR12 Exhibit 13-8 V12 1680 Exhibit 13-8 4400:All NoLevel of Service Determination (if not F) Level of Service Determination (if not F)

DR = 5.475 + 0.00734 v R + 0.0078 V12 - 0.00627 LADR = (pc/mi/ln)LOS = (Exhibit 13-2)

DR = 4.252 + 0.0086 V12 - 0.009 LDDR = 13.8 (pc/mi/ln)LOS = B (Exhibit 13-2)

Speed Determination Speed DeterminationMS = (Exibit 13-11) SR= mph (Exhibit 13-11) S0= mph (Exhibit 13-11) S = mph (Exhibit 13-13)

Ds = 0.273 (Exhibit 13-12) SR= 58.7 mph (Exhibit 13-12) S0= N/A mph (Exhibit 13-12) S = 58.7 mph (Exhibit 13-13)

Copyright © 2013 University of Florida, All Rights Reserved HCS2010TM Version 6.50 Generated: 7/2/2015 9:34 AM

Page 58: BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange Operations Study BEL-7-18.07 5.5 Build Intersection Figure 5 SR 7 & IR 470 Westbound

RAMPS AND RAMP JUNCTIONS WORKSHEETGeneral Information Site Information Analyst ARCADIS Freeway/Dir of Travel WestboundAgency or Company ODOT Junction I-470 exit ramp from the EastDate Performed 5/29/2015 Jurisdiction ODOTAnalysis Time Period AM DHV Analysis Year 2035Project Description BEL-7-18.07 Inputs

Upstream Adj Ramp

Yes On

No Off

Lup = 2450 ft

Vu = 500 veh/h

Freeway Number of Lanes, N 2 Ramp Number of Lanes, N 1 Acceleration Lane Length, LADeceleration Lane Length LD 660 Freeway Volume, VF 1350 Ramp Volume, VR 530 Freeway Free-Flow Speed, SFF 65.0 Ramp Free-Flow Speed, SFR 35.0

Downstream Adj Ramp

Yes On

No Off

Ldown = ft

VD = veh/h

Conversion to pc/h Under Base Conditions (pc/h) V

(Veh/hr) PHF Terrain %Truck %Rv fHV fp v = V/PHF x fHV x fpFreeway 1350 0.94 Level 8 0 0.962 1.00 1494Ramp 530 0.94 Level 8 0 0.962 1.00 586UpStream 500 0.94 Level 6 0 0.971 1.00 548DownStream

Merge Areas Diverge AreasEstimation of v12 Estimation of v12

V12 = VF ( PFM )LEQ = (Equation 13-6 or 13-7)PFM = using Equation (Exhibit 13-6) V12 = pc/h V3 or Vav34 pc/h (Equation 13-14 or 13-17)Is V3 or Vav34 > 2,700 pc/h? Yes NoIs V3 or Vav34 > 1.5 * V12/2 Yes No

If Yes,V12a = pc/h (Equation 13-16, 13-18, or 13-19)

V12 = VR + (VF - VR)PFDLEQ = (Equation 13-12 or 13-13) PFD = 1.000 using Equation (Exhibit 13-7) V12 = 1494 pc/h V3 or Vav34 0 pc/h (Equation 13-14 or 13-17)Is V3 or Vav34 > 2,700 pc/h? Yes No

Is V3 or Vav34 > 1.5 * V12/2 Yes No

If Yes,V12a = pc/h (Equation 13-16, 13-18, or 13-19)

Capacity Checks Capacity ChecksActual Capacity LOS F? Actual Capacity LOS F?

VFO Exhibit 13-8

VF 1494 Exhibit 13-8 4700 NoVFO = VF - VR 908 Exhibit 13-8 4700 No

VR 586 Exhibit 13-10 2000 No

Flow Entering Merge Influence Area Flow Entering Diverge Influence AreaActual Max Desirable Violation? Actual Max Desirable Violation?

VR12 Exhibit 13-8 V12 1494 Exhibit 13-8 4400:All NoLevel of Service Determination (if not F) Level of Service Determination (if not F)

DR = 5.475 + 0.00734 v R + 0.0078 V12 - 0.00627 LADR = (pc/mi/ln)LOS = (Exhibit 13-2)

DR = 4.252 + 0.0086 V12 - 0.009 LDDR = 11.2 (pc/mi/ln)LOS = B (Exhibit 13-2)

Speed Determination Speed DeterminationMS = (Exibit 13-11) SR= mph (Exhibit 13-11) S0= mph (Exhibit 13-11) S = mph (Exhibit 13-13)

Ds = 0.481 (Exhibit 13-12) SR= 53.9 mph (Exhibit 13-12) S0= N/A mph (Exhibit 13-12) S = 53.9 mph (Exhibit 13-13)

Copyright © 2013 University of Florida, All Rights Reserved HCS2010TM Version 6.50 Generated: 7/2/2015 9:36 AM

Page 59: BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange Operations Study BEL-7-18.07 5.5 Build Intersection Figure 5 SR 7 & IR 470 Westbound

RAMPS AND RAMP JUNCTIONS WORKSHEETGeneral Information Site Information Analyst ARCADIS Freeway/Dir of Travel WestboundAgency or Company ODOT Junction I-470 exit ramp from the EastDate Performed 5/29/2015 Jurisdiction ODOTAnalysis Time Period PM DHV Analysis Year 2035Project Description BEL-7-18.07 Inputs

Upstream Adj Ramp

Yes On

No Off

Lup = 2450 ft

Vu = 500 veh/h

Freeway Number of Lanes, N 2 Ramp Number of Lanes, N 1 Acceleration Lane Length, LADeceleration Lane Length LD 660 Freeway Volume, VF 2360 Ramp Volume, VR 1000 Freeway Free-Flow Speed, SFF 65.0 Ramp Free-Flow Speed, SFR 35.0

Downstream Adj Ramp

Yes On

No Off

Ldown = ft

VD = veh/h

Conversion to pc/h Under Base Conditions (pc/h) V

(Veh/hr) PHF Terrain %Truck %Rv fHV fp v = V/PHF x fHV x fpFreeway 2360 0.94 Level 8 0 0.962 1.00 2611Ramp 1000 0.94 Level 8 0 0.962 1.00 1106UpStream 500 0.94 Level 6 0 0.971 1.00 548DownStream

Merge Areas Diverge AreasEstimation of v12 Estimation of v12

V12 = VF ( PFM )LEQ = (Equation 13-6 or 13-7)PFM = using Equation (Exhibit 13-6) V12 = pc/h V3 or Vav34 pc/h (Equation 13-14 or 13-17)Is V3 or Vav34 > 2,700 pc/h? Yes NoIs V3 or Vav34 > 1.5 * V12/2 Yes No

If Yes,V12a = pc/h (Equation 13-16, 13-18, or 13-19)

V12 = VR + (VF - VR)PFDLEQ = (Equation 13-12 or 13-13) PFD = 1.000 using Equation (Exhibit 13-7) V12 = 2611 pc/h V3 or Vav34 0 pc/h (Equation 13-14 or 13-17)Is V3 or Vav34 > 2,700 pc/h? Yes No

Is V3 or Vav34 > 1.5 * V12/2 Yes No

If Yes,V12a = pc/h (Equation 13-16, 13-18, or 13-19)

Capacity Checks Capacity ChecksActual Capacity LOS F? Actual Capacity LOS F?

VFO Exhibit 13-8

VF 2611 Exhibit 13-8 4700 NoVFO = VF - VR 1505 Exhibit 13-8 4700 No

VR 1106 Exhibit 13-10 2000 No

Flow Entering Merge Influence Area Flow Entering Diverge Influence AreaActual Max Desirable Violation? Actual Max Desirable Violation?

VR12 Exhibit 13-8 V12 2611 Exhibit 13-8 4400:All NoLevel of Service Determination (if not F) Level of Service Determination (if not F)

DR = 5.475 + 0.00734 v R + 0.0078 V12 - 0.00627 LADR = (pc/mi/ln)LOS = (Exhibit 13-2)

DR = 4.252 + 0.0086 V12 - 0.009 LDDR = 20.8 (pc/mi/ln)LOS = C (Exhibit 13-2)

Speed Determination Speed DeterminationMS = (Exibit 13-11) SR= mph (Exhibit 13-11)S0= mph (Exhibit 13-11) S = mph (Exhibit 13-13)

Ds = 0.528 (Exhibit 13-12) SR= 52.9 mph (Exhibit 13-12) S0= N/A mph (Exhibit 13-12) S = 52.9 mph (Exhibit 13-13)

Copyright © 2013 University of Florida, All Rights Reserved HCS2010TM Version 6.50 Generated: 7/2/2015 9:37 AM

Page 60: BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange Operations Study BEL-7-18.07 5.5 Build Intersection Figure 5 SR 7 & IR 470 Westbound

RAMPS AND RAMP JUNCTIONS WORKSHEETGeneral Information Site Information Analyst ARCADIS Freeway/Dir of Travel EastboundAgency or Company ODOT Junction I-470 Entrance RampDate Performed 5/28/2015 Jurisdiction ODOTAnalysis Time Period AM DHV Analysis Year 2035Project Description BEL-7-18.07 InputsUpstream Adj Ramp

