Project Summary: CoB Vacuum Truck - Center Drive East, Site Photographs Center Drive West, Acorn Hill Avenue and Lovejoy Street Project #: 2011-540 Completed: Nov-10 Before Narrative Description of Project: Material Cost, Rental Equipment Summary, and Labor Material Unit Cost/Unit Qty Cost Water gallon $0.01 4,500 $45.00 Diesel gallon $2.56 12.0 $30.72 Labor hours 12.0 $273.34 Indirect Labor, Services, and Supplies $195.54 Total Cost of Materials, Rental Equip., and Labor $544.60 During Note: Labor cost includes the employee's salary plus fringe benefits. Equipment Cost Item Asset Cost/Hour Hrs. Cost Vacuum Truck 22812 $22.16 5.5 $121.88 Total Equipment Cost $121.88 Cost/hour excludes fuel cost. Total Cost: $666.48 After Beaufort County Public Works Stormwater Infrastructure Project Summary Cleaned out (7) catch basins. Jetted 115 L.F. of roadside pipe and 150 L.F. of outfall pipe.

Transcript of Beaufort County Public Works Stormwater Infrastructure ... · Project: COB - Center Drive East,...

Page 1: Beaufort County Public Works Stormwater Infrastructure ... · Project: COB - Center Drive East, Center Drive West & Acorn Hill Avenue (Reimbursement) Activity: Vacuum Truck Project

Project Summary: CoB Vacuum Truck - Center Drive East, Site PhotographsCenter Drive West, Acorn Hill Avenue and Lovejoy Street

Project #: 2011-540 Completed: Nov-10 Before

Narrative Description of Project:

Material Cost, Rental Equipment Summary, and Labor

Material Unit Cost/Unit Qty CostWater gallon $0.01 4,500 $45.00Diesel gallon $2.56 12.0 $30.72Labor hours 12.0 $273.34Indirect Labor, Services, and Supplies $195.54Total Cost of Materials, Rental Equip., and Labor $544.60 During

Note: Labor cost includes the employee's salary plus fringe benefits. Equipment Cost

Item Asset Cost/Hour Hrs. Cost

Vacuum Truck 22812 $22.16 5.5 $121.88Total Equipment Cost $121.88 Cost/hour excludes fuel cost.

Total Cost: $666.48

After

Beaufort County Public WorksStormwater Infrastructure

Project Summary

Cleaned out (7) catch basins. Jetted 115 L.F. of roadside pipe and 150 L.F. of outfall pipe.

Page 2: Beaufort County Public Works Stormwater Infrastructure ... · Project: COB - Center Drive East, Center Drive West & Acorn Hill Avenue (Reimbursement) Activity: Vacuum Truck Project

LegendDrainage Type

River

Stream

Outfall

Lateral

Lateral Pipe

Roadside

Roadside Pipe

Crossline

D/W

Access

Piped

Bleeder

Parcels

0 75 150 225 30037.5Feet 1 inch = 96 feet

Prepared By: BC Stormwater Management UtilityDate Print: 12/21/10File:C:/sethdata/projects/projectmaps/Vac/COB - Center Dr E&W

")

")")

")

")

")

")

")

")

")

")

")

")

")

") ")

")

")

")

")")

")

")

CENT

ER D

R E

CENT

ER D

R W

ACORN HILL AVE

Project: COB - Center Drive East,Center Drive West& Acorn Hill Avenue(Reimbursement)

Activity: VacuumTruck

Project #:2011-540

Township: Cityof Beaufort

Completed:November 2010

®Cleaned out (3)catch basins.

Jetted 115 LF ofroadside pipe.

Page 3: Beaufort County Public Works Stormwater Infrastructure ... · Project: COB - Center Drive East, Center Drive West & Acorn Hill Avenue (Reimbursement) Activity: Vacuum Truck Project

LegendDrainage Type

River

Stream

Outfall

Lateral

Lateral Pipe

Roadside

Roadside Pipe

Crossline

D/W

Access

Piped

Bleeder

Parcels

0 40 80 120 16020Feet 1 inch equals 58 feet

Prepared By: BC Stormwater Management UtilityDate Print: 11/16/10File:C:/sethdata/projects/projectmaps/Vac/COB - Lovejoy St 2011-540

")

")")

")

")

")

")

")")

")

")

")

")

")

")

")

")

")

")

")

")")

")

")

")

")

")

")

") ")

")

")

") ")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")")

")

")

")

") ")

")

")

")")

")

")

")")

")")")

")")

")

")

") ")

") ") ") ")

LOVEJOY ST

BOUNDARY ST

PALM

ETTO

ST

D/W

RIBA

UT R

D

UNIO

N ST

Project: COB - Lovejoy Street(Reimbursement)

Activity: VacuumTruck

Project #:2011-540

Township: Cityof Beaufort

Completed:November 2010

®Jetted 150 LF ofoutfall pipe.

Cleaned out (4)catch basins.