Bedford 13692C
NH Route 101 over Pulpit BrookRed List Bridge Effort
Bridge No. 090/065
Public Informational MeetingJune 20, 2019
![Page 2: Bedford 13962C PIM Presentation 6-19-19 final.ppt [Read-Only]...%hgirug & 1+ 5rxwh ryhu 3xoslw %urrn 5hg /lvw %ulgjh (iiruw %ulgjh 1r 3xeolf ,qirupdwlrqdo 0hhwlqj-xqh](https://reader034.fdocuments.net/reader034/viewer/2022042415/5f2fbbe5980b9953500743e6/html5/thumbnails/2.jpg)
Agenda
• Welcome & Introductions
• Project Location
• Existing Conditions
• Natural & Cultural Resources Update
• Initial Alternatives & Proposed Solution
• Schedule & Construction Cost
• Questions and Comments
![Page 3: Bedford 13962C PIM Presentation 6-19-19 final.ppt [Read-Only]...%hgirug & 1+ 5rxwh ryhu 3xoslw %urrn 5hg /lvw %ulgjh (iiruw %ulgjh 1r 3xeolf ,qirupdwlrqdo 0hhwlqj-xqh](https://reader034.fdocuments.net/reader034/viewer/2022042415/5f2fbbe5980b9953500743e6/html5/thumbnails/3.jpg)
Project Location
Pulpit Brook
Bridge Location
Bragdon Farm
LaBelle Winery
Twin Brook Lane
Joppa Hill Road
StowellRoadAmherst
Bedford
N
![Page 4: Bedford 13962C PIM Presentation 6-19-19 final.ppt [Read-Only]...%hgirug & 1+ 5rxwh ryhu 3xoslw %urrn 5hg /lvw %ulgjh (iiruw %ulgjh 1r 3xeolf ,qirupdwlrqdo 0hhwlqj-xqh](https://reader034.fdocuments.net/reader034/viewer/2022042415/5f2fbbe5980b9953500743e6/html5/thumbnails/4.jpg)
Site Photos
North Headwall
South Headwall
Looking Southwest on NH 101 (Bridge in Picture)
![Page 5: Bedford 13962C PIM Presentation 6-19-19 final.ppt [Read-Only]...%hgirug & 1+ 5rxwh ryhu 3xoslw %urrn 5hg /lvw %ulgjh (iiruw %ulgjh 1r 3xeolf ,qirupdwlrqdo 0hhwlqj-xqh](https://reader034.fdocuments.net/reader034/viewer/2022042415/5f2fbbe5980b9953500743e6/html5/thumbnails/5.jpg)
Exist. Roadway Overview – NH 101
• Constructed in 1951 (68 years old)
• Average Daily Traffic = 20,100 vehicles per day (2019)
• Posted Speed Limit = 50 mph
• Roadway width = 40 feet– 12-foot travel lanes – 8-foot shoulders
• 100’ Right-of-Way width
![Page 6: Bedford 13962C PIM Presentation 6-19-19 final.ppt [Read-Only]...%hgirug & 1+ 5rxwh ryhu 3xoslw %urrn 5hg /lvw %ulgjh (iiruw %ulgjh 1r 3xeolf ,qirupdwlrqdo 0hhwlqj-xqh](https://reader034.fdocuments.net/reader034/viewer/2022042415/5f2fbbe5980b9953500743e6/html5/thumbnails/6.jpg)
Existing Bridge
• Twin 5’-0” Concrete Culverts
• Constructed in 1951 with roadway (68 years old)
• #44 on the 2018 New Hampshire DOT Red List
• Northern headwall replaced by Bridge Maintenance in 2011
![Page 7: Bedford 13962C PIM Presentation 6-19-19 final.ppt [Read-Only]...%hgirug & 1+ 5rxwh ryhu 3xoslw %urrn 5hg /lvw %ulgjh (iiruw %ulgjh 1r 3xeolf ,qirupdwlrqdo 0hhwlqj-xqh](https://reader034.fdocuments.net/reader034/viewer/2022042415/5f2fbbe5980b9953500743e6/html5/thumbnails/7.jpg)
Existing Bridge Condition
![Page 8: Bedford 13962C PIM Presentation 6-19-19 final.ppt [Read-Only]...%hgirug & 1+ 5rxwh ryhu 3xoslw %urrn 5hg /lvw %ulgjh (iiruw %ulgjh 1r 3xeolf ,qirupdwlrqdo 0hhwlqj-xqh](https://reader034.fdocuments.net/reader034/viewer/2022042415/5f2fbbe5980b9953500743e6/html5/thumbnails/8.jpg)
Natural/Cultural Resources Update
• Assessment of Natural and Cultural Resources for NEPA and Section 106 compliance
• Natural Resource Concerns
– Wetlands / Vernal Pools
– Stormwater Treatment (MS4 Compliant)
– NHDES Stream crossing rules
– Threatened and Endangered Species• Blanding’s Turtle
• Northern Long-eared Bat
– Conservation lands (Bragdon Farm)