Yes On

No Off

Lup = ft

Vu = veh/h

Freeway Number of Lanes, N 2 Ramp Number of Lanes, N 1 Acceleration Lane Length, LA 620 Deceleration Lane Length LDFreeway Volume, VF 780 Ramp Volume, VR 820 Freeway Free-Flow Speed, SFF 65.0 Ramp Free-Flow Speed, SFR 35.0

Downstream Adj Ramp

Yes On

No Off

Ldown = 1520 ft

VD = 500 veh/h

Conversion to pc/h Under Base Conditions (pc/h) V

(Veh/hr) PHF Terrain %Truck %Rv fHV fp v = V/PHF x fHV x fpFreeway 780 0.94 Level 8 0 0.962 1.00 863Ramp 820 0.94 Level 4 0 0.980 1.00 890UpStreamDownStream 500 0.94 Level 5 0 0.976 1.00 545

Merge Areas Diverge AreasEstimation of v12 Estimation of v12

V12 = VF ( PFM )LEQ = (Equation 13-6 or 13-7)PFM = 1.000 using Equation (Exhibit 13-6) V12 = 863 pc/h V3 or Vav34 0 pc/h (Equation 13-14 or 13-17)Is V3 or Vav34 > 2,700 pc/h? Yes No

Is V3 or Vav34 > 1.5 * V12/2 Yes No

If Yes,V12a = pc/h (Equation 13-16, 13-18, or 13-19)

V12 = VR + (VF - VR)PFDLEQ = (Equation 13-12 or 13-13) PFD = using Equation (Exhibit 13-7) V12 = pc/h V3 or Vav34 pc/h (Equation 13-14 or 13-17)Is V3 or Vav34 > 2,700 pc/h? Yes NoIs V3 or Vav34 > 1.5 * V12/2 Yes No

If Yes,V12a = pc/h (Equation 13-16, 13-18, or 13-19)

Capacity Checks Capacity ChecksActual Capacity LOS F? Actual Capacity LOS F?

VFO 1753 Exhibit 13-8 No

VF Exhibit 13-8VFO = VF - VR Exhibit 13-8

VRExhibit 13-

10Flow Entering Merge Influence Area Flow Entering Diverge Influence Area

Actual Max Desirable Violation? Actual Max Desirable Violation? VR12 1753 Exhibit 13-8 4600:All No V12 Exhibit 13-8

Level of Service Determination (if not F) Level of Service Determination (if not F)DR = 5.475 + 0.00734 v R + 0.0078 V12 - 0.00627 LA

DR = 14.9 (pc/mi/ln) LOS = B (Exhibit 13-2)

DR = 4.252 + 0.0086 V12 - 0.009 LDDR = (pc/mi/ln)LOS = (Exhibit 13-2)

Speed Determination Speed DeterminationMS = 0.300 (Exibit 13-11) SR= 58.1 mph (Exhibit 13-11) S0= N/A mph (Exhibit 13-11) S = 58.1 mph (Exhibit 13-13)

Ds = (Exhibit 13-12) SR= mph (Exhibit 13-12) S0= mph (Exhibit 13-12) S = mph (Exhibit 13-13)

Copyright © 2013 University of Florida, All Rights Reserved HCS2010TM Version 6.50 Generated: 7/2/2015 9:32 AM

Page 61: BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange Operations Study BEL-7-18.07 5.5 Build Intersection Figure 5 SR 7 & IR 470 Westbound

RAMPS AND RAMP JUNCTIONS WORKSHEETGeneral Information Site Information Analyst ARCADIS Freeway/Dir of Travel EastboundAgency or Company ODOT Junction I-470 Entrance RampDate Performed 5/28/2015 Jurisdiction ODOTAnalysis Time Period PM DHV Analysis Year 2035Project Description BEL-7-18.07 InputsUpstream Adj Ramp

Yes On

No Off

Lup = ft

Vu = veh/h

Freeway Number of Lanes, N 2 Ramp Number of Lanes, N 1 Acceleration Lane Length, LA 620 Deceleration Lane Length LDFreeway Volume, VF 1100 Ramp Volume, VR 840 Freeway Free-Flow Speed, SFF 65.0 Ramp Free-Flow Speed, SFR 35.0

Downstream Adj Ramp

Yes On

No Off

Ldown = 1520 ft

VD = 500 veh/h

Conversion to pc/h Under Base Conditions (pc/h) V

(Veh/hr) PHF Terrain %Truck %Rv fHV fp v = V/PHF x fHV x fpFreeway 1100 0.94 Level 8 0 0.962 1.00 1217Ramp 840 0.94 Level 4 0 0.980 1.00 911UpStreamDownStream 500 0.94 Level 5 0 0.976 1.00 545

Merge Areas Diverge AreasEstimation of v12 Estimation of v12

V12 = VF ( PFM )LEQ = (Equation 13-6 or 13-7)PFM = 1.000 using Equation (Exhibit 13-6) V12 = 1217 pc/h V3 or Vav34 0 pc/h (Equation 13-14 or 13-17)Is V3 or Vav34 > 2,700 pc/h? Yes No

Is V3 or Vav34 > 1.5 * V12/2 Yes No

If Yes,V12a = pc/h (Equation 13-16, 13-18, or 13-19)

V12 = VR + (VF - VR)PFDLEQ = (Equation 13-12 or 13-13) PFD = using Equation (Exhibit 13-7) V12 = pc/h V3 or Vav34 pc/h (Equation 13-14 or 13-17)Is V3 or Vav34 > 2,700 pc/h? Yes NoIs V3 or Vav34 > 1.5 * V12/2 Yes No

If Yes,V12a = pc/h (Equation 13-16, 13-18, or 13-19)

Capacity Checks Capacity ChecksActual Capacity LOS F? Actual Capacity LOS F?

VFO 2128 Exhibit 13-8 No

VF Exhibit 13-8VFO = VF - VR Exhibit 13-8

VRExhibit 13-

10Flow Entering Merge Influence Area Flow Entering Diverge Influence Area

Actual Max Desirable Violation? Actual Max Desirable Violation? VR12 2128 Exhibit 13-8 4600:All No V12 Exhibit 13-8

Level of Service Determination (if not F) Level of Service Determination (if not F)DR = 5.475 + 0.00734 v R + 0.0078 V12 - 0.00627 LA

DR = 17.8 (pc/mi/ln) LOS = B (Exhibit 13-2)

DR = 4.252 + 0.0086 V12 - 0.009 LDDR = (pc/mi/ln)LOS = (Exhibit 13-2)

Speed Determination Speed DeterminationMS = 0.310 (Exibit 13-11) SR= 57.9 mph (Exhibit 13-11) S0= N/A mph (Exhibit 13-11) S = 57.9 mph (Exhibit 13-13)

Ds = (Exhibit 13-12) SR= mph (Exhibit 13-12) S0= mph (Exhibit 13-12) S = mph (Exhibit 13-13)

Copyright © 2013 University of Florida, All Rights Reserved HCS2010TM Version 6.50 Generated: 7/2/2015 9:33 AM

Page 62: BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange Operations Study BEL-7-18.07 5.5 Build Intersection Figure 5 SR 7 & IR 470 Westbound

HCS 2010: Basic Freeway Segments Release 6.50 Phone: Fax: E-mail: _________________________Operational Analysis__________________________________ Analyst: ARCADIS Agency or Company: ODOT Date Performed: 5/29/2015 Analysis Time Period: AM DHV Freeway/Direction: IR 470 Westbound From/To: Add Lane from SR 7 Ramp Jurisdiction: ODOT Analysis Year: 2035 Description: BEL-7-18.07 _________________________Flow Inputs and Adjustments___________________________ Volume, V 1320 veh/h Peak-hour factor, PHF 0.94 Peak 15-min volume, v15 351 v Trucks and buses 12 % Recreational vehicles 0 % Terrain type: Level Grade - % Segment length - mi Trucks and buses PCE, ET 1.5 Recreational vehicle PCE, ER 1.2 Heavy vehicle adjustment, fHV 0.943 Driver population factor, fp 1.00 Flow rate, vp 496 pc/h/ln _________________________Speed Inputs and Adjustments__________________________ Lane width - ft Right-side lateral clearance - ft Total ramp density, TRD - ramps/mi Number of lanes, N 3 Free-flow speed: Measured FFS or BFFS 65.0 mi/h Lane width adjustment, fLW - mi/h Lateral clearance adjustment, fLC - mi/h TRD adjustment - mi/h Free-flow speed, FFS 65.0 mi/h _________________________LOS and Performance Measures__________________________ Flow rate, vp 496 pc/h/ln Free-flow speed, FFS 65.0 mi/h Average passenger-car speed, S 65.0 mi/h Number of lanes, N 3 Density, D 7.6 pc/mi/ln Level of service, LOS A

Page 63: BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange Operations Study BEL-7-18.07 5.5 Build Intersection Figure 5 SR 7 & IR 470 Westbound

HCS 2010: Basic Freeway Segments Release 6.50 Phone: Fax: E-mail: _________________________Operational Analysis__________________________________ Analyst: ARCADIS Agency or Company: ODOT Date Performed: 5/29/2015 Analysis Time Period: PM DHV Freeway/Direction: IR 470 Westbound From/To: Add Lane from SR 7 Ramp Jurisdiction: ODOT Analysis Year: 2035 Description: BEL-7-18.07 _________________________Flow Inputs and Adjustments___________________________ Volume, V 2020 veh/h Peak-hour factor, PHF 0.94 Peak 15-min volume, v15 537 v Trucks and buses 12 % Recreational vehicles 0 % Terrain type: Level Grade - % Segment length - mi Trucks and buses PCE, ET 1.5 Recreational vehicle PCE, ER 1.2 Heavy vehicle adjustment, fHV 0.943 Driver population factor, fp 1.00 Flow rate, vp 759 pc/h/ln _________________________Speed Inputs and Adjustments__________________________ Lane width - ft Right-side lateral clearance - ft Total ramp density, TRD - ramps/mi Number of lanes, N 3 Free-flow speed: Measured FFS or BFFS 65.0 mi/h Lane width adjustment, fLW - mi/h Lateral clearance adjustment, fLC - mi/h TRD adjustment - mi/h Free-flow speed, FFS 65.0 mi/h _________________________LOS and Performance Measures__________________________ Flow rate, vp 759 pc/h/ln Free-flow speed, FFS 65.0 mi/h Average passenger-car speed, S 65.0 mi/h Number of lanes, N 3 Density, D 11.7 pc/mi/ln Level of service, LOS B

Page 64: BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange Operations Study BEL-7-18.07 5.5 Build Intersection Figure 5 SR 7 & IR 470 Westbound

Appendix E

Ramp Analysis – Build

Page 65: BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange Operations Study BEL-7-18.07 5.5 Build Intersection Figure 5 SR 7 & IR 470 Westbound

RAMPS AND RAMP JUNCTIONS WORKSHEETGeneral Information Site Information Analyst ARCADIS Freeway/Dir of Travel NorthboundAgency or Company ODOT Junction SR 7 exit ramp to I-470Date Performed 5/29/2015 Jurisdiction ODOTAnalysis Time Period AM DHV Analysis Year 2035Project Description BEL-7-18.07 Inputs

Upstream Adj Ramp

Yes On

No Off

Lup = 3950 ft

Vu = 140 veh/h

Freeway Number of Lanes, N 2Ramp Number of Lanes, N 1Acceleration Lane Length, LADeceleration Lane Length LD 420Freeway Volume, VF 850Ramp Volume, VR 620Freeway Free-Flow Speed, SFF 55.0Ramp Free-Flow Speed, SFR 40.0

Downstream Adj Ramp

Yes On

No Off

Ldown = ft

VD = veh/h

Conversion to pc/h Under Base Conditions (pc/h) V

(Veh/hr) PHF Terrain %Truck %Rv fHV fp v = V/PHF x fHV x fpFreeway 850 0.94 Level 7 0 0.966 1.00 936Ramp 620 0.94 Level 6 0 0.971 1.00 679UpStream 140 0.94 Level 3 0 0.985 1.00 151DownStream

Merge Areas Diverge AreasEstimation of v12 Estimation of v12

V12 = VF ( PFM )LEQ = (Equation 13-6 or 13-7)PFM = using Equation (Exhibit 13-6) V12 = pc/hV3 or Vav34 pc/h (Equation 13-14 or 13-17)Is V3 or Vav34 > 2,700 pc/h? Yes NoIs V3 or Vav34 > 1.5 * V12/2 Yes No

If Yes,V12a = pc/h (Equation 13-16, 13-18, or 13-19)

V12 = VR + (VF - VR)PFDLEQ = (Equation 13-12 or 13-13) PFD = 1.000 using Equation (Exhibit 13-7) V12 = 936 pc/h V3 or Vav34 0 pc/h (Equation 13-14 or 13-17)Is V3 or Vav34 > 2,700 pc/h? Yes NoIs V3 or Vav34 > 1.5 * V12/2 Yes No

If Yes,V12a = pc/h (Equation 13-16, 13-18, or 13-19)

Capacity Checks Capacity ChecksActual Capacity LOS F? Actual Capacity LOS F?

VFO Exhibit 13-8

VF 936 Exhibit 13-8 4500 NoVFO = VF - VR 257 Exhibit 13-8 4500 No

VR 679 Exhibit 13-10 2100 No

Flow Entering Merge Influence Area Flow Entering Diverge Influence AreaActual Max Desirable Violation? Actual Max Desirable Violation?

VR12 Exhibit 13-8 V12 936 Exhibit 13-8 4400:All NoLevel of Service Determination (if not F) Level of Service Determination (if not F)

DR = 5.475 + 0.00734 v R + 0.0078 V12 - 0.00627 LADR = (pc/mi/ln)LOS = (Exhibit 13-2)

DR = 4.252 + 0.0086 V12 - 0.009 LDDR = 8.5 (pc/mi/ln)LOS = A (Exhibit 13-2)

Speed Determination Speed DeterminationMS = (Exibit 13-11) SR= mph (Exhibit 13-11) S0= mph (Exhibit 13-11) S = mph (Exhibit 13-13)

Ds = 0.424 (Exhibit 13-12) SR= 49.5 mph (Exhibit 13-12) S0= N/A mph (Exhibit 13-12) S = 49.5 mph (Exhibit 13-13)

Copyright © 2013 University of Florida, All Rights Reserved HCS2010TM Version 6.50 Generated: 7/2/2015 9:34 AM

Page 66: BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange Operations Study BEL-7-18.07 5.5 Build Intersection Figure 5 SR 7 & IR 470 Westbound

RAMPS AND RAMP JUNCTIONS WORKSHEETGeneral Information Site Information Analyst ARCADIS Freeway/Dir of Travel NorthboundAgency or Company ODOT Junction SR 7 exit ramp to I-470Date Performed 5/29/2015 Jurisdiction ODOTAnalysis Time Period PM DHV Analysis Year 2035Project Description BEL-7-18.07 Inputs

Upstream Adj Ramp

Yes On

No Off

Lup = 3950 ft

Vu = 210 veh/h

Freeway Number of Lanes, N 2Ramp Number of Lanes, N 1Acceleration Lane Length, LADeceleration Lane Length LD 420Freeway Volume, VF 940Ramp Volume, VR 590Freeway Free-Flow Speed, SFF 55.0Ramp Free-Flow Speed, SFR 40.0

Downstream Adj Ramp

Yes On

No Off

Ldown = ft

VD = veh/h

Conversion to pc/h Under Base Conditions (pc/h) V

(Veh/hr) PHF Terrain %Truck %Rv fHV fp v = V/PHF x fHV x fpFreeway 940 0.94 Level 7 0 0.966 1.00 1035Ramp 590 0.94 Level 6 0 0.971 1.00 646UpStream 210 0.94 Level 3 0 0.985 1.00 227DownStream

Merge Areas Diverge AreasEstimation of v12 Estimation of v12

V12 = VF ( PFM )LEQ = (Equation 13-6 or 13-7)PFM = using Equation (Exhibit 13-6) V12 = pc/hV3 or Vav34 pc/h (Equation 13-14 or 13-17)Is V3 or Vav34 > 2,700 pc/h? Yes NoIs V3 or Vav34 > 1.5 * V12/2 Yes No

If Yes,V12a = pc/h (Equation 13-16, 13-18, or 13-19)

V12 = VR + (VF - VR)PFDLEQ = (Equation 13-12 or 13-13) PFD = 1.000 using Equation (Exhibit 13-7) V12 = 1035 pc/h V3 or Vav34 0 pc/h (Equation 13-14 or 13-17)Is V3 or Vav34 > 2,700 pc/h? Yes NoIs V3 or Vav34 > 1.5 * V12/2 Yes No

If Yes,V12a = pc/h (Equation 13-16, 13-18, or 13-19)

Capacity Checks Capacity ChecksActual Capacity LOS F? Actual Capacity LOS F?

VFO Exhibit 13-8

VF 1035 Exhibit 13-8 4500 NoVFO = VF - VR 389 Exhibit 13-8 4500 No

VR 646 Exhibit 13-10 2100 NoFlow Entering Merge Influence Area Flow Entering Diverge Influence Area

Actual Max Desirable Violation? Actual Max Desirable Violation? VR12 Exhibit 13-8 V12 1035 Exhibit 13-8 4400:All No

Level of Service Determination (if not F) Level of Service Determination (if not F)DR = 5.475 + 0.00734 v R + 0.0078 V12 - 0.00627 LA

DR = (pc/mi/ln)LOS = (Exhibit 13-2)

DR = 4.252 + 0.0086 V12 - 0.009 LDDR = 9.4 (pc/mi/ln)LOS = A (Exhibit 13-2)

Speed Determination Speed DeterminationMS = (Exibit 13-11) SR= mph (Exhibit 13-11) S0= mph (Exhibit 13-11) S = mph (Exhibit 13-13)

Ds = 0.421 (Exhibit 13-12) SR= 49.5 mph (Exhibit 13-12) S0= N/A mph (Exhibit 13-12) S = 49.5 mph (Exhibit 13-13)

Copyright © 2013 University of Florida, All Rights Reserved HCS2010TM Version 6.50 Generated: 7/2/2015 9:34 AM

Page 67: BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange Operations Study BEL-7-18.07 5.5 Build Intersection Figure 5 SR 7 & IR 470 Westbound

RAMPS AND RAMP JUNCTIONS WORKSHEETGeneral Information Site Information Analyst ARCADIS Freeway/Dir of Travel SouthboundAgency or Company ODOT Junction SR 7 exit ramp to I-470Date Performed 5/29/2015 Jurisdiction ODOTAnalysis Time Period AM DHV Analysis Year 2035Project Description BEL-7-18.07 Inputs