• No impacts to Cultural Resources (archaeological sites or historic structures) identified
![Page 9: Bedford 13962C PIM Presentation 6-19-19 final.ppt [Read-Only]...%hgirug & 1+ 5rxwh ryhu 3xoslw %urrn 5hg /lvw %ulgjh (iiruw %ulgjh 1r 3xeolf ,qirupdwlrqdo 0hhwlqj-xqh](https://reader034.fdocuments.net/reader034/viewer/2022042415/5f2fbbe5980b9953500743e6/html5/thumbnails/9.jpg)
Initial Alternatives Analysis
1. Rehabilitation or No Build Options (Not Feasible)• Hydraulic Deficiencies (Route 101 will overtop in a 50-
year storm)
2. Replacement Options
• Phased Bridge Construction (requires over-widening)
• Accelerated Bridge Construction (ABC) with Roadway Closure
• Conventional Construction with On-Site Traffic Diversion and Temporary Bridge
Preferred inFebruary 2018
![Page 10: Bedford 13962C PIM Presentation 6-19-19 final.ppt [Read-Only]...%hgirug & 1+ 5rxwh ryhu 3xoslw %urrn 5hg /lvw %ulgjh (iiruw %ulgjh 1r 3xeolf ,qirupdwlrqdo 0hhwlqj-xqh](https://reader034.fdocuments.net/reader034/viewer/2022042415/5f2fbbe5980b9953500743e6/html5/thumbnails/10.jpg)
Proposed Plan - Final
Left Turn Lane Added (for Twin Brook Lane)
![Page 11: Bedford 13962C PIM Presentation 6-19-19 final.ppt [Read-Only]...%hgirug & 1+ 5rxwh ryhu 3xoslw %urrn 5hg /lvw %ulgjh (iiruw %ulgjh 1r 3xeolf ,qirupdwlrqdo 0hhwlqj-xqh](https://reader034.fdocuments.net/reader034/viewer/2022042415/5f2fbbe5980b9953500743e6/html5/thumbnails/11.jpg)
Proposed Plan – Phase 1Temporary Impacts
• Temporary on-site diversion
• Possible aerial utility relocations
• Public Hearing Required– ROW needed for stormwater treatment
![Page 12: Bedford 13962C PIM Presentation 6-19-19 final.ppt [Read-Only]...%hgirug & 1+ 5rxwh ryhu 3xoslw %urrn 5hg /lvw %ulgjh (iiruw %ulgjh 1r 3xeolf ,qirupdwlrqdo 0hhwlqj-xqh](https://reader034.fdocuments.net/reader034/viewer/2022042415/5f2fbbe5980b9953500743e6/html5/thumbnails/12.jpg)
Proposed Traffic Phasing
Revised Phased Construction ApproachPhase 1 - On-Site Traffic Diversion and Temporary Bridge
Phase 2 - Traffic shifted to Portion of Newly Constructed Bridge
![Page 13: Bedford 13962C PIM Presentation 6-19-19 final.ppt [Read-Only]...%hgirug & 1+ 5rxwh ryhu 3xoslw %urrn 5hg /lvw %ulgjh (iiruw %ulgjh 1r 3xeolf ,qirupdwlrqdo 0hhwlqj-xqh](https://reader034.fdocuments.net/reader034/viewer/2022042415/5f2fbbe5980b9953500743e6/html5/thumbnails/13.jpg)
Proposed Bridge Details
• 48-foot clear span
• Butted precast concrete box beams
• Conventional cast-in-place abutments and wingwalls
![Page 14: Bedford 13962C PIM Presentation 6-19-19 final.ppt [Read-Only]...%hgirug & 1+ 5rxwh ryhu 3xoslw %urrn 5hg /lvw %ulgjh (iiruw %ulgjh 1r 3xeolf ,qirupdwlrqdo 0hhwlqj-xqh](https://reader034.fdocuments.net/reader034/viewer/2022042415/5f2fbbe5980b9953500743e6/html5/thumbnails/14.jpg)
Project Schedule and Cost
Schedule
• Public Hearing – Fall 2019
• Final Design – 2020
• Advertising – Early Spring 2021
• Construction starting late summer 2021
Construction Cost Estimated at $3.5 million
![Page 15: Bedford 13962C PIM Presentation 6-19-19 final.ppt [Read-Only]...%hgirug & 1+ 5rxwh ryhu 3xoslw %urrn 5hg /lvw %ulgjh (iiruw %ulgjh 1r 3xeolf ,qirupdwlrqdo 0hhwlqj-xqh](https://reader034.fdocuments.net/reader034/viewer/2022042415/5f2fbbe5980b9953500743e6/html5/thumbnails/15.jpg)
Thank You
Presentation Material is Availableon the Department’s website
www.nh.gov/dot/projectsBedford 13692C