Upstream Adj Ramp

Yes On

No Off

Lup = 5200 ft

Vu = 150 veh/h

Freeway Number of Lanes, N 2Ramp Number of Lanes, N 1Acceleration Lane Length, LADeceleration Lane Length LD 400Freeway Volume, VF 620Ramp Volume, VR 450Freeway Free-Flow Speed, SFF 55.0Ramp Free-Flow Speed, SFR 40.0

Downstream Adj Ramp

Yes On

No Off

Ldown = ft

VD = veh/h

Conversion to pc/h Under Base Conditions (pc/h) V

(Veh/hr) PHF Terrain %Truck %Rv fHV fp v = V/PHF x fHV x fpFreeway 620 0.94 Level 4 0 0.980 1.00 673Ramp 450 0.94 Level 7 0 0.966 1.00 495UpStream 150 0.94 Level 4 0 0.980 1.00 163DownStream

Merge Areas Diverge AreasEstimation of v12 Estimation of v12

V12 = VF ( PFM )LEQ = (Equation 13-6 or 13-7)PFM = using Equation (Exhibit 13-6) V12 = pc/hV3 or Vav34 pc/h (Equation 13-14 or 13-17)Is V3 or Vav34 > 2,700 pc/h? Yes NoIs V3 or Vav34 > 1.5 * V12/2 Yes No

If Yes,V12a = pc/h (Equation 13-16, 13-18, or 13-19)

V12 = VR + (VF - VR)PFDLEQ = (Equation 13-12 or 13-13) PFD = 1.000 using Equation (Exhibit 13-7) V12 = 673 pc/h V3 or Vav34 0 pc/h (Equation 13-14 or 13-17)Is V3 or Vav34 > 2,700 pc/h? Yes NoIs V3 or Vav34 > 1.5 * V12/2 Yes No

If Yes,V12a = pc/h (Equation 13-16, 13-18, or 13-19)

Capacity Checks Capacity ChecksActual Capacity LOS F? Actual Capacity LOS F?

VFO Exhibit 13-8

VF 673 Exhibit 13-8 4500 NoVFO = VF - VR 178 Exhibit 13-8 4500 No

VR 495 Exhibit 13-10 2100 No

Flow Entering Merge Influence Area Flow Entering Diverge Influence AreaActual Max Desirable Violation? Actual Max Desirable Violation?

VR12 Exhibit 13-8 V12 673 Exhibit 13-8 4400:All NoLevel of Service Determination (if not F) Level of Service Determination (if not F)

DR = 5.475 + 0.00734 v R + 0.0078 V12 - 0.00627 LADR = (pc/mi/ln)LOS = (Exhibit 13-2)

DR = 4.252 + 0.0086 V12 - 0.009 LDDR = 6.4 (pc/mi/ln)LOS = A (Exhibit 13-2)

Speed Determination Speed DeterminationMS = (Exibit 13-11) SR= mph (Exhibit 13-11) S0= mph (Exhibit 13-11) S = mph (Exhibit 13-13)

Ds = 0.408 (Exhibit 13-12) SR= 49.7 mph (Exhibit 13-12) S0= N/A mph (Exhibit 13-12) S = 49.7 mph (Exhibit 13-13)

Copyright © 2013 University of Florida, All Rights Reserved HCS2010TM Version 6.50 Generated: 7/2/2015 9:35 AM

Page 68: BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange Operations Study BEL-7-18.07 5.5 Build Intersection Figure 5 SR 7 & IR 470 Westbound

RAMPS AND RAMP JUNCTIONS WORKSHEETGeneral Information Site Information Analyst ARCADIS Freeway/Dir of Travel SouthboundAgency or Company ODOT Junction SR 7 exit ramp to I-470Date Performed 5/29/2015 Jurisdiction ODOTAnalysis Time Period PM DHV Analysis Year 2035Project Description BEL-7-18.07 Inputs

Upstream Adj Ramp

Yes On

No Off

Lup = 5200 ft

Vu = 390 veh/h

Freeway Number of Lanes, N 2Ramp Number of Lanes, N 1Acceleration Lane Length, LADeceleration Lane Length LD 400Freeway Volume, VF 890Ramp Volume, VR 580Freeway Free-Flow Speed, SFF 55.0Ramp Free-Flow Speed, SFR 40.0

Downstream Adj Ramp

Yes On

No Off

Ldown = ft

VD = veh/h

Conversion to pc/h Under Base Conditions (pc/h) V

(Veh/hr) PHF Terrain %Truck %Rv fHV fp v = V/PHF x fHV x fpFreeway 890 0.94 Level 4 0 0.980 1.00 966Ramp 580 0.94 Level 7 0 0.966 1.00 639UpStream 390 0.94 Level 4 0 0.980 1.00 423DownStream

Merge Areas Diverge AreasEstimation of v12 Estimation of v12

V12 = VF ( PFM )LEQ = (Equation 13-6 or 13-7)PFM = using Equation (Exhibit 13-6) V12 = pc/hV3 or Vav34 pc/h (Equation 13-14 or 13-17)Is V3 or Vav34 > 2,700 pc/h? Yes NoIs V3 or Vav34 > 1.5 * V12/2 Yes No

If Yes,V12a = pc/h (Equation 13-16, 13-18, or 13-19)

V12 = VR + (VF - VR)PFDLEQ = (Equation 13-12 or 13-13) PFD = 1.000 using Equation (Exhibit 13-7) V12 = 966 pc/h V3 or Vav34 0 pc/h (Equation 13-14 or 13-17)Is V3 or Vav34 > 2,700 pc/h? Yes NoIs V3 or Vav34 > 1.5 * V12/2 Yes No

If Yes,V12a = pc/h (Equation 13-16, 13-18, or 13-19)

Capacity Checks Capacity ChecksActual Capacity LOS F? Actual Capacity LOS F?

VFO Exhibit 13-8

VF 966 Exhibit 13-8 4500 NoVFO = VF - VR 327 Exhibit 13-8 4500 No

VR 639 Exhibit 13-10 2100 No

Flow Entering Merge Influence Area Flow Entering Diverge Influence AreaActual Max Desirable Violation? Actual Max Desirable Violation?

VR12 Exhibit 13-8 V12 966 Exhibit 13-8 4400:All NoLevel of Service Determination (if not F) Level of Service Determination (if not F)

DR = 5.475 + 0.00734 v R + 0.0078 V12 - 0.00627 LADR = (pc/mi/ln)LOS = (Exhibit 13-2)

DR = 4.252 + 0.0086 V12 - 0.009 LDDR = 9.0 (pc/mi/ln)LOS = A (Exhibit 13-2)

Speed Determination Speed DeterminationMS = (Exibit 13-11) SR= mph (Exhibit 13-11) S0= mph (Exhibit 13-11) S = mph (Exhibit 13-13)

Ds = 0.421 (Exhibit 13-12) SR= 49.5 mph (Exhibit 13-12) S0= N/A mph (Exhibit 13-12) S = 49.5 mph (Exhibit 13-13)

Copyright © 2013 University of Florida, All Rights Reserved HCS2010TM Version 6.50 Generated: 7/2/2015 9:35 AM

Page 69: BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange Operations Study BEL-7-18.07 5.5 Build Intersection Figure 5 SR 7 & IR 470 Westbound

RAMPS AND RAMP JUNCTIONS WORKSHEETGeneral Information Site Information Analyst ARCADIS Freeway/Dir of Travel EastboundAgency or Company ODOT Junction I-470 exit ramp to SR 7Date Performed 5/29/2015 Jurisdiction ODOTAnalysis Time Period AM DHV Analysis Year 2035Project Description BEL-7-18.07 Inputs

Upstream Adj Ramp

Yes On

No Off

Lup = 9999 ft

Vu = 90 veh/h

Freeway Number of Lanes, N 2Ramp Number of Lanes, N 1Acceleration Lane Length, LADeceleration Lane Length LD 540Freeway Volume, VF 1200 Ramp Volume, VR 420Freeway Free-Flow Speed, SFF 65.0Ramp Free-Flow Speed, SFR 50.0

Downstream Adj Ramp

Yes On

No Off

Ldown = ft

VD = veh/h

Conversion to pc/h Under Base Conditions (pc/h) V

(Veh/hr) PHF Terrain %Truck %Rv fHV fp v = V/PHF x fHV x fpFreeway 1200 0.94 Level 12 0 0.943 1.00 1353Ramp 420 0.94 Level 17 0 0.922 1.00 485UpStream 90 0.94 Level 6 0 0.971 1.00 99DownStream

Merge Areas Diverge AreasEstimation of v12 Estimation of v12

V12 = VF ( PFM )LEQ = (Equation 13-6 or 13-7)PFM = using Equation (Exhibit 13-6) V12 = pc/hV3 or Vav34 pc/h (Equation 13-14 or 13-17)Is V3 or Vav34 > 2,700 pc/h? Yes NoIs V3 or Vav34 > 1.5 * V12/2 Yes No

If Yes,V12a = pc/h (Equation 13-16, 13-18, or 13-19)

V12 = VR + (VF - VR)PFDLEQ = (Equation 13-12 or 13-13) PFD = 1.000 using Equation (Exhibit 13-7) V12 = 1353 pc/h V3 or Vav34 0 pc/h (Equation 13-14 or 13-17)Is V3 or Vav34 > 2,700 pc/h? Yes NoIs V3 or Vav34 > 1.5 * V12/2 Yes No

If Yes,V12a = pc/h (Equation 13-16, 13-18, or 13-19)

Capacity Checks Capacity ChecksActual Capacity LOS F? Actual Capacity LOS F?

VFO Exhibit 13-8

VF 1353 Exhibit 13-8 4700 NoVFO = VF - VR 868 Exhibit 13-8 4700 No

VR 485 Exhibit 13-10 2100 No

Flow Entering Merge Influence Area Flow Entering Diverge Influence AreaActual Max Desirable Violation? Actual Max Desirable Violation?

VR12 Exhibit 13-8 V12 1353 Exhibit 13-8 4400:All NoLevel of Service Determination (if not F) Level of Service Determination (if not F)

DR = 5.475 + 0.00734 v R + 0.0078 V12 - 0.00627 LADR = (pc/mi/ln)LOS = (Exhibit 13-2)

DR = 4.252 + 0.0086 V12 - 0.009 LDDR = 11.0 (pc/mi/ln)LOS = B (Exhibit 13-2)

Speed Determination Speed DeterminationMS = (Exibit 13-11) SR= mph (Exhibit 13-11) S0= mph (Exhibit 13-11) S = mph (Exhibit 13-13)

Ds = 0.277 (Exhibit 13-12) SR= 58.6 mph (Exhibit 13-12) S0= N/A mph (Exhibit 13-12) S = 58.6 mph (Exhibit 13-13)

Copyright © 2013 University of Florida, All Rights Reserved HCS2010TM Version 6.50 Generated: 7/2/2015 9:33 AM

Page 70: BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange Operations Study BEL-7-18.07 5.5 Build Intersection Figure 5 SR 7 & IR 470 Westbound

RAMPS AND RAMP JUNCTIONS WORKSHEETGeneral Information Site Information Analyst ARCADIS Freeway/Dir of Travel EastboundAgency or Company ODOT Junction I-470 exit ramp to SR 7Date Performed 5/29/2015 Jurisdiction ODOTAnalysis Time Period PM DHV Analysis Year 2035Project Description BEL-7-18.07 Inputs

Upstream Adj Ramp

Yes On

No Off

Lup = 9999 ft

Vu = 50 veh/h

Freeway Number of Lanes, N 2Ramp Number of Lanes, N 1Acceleration Lane Length, LADeceleration Lane Length LD 540Freeway Volume, VF 1490 Ramp Volume, VR 390Freeway Free-Flow Speed, SFF 65.0Ramp Free-Flow Speed, SFR 50.0

Downstream Adj Ramp

Yes On

No Off

Ldown = ft

VD = veh/h

Conversion to pc/h Under Base Conditions (pc/h) V

(Veh/hr) PHF Terrain %Truck %Rv fHV fp v = V/PHF x fHV x fpFreeway 1490 0.94 Level 12 0 0.943 1.00 1680Ramp 390 0.94 Level 17 0 0.922 1.00 450UpStream 50 0.94 Level 6 0 0.971 1.00 55DownStream

Merge Areas Diverge AreasEstimation of v12 Estimation of v12

V12 = VF ( PFM )LEQ = (Equation 13-6 or 13-7)PFM = using Equation (Exhibit 13-6) V12 = pc/hV3 or Vav34 pc/h (Equation 13-14 or 13-17)Is V3 or Vav34 > 2,700 pc/h? Yes NoIs V3 or Vav34 > 1.5 * V12/2 Yes No

If Yes,V12a = pc/h (Equation 13-16, 13-18, or 13-19)

V12 = VR + (VF - VR)PFDLEQ = (Equation 13-12 or 13-13) PFD = 1.000 using Equation (Exhibit 13-7) V12 = 1680 pc/h V3 or Vav34 0 pc/h (Equation 13-14 or 13-17)Is V3 or Vav34 > 2,700 pc/h? Yes NoIs V3 or Vav34 > 1.5 * V12/2 Yes No

If Yes,V12a = pc/h (Equation 13-16, 13-18, or 13-19)

Capacity Checks Capacity ChecksActual Capacity LOS F? Actual Capacity LOS F?

VFO Exhibit 13-8

VF 1680 Exhibit 13-8 4700 NoVFO = VF - VR 1230 Exhibit 13-8 4700 No

VR 450 Exhibit 13-10 2100 No

Flow Entering Merge Influence Area Flow Entering Diverge Influence AreaActual Max Desirable Violation? Actual Max Desirable Violation?

VR12 Exhibit 13-8 V12 1680 Exhibit 13-8 4400:All NoLevel of Service Determination (if not F) Level of Service Determination (if not F)

DR = 5.475 + 0.00734 v R + 0.0078 V12 - 0.00627 LADR = (pc/mi/ln)LOS = (Exhibit 13-2)

DR = 4.252 + 0.0086 V12 - 0.009 LDDR = 13.8 (pc/mi/ln)LOS = B (Exhibit 13-2)

Speed Determination Speed DeterminationMS = (Exibit 13-11) SR= mph (Exhibit 13-11) S0= mph (Exhibit 13-11) S = mph (Exhibit 13-13)

Ds = 0.273 (Exhibit 13-12) SR= 58.7 mph (Exhibit 13-12) S0= N/A mph (Exhibit 13-12) S = 58.7 mph (Exhibit 13-13)

Copyright © 2013 University of Florida, All Rights Reserved HCS2010TM Version 6.50 Generated: 7/2/2015 9:34 AM

Page 71: BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange Operations Study BEL-7-18.07 5.5 Build Intersection Figure 5 SR 7 & IR 470 Westbound

RAMPS AND RAMP JUNCTIONS WORKSHEETGeneral Information Site Information Analyst ARCADIS Freeway/Dir of Travel WestboundAgency or Company ODOT Junction I-470 exit ramp from the EastDate Performed 5/29/2015 Jurisdiction ODOTAnalysis Time Period AM DHV Analysis Year 2035Project Description BEL-7-18.07 Inputs

Upstream Adj Ramp

Yes On

No Off

Lup = 2450 ft

Vu = 500 veh/h

Freeway Number of Lanes, N 2Ramp Number of Lanes, N 1Acceleration Lane Length, LADeceleration Lane Length LD 660Freeway Volume, VF 1350 Ramp Volume, VR 530Freeway Free-Flow Speed, SFF 65.0Ramp Free-Flow Speed, SFR 35.0

Downstream Adj Ramp

Yes On

No Off

Ldown = ft

VD = veh/h

Conversion to pc/h Under Base Conditions (pc/h) V

(Veh/hr) PHF Terrain %Truck %Rv fHV fp v = V/PHF x fHV x fpFreeway 1350 0.94 Level 8 0 0.962 1.00 1494Ramp 530 0.94 Level 8 0 0.962 1.00 586UpStream 500 0.94 Level 6 0 0.971 1.00 548DownStream

Merge Areas Diverge AreasEstimation of v12 Estimation of v12

V12 = VF ( PFM )LEQ = (Equation 13-6 or 13-7)PFM = using Equation (Exhibit 13-6) V12 = pc/hV3 or Vav34 pc/h (Equation 13-14 or 13-17)Is V3 or Vav34 > 2,700 pc/h? Yes NoIs V3 or Vav34 > 1.5 * V12/2 Yes No

If Yes,V12a = pc/h (Equation 13-16, 13-18, or 13-19)

V12 = VR + (VF - VR)PFDLEQ = (Equation 13-12 or 13-13) PFD = 1.000 using Equation (Exhibit 13-7) V12 = 1494 pc/h V3 or Vav34 0 pc/h (Equation 13-14 or 13-17)Is V3 or Vav34 > 2,700 pc/h? Yes NoIs V3 or Vav34 > 1.5 * V12/2 Yes No

If Yes,V12a = pc/h (Equation 13-16, 13-18, or 13-19)

Capacity Checks Capacity ChecksActual Capacity LOS F? Actual Capacity LOS F?

VFO Exhibit 13-8

VF 1494 Exhibit 13-8 4700 NoVFO = VF - VR 908 Exhibit 13-8 4700 No

VR 586 Exhibit 13-10 2000 No

Flow Entering Merge Influence Area Flow Entering Diverge Influence AreaActual Max Desirable Violation? Actual Max Desirable Violation?

VR12 Exhibit 13-8 V12 1494 Exhibit 13-8 4400:All NoLevel of Service Determination (if not F) Level of Service Determination (if not F)

DR = 5.475 + 0.00734 v R + 0.0078 V12 - 0.00627 LADR = (pc/mi/ln)LOS = (Exhibit 13-2)

DR = 4.252 + 0.0086 V12 - 0.009 LDDR = 11.2 (pc/mi/ln)LOS = B (Exhibit 13-2)

Speed Determination Speed DeterminationMS = (Exibit 13-11) SR= mph (Exhibit 13-11) S0= mph (Exhibit 13-11) S = mph (Exhibit 13-13)

Ds = 0.481 (Exhibit 13-12) SR= 53.9 mph (Exhibit 13-12) S0= N/A mph (Exhibit 13-12) S = 53.9 mph (Exhibit 13-13)

Copyright © 2013 University of Florida, All Rights Reserved HCS2010TM Version 6.50 Generated: 7/2/2015 9:36 AM

Page 72: BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange Operations Study BEL-7-18.07 5.5 Build Intersection Figure 5 SR 7 & IR 470 Westbound

RAMPS AND RAMP JUNCTIONS WORKSHEETGeneral Information Site Information Analyst ARCADIS Freeway/Dir of Travel WestboundAgency or Company ODOT Junction I-470 exit ramp from the EastDate Performed 5/29/2015 Jurisdiction ODOTAnalysis Time Period PM DHV Analysis Year 2035Project Description BEL-7-18.07 Inputs

Upstream Adj Ramp

Yes On

No Off

Lup = 2450 ft

Vu = 500 veh/h

Freeway Number of Lanes, N 2Ramp Number of Lanes, N 1Acceleration Lane Length, LADeceleration Lane Length LD 660Freeway Volume, VF 2360 Ramp Volume, VR 1000 Freeway Free-Flow Speed, SFF 65.0Ramp Free-Flow Speed, SFR 35.0

Downstream Adj Ramp

Yes On

No Off

Ldown = ft

VD = veh/h

Conversion to pc/h Under Base Conditions (pc/h) V

(Veh/hr) PHF Terrain %Truck %Rv fHV fp v = V/PHF x fHV x fpFreeway 2360 0.94 Level 8 0 0.962 1.00 2611Ramp 1000 0.94 Level 8 0 0.962 1.00 1106UpStream 500 0.94 Level 6 0 0.971 1.00 548DownStream

Merge Areas Diverge AreasEstimation of v12 Estimation of v12

V12 = VF ( PFM )LEQ = (Equation 13-6 or 13-7)PFM = using Equation (Exhibit 13-6) V12 = pc/hV3 or Vav34 pc/h (Equation 13-14 or 13-17)Is V3 or Vav34 > 2,700 pc/h? Yes NoIs V3 or Vav34 > 1.5 * V12/2 Yes No

If Yes,V12a = pc/h (Equation 13-16, 13-18, or 13-19)

V12 = VR + (VF - VR)PFDLEQ = (Equation 13-12 or 13-13) PFD = 1.000 using Equation (Exhibit 13-7) V12 = 2611 pc/h V3 or Vav34 0 pc/h (Equation 13-14 or 13-17)Is V3 or Vav34 > 2,700 pc/h? Yes NoIs V3 or Vav34 > 1.5 * V12/2 Yes No

If Yes,V12a = pc/h (Equation 13-16, 13-18, or 13-19)

Capacity Checks Capacity ChecksActual Capacity LOS F? Actual Capacity LOS F?

VFO Exhibit 13-8

VF 2611 Exhibit 13-8 4700 NoVFO = VF - VR 1505 Exhibit 13-8 4700 No

VR 1106 Exhibit 13-10 2000 No

Flow Entering Merge Influence Area Flow Entering Diverge Influence AreaActual Max Desirable Violation? Actual Max Desirable Violation?

VR12 Exhibit 13-8 V12 2611 Exhibit 13-8 4400:All NoLevel of Service Determination (if not F) Level of Service Determination (if not F)

DR = 5.475 + 0.00734 v R + 0.0078 V12 - 0.00627 LADR = (pc/mi/ln)LOS = (Exhibit 13-2)

DR = 4.252 + 0.0086 V12 - 0.009 LDDR = 20.8 (pc/mi/ln)LOS = C (Exhibit 13-2)

Speed Determination Speed DeterminationMS = (Exibit 13-11) SR= mph (Exhibit 13-11)S0= mph (Exhibit 13-11) S = mph (Exhibit 13-13)

Ds = 0.528 (Exhibit 13-12) SR= 52.9 mph (Exhibit 13-12) S0= N/A mph (Exhibit 13-12) S = 52.9 mph (Exhibit 13-13)

Copyright © 2013 University of Florida, All Rights Reserved HCS2010TM Version 6.50 Generated: 7/2/2015 9:37 AM

Page 73: BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange Operations Study BEL-7-18.07 5.5 Build Intersection Figure 5 SR 7 & IR 470 Westbound

RAMPS AND RAMP JUNCTIONS WORKSHEETGeneral Information Site Information Analyst ARCADIS Freeway/Dir of Travel EastboundAgency or Company ODOT Junction I-470 Entrance RampDate Performed 5/28/2015 Jurisdiction ODOTAnalysis Time Period AM DHV Analysis Year 2035Project Description BEL-7-18.07 InputsUpstream Adj Ramp

Yes On

No Off

Lup = ft

Vu = veh/h

Freeway Number of Lanes, N 2Ramp Number of Lanes, N 1Acceleration Lane Length, LA 620 Deceleration Lane Length LDFreeway Volume, VF 780 Ramp Volume, VR 820 Freeway Free-Flow Speed, SFF 65.0 Ramp Free-Flow Speed, SFR 35.0

Downstream Adj Ramp

Yes On

No Off

Ldown = 1520 ft

VD = 500 veh/h

Conversion to pc/h Under Base Conditions (pc/h) V

(Veh/hr) PHF Terrain %Truck %Rv fHV fp v = V/PHF x fHV x fpFreeway 780 0.94 Level 8 0 0.962 1.00 863Ramp 820 0.94 Level 4 0 0.980 1.00 890UpStreamDownStream 500 0.94 Level 5 0 0.976 1.00 545

Merge Areas Diverge AreasEstimation of v12 Estimation of v12

V12 = VF ( PFM )LEQ = (Equation 13-6 or 13-7)PFM = 1.000 using Equation (Exhibit 13-6) V12 = 863 pc/h V3 or Vav34 0 pc/h (Equation 13-14 or 13-17)Is V3 or Vav34 > 2,700 pc/h? Yes NoIs V3 or Vav34 > 1.5 * V12/2 Yes No

If Yes,V12a = pc/h (Equation 13-16, 13-18, or13-19)

V12 = VR + (VF - VR)PFDLEQ = (Equation 13-12 or 13-13) PFD = using Equation (Exhibit 13-7) V12 = pc/h V3 or Vav34 pc/h (Equation 13-14 or 13-17)Is V3 or Vav34 > 2,700 pc/h? Yes NoIs V3 or Vav34 > 1.5 * V12/2 Yes No

If Yes,V12a = pc/h (Equation 13-16, 13-18, or13-19)

Capacity Checks Capacity ChecksActual Capacity LOS F? Actual Capacity LOS F?

VFO 1753 Exhibit 13-8 No

VF Exhibit 13-8VFO = VF - VR Exhibit 13-8

VRExhibit 13-

10Flow Entering Merge Influence Area Flow Entering Diverge Influence Area

Actual Max Desirable Violation? Actual Max Desirable Violation? VR12 1753 Exhibit 13-8 4600:All No V12 Exhibit 13-8

Level of Service Determination (if not F) Level of Service Determination (if not F)DR = 5.475 + 0.00734 v R + 0.0078 V12 - 0.00627 LA

DR = 14.9 (pc/mi/ln) LOS = B (Exhibit 13-2)

DR = 4.252 + 0.0086 V12 - 0.009 LDDR = (pc/mi/ln)LOS = (Exhibit 13-2)

Speed Determination Speed DeterminationMS = 0.300 (Exibit 13-11) SR= 58.1 mph (Exhibit 13-11) S0= N/A mph (Exhibit 13-11) S = 58.1 mph (Exhibit 13-13)

Ds = (Exhibit 13-12) SR= mph (Exhibit 13-12) S0= mph (Exhibit 13-12) S = mph (Exhibit 13-13)

Copyright © 2013 University of Florida, All Rights Reserved HCS2010TM Version 6.50 Generated: 7/2/2015 9:32 AM

Page 74: BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange Operations Study BEL-7-18.07 5.5 Build Intersection Figure 5 SR 7 & IR 470 Westbound

RAMPS AND RAMP JUNCTIONS WORKSHEETGeneral Information Site Information Analyst ARCADIS Freeway/Dir of Travel EastboundAgency or Company ODOT Junction I-470 Entrance RampDate Performed 5/28/2015 Jurisdiction ODOTAnalysis Time Period PM DHV Analysis Year 2035Project Description BEL-7-18.07 InputsUpstream Adj Ramp

Yes On

No Off

Lup = ft

Vu = veh/h

Freeway Number of Lanes, N 2Ramp Number of Lanes, N 1Acceleration Lane Length, LA 620 Deceleration Lane Length LDFreeway Volume, VF 1100 Ramp Volume, VR 840 Freeway Free-Flow Speed, SFF 65.0 Ramp Free-Flow Speed, SFR 35.0

Downstream Adj Ramp

Yes On

No Off

Ldown = 1520 ft

VD = 500 veh/h

Conversion to pc/h Under Base Conditions (pc/h) V

(Veh/hr) PHF Terrain %Truck %Rv fHV fp v = V/PHF x fHV x fpFreeway 1100 0.94 Level 8 0 0.962 1.00 1217Ramp 840 0.94 Level 4 0 0.980 1.00 911UpStreamDownStream 500 0.94 Level 5 0 0.976 1.00 545

Merge Areas Diverge AreasEstimation of v12 Estimation of v12

V12 = VF ( PFM )LEQ = (Equation 13-6 or 13-7)PFM = 1.000 using Equation (Exhibit 13-6) V12 = 1217 pc/h V3 or Vav34 0 pc/h (Equation 13-14 or 13-17)Is V3 or Vav34 > 2,700 pc/h? Yes NoIs V3 or Vav34 > 1.5 * V12/2 Yes No

If Yes,V12a = pc/h (Equation 13-16, 13-18, or13-19)

V12 = VR + (VF - VR)PFDLEQ = (Equation 13-12 or 13-13) PFD = using Equation (Exhibit 13-7) V12 = pc/h V3 or Vav34 pc/h (Equation 13-14 or 13-17)Is V3 or Vav34 > 2,700 pc/h? Yes NoIs V3 or Vav34 > 1.5 * V12/2 Yes No

If Yes,V12a = pc/h (Equation 13-16, 13-18, or13-19)

Capacity Checks Capacity ChecksActual Capacity LOS F? Actual Capacity LOS F?

VFO 2128 Exhibit 13-8 No

VF Exhibit 13-8VFO = VF - VR Exhibit 13-8

VRExhibit 13-

10Flow Entering Merge Influence Area Flow Entering Diverge Influence Area

Actual Max Desirable Violation? Actual Max Desirable Violation? VR12 2128 Exhibit 13-8 4600:All No V12 Exhibit 13-8

Level of Service Determination (if not F) Level of Service Determination (if not F)DR = 5.475 + 0.00734 v R + 0.0078 V12 - 0.00627 LA

DR = 17.8 (pc/mi/ln) LOS = B (Exhibit 13-2)

DR = 4.252 + 0.0086 V12 - 0.009 LDDR = (pc/mi/ln)LOS = (Exhibit 13-2)

Speed Determination Speed DeterminationMS = 0.310 (Exibit 13-11) SR= 57.9 mph (Exhibit 13-11) S0= N/A mph (Exhibit 13-11) S = 57.9 mph (Exhibit 13-13)

Ds = (Exhibit 13-12) SR= mph (Exhibit 13-12) S0= mph (Exhibit 13-12) S = mph (Exhibit 13-13)

Copyright © 2013 University of Florida, All Rights Reserved HCS2010TM Version 6.50 Generated: 7/2/2015 9:33 AM

Page 75: BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange Operations Study BEL-7-18.07 5.5 Build Intersection Figure 5 SR 7 & IR 470 Westbound

HCS 2010: Basic Freeway Segments Release 6.50 Phone: Fax: E-mail: _________________________Operational Analysis__________________________________ Analyst: ARCADIS Agency or Company: ODOT Date Performed: 5/29/2015 Analysis Time Period: AM DHV Freeway/Direction: IR 470 Westbound From/To: Add Lane from SR 7 Ramp Jurisdiction: ODOT Analysis Year: 2035 Description: BEL-7-18.07 _________________________Flow Inputs and Adjustments___________________________ Volume, V 1320 veh/h Peak-hour factor, PHF 0.94 Peak 15-min volume, v15 351 v Trucks and buses 12 % Recreational vehicles 0 % Terrain type: Level Grade - % Segment length - mi Trucks and buses PCE, ET 1.5 Recreational vehicle PCE, ER 1.2 Heavy vehicle adjustment, fHV 0.943 Driver population factor, fp 1.00 Flow rate, vp 496 pc/h/ln _________________________Speed Inputs and Adjustments__________________________ Lane width - ft Right-side lateral clearance - ft Total ramp density, TRD - ramps/mi Number of lanes, N 3 Free-flow speed: Measured FFS or BFFS 65.0 mi/h Lane width adjustment, fLW - mi/h Lateral clearance adjustment, fLC - mi/h TRD adjustment - mi/h Free-flow speed, FFS 65.0 mi/h _________________________LOS and Performance Measures__________________________ Flow rate, vp 496 pc/h/ln Free-flow speed, FFS 65.0 mi/h Average passenger-car speed, S 65.0 mi/h Number of lanes, N 3 Density, D 7.6 pc/mi/ln Level of service, LOS A

Page 76: BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange Operations Study BEL-7-18.07 5.5 Build Intersection Figure 5 SR 7 & IR 470 Westbound

HCS 2010: Basic Freeway Segments Release 6.50 Phone: Fax: E-mail: _________________________Operational Analysis__________________________________ Analyst: ARCADIS Agency or Company: ODOT Date Performed: 5/29/2015 Analysis Time Period: PM DHV Freeway/Direction: IR 470 Westbound From/To: Add Lane from SR 7 Ramp Jurisdiction: ODOT Analysis Year: 2035 Description: BEL-7-18.07 _________________________Flow Inputs and Adjustments___________________________ Volume, V 2020 veh/h Peak-hour factor, PHF 0.94 Peak 15-min volume, v15 537 v Trucks and buses 12 % Recreational vehicles 0 % Terrain type: Level Grade - % Segment length - mi Trucks and buses PCE, ET 1.5 Recreational vehicle PCE, ER 1.2 Heavy vehicle adjustment, fHV 0.943 Driver population factor, fp 1.00 Flow rate, vp 759 pc/h/ln _________________________Speed Inputs and Adjustments__________________________ Lane width - ft Right-side lateral clearance - ft Total ramp density, TRD - ramps/mi Number of lanes, N 3 Free-flow speed: Measured FFS or BFFS 65.0 mi/h Lane width adjustment, fLW - mi/h Lateral clearance adjustment, fLC - mi/h TRD adjustment - mi/h Free-flow speed, FFS 65.0 mi/h _________________________LOS and Performance Measures__________________________ Flow rate, vp 759 pc/h/ln Free-flow speed, FFS 65.0 mi/h Average passenger-car speed, S 65.0 mi/h Number of lanes, N 3 Density, D 11.7 pc/mi/ln Level of service, LOS B

Page 77: BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange Operations Study BEL-7-18.07 5.5 Build Intersection Figure 5 SR 7 & IR 470 Westbound

Appendix F

Intersection Analysis – No Build

Page 78: BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange Operations Study BEL-7-18.07 5.5 Build Intersection Figure 5 SR 7 & IR 470 Westbound

ALL-WAY STOP CONTROL ANALYSISGeneral Information Site Information Analyst ARCADIS Agency/Co. ODOT Date PerformedAnalysis Time Period AM DHV

Intersection IR 470 Ramos at SR 7 Jurisdiction ODOT Analysis Year 2035

Project ID BEL-7-18.07 East/West Street: North/South Street:

Volume Adjustments and Site CharacteristicsApproach Eastbound WestboundMovement L T R L T RVolume (veh/h) 390 0 560 0 0 0 %Thrus Left Lane

Approach Northbound SouthboundMovement L T R L T RVolume (veh/h) 620 0 0 0 0 450 %Thrus Left Lane

Eastbound Westbound Northbound Southbound

L1 L2 L1 L2 L1 L2 L1 L2

Configuration L R LT TR PHF 0.92 1.00 0.92 1.00 Flow Rate (veh/h) 423 560 673 450 % Heavy Vehicles 7 0 6 7 No. Lanes 2 0 1 1 Geometry Group 1 2 2 Duration, T 0.25 Saturation Headway Adjustment WorksheetProp. Left-Turns 1.0 0.0 1.0 0.0 Prop. Right-Turns 0.0 1.0 0.0 1.0 Prop. Heavy Vehicle 0.1 0.0 0.1 0.1 hLT-adj 0.2 0.2 0.2 0.2 0.2 0.2 hRT-adj -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 hHV-adj 1.7 1.7 1.7 1.7 1.7 1.7 hadj, computed 0.3 -0.6 0.3 -0.5 Departure Headway and Service Timehd, initial value (s) 3.20 3.20 3.20 3.20 x, initial 0.38 0.50 0.60 0.40 hd, final value (s) 7.22 6.28 7.21 6.62 x, final value 0.85 0.98 1.35 0.83 Move-up time, m (s) 2.0 2.0 2.0 Service Time, ts (s) 5.2 4.3 5.2 4.6 Capacity and Level of Service

Eastbound Westbound Northbound Southbound

L1 L2 L1 L2 L1 L2 L1 L2

Capacity (veh/h) 499 574 673 543 Delay (s/veh) 38.80 56.90 190.60 33.91 LOS E F F D Approach: Delay (s/veh) 49.11 190.60 33.91 LOS E F D

Intersection Delay (s/veh) 91.08 Intersection LOS F Copyright © 2010 University of Florida, All Rights Reserved HCS+TM Version 5.6 Generated: 7/2/2015 10:33 AM

Page 79: BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange Operations Study BEL-7-18.07 5.5 Build Intersection Figure 5 SR 7 & IR 470 Westbound

ALL-WAY STOP CONTROL ANALYSISGeneral Information Site Information Analyst ARCADIS Agency/Co. ODOT Date PerformedAnalysis Time Period PM DHV

Intersection IR 470 Ramos at SR 7 Jurisdiction ODOT Analysis Year 2035

Project ID BEL-7-18.07 East/West Street: North/South Street:

Volume Adjustments and Site CharacteristicsApproach Eastbound WestboundMovement L T R L T RVolume (veh/h) 590 0 800 0 0 0 %Thrus Left Lane

Approach Northbound SouthboundMovement L T R L T RVolume (veh/h) 590 0 0 0 0 450 %Thrus Left Lane

Eastbound Westbound Northbound Southbound

L1 L2 L1 L2 L1 L2 L1 L2

Configuration L R LT TR PHF 0.92 1.00 0.92 0.92 Flow Rate (veh/h) 641 800 641 489 % Heavy Vehicles 7 0 6 7 No. Lanes 2 0 1 1 Geometry Group 1 2 2 Duration, T 0.25 Saturation Headway Adjustment WorksheetProp. Left-Turns 1.0 0.0 1.0 0.0 Prop. Right-Turns 0.0 1.0 0.0 1.0 Prop. Heavy Vehicle 0.1 0.0 0.1 0.1 hLT-adj 0.2 0.2 0.2 0.2 0.2 0.2 hRT-adj -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 hHV-adj 1.7 1.7 1.7 1.7 1.7 1.7 hadj, computed 0.3 -0.6 0.3 -0.5 Departure Headway and Service Timehd, initial value (s) 3.20 3.20 3.20 3.20 x, initial 0.57 0.71 0.57 0.43 hd, final value (s) 7.32 6.37 7.31 6.63 x, final value 1.30 1.42 1.30 0.90 Move-up time, m (s) 2.0 2.0 2.0 Service Time, ts (s) 5.3 4.4 5.3 4.6 Capacity and Level of Service

Eastbound Westbound Northbound Southbound

L1 L2 L1 L2 L1 L2 L1 L2

Capacity (veh/h) 641 800 641 543 Delay (s/veh) 173.21 216.45 172.53 43.79 LOS F F F E Approach: Delay (s/veh) 197.22 172.53 43.79 LOS F F E

Intersection Delay (s/veh) 161.88 Intersection LOS F Copyright © 2010 University of Florida, All Rights Reserved HCS+TM Version 5.6 Generated: 7/2/2015 10:41 AM

Page 80: BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange Operations Study BEL-7-18.07 5.5 Build Intersection Figure 5 SR 7 & IR 470 Westbound

Appendix G

Intersection Analysis - Build

Page 81: BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange Operations Study BEL-7-18.07 5.5 Build Intersection Figure 5 SR 7 & IR 470 Westbound

Lanes, Volumes, TimingsBuild Signalized 5/28/2015

AM Design Year.syn Synchro 8 ReportAM Design Year Page 1

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsVolume (vph) 390 560 620 0 0 450Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900Storage Length (ft) 0 0 475 150Storage Lanes 1 1 0 0Taper Length (ft) 25 25Lane Util. Factor 1.00 1.00 0.97 1.00 1.00 1.00Frt 0.850 0.865Flt Protected 0.950 0.950Satd. Flow (prot) 1770 1583 3433 0 0 1611Flt Permitted 0.950 0.950Satd. Flow (perm) 1770 1583 3433 0 0 1611Right Turn on Red No NoSatd. Flow (RTOR)Link Speed (mph) 35 35 35Link Distance (ft) 1347 703 752Travel Time (s) 26.2 13.7 14.6Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 424 609 674 0 0 489Shared Lane Traffic (%)Lane Group Flow (vph) 424 609 674 0 0 489Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(ft) 12 24 24Link Offset(ft) 0 0 0Crosswalk Width(ft) 16 16 16Two way Left Turn LaneHeadway Factor 1.00 1.00 1.00 1.00 1.00 1.00Turning Speed (mph) 15 9 15 9Number of Detectors 1 1 1 1Detector Template Left Right Left RightLeading Detector (ft) 20 20 20 20Trailing Detector (ft) 0 0 0 0Detector 1 Position(ft) 0 0 0 0Detector 1 Size(ft) 20 20 20 20Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0Turn Type NA pt+ov Prot OverProtected Phases 4 4 2 2 4Permitted PhasesDetector Phase 4 4 2 2 4Switch PhaseMinimum Initial (s) 4.0 4.0 4.0Minimum Split (s) 22.0 22.0 22.0Total Split (s) 35.0 25.0 35.0Total Split (%) 58.3% 41.7% 58.3%

Page 82: BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange Operations Study BEL-7-18.07 5.5 Build Intersection Figure 5 SR 7 & IR 470 Westbound

Lanes, Volumes, TimingsBuild Signalized 5/28/2015

AM Design Year.syn Synchro 8 ReportAM Design Year Page 2

Lane Group EBL EBR NBL NBT SBT SBRMaximum Green (s) 28.0 18.0 28.0Yellow Time (s) 5.0 5.0 5.0All-Red Time (s) 2.0 2.0 2.0Lost Time Adjust (s) 0.0 0.0 0.0Total Lost Time (s) 7.0 7.0 7.0Lead/LagLead-Lag Optimize?Vehicle Extension (s) 3.0 3.0 3.0Recall Mode None Min NoneAct Effct Green (s) 21.7 52.0 15.8 21.7Actuated g/C Ratio 0.42 1.00 0.30 0.42v/c Ratio 0.57 0.38 0.65 0.73Control Delay 15.1 0.7 20.0 19.9Queue Delay 0.0 0.0 0.0 0.0Total Delay 15.1 0.7 20.0 19.9LOS B A C BApproach Delay 6.6Approach LOS A

Intersection SummaryArea Type: OtherCycle Length: 60Actuated Cycle Length: 52Natural Cycle: 55Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.73Intersection Signal Delay: 13.7 Intersection LOS: BIntersection Capacity Utilization 54.7% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 4:

Page 83: BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange Operations Study BEL-7-18.07 5.5 Build Intersection Figure 5 SR 7 & IR 470 Westbound

Lanes, Volumes, TimingsBuild Signalized 7/2/2015

PM Design Year.syn Synchro 8 ReportPM Design Year Page 1

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsVolume (vph) 590 800 590 0 0 580Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900Storage Length (ft) 0 0 475 150Storage Lanes 1 1 0 0Taper Length (ft) 25 25Lane Util. Factor 1.00 1.00 0.97 1.00 1.00 1.00Frt 0.850 0.865Flt Protected 0.950 0.950Satd. Flow (prot) 1770 1583 3433 0 0 1611Flt Permitted 0.950 0.950Satd. Flow (perm) 1770 1583 3433 0 0 1611Right Turn on Red No NoSatd. Flow (RTOR)Link Speed (mph) 35 35 35Link Distance (ft) 1347 703 752Travel Time (s) 26.2 13.7 14.6Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 641 870 641 0 0 630Shared Lane Traffic (%)Lane Group Flow (vph) 641 870 641 0 0 630Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(ft) 12 24 24Link Offset(ft) 0 0 0Crosswalk Width(ft) 16 16 16Two way Left Turn LaneHeadway Factor 1.00 1.00 1.00 1.00 1.00 1.00Turning Speed (mph) 15 9 15 9Number of Detectors 1 1 1 1Detector Template Left Right Left RightLeading Detector (ft) 20 20 20 20Trailing Detector (ft) 0 0 0 0Detector 1 Position(ft) 0 0 0 0Detector 1 Size(ft) 20 20 20 20Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0Turn Type NA pt+ov Prot OverProtected Phases 4 4 2 2 4Permitted PhasesDetector Phase 4 4 2 2 4Switch PhaseMinimum Initial (s) 4.0 4.0 4.0Minimum Split (s) 22.0 22.0 22.0Total Split (s) 36.0 24.0 36.0Total Split (%) 60.0% 40.0% 60.0%

Page 84: BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange Operations Study BEL-7-18.07 5.5 Build Intersection Figure 5 SR 7 & IR 470 Westbound

Lanes, Volumes, TimingsBuild Signalized 7/2/2015

PM Design Year.syn Synchro 8 ReportPM Design Year Page 2

Lane Group EBL EBR NBL NBT SBT SBRMaximum Green (s) 29.0 17.0 29.0Yellow Time (s) 5.0 5.0 5.0All-Red Time (s) 2.0 2.0 2.0Lost Time Adjust (s) 0.0 0.0 0.0Total Lost Time (s) 7.0 7.0 7.0Lead/LagLead-Lag Optimize?Vehicle Extension (s) 3.0 3.0 3.0Recall Mode None Min NoneAct Effct Green (s) 26.8 56.7 15.7 26.8Actuated g/C Ratio 0.47 1.00 0.28 0.47v/c Ratio 0.77 0.55 0.67 0.83Control Delay 20.3 1.4 22.7 25.1Queue Delay 0.0 0.0 0.0 0.0Total Delay 20.3 1.4 22.7 25.1LOS C A C CApproach Delay 9.4Approach LOS A

Intersection SummaryArea Type: OtherCycle Length: 60Actuated Cycle Length: 56.7Natural Cycle: 60Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.83Intersection Signal Delay: 16.0 Intersection LOS: BIntersection Capacity Utilization 61.9% ICU Level of Service BAnalysis Period (min) 15

Splits and Phases: 4:

Page 85: BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange Operations Study BEL-7-18.07 5.5 Build Intersection Figure 5 SR 7 & IR 470 Westbound

Appendix H

Turn Lane Calculations

Page 86: BEL-7-18.07 PID 99087 Interchange Operations Study Exa… · bel-7-1807 ios.docx 9 Interchange Operations Study BEL-7-18.07 5.5 Build Intersection Figure 5 SR 7 & IR 470 Westbound

BEL-7-18.07TURN LANE CALCULATIONS

Mainline IR 470Date 7/2/2015Calculated By DRJChecked By JMMDesign Speed 45Condition B Required = 175 'Condition C Required = 125 ' +Storage Length

SecondsCycles per

HourAM Cycle Length 60 60PM Cycle Length 60 60

Intersecting Street SR 7 NB RampDirection NB

# AM PM

Avg. Vehicles per Cycle (AM)

Avg. Vehicles per Cycle (PM)

Storage Length (AM)

Storage Length (PM)

1 LT 620 590 11 10 400 ' 375 'Lanes 1 LT 1 1 1 1 50 ' 50 '

Is there thru lane backup NRequired Length including diverging tape 525 ' Dual Turn Lane Warranted

Based on analysis use 425'

With Certified Traffic Provided by ODOT

1 of 